      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1,
      "raw": {
        "INR": "15INR0064b",
        "Project Name": "Harald (BearKat Wind B)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "McCrae Wind Energy II, LLC",
        "POI Location": "59903 Bearkat 345kV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-03T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 162.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2013-11-27T00:00:00",
        "Screening Study Complete": "2014-01-27T00:00:00",
        "FIS Requested": "2014-04-15T00:00:00",
        "FIS Approved": "2017-09-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-05-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-05-30T00:00:00",
        "Meets All Planning": "2018-09-19T00:00:00",
        "Unnamed: 25": "2019-01-22T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-02-10T00:00:00",
        "Approved for Synchronization": "2020-05-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "15INR0064b",
        "Project Name": "Harald (BearKat Wind B)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "McCrae Wind Energy II, LLC",
        "POI Location": "59903 Bearkat 345kV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-03T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 162.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2013-11-27T00:00:00",
        "Screening Study Complete": "2014-01-27T00:00:00",
        "FIS Requested": "2014-04-15T00:00:00",
        "FIS Approved": "2017-09-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-05-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-05-30T00:00:00",
        "Meets All Planning": "2018-09-19T00:00:00",
        "Unnamed: 25": "2019-01-22T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-02-10T00:00:00",
        "Approved for Synchronization": "2020-05-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 2,
      "raw": {
        "INR": "16INR0049",
        "Project Name": "Nazareth Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TX Nazareth Solar, LLC",
        "POI Location": "tap 345kV 23914 Tule Canyon - 23912 Ogallala C2",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2014-07-07T00:00:00",
        "Screening Study Started": "2014-06-19T00:00:00",
        "Screening Study Complete": "2014-07-25T00:00:00",
        "FIS Requested": "2014-07-01T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-03-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "16INR0049",
        "Project Name": "Nazareth Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TX Nazareth Solar, LLC",
        "POI Location": "tap 345kV 23914 Tule Canyon - 23912 Ogallala C2",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2014-07-07T00:00:00",
        "Screening Study Started": "2014-06-19T00:00:00",
        "Screening Study Complete": "2014-07-25T00:00:00",
        "FIS Requested": "2014-07-01T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-03-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 3,
      "raw": {
        "INR": "16INR0081",
        "Project Name": "Mesteno Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mesteno Windpower, LLC",
        "POI Location": "80355 Del Sol 345kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2014-12-30T00:00:00",
        "Screening Study Started": "2014-12-30T00:00:00",
        "Screening Study Complete": "2015-03-09T00:00:00",
        "FIS Requested": "2014-12-30T00:00:00",
        "FIS Approved": "2018-01-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-04-25T00:00:00",
        "Meets All Planning": "2019-03-28T00:00:00",
        "Unnamed: 25": "2019-04-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2019-11-26T00:00:00",
        "Approved for Synchronization": "2019-12-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "16INR0081",
        "Project Name": "Mesteno Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mesteno Windpower, LLC",
        "POI Location": "80355 Del Sol 345kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2014-12-30T00:00:00",
        "Screening Study Started": "2014-12-30T00:00:00",
        "Screening Study Complete": "2015-03-09T00:00:00",
        "FIS Requested": "2014-12-30T00:00:00",
        "FIS Approved": "2018-01-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-04-25T00:00:00",
        "Meets All Planning": "2019-03-28T00:00:00",
        "Unnamed: 25": "2019-04-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2019-11-26T00:00:00",
        "Approved for Synchronization": "2019-12-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 4,
      "raw": {
        "INR": "16INR0085",
        "Project Name": "Priddy Wind ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ENGIE North America",
        "POI Location": "tap 345kV 1444 Brown – 3422 Killeen",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 302.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2015-03-06T00:00:00",
        "Screening Study Started": "2015-01-14T00:00:00",
        "Screening Study Complete": "2015-02-10T00:00:00",
        "FIS Requested": "2015-03-06T00:00:00",
        "FIS Approved": "2021-04-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-29T00:00:00",
        "Meets All Planning": "2021-04-30T00:00:00",
        "Unnamed: 25": "2021-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-10-13T00:00:00",
        "Approved for Synchronization": "2021-11-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "16INR0085",
        "Project Name": "Priddy Wind ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ENGIE North America",
        "POI Location": "tap 345kV 1444 Brown – 3422 Killeen",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 302.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2015-03-06T00:00:00",
        "Screening Study Started": "2015-01-14T00:00:00",
        "Screening Study Complete": "2015-02-10T00:00:00",
        "FIS Requested": "2015-03-06T00:00:00",
        "FIS Approved": "2021-04-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-29T00:00:00",
        "Meets All Planning": "2021-04-30T00:00:00",
        "Unnamed: 25": "2021-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-10-13T00:00:00",
        "Approved for Synchronization": "2021-11-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 5,
      "raw": {
        "INR": "16INR0104",
        "Project Name": "Big Sampson Wind ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Big Sampson Wind Project, LLC",
        "POI Location": "tap 345kV 76015 Cedar Canyon - 7053 Noelke",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 265.4,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2015-05-11T00:00:00",
        "Screening Study Complete": "2015-06-17T00:00:00",
        "FIS Requested": "2015-05-11T00:00:00",
        "FIS Approved": "2024-10-30T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2019-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-10-31T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-11-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-04T00:00:00",
        "Approved for Synchronization": "2025-06-16T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "16INR0104",
        "Project Name": "Big Sampson Wind ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Big Sampson Wind Project, LLC",
        "POI Location": "tap 345kV 76015 Cedar Canyon - 7053 Noelke",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 265.4,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2015-05-11T00:00:00",
        "Screening Study Complete": "2015-06-17T00:00:00",
        "FIS Requested": "2015-05-11T00:00:00",
        "FIS Approved": "2024-10-30T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2019-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-10-31T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-11-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-04T00:00:00",
        "Approved for Synchronization": "2025-06-16T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 6,
      "raw": {
        "INR": "16INR0112",
        "Project Name": "Loma Pinta Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Enerverse",
        "POI Location": "5705 Fowlerton 138kV",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.01,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2015-05-18T00:00:00",
        "Screening Study Complete": "2015-07-02T00:00:00",
        "FIS Requested": "2015-05-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2017-12-13T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "16INR0112",
        "Project Name": "Loma Pinta Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Enerverse",
        "POI Location": "5705 Fowlerton 138kV",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.01,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2015-05-18T00:00:00",
        "Screening Study Complete": "2015-07-02T00:00:00",
        "FIS Requested": "2015-05-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2017-12-13T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 7,
      "raw": {
        "INR": "17INR0027b",
        "Project Name": "Coyote Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Coyote Wind",
        "POI Location": "11305 Dermott 345kV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-28T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 242.6,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2015-04-22T00:00:00",
        "Screening Study Complete": "2015-05-22T00:00:00",
        "FIS Requested": "2015-06-11T00:00:00",
        "FIS Approved": "2020-01-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2016-08-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2016-08-09T00:00:00",
        "Meets All Planning": "2020-01-28T00:00:00",
        "Unnamed: 25": "2020-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-08-24T00:00:00",
        "Approved for Synchronization": "2020-11-25T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0027b",
        "Project Name": "Coyote Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Coyote Wind",
        "POI Location": "11305 Dermott 345kV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-28T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 242.6,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2015-04-22T00:00:00",
        "Screening Study Complete": "2015-05-22T00:00:00",
        "FIS Requested": "2015-06-11T00:00:00",
        "FIS Approved": "2020-01-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2016-08-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2016-08-09T00:00:00",
        "Meets All Planning": "2020-01-28T00:00:00",
        "Unnamed: 25": "2020-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-08-24T00:00:00",
        "Approved for Synchronization": "2020-11-25T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 8,
      "raw": {
        "INR": "17INR0043",
        "Project Name": "Vaquero 1 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Enerverse",
        "POI Location": "tap 345kV 8905 N Edinb - 8455 Lon Hill",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-01-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-04-01T00:00:00",
        "Screening Study Started": "2016-04-01T00:00:00",
        "Screening Study Complete": "2016-05-10T00:00:00",
        "FIS Requested": "2016-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0043",
        "Project Name": "Vaquero 1 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Enerverse",
        "POI Location": "tap 345kV 8905 N Edinb - 8455 Lon Hill",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-01-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-04-01T00:00:00",
        "Screening Study Started": "2016-04-01T00:00:00",
        "Screening Study Complete": "2016-05-10T00:00:00",
        "FIS Requested": "2016-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 9,
      "raw": {
        "INR": "17INR0052",
        "Project Name": "Horse13 CallD repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "6216 Bluff Creek 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-10-03T00:00:00",
        "Screening Study Started": "2016-10-03T00:00:00",
        "Screening Study Complete": "2016-10-17T00:00:00",
        "FIS Requested": "2016-10-03T00:00:00",
        "FIS Approved": "2018-04-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-05-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-04-13T00:00:00",
        "Meets All Planning": "2020-04-13T00:00:00",
        "Unnamed: 25": "2020-04-13T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2021-03-16T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0052",
        "Project Name": "Horse13 CallD repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "6216 Bluff Creek 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-10-03T00:00:00",
        "Screening Study Started": "2016-10-03T00:00:00",
        "Screening Study Complete": "2016-10-17T00:00:00",
        "FIS Requested": "2016-10-03T00:00:00",
        "FIS Approved": "2018-04-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-05-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-04-13T00:00:00",
        "Meets All Planning": "2020-04-13T00:00:00",
        "Unnamed: 25": "2020-04-13T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2021-03-16T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 10,
      "raw": {
        "INR": "17INR0053",
        "Project Name": "HHGT repower Horse13+CallD",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "7046 Kendal 345kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-10-03T00:00:00",
        "Screening Study Started": "2016-10-03T00:00:00",
        "Screening Study Complete": "2016-10-17T00:00:00",
        "FIS Requested": "2016-10-03T00:00:00",
        "FIS Approved": "2017-07-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2009-06-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-04-13T00:00:00",
        "Meets All Planning": "2020-04-13T00:00:00",
        "Unnamed: 25": "2020-04-13T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2021-09-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0053",
        "Project Name": "HHGT repower Horse13+CallD",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "7046 Kendal 345kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-10-03T00:00:00",
        "Screening Study Started": "2016-10-03T00:00:00",
        "Screening Study Complete": "2016-10-17T00:00:00",
        "FIS Requested": "2016-10-03T00:00:00",
        "FIS Approved": "2017-07-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2009-06-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-04-13T00:00:00",
        "Meets All Planning": "2020-04-13T00:00:00",
        "Unnamed: 25": "2020-04-13T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2021-09-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 11,
      "raw": {
        "INR": "17INR0054",
        "Project Name": "Capricorn I & III repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "180757 Capricorn Ridge 3 138kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-03-09T00:00:00",
        "Screening Study Started": "2017-03-09T00:00:00",
        "Screening Study Complete": "2017-04-24T00:00:00",
        "FIS Requested": "2017-03-09T00:00:00",
        "FIS Approved": "2018-02-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2006-11-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-02-28T00:00:00",
        "Meets All Planning": "2021-02-28T00:00:00",
        "Unnamed: 25": "2021-02-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2021-03-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0054",
        "Project Name": "Capricorn I & III repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "180757 Capricorn Ridge 3 138kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-03-09T00:00:00",
        "Screening Study Started": "2017-03-09T00:00:00",
        "Screening Study Complete": "2017-04-24T00:00:00",
        "FIS Requested": "2017-03-09T00:00:00",
        "FIS Approved": "2018-02-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2006-11-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-02-28T00:00:00",
        "Meets All Planning": "2021-02-28T00:00:00",
        "Unnamed: 25": "2021-02-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2021-03-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 12,
      "raw": {
        "INR": "17INR0068",
        "Project Name": "Sweetwater 2 repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Leeward Energy",
        "POI Location": "71050 Bitter Creek 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2024-11-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 7.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-10-05T00:00:00",
        "Screening Study Started": "2017-10-05T00:00:00",
        "Screening Study Complete": "2017-10-05T00:00:00",
        "FIS Requested": "2017-10-05T00:00:00",
        "FIS Approved": "2017-11-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2003-06-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2017-12-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0068",
        "Project Name": "Sweetwater 2 repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Leeward Energy",
        "POI Location": "71050 Bitter Creek 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2024-11-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 7.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-10-05T00:00:00",
        "Screening Study Started": "2017-10-05T00:00:00",
        "Screening Study Complete": "2017-10-05T00:00:00",
        "FIS Requested": "2017-10-05T00:00:00",
        "FIS Approved": "2017-11-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2003-06-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2017-12-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 13,
      "raw": {
        "INR": "17INR0069",
        "Project Name": "Trent repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TRENT WIND FARM LLC ",
        "POI Location": "1338 Eskota 138kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-01-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 6.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-11-08T00:00:00",
        "Screening Study Started": "2017-11-08T00:00:00",
        "Screening Study Complete": "2017-11-28T00:00:00",
        "FIS Requested": "2017-11-08T00:00:00",
        "FIS Approved": "2018-03-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2019-05-09T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0069",
        "Project Name": "Trent repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TRENT WIND FARM LLC ",
        "POI Location": "1338 Eskota 138kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-01-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 6.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-11-08T00:00:00",
        "Screening Study Started": "2017-11-08T00:00:00",
        "Screening Study Complete": "2017-11-28T00:00:00",
        "FIS Requested": "2017-11-08T00:00:00",
        "FIS Approved": "2018-03-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2019-05-09T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 14,
      "raw": {
        "INR": "17INR0070",
        "Project Name": "Desert Sky repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "DESERT SKY WIND FARM LLC",
        "POI Location": "two LCRA 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2023-05-16T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 7.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-11-08T00:00:00",
        "Screening Study Started": "2017-11-08T00:00:00",
        "Screening Study Complete": "2017-11-28T00:00:00",
        "FIS Requested": "2017-11-08T00:00:00",
        "FIS Approved": "2018-02-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2019-09-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "17INR0070",
        "Project Name": "Desert Sky repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "DESERT SKY WIND FARM LLC",
        "POI Location": "two LCRA 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2023-05-16T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 7.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-11-08T00:00:00",
        "Screening Study Started": "2017-11-08T00:00:00",
        "Screening Study Complete": "2017-11-28T00:00:00",
        "FIS Requested": "2017-11-08T00:00:00",
        "FIS Approved": "2018-02-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2019-09-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 15,
      "raw": {
        "INR": "18INR0009",
        "Project Name": "Eagle Pines Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FGE Power",
        "POI Location": "tap 345kV 3109 Stryker - 3123 Trinidad",
        "County": "Cherokee",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1173.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2015-03-24T00:00:00",
        "Screening Study Started": "2015-03-30T00:00:00",
        "Screening Study Complete": "2015-06-23T00:00:00",
        "FIS Requested": "2015-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2017-02-14T00:00:00",
        "GHG Permit": "2015-11-04T00:00:00",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-01-30T00:00:00",
        "Construction End": "2028-08-14T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0009",
        "Project Name": "Eagle Pines Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FGE Power",
        "POI Location": "tap 345kV 3109 Stryker - 3123 Trinidad",
        "County": "Cherokee",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1173.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2015-03-24T00:00:00",
        "Screening Study Started": "2015-03-30T00:00:00",
        "Screening Study Complete": "2015-06-23T00:00:00",
        "FIS Requested": "2015-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2017-02-14T00:00:00",
        "GHG Permit": "2015-11-04T00:00:00",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-01-30T00:00:00",
        "Construction End": "2028-08-14T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 16,
      "raw": {
        "INR": "18INR0031",
        "Project Name": "Maryneal Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Maryneal Windpower, LLC",
        "POI Location": "71050 Bitter Creek 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 182.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-07-22T00:00:00",
        "Screening Study Started": "2016-05-26T00:00:00",
        "Screening Study Complete": "2016-07-21T00:00:00",
        "FIS Requested": "2016-07-22T00:00:00",
        "FIS Approved": "2020-01-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-01-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-01-31T00:00:00",
        "Meets All Planning": "2020-01-31T00:00:00",
        "Unnamed: 25": "2020-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-01-08T00:00:00",
        "Approved for Synchronization": "2021-04-23T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0031",
        "Project Name": "Maryneal Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Maryneal Windpower, LLC",
        "POI Location": "71050 Bitter Creek 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 182.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-07-22T00:00:00",
        "Screening Study Started": "2016-05-26T00:00:00",
        "Screening Study Complete": "2016-07-21T00:00:00",
        "FIS Requested": "2016-07-22T00:00:00",
        "FIS Approved": "2020-01-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-01-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-01-31T00:00:00",
        "Meets All Planning": "2020-01-31T00:00:00",
        "Unnamed: 25": "2020-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-01-08T00:00:00",
        "Approved for Synchronization": "2021-04-23T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 17,
      "raw": {
        "INR": "18INR0064",
        "Project Name": "Silver Star repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Silver Star I Power Partners, LLC",
        "POI Location": "1642 Flat Creek 138kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": -7.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2017-07-06T00:00:00",
        "Screening Study Started": "2017-04-05T00:00:00",
        "Screening Study Complete": "2017-05-08T00:00:00",
        "FIS Requested": "2017-07-06T00:00:00",
        "FIS Approved": "2018-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-10-23T00:00:00",
        "Meets All Planning": "2019-10-23T00:00:00",
        "Unnamed: 25": "2019-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2020-07-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0064",
        "Project Name": "Silver Star repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Silver Star I Power Partners, LLC",
        "POI Location": "1642 Flat Creek 138kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": -7.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2017-07-06T00:00:00",
        "Screening Study Started": "2017-04-05T00:00:00",
        "Screening Study Complete": "2017-05-08T00:00:00",
        "FIS Requested": "2017-07-06T00:00:00",
        "FIS Approved": "2018-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-10-23T00:00:00",
        "Meets All Planning": "2019-10-23T00:00:00",
        "Unnamed: 25": "2019-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2020-07-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 18,
      "raw": {
        "INR": "18INR0069",
        "Project Name": "Indian Mesa repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "76019 Indian NWP 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 9.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-05-22T00:00:00",
        "Screening Study Started": "2018-05-22T00:00:00",
        "Screening Study Complete": "2018-08-29T00:00:00",
        "FIS Requested": "2018-05-22T00:00:00",
        "FIS Approved": "2018-10-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2018-11-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0069",
        "Project Name": "Indian Mesa repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "76019 Indian NWP 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 9.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-05-22T00:00:00",
        "Screening Study Started": "2018-05-22T00:00:00",
        "Screening Study Complete": "2018-08-29T00:00:00",
        "FIS Requested": "2018-05-22T00:00:00",
        "FIS Approved": "2018-10-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2018-11-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 19,
      "raw": {
        "INR": "18INR0073",
        "Project Name": "Sweetwater 1 repower ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Leeward Energy",
        "POI Location": "71050 Bitter Creek 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2024-11-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-09T00:00:00",
        "Screening Study Started": "2018-02-09T00:00:00",
        "Screening Study Complete": "2018-02-09T00:00:00",
        "FIS Requested": "2018-02-09T00:00:00",
        "FIS Approved": "2018-12-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2002-10-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0073",
        "Project Name": "Sweetwater 1 repower ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Leeward Energy",
        "POI Location": "71050 Bitter Creek 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2024-11-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-09T00:00:00",
        "Screening Study Started": "2018-02-09T00:00:00",
        "Screening Study Complete": "2018-02-09T00:00:00",
        "FIS Requested": "2018-02-09T00:00:00",
        "FIS Approved": "2018-12-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2002-10-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 20,
      "raw": {
        "INR": "18INR0079",
        "Project Name": "Woodward I repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "60400 Lynx 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-06-27T00:00:00",
        "Screening Study Started": "2018-06-27T00:00:00",
        "Screening Study Complete": "2018-06-27T00:00:00",
        "FIS Requested": "2018-06-27T00:00:00",
        "FIS Approved": "2019-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-10-30T00:00:00",
        "Meets All Planning": "2020-10-30T00:00:00",
        "Unnamed: 25": "2020-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2019-11-07T00:00:00",
        "Approved for Synchronization": "2019-11-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0079",
        "Project Name": "Woodward I repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "60400 Lynx 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-06-27T00:00:00",
        "Screening Study Started": "2018-06-27T00:00:00",
        "Screening Study Complete": "2018-06-27T00:00:00",
        "FIS Requested": "2018-06-27T00:00:00",
        "FIS Approved": "2019-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-10-30T00:00:00",
        "Meets All Planning": "2020-10-30T00:00:00",
        "Unnamed: 25": "2020-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2019-11-07T00:00:00",
        "Approved for Synchronization": "2019-11-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 21,
      "raw": {
        "INR": "18INR0080",
        "Project Name": "Woodward 2 repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "60400 Lynx 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-06-19T00:00:00",
        "Screening Study Started": "2018-06-19T00:00:00",
        "Screening Study Complete": "2018-06-19T00:00:00",
        "FIS Requested": "2018-06-19T00:00:00",
        "FIS Approved": "2018-11-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-11-29T00:00:00",
        "Meets All Planning": "2018-11-29T00:00:00",
        "Unnamed: 25": "2020-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2018-12-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "18INR0080",
        "Project Name": "Woodward 2 repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nextera",
        "POI Location": "60400 Lynx 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-06-19T00:00:00",
        "Screening Study Started": "2018-06-19T00:00:00",
        "Screening Study Complete": "2018-06-19T00:00:00",
        "FIS Requested": "2018-06-19T00:00:00",
        "FIS Approved": "2018-11-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-11-29T00:00:00",
        "Meets All Planning": "2018-11-29T00:00:00",
        "Unnamed: 25": "2020-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2018-12-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 22,
      "raw": {
        "INR": "19INR0002",
        "Project Name": "Grandfalls Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "King Mountain Solar, LLC",
        "POI Location": "842 King Mountain Station 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 175.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-05-24T00:00:00",
        "Screening Study Started": "2016-05-24T00:00:00",
        "Screening Study Complete": "2016-06-06T00:00:00",
        "FIS Requested": "2016-05-24T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-08T00:00:00",
        "Meets All Planning": "2026-01-26T00:00:00",
        "Unnamed: 25": "2026-01-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-24T00:00:00",
        "Approved for Synchronization": "2026-07-15T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0002",
        "Project Name": "Grandfalls Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "King Mountain Solar, LLC",
        "POI Location": "842 King Mountain Station 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 175.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-05-24T00:00:00",
        "Screening Study Started": "2016-05-24T00:00:00",
        "Screening Study Complete": "2016-06-06T00:00:00",
        "FIS Requested": "2016-05-24T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-08T00:00:00",
        "Meets All Planning": "2026-01-26T00:00:00",
        "Unnamed: 25": "2026-01-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-24T00:00:00",
        "Approved for Synchronization": "2026-07-15T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 23,
      "raw": {
        "INR": "19INR0023",
        "Project Name": "Monte Alto 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Monte Alto Windpower, LLC",
        "POI Location": "tap 345kV 8318 Rio Hondo - 8383 N Edinburg",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 199.2,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2016-11-04T00:00:00",
        "Screening Study Complete": "2017-01-10T00:00:00",
        "FIS Requested": "2017-03-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-03-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0023",
        "Project Name": "Monte Alto 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Monte Alto Windpower, LLC",
        "POI Location": "tap 345kV 8318 Rio Hondo - 8383 N Edinburg",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 199.2,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2016-11-04T00:00:00",
        "Screening Study Complete": "2017-01-10T00:00:00",
        "FIS Requested": "2017-03-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-03-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 24,
      "raw": {
        "INR": "19INR0035",
        "Project Name": "Norton Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TAI Norton Solar, LLC",
        "POI Location": "60451 Garnet 138kV",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-11-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 128.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-11-08T00:00:00",
        "Screening Study Started": "2017-03-06T00:00:00",
        "Screening Study Complete": "2017-04-20T00:00:00",
        "FIS Requested": "2017-11-08T00:00:00",
        "FIS Approved": "2024-10-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-06-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-07-12T00:00:00",
        "Meets All Planning": "2023-05-30T00:00:00",
        "Unnamed: 25": "2025-01-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-07-24T00:00:00",
        "Approved for Synchronization": "2025-08-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0035",
        "Project Name": "Norton Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TAI Norton Solar, LLC",
        "POI Location": "60451 Garnet 138kV",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-11-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 128.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-11-08T00:00:00",
        "Screening Study Started": "2017-03-06T00:00:00",
        "Screening Study Complete": "2017-04-20T00:00:00",
        "FIS Requested": "2017-11-08T00:00:00",
        "FIS Approved": "2024-10-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-06-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-07-12T00:00:00",
        "Meets All Planning": "2023-05-30T00:00:00",
        "Unnamed: 25": "2025-01-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-07-24T00:00:00",
        "Approved for Synchronization": "2025-08-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 25,
      "raw": {
        "INR": "19INR0041",
        "Project Name": "Myrtle Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Myrtle Solar, LLC ",
        "POI Location": "42110 Angleton 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.2,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2017-03-15T00:00:00",
        "Screening Study Complete": "2017-04-28T00:00:00",
        "FIS Requested": "2017-05-09T00:00:00",
        "FIS Approved": "2022-01-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2019-11-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-11-30T00:00:00",
        "Meets All Planning": "2020-05-06T00:00:00",
        "Unnamed: 25": "2022-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-12-07T00:00:00",
        "Approved for Synchronization": "2022-12-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0041",
        "Project Name": "Myrtle Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Myrtle Solar, LLC ",
        "POI Location": "42110 Angleton 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.2,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2017-03-15T00:00:00",
        "Screening Study Complete": "2017-04-28T00:00:00",
        "FIS Requested": "2017-05-09T00:00:00",
        "FIS Approved": "2022-01-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2019-11-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-11-30T00:00:00",
        "Meets All Planning": "2020-05-06T00:00:00",
        "Unnamed: 25": "2022-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-12-07T00:00:00",
        "Approved for Synchronization": "2022-12-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 26,
      "raw": {
        "INR": "19INR0055",
        "Project Name": "Monte Cristo II Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Monte Cristo Windpower II, LLC",
        "POI Location": "8574 Pomelo 345kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 233.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-07-28T00:00:00",
        "Screening Study Started": "2017-04-11T00:00:00",
        "Screening Study Complete": "2017-05-03T00:00:00",
        "FIS Requested": "2017-07-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0055",
        "Project Name": "Monte Cristo II Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Monte Cristo Windpower II, LLC",
        "POI Location": "8574 Pomelo 345kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 233.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-07-28T00:00:00",
        "Screening Study Started": "2017-04-11T00:00:00",
        "Screening Study Complete": "2017-05-03T00:00:00",
        "FIS Requested": "2017-07-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 27,
      "raw": {
        "INR": "19INR0075",
        "Project Name": "Horseshoe Bend Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clenera",
        "POI Location": "1444 Brown 345kV",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-09T00:00:00",
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0075",
        "Project Name": "Horseshoe Bend Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clenera",
        "POI Location": "1444 Brown 345kV",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-09T00:00:00",
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 28,
      "raw": {
        "INR": "19INR0080",
        "Project Name": "Whitehorse Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MESQUITE STAR SPECIAL LLC",
        "POI Location": "68001 Clayton 345kV",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 418.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-16T00:00:00",
        "FIS Approved": "2019-01-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-03-12T00:00:00",
        "Meets All Planning": "2019-04-02T00:00:00",
        "Unnamed: 25": "2019-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2019-12-12T00:00:00",
        "Approved for Synchronization": "2019-12-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0080",
        "Project Name": "Whitehorse Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MESQUITE STAR SPECIAL LLC",
        "POI Location": "68001 Clayton 345kV",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 418.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-16T00:00:00",
        "FIS Approved": "2019-01-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-03-12T00:00:00",
        "Meets All Planning": "2019-04-02T00:00:00",
        "Unnamed: 25": "2019-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2019-12-12T00:00:00",
        "Approved for Synchronization": "2019-12-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 29,
      "raw": {
        "INR": "19INR0085",
        "Project Name": "Blue Jay Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blue Jay Solar I, LLC",
        "POI Location": "4 Iola 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 141.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2017-05-30T00:00:00",
        "Screening Study Complete": "2017-08-11T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": "2021-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-12-02T00:00:00",
        "Meets All Planning": "2021-04-26T00:00:00",
        "Unnamed: 25": "2021-04-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-11-11T00:00:00",
        "Approved for Synchronization": "2022-06-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0085",
        "Project Name": "Blue Jay Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blue Jay Solar I, LLC",
        "POI Location": "4 Iola 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 141.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2017-05-30T00:00:00",
        "Screening Study Complete": "2017-08-11T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": "2021-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-12-02T00:00:00",
        "Meets All Planning": "2021-04-26T00:00:00",
        "Unnamed: 25": "2021-04-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-11-11T00:00:00",
        "Approved for Synchronization": "2022-06-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 30,
      "raw": {
        "INR": "19INR0100",
        "Project Name": "Prairie Hill Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Prairie Hill LLC",
        "POI Location": "tap 345kV 3405 Tradinghouse - 3402 Lake Creek ",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-06-19T00:00:00",
        "Screening Study Started": "2017-06-19T00:00:00",
        "Screening Study Complete": "2017-08-11T00:00:00",
        "FIS Requested": "2017-06-19T00:00:00",
        "FIS Approved": "2020-04-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-09-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-11-27T00:00:00",
        "Meets All Planning": "2020-04-21T00:00:00",
        "Unnamed: 25": "2020-04-21T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-10-19T00:00:00",
        "Approved for Synchronization": "2020-11-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0100",
        "Project Name": "Prairie Hill Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Prairie Hill LLC",
        "POI Location": "tap 345kV 3405 Tradinghouse - 3402 Lake Creek ",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-06-19T00:00:00",
        "Screening Study Started": "2017-06-19T00:00:00",
        "Screening Study Complete": "2017-08-11T00:00:00",
        "FIS Requested": "2017-06-19T00:00:00",
        "FIS Approved": "2020-04-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-09-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-11-27T00:00:00",
        "Meets All Planning": "2020-04-21T00:00:00",
        "Unnamed: 25": "2020-04-21T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-10-19T00:00:00",
        "Approved for Synchronization": "2020-11-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 31,
      "raw": {
        "INR": "19INR0103",
        "Project Name": "Rodeo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Core Solar SPV I, LLC",
        "POI Location": "138kV 11273 NELSON SWITCH\n",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-19T00:00:00",
        "Screening Study Started": "2017-06-29T00:00:00",
        "Screening Study Complete": "2017-08-04T00:00:00",
        "FIS Requested": "2018-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2019-08-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-10T00:00:00",
        "Meets All Planning": "2022-11-01T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0103",
        "Project Name": "Rodeo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Core Solar SPV I, LLC",
        "POI Location": "138kV 11273 NELSON SWITCH\n",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-19T00:00:00",
        "Screening Study Started": "2017-06-29T00:00:00",
        "Screening Study Complete": "2017-08-04T00:00:00",
        "FIS Requested": "2018-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2019-08-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-10T00:00:00",
        "Meets All Planning": "2022-11-01T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 32,
      "raw": {
        "INR": "19INR0110",
        "Project Name": "Azalea Springs Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "AZALEA SPRINGS SOLAR PARK LLC ",
        "POI Location": "tap 138kV Jim English – Lufkin Chipper Mill",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-03-15T00:00:00",
        "Screening Study Started": "2017-07-26T00:00:00",
        "Screening Study Complete": "2017-09-15T00:00:00",
        "FIS Requested": "2018-03-15T00:00:00",
        "FIS Approved": "2024-04-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-09-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-05-01T00:00:00",
        "Meets All Planning": "2024-05-01T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-01-29T00:00:00",
        "Approved for Synchronization": "2025-02-11T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0110",
        "Project Name": "Azalea Springs Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "AZALEA SPRINGS SOLAR PARK LLC ",
        "POI Location": "tap 138kV Jim English – Lufkin Chipper Mill",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-03-15T00:00:00",
        "Screening Study Started": "2017-07-26T00:00:00",
        "Screening Study Complete": "2017-09-15T00:00:00",
        "FIS Requested": "2018-03-15T00:00:00",
        "FIS Approved": "2024-04-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-09-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-05-01T00:00:00",
        "Meets All Planning": "2024-05-01T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-01-29T00:00:00",
        "Approved for Synchronization": "2025-02-11T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 33,
      "raw": {
        "INR": "19INR0120",
        "Project Name": "Sherbino II Wind repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sherbino II Wind Farm LLC",
        "POI Location": "38430 TN White Baker 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-22T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": -18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-09-21T00:00:00",
        "Screening Study Started": "2017-08-18T00:00:00",
        "Screening Study Complete": "2017-09-28T00:00:00",
        "FIS Requested": "2017-09-21T00:00:00",
        "FIS Approved": "2018-12-04T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2008-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-10-28T00:00:00",
        "Meets All Planning": "2019-10-28T00:00:00",
        "Unnamed: 25": "2019-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2020-06-09T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0120",
        "Project Name": "Sherbino II Wind repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sherbino II Wind Farm LLC",
        "POI Location": "38430 TN White Baker 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-22T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": -18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2017-09-21T00:00:00",
        "Screening Study Started": "2017-08-18T00:00:00",
        "Screening Study Complete": "2017-09-28T00:00:00",
        "FIS Requested": "2017-09-21T00:00:00",
        "FIS Approved": "2018-12-04T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2008-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-10-28T00:00:00",
        "Meets All Planning": "2019-10-28T00:00:00",
        "Unnamed: 25": "2019-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2020-06-09T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 34,
      "raw": {
        "INR": "19INR0134",
        "Project Name": "Cottonwood Bayou Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cottonwood Bayou Solar, LLC",
        "POI Location": "tap 138kV 42870 Liverpool - 43070 Petson",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 351.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": null,
        "Screening Study Started": "2017-09-22T00:00:00",
        "Screening Study Complete": "2017-11-17T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": "2023-04-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-11-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-04-27T00:00:00",
        "Meets All Planning": "2023-04-27T00:00:00",
        "Unnamed: 25": "2023-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-05-01T00:00:00",
        "Approved for Synchronization": "2024-05-29T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0134",
        "Project Name": "Cottonwood Bayou Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cottonwood Bayou Solar, LLC",
        "POI Location": "tap 138kV 42870 Liverpool - 43070 Petson",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 351.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": null,
        "Screening Study Started": "2017-09-22T00:00:00",
        "Screening Study Complete": "2017-11-17T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": "2023-04-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-11-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-04-27T00:00:00",
        "Meets All Planning": "2023-04-27T00:00:00",
        "Unnamed: 25": "2023-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-05-01T00:00:00",
        "Approved for Synchronization": "2024-05-29T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 35,
      "raw": {
        "INR": "19INR0174",
        "Project Name": "Elbow Creek repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Elbow Creek Wind Project, LLC",
        "POI Location": "1058 Longshore 345kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-07-19T00:00:00",
        "Screening Study Started": "2018-05-04T00:00:00",
        "Screening Study Complete": "2018-05-18T00:00:00",
        "FIS Requested": "2018-07-19T00:00:00",
        "FIS Approved": "2018-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2007-11-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2019-06-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0174",
        "Project Name": "Elbow Creek repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Elbow Creek Wind Project, LLC",
        "POI Location": "1058 Longshore 345kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-07-19T00:00:00",
        "Screening Study Started": "2018-05-04T00:00:00",
        "Screening Study Complete": "2018-05-18T00:00:00",
        "FIS Requested": "2018-07-19T00:00:00",
        "FIS Approved": "2018-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2007-11-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2018-10-31T00:00:00",
        "Meets All Planning": "2018-10-31T00:00:00",
        "Unnamed: 25": "2018-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2019-06-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 36,
      "raw": {
        "INR": "19INR0189",
        "Project Name": "SP TX-12B Phase III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ConEd Development",
        "POI Location": "76040 Castillo 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-12-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-29T00:00:00",
        "Screening Study Started": "2018-09-12T00:00:00",
        "Screening Study Complete": "2018-10-03T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "19INR0189",
        "Project Name": "SP TX-12B Phase III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ConEd Development",
        "POI Location": "76040 Castillo 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-12-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-29T00:00:00",
        "Screening Study Started": "2018-09-12T00:00:00",
        "Screening Study Complete": "2018-10-03T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 37,
      "raw": {
        "INR": "20INR0012",
        "Project Name": "Lueders Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Innovative Solar 75",
        "POI Location": "Tap 138kV 6161 Paint Creek - 6200 Ft Phantom",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2017-07-11T00:00:00",
        "Screening Study Complete": "2017-08-28T00:00:00",
        "FIS Requested": "2017-10-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0012",
        "Project Name": "Lueders Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Innovative Solar 75",
        "POI Location": "Tap 138kV 6161 Paint Creek - 6200 Ft Phantom",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2017-07-11T00:00:00",
        "Screening Study Complete": "2017-08-28T00:00:00",
        "FIS Requested": "2017-10-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 38,
      "raw": {
        "INR": "20INR0019",
        "Project Name": "Trinity Hills Wind repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Trinity Hills Wind Farm LLC",
        "POI Location": "17002 Garvey Rd 345kV",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": -27,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2017-09-21T00:00:00",
        "Screening Study Started": "2017-07-20T00:00:00",
        "Screening Study Complete": "2017-09-08T00:00:00",
        "FIS Requested": "2017-09-21T00:00:00",
        "FIS Approved": "2018-08-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-10-29T00:00:00",
        "Meets All Planning": "2019-10-29T00:00:00",
        "Unnamed: 25": "2019-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2020-05-22T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0019",
        "Project Name": "Trinity Hills Wind repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Trinity Hills Wind Farm LLC",
        "POI Location": "17002 Garvey Rd 345kV",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": -27,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2017-09-21T00:00:00",
        "Screening Study Started": "2017-07-20T00:00:00",
        "Screening Study Complete": "2017-09-08T00:00:00",
        "FIS Requested": "2017-09-21T00:00:00",
        "FIS Approved": "2018-08-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2018-10-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-10-29T00:00:00",
        "Meets All Planning": "2019-10-29T00:00:00",
        "Unnamed: 25": "2019-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2020-05-22T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 39,
      "raw": {
        "INR": "20INR0033",
        "Project Name": "WILDWIND",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wildcat Creek",
        "POI Location": "tap 345kV 1730 KrumW - 2373 Anna",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-04-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-06-14T00:00:00",
        "Screening Study Started": "2017-10-18T00:00:00",
        "Screening Study Complete": "2017-12-11T00:00:00",
        "FIS Requested": "2018-06-14T00:00:00",
        "FIS Approved": "2019-11-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-03-23T00:00:00",
        "Meets All Planning": "2020-04-30T00:00:00",
        "Unnamed: 25": "2020-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-12-22T00:00:00",
        "Approved for Synchronization": "2021-02-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0033",
        "Project Name": "WILDWIND",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wildcat Creek",
        "POI Location": "tap 345kV 1730 KrumW - 2373 Anna",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-04-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-06-14T00:00:00",
        "Screening Study Started": "2017-10-18T00:00:00",
        "Screening Study Complete": "2017-12-11T00:00:00",
        "FIS Requested": "2018-06-14T00:00:00",
        "FIS Approved": "2019-11-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-03-23T00:00:00",
        "Meets All Planning": "2020-04-30T00:00:00",
        "Unnamed: 25": "2020-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2020-12-22T00:00:00",
        "Approved for Synchronization": "2021-02-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 40,
      "raw": {
        "INR": "20INR0047",
        "Project Name": "Siete",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Apex Clean Energy",
        "POI Location": "345kV 8718 Triada",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 492.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-06-13T00:00:00",
        "Screening Study Started": "2018-10-23T00:00:00",
        "Screening Study Complete": "2018-12-11T00:00:00",
        "FIS Requested": "2019-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-06-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-07-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0047",
        "Project Name": "Siete",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Apex Clean Energy",
        "POI Location": "345kV 8718 Triada",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 492.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-06-13T00:00:00",
        "Screening Study Started": "2018-10-23T00:00:00",
        "Screening Study Complete": "2018-12-11T00:00:00",
        "FIS Requested": "2019-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-06-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-07-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 41,
      "raw": {
        "INR": "20INR0050",
        "Project Name": "Castro Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Castro Solar One, LLC",
        "POI Location": "23912 Ogallala 345kV",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-04-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 224.67,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-05-15T00:00:00",
        "Screening Study Started": "2018-02-08T00:00:00",
        "Screening Study Complete": "2018-04-09T00:00:00",
        "FIS Requested": "2018-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-11-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0050",
        "Project Name": "Castro Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Castro Solar One, LLC",
        "POI Location": "23912 Ogallala 345kV",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-04-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 224.67,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-05-15T00:00:00",
        "Screening Study Started": "2018-02-08T00:00:00",
        "Screening Study Complete": "2018-04-09T00:00:00",
        "FIS Requested": "2018-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-11-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 42,
      "raw": {
        "INR": "20INR0069",
        "Project Name": "Danish Fields Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Danish Fields Solar, LLC ",
        "POI Location": "44200 Hillje 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 602.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-20T00:00:00",
        "Screening Study Started": "2018-04-12T00:00:00",
        "Screening Study Complete": "2018-06-05T00:00:00",
        "FIS Requested": "2018-08-21T00:00:00",
        "FIS Approved": "2022-07-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-02-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-07-28T00:00:00",
        "Meets All Planning": "2022-07-28T00:00:00",
        "Unnamed: 25": "2022-07-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-03-27T00:00:00",
        "Approved for Synchronization": "2023-05-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0069",
        "Project Name": "Danish Fields Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Danish Fields Solar, LLC ",
        "POI Location": "44200 Hillje 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 602.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-20T00:00:00",
        "Screening Study Started": "2018-04-12T00:00:00",
        "Screening Study Complete": "2018-06-05T00:00:00",
        "FIS Requested": "2018-08-21T00:00:00",
        "FIS Approved": "2022-07-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-02-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-07-28T00:00:00",
        "Meets All Planning": "2022-07-28T00:00:00",
        "Unnamed: 25": "2022-07-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-03-27T00:00:00",
        "Approved for Synchronization": "2023-05-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 43,
      "raw": {
        "INR": "20INR0083",
        "Project Name": "Baird North Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BMP Wind, LLC",
        "POI Location": "68008 Latimer 345kV",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 340,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-05-04T00:00:00",
        "Screening Study Complete": "2018-06-12T00:00:00",
        "FIS Requested": "2018-08-20T00:00:00",
        "FIS Approved": "2020-10-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-05-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-07-19T00:00:00",
        "Meets All Planning": "2020-10-30T00:00:00",
        "Unnamed: 25": "2020-11-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-08-09T00:00:00",
        "Approved for Synchronization": "2021-08-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0083",
        "Project Name": "Baird North Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BMP Wind, LLC",
        "POI Location": "68008 Latimer 345kV",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 340,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-05-04T00:00:00",
        "Screening Study Complete": "2018-06-12T00:00:00",
        "FIS Requested": "2018-08-20T00:00:00",
        "FIS Approved": "2020-10-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-05-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2019-07-19T00:00:00",
        "Meets All Planning": "2020-10-30T00:00:00",
        "Unnamed: 25": "2020-11-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-08-09T00:00:00",
        "Approved for Synchronization": "2021-08-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 44,
      "raw": {
        "INR": "20INR0086",
        "Project Name": "Arroyo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BT Cantwell Solar, LLC",
        "POI Location": "345 KV Tap #8318 Rio Hondo - #8317 La Palma",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-10-10T00:00:00",
        "Screening Study Started": "2018-05-09T00:00:00",
        "Screening Study Complete": "2018-07-09T00:00:00",
        "FIS Requested": "2018-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2021-09-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0086",
        "Project Name": "Arroyo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BT Cantwell Solar, LLC",
        "POI Location": "345 KV Tap #8318 Rio Hondo - #8317 La Palma",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-10-10T00:00:00",
        "Screening Study Started": "2018-05-09T00:00:00",
        "Screening Study Complete": "2018-07-09T00:00:00",
        "FIS Requested": "2018-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2021-09-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 45,
      "raw": {
        "INR": "20INR0097",
        "Project Name": "El Sauz Ranch",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "El Sauz Ranch Wind, LLC",
        "POI Location": "8663 EL SAUZ POI 345kV",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-02-01T00:00:00",
        "Screening Study Started": "2018-06-19T00:00:00",
        "Screening Study Complete": "2018-08-22T00:00:00",
        "FIS Requested": "2019-01-31T00:00:00",
        "FIS Approved": "2021-10-29T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-01-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-14T00:00:00",
        "Meets All Planning": "2022-01-26T00:00:00",
        "Unnamed: 25": "2022-01-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-09-28T00:00:00",
        "Approved for Synchronization": "2023-02-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0097",
        "Project Name": "El Sauz Ranch",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "El Sauz Ranch Wind, LLC",
        "POI Location": "8663 EL SAUZ POI 345kV",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-02-01T00:00:00",
        "Screening Study Started": "2018-06-19T00:00:00",
        "Screening Study Complete": "2018-08-22T00:00:00",
        "FIS Requested": "2019-01-31T00:00:00",
        "FIS Approved": "2021-10-29T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-01-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-14T00:00:00",
        "Meets All Planning": "2022-01-26T00:00:00",
        "Unnamed: 25": "2022-01-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-09-28T00:00:00",
        "Approved for Synchronization": "2023-02-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 46,
      "raw": {
        "INR": "20INR0106",
        "Project Name": "Wang Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Yixin Solar, LLC",
        "POI Location": "tap 345kV 3409 LakeCr1 - 3414 TempSS",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 144.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-08-29T00:00:00",
        "Screening Study Started": "2018-06-14T00:00:00",
        "Screening Study Complete": "2018-08-13T00:00:00",
        "FIS Requested": "2018-08-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0106",
        "Project Name": "Wang Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Yixin Solar, LLC",
        "POI Location": "tap 345kV 3409 LakeCr1 - 3414 TempSS",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 144.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-08-29T00:00:00",
        "Screening Study Started": "2018-06-14T00:00:00",
        "Screening Study Complete": "2018-08-13T00:00:00",
        "FIS Requested": "2018-08-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 47,
      "raw": {
        "INR": "20INR0129",
        "Project Name": "Foxtrot Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lincoln Clean",
        "POI Location": "AEP 88689 Tango 345kV station",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 268.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": null,
        "Screening Study Started": "2018-07-26T00:00:00",
        "Screening Study Complete": "2018-09-14T00:00:00",
        "FIS Requested": "2018-07-26T00:00:00",
        "FIS Approved": "2021-07-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-05-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-07-30T00:00:00",
        "Meets All Planning": "2021-07-30T00:00:00",
        "Unnamed: 25": "2021-07-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-02-23T00:00:00",
        "Approved for Synchronization": "2022-03-09T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0129",
        "Project Name": "Foxtrot Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lincoln Clean",
        "POI Location": "AEP 88689 Tango 345kV station",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 268.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": null,
        "Screening Study Started": "2018-07-26T00:00:00",
        "Screening Study Complete": "2018-09-14T00:00:00",
        "FIS Requested": "2018-07-26T00:00:00",
        "FIS Approved": "2021-07-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-05-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-07-30T00:00:00",
        "Meets All Planning": "2021-07-30T00:00:00",
        "Unnamed: 25": "2021-07-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-02-23T00:00:00",
        "Approved for Synchronization": "2022-03-09T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 48,
      "raw": {
        "INR": "20INR0143",
        "Project Name": "Tri-X Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane I Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-08T00:00:00",
        "Screening Study Started": "2016-11-07T00:00:00",
        "Screening Study Complete": "2016-11-08T00:00:00",
        "FIS Requested": "2017-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-08-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0143",
        "Project Name": "Tri-X Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane I Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-08T00:00:00",
        "Screening Study Started": "2016-11-07T00:00:00",
        "Screening Study Complete": "2016-11-08T00:00:00",
        "FIS Requested": "2017-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-08-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 49,
      "raw": {
        "INR": "20INR0155",
        "Project Name": "Peyton Creek Wind II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables Development, LLC",
        "POI Location": "42400 Refuge 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 241.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-30T00:00:00",
        "Screening Study Started": "2018-08-21T00:00:00",
        "Screening Study Complete": "2018-11-02T00:00:00",
        "FIS Requested": "2019-03-14T00:00:00",
        "FIS Approved": "2024-06-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-04-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-25T00:00:00",
        "Meets All Planning": "2024-07-24T00:00:00",
        "Unnamed: 25": "2024-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-12-30T00:00:00",
        "Approved for Synchronization": "2025-02-05T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0155",
        "Project Name": "Peyton Creek Wind II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables Development, LLC",
        "POI Location": "42400 Refuge 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 241.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-30T00:00:00",
        "Screening Study Started": "2018-08-21T00:00:00",
        "Screening Study Complete": "2018-11-02T00:00:00",
        "FIS Requested": "2019-03-14T00:00:00",
        "FIS Approved": "2024-06-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-04-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-25T00:00:00",
        "Meets All Planning": "2024-07-24T00:00:00",
        "Unnamed: 25": "2024-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-12-30T00:00:00",
        "Approved for Synchronization": "2025-02-05T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 50,
      "raw": {
        "INR": "20INR0162",
        "Project Name": "Diamondback solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Diamondback Solar, LLC",
        "POI Location": "80355 Del Sol 345kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.5,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": null,
        "Screening Study Started": "2018-09-13T00:00:00",
        "Screening Study Complete": "2018-12-06T00:00:00",
        "FIS Requested": "2018-11-07T00:00:00",
        "FIS Approved": "2026-06-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0162",
        "Project Name": "Diamondback solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Diamondback Solar, LLC",
        "POI Location": "80355 Del Sol 345kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.5,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": null,
        "Screening Study Started": "2018-09-13T00:00:00",
        "Screening Study Complete": "2018-12-06T00:00:00",
        "FIS Requested": "2018-11-07T00:00:00",
        "FIS Approved": "2026-06-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 51,
      "raw": {
        "INR": "20INR0203",
        "Project Name": "Pine Forest Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pine Forest Solar I, LLC",
        "POI Location": "Monticello Switch – Allen Switch 345 kV Line",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.51,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-03-26T00:00:00",
        "Screening Study Started": "2018-10-04T00:00:00",
        "Screening Study Complete": "2018-11-20T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2024-12-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-07-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-05-22T00:00:00",
        "Meets All Planning": "2025-01-28T00:00:00",
        "Unnamed: 25": "2025-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-03T00:00:00",
        "Approved for Synchronization": "2025-07-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0203",
        "Project Name": "Pine Forest Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pine Forest Solar I, LLC",
        "POI Location": "Monticello Switch – Allen Switch 345 kV Line",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.51,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-03-26T00:00:00",
        "Screening Study Started": "2018-10-04T00:00:00",
        "Screening Study Complete": "2018-11-20T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2024-12-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-07-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-05-22T00:00:00",
        "Meets All Planning": "2025-01-28T00:00:00",
        "Unnamed: 25": "2025-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-03T00:00:00",
        "Approved for Synchronization": "2025-07-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 52,
      "raw": {
        "INR": "20INR0205",
        "Project Name": "Roseland Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Enel Green Power Roseland Solar, LLC",
        "POI Location": "tap 345kV 3390 Jewett - 3399 Ratsnake",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-11-05T00:00:00",
        "Screening Study Started": "2018-11-30T00:00:00",
        "Screening Study Complete": "2019-02-04T00:00:00",
        "FIS Requested": "2019-02-04T00:00:00",
        "FIS Approved": "2021-10-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-12-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-08-18T00:00:00",
        "Meets All Planning": "2021-11-01T00:00:00",
        "Unnamed: 25": "2021-10-25T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-06-07T00:00:00",
        "Approved for Synchronization": "2022-09-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0205",
        "Project Name": "Roseland Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Enel Green Power Roseland Solar, LLC",
        "POI Location": "tap 345kV 3390 Jewett - 3399 Ratsnake",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-11-05T00:00:00",
        "Screening Study Started": "2018-11-30T00:00:00",
        "Screening Study Complete": "2019-02-04T00:00:00",
        "FIS Requested": "2019-02-04T00:00:00",
        "FIS Approved": "2021-10-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-12-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-08-18T00:00:00",
        "Meets All Planning": "2021-11-01T00:00:00",
        "Unnamed: 25": "2021-10-25T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-06-07T00:00:00",
        "Approved for Synchronization": "2022-09-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 53,
      "raw": {
        "INR": "20INR0216",
        "Project Name": "Starr Solar Ranch",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Starr Solar Ranch 1 LLC",
        "POI Location": "8795 Roma 138kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-08-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 136.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-11-07T00:00:00",
        "Screening Study Started": "2018-11-07T00:00:00",
        "Screening Study Complete": "2018-12-14T00:00:00",
        "FIS Requested": "2018-11-07T00:00:00",
        "FIS Approved": "2024-01-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-01-24T00:00:00",
        "Meets All Planning": "2024-01-24T00:00:00",
        "Unnamed: 25": "2024-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-09T00:00:00",
        "Approved for Synchronization": "2024-10-30T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0216",
        "Project Name": "Starr Solar Ranch",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Starr Solar Ranch 1 LLC",
        "POI Location": "8795 Roma 138kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-08-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 136.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-11-07T00:00:00",
        "Screening Study Started": "2018-11-07T00:00:00",
        "Screening Study Complete": "2018-12-14T00:00:00",
        "FIS Requested": "2018-11-07T00:00:00",
        "FIS Approved": "2024-01-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-01-24T00:00:00",
        "Meets All Planning": "2024-01-24T00:00:00",
        "Unnamed: 25": "2024-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-09T00:00:00",
        "Approved for Synchronization": "2024-10-30T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 54,
      "raw": {
        "INR": "20INR0236",
        "Project Name": "New Hickory Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "New Hickory Solar LLC",
        "POI Location": "OLD_HCKRY_5 bus 5323 345 kV",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 209.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-27T00:00:00",
        "Screening Study Started": "2019-01-25T00:00:00",
        "Screening Study Complete": "2019-04-19T00:00:00",
        "FIS Requested": "2019-08-12T00:00:00",
        "FIS Approved": "2024-06-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-06-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-04-12T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-20T00:00:00",
        "Approved for Synchronization": "2026-09-15T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0236",
        "Project Name": "New Hickory Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "New Hickory Solar LLC",
        "POI Location": "OLD_HCKRY_5 bus 5323 345 kV",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 209.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-27T00:00:00",
        "Screening Study Started": "2019-01-25T00:00:00",
        "Screening Study Complete": "2019-04-19T00:00:00",
        "FIS Requested": "2019-08-12T00:00:00",
        "FIS Approved": "2024-06-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-06-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-04-12T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-20T00:00:00",
        "Approved for Synchronization": "2026-09-15T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 55,
      "raw": {
        "INR": "20INR0238",
        "Project Name": "Voyager Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EDF Renewables Development, Inc.",
        "POI Location": "44200 Hillje 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-30T00:00:00",
        "Screening Study Started": "2019-01-14T00:00:00",
        "Screening Study Complete": "2019-03-19T00:00:00",
        "FIS Requested": "2019-04-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0238",
        "Project Name": "Voyager Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EDF Renewables Development, Inc.",
        "POI Location": "44200 Hillje 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-30T00:00:00",
        "Screening Study Started": "2019-01-14T00:00:00",
        "Screening Study Complete": "2019-03-19T00:00:00",
        "FIS Requested": "2019-04-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 56,
      "raw": {
        "INR": "20INR0241",
        "Project Name": "Crowded Star Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jones City Solar, LLC",
        "POI Location": "tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 218.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-23T00:00:00",
        "Screening Study Started": "2019-01-21T00:00:00",
        "Screening Study Complete": "2019-04-19T00:00:00",
        "FIS Requested": "2019-05-22T00:00:00",
        "FIS Approved": "2024-11-05T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2019-12-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-12-01T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-04-22T00:00:00",
        "Approved for Synchronization": "2026-05-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0241",
        "Project Name": "Crowded Star Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jones City Solar, LLC",
        "POI Location": "tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 218.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-23T00:00:00",
        "Screening Study Started": "2019-01-21T00:00:00",
        "Screening Study Complete": "2019-04-19T00:00:00",
        "FIS Requested": "2019-05-22T00:00:00",
        "FIS Approved": "2024-11-05T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2019-12-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-12-01T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-04-22T00:00:00",
        "Approved for Synchronization": "2026-05-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 57,
      "raw": {
        "INR": "20INR0242",
        "Project Name": "Anson Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Anson Solar Center 2, LLC",
        "POI Location": "existing tap 345 kV 68004 Phantom Hill station ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": "2025-03-19T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-05-22T00:00:00",
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-04T00:00:00",
        "Approved for Synchronization": "2025-11-25T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0242",
        "Project Name": "Anson Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Anson Solar Center 2, LLC",
        "POI Location": "existing tap 345 kV 68004 Phantom Hill station ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": "2025-03-19T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-05-22T00:00:00",
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-04T00:00:00",
        "Approved for Synchronization": "2025-11-25T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 58,
      "raw": {
        "INR": "20INR0245",
        "Project Name": "Volunteer Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Blackjack Storage LLC",
        "POI Location": "7216 Lockhart 138kV",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-16T00:00:00",
        "Screening Study Started": "2019-01-15T00:00:00",
        "Screening Study Complete": "2019-07-02T00:00:00",
        "FIS Requested": "2019-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0245",
        "Project Name": "Volunteer Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Blackjack Storage LLC",
        "POI Location": "7216 Lockhart 138kV",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-16T00:00:00",
        "Screening Study Started": "2019-01-15T00:00:00",
        "Screening Study Complete": "2019-07-02T00:00:00",
        "FIS Requested": "2019-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 59,
      "raw": {
        "INR": "20INR0246",
        "Project Name": "Ryan Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Ryan Storage LLC",
        "POI Location": "37580 TNPancake 69kV",
        "County": "Coryell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-08T00:00:00",
        "Screening Study Started": "2019-01-15T00:00:00",
        "Screening Study Complete": "2019-04-05T00:00:00",
        "FIS Requested": "2019-03-15T00:00:00",
        "FIS Approved": "2025-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2022-08-03T00:00:00",
        "Meets All Planning": "2026-01-27T00:00:00",
        "Unnamed: 25": "2026-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0246",
        "Project Name": "Ryan Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Ryan Storage LLC",
        "POI Location": "37580 TNPancake 69kV",
        "County": "Coryell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-08T00:00:00",
        "Screening Study Started": "2019-01-15T00:00:00",
        "Screening Study Complete": "2019-04-05T00:00:00",
        "FIS Requested": "2019-03-15T00:00:00",
        "FIS Approved": "2025-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2022-08-03T00:00:00",
        "Meets All Planning": "2026-01-27T00:00:00",
        "Unnamed: 25": "2026-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 60,
      "raw": {
        "INR": "20INR0247",
        "Project Name": "Water Valley Wind Energy",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Water Valley Wind Energy, LLC",
        "POI Location": "345 kV 76009 Twin Buttes to 76090 Divide Double Circuit ",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-10T00:00:00",
        "Screening Study Started": "2019-01-15T00:00:00",
        "Screening Study Complete": "2019-03-29T00:00:00",
        "FIS Requested": "2019-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0247",
        "Project Name": "Water Valley Wind Energy",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Water Valley Wind Energy, LLC",
        "POI Location": "345 kV 76009 Twin Buttes to 76090 Divide Double Circuit ",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-01-10T00:00:00",
        "Screening Study Started": "2019-01-15T00:00:00",
        "Screening Study Complete": "2019-03-29T00:00:00",
        "FIS Requested": "2019-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 61,
      "raw": {
        "INR": "20INR0248",
        "Project Name": "DAMAZO (Second Division) SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TX Gulf Solar 1 LLC",
        "POI Location": "Tap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-06T00:00:00",
        "Screening Study Started": "2019-03-28T00:00:00",
        "Screening Study Complete": "2019-06-18T00:00:00",
        "FIS Requested": "2019-07-29T00:00:00",
        "FIS Approved": "2022-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-31T00:00:00",
        "Meets All Planning": "2023-10-31T00:00:00",
        "Unnamed: 25": "2023-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-08T00:00:00",
        "Approved for Synchronization": "2024-10-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0248",
        "Project Name": "DAMAZO (Second Division) SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TX Gulf Solar 1 LLC",
        "POI Location": "Tap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-06T00:00:00",
        "Screening Study Started": "2019-03-28T00:00:00",
        "Screening Study Complete": "2019-06-18T00:00:00",
        "FIS Requested": "2019-07-29T00:00:00",
        "FIS Approved": "2022-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-31T00:00:00",
        "Meets All Planning": "2023-10-31T00:00:00",
        "Unnamed: 25": "2023-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-08T00:00:00",
        "Approved for Synchronization": "2024-10-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 62,
      "raw": {
        "INR": "20INR0255",
        "Project Name": "Renegade Project",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Renegade Renewable LLC",
        "POI Location": "Tap 345kV 23910 Windmill - 23906 AJ Swope",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 515.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-01T00:00:00",
        "Screening Study Started": "2019-02-26T00:00:00",
        "Screening Study Complete": "2019-05-17T00:00:00",
        "FIS Requested": "2019-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2021-01-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-04-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-03-01T00:00:00",
        "Construction End": "2027-12-09T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0255",
        "Project Name": "Renegade Project",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Renegade Renewable LLC",
        "POI Location": "Tap 345kV 23910 Windmill - 23906 AJ Swope",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 515.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-01T00:00:00",
        "Screening Study Started": "2019-02-26T00:00:00",
        "Screening Study Complete": "2019-05-17T00:00:00",
        "FIS Requested": "2019-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2021-01-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-04-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-03-01T00:00:00",
        "Construction End": "2027-12-09T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 63,
      "raw": {
        "INR": "20INR0266",
        "Project Name": "Tres Bahias Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tres Bahias Solar Power LLC",
        "POI Location": "8140 Joslin 138kV",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-06-03T00:00:00",
        "Screening Study Started": "2019-03-26T00:00:00",
        "Screening Study Complete": "2019-06-11T00:00:00",
        "FIS Requested": "2019-06-03T00:00:00",
        "FIS Approved": "2022-01-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-10-07T00:00:00",
        "Meets All Planning": "2022-12-20T00:00:00",
        "Unnamed: 25": "2023-01-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-06-26T00:00:00",
        "Approved for Synchronization": "2023-09-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0266",
        "Project Name": "Tres Bahias Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tres Bahias Solar Power LLC",
        "POI Location": "8140 Joslin 138kV",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-06-03T00:00:00",
        "Screening Study Started": "2019-03-26T00:00:00",
        "Screening Study Complete": "2019-06-11T00:00:00",
        "FIS Requested": "2019-06-03T00:00:00",
        "FIS Approved": "2022-01-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-10-07T00:00:00",
        "Meets All Planning": "2022-12-20T00:00:00",
        "Unnamed: 25": "2023-01-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-06-26T00:00:00",
        "Approved for Synchronization": "2023-09-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 64,
      "raw": {
        "INR": "20INR0286",
        "Project Name": "Wise County Power Repower (CT1, CT2)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wise County Power Company LLC",
        "POI Location": "1421 Willow Creek 345kV",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-07-15T00:00:00",
        "Screening Study Started": "2019-07-25T00:00:00",
        "Screening Study Complete": "2019-10-23T00:00:00",
        "FIS Requested": "2019-07-16T00:00:00",
        "FIS Approved": "2019-10-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2001-03-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2020-01-21T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2019-12-05T00:00:00",
        "Meets Planning": "2020-01-22T00:00:00",
        "Meets All Planning": "2020-01-27T00:00:00",
        "Unnamed: 25": "2020-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "20INR0286",
        "Project Name": "Wise County Power Repower (CT1, CT2)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wise County Power Company LLC",
        "POI Location": "1421 Willow Creek 345kV",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-07-15T00:00:00",
        "Screening Study Started": "2019-07-25T00:00:00",
        "Screening Study Complete": "2019-10-23T00:00:00",
        "FIS Requested": "2019-07-16T00:00:00",
        "FIS Approved": "2019-10-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2001-03-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2020-01-21T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2019-12-05T00:00:00",
        "Meets Planning": "2020-01-22T00:00:00",
        "Meets All Planning": "2020-01-27T00:00:00",
        "Unnamed: 25": "2020-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 65,
      "raw": {
        "INR": "21INR0006",
        "Project Name": "Giddings Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pioneer Natural Resources",
        "POI Location": "71212 Upton 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-09T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 240,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-02T00:00:00",
        "Screening Study Started": "2017-09-06T00:00:00",
        "Screening Study Complete": "2019-08-19T00:00:00",
        "FIS Requested": "2020-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0006",
        "Project Name": "Giddings Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pioneer Natural Resources",
        "POI Location": "71212 Upton 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-09T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 240,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-02T00:00:00",
        "Screening Study Started": "2017-09-06T00:00:00",
        "Screening Study Complete": "2019-08-19T00:00:00",
        "FIS Requested": "2020-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 66,
      "raw": {
        "INR": "21INR0012",
        "Project Name": "Air Products GCA",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Air Products",
        "POI Location": "39140 TNTxCityMain 69kV  (Will be upgraded to 138kV)",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "ST",
        "Capacity (MW)": 14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-03-26T00:00:00",
        "Screening Study Started": "2018-06-07T00:00:00",
        "Screening Study Complete": "2018-08-01T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2023-03-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2020-03-31T00:00:00",
        "Meets Planning": "2023-03-13T00:00:00",
        "Meets All Planning": "2023-03-13T00:00:00",
        "Unnamed: 25": "2023-03-13T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-11-07T00:00:00",
        "Approved for Synchronization": "2024-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0012",
        "Project Name": "Air Products GCA",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Air Products",
        "POI Location": "39140 TNTxCityMain 69kV  (Will be upgraded to 138kV)",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "ST",
        "Capacity (MW)": 14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-03-26T00:00:00",
        "Screening Study Started": "2018-06-07T00:00:00",
        "Screening Study Complete": "2018-08-01T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2023-03-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2020-03-31T00:00:00",
        "Meets Planning": "2023-03-13T00:00:00",
        "Meets All Planning": "2023-03-13T00:00:00",
        "Unnamed: 25": "2023-03-13T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-11-07T00:00:00",
        "Approved for Synchronization": "2024-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 67,
      "raw": {
        "INR": "21INR0022",
        "Project Name": "Red Holly Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GreenGo Energy",
        "POI Location": "tap 345kV 59900 Longdraw - 79641 Farmland",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 260,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-07-11T00:00:00",
        "Screening Study Complete": "2018-08-16T00:00:00",
        "FIS Requested": "2018-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0022",
        "Project Name": "Red Holly Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GreenGo Energy",
        "POI Location": "tap 345kV 59900 Longdraw - 79641 Farmland",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 260,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-07-11T00:00:00",
        "Screening Study Complete": "2018-08-16T00:00:00",
        "FIS Requested": "2018-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 68,
      "raw": {
        "INR": "21INR0029",
        "Project Name": "Red Holly Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GreenGo Energy",
        "POI Location": "tap 345kV 59900 Longdraw - 79641 Farmland",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-07-11T00:00:00",
        "Screening Study Complete": "2018-08-16T00:00:00",
        "FIS Requested": "2018-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2020-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0029",
        "Project Name": "Red Holly Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GreenGo Energy",
        "POI Location": "tap 345kV 59900 Longdraw - 79641 Farmland",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-07-11T00:00:00",
        "Screening Study Complete": "2018-08-16T00:00:00",
        "FIS Requested": "2018-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2020-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 69,
      "raw": {
        "INR": "21INR0031",
        "Project Name": "Indigo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-16T00:00:00",
        "Screening Study Started": "2018-09-27T00:00:00",
        "Screening Study Complete": "2018-11-20T00:00:00",
        "FIS Requested": "2019-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0031",
        "Project Name": "Indigo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-16T00:00:00",
        "Screening Study Started": "2018-09-27T00:00:00",
        "Screening Study Complete": "2018-11-20T00:00:00",
        "FIS Requested": "2019-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 70,
      "raw": {
        "INR": "21INR0033",
        "Project Name": "Red Holly Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GreenGo Energy",
        "POI Location": "tap 345kV 59900 Longdraw - 79641 Farmland",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-09-27T00:00:00",
        "Screening Study Complete": "2018-12-18T00:00:00",
        "FIS Requested": "2018-12-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0033",
        "Project Name": "Red Holly Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GreenGo Energy",
        "POI Location": "tap 345kV 59900 Longdraw - 79641 Farmland",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-09-27T00:00:00",
        "Screening Study Complete": "2018-12-18T00:00:00",
        "FIS Requested": "2018-12-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-10-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 71,
      "raw": {
        "INR": "21INR0203",
        "Project Name": "Eastbell Milam Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "EDP RENEWABLES NORTH AMERICA LLC",
        "POI Location": "345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 244.86,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-04-23T00:00:00",
        "Screening Study Started": "2018-10-10T00:00:00",
        "Screening Study Complete": "2018-12-09T00:00:00",
        "FIS Requested": "2019-04-23T00:00:00",
        "FIS Approved": "2022-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-09-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-11-03T00:00:00",
        "Meets All Planning": "2022-11-03T00:00:00",
        "Unnamed: 25": "2022-11-12T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-10-13T00:00:00",
        "Approved for Synchronization": "2023-11-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0203",
        "Project Name": "Eastbell Milam Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "EDP RENEWABLES NORTH AMERICA LLC",
        "POI Location": "345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 244.86,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-04-23T00:00:00",
        "Screening Study Started": "2018-10-10T00:00:00",
        "Screening Study Complete": "2018-12-09T00:00:00",
        "FIS Requested": "2019-04-23T00:00:00",
        "FIS Approved": "2022-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-09-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-11-03T00:00:00",
        "Meets All Planning": "2022-11-03T00:00:00",
        "Unnamed: 25": "2022-11-12T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-10-13T00:00:00",
        "Approved for Synchronization": "2023-11-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 72,
      "raw": {
        "INR": "21INR0207",
        "Project Name": "Quantum Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP QUANTUM II, LLC",
        "POI Location": "60089 Kilby Station 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-11-07T00:00:00",
        "Screening Study Started": "2018-09-27T00:00:00",
        "Screening Study Complete": "2018-11-14T00:00:00",
        "FIS Requested": "2018-11-07T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2025-08-04T00:00:00",
        "Unnamed: 25": "2025-08-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-06T00:00:00",
        "Approved for Synchronization": "2026-04-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0207",
        "Project Name": "Quantum Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP QUANTUM II, LLC",
        "POI Location": "60089 Kilby Station 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-11-07T00:00:00",
        "Screening Study Started": "2018-09-27T00:00:00",
        "Screening Study Complete": "2018-11-14T00:00:00",
        "FIS Requested": "2018-11-07T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2025-08-04T00:00:00",
        "Unnamed: 25": "2025-08-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-06T00:00:00",
        "Approved for Synchronization": "2026-04-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 73,
      "raw": {
        "INR": "21INR0210",
        "Project Name": "Adamstown Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Adams Creek Solar Project, LLC",
        "POI Location": "tap 345kV 1730 West Krum - 6111 Riley Ckt 2",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-22T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-02-04T00:00:00",
        "FIS Requested": "2019-05-16T00:00:00",
        "FIS Approved": "2026-02-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-12-19T00:00:00",
        "Meets All Planning": "2026-07-17T00:00:00",
        "Unnamed: 25": "2026-07-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0210",
        "Project Name": "Adamstown Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Adams Creek Solar Project, LLC",
        "POI Location": "tap 345kV 1730 West Krum - 6111 Riley Ckt 2",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-22T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-02-04T00:00:00",
        "FIS Requested": "2019-05-16T00:00:00",
        "FIS Approved": "2026-02-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-12-19T00:00:00",
        "Meets All Planning": "2026-07-17T00:00:00",
        "Unnamed: 25": "2026-07-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 74,
      "raw": {
        "INR": "21INR0220",
        "Project Name": "Maleza Solar",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Brush Solar LLC",
        "POI Location": "tap Blue – Hillje 345 kv Ckt.#27",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-03-07T00:00:00",
        "Screening Study Started": "2018-12-06T00:00:00",
        "Screening Study Complete": "2019-01-18T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2021-01-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2022-12-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0220",
        "Project Name": "Maleza Solar",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Brush Solar LLC",
        "POI Location": "tap Blue – Hillje 345 kv Ckt.#27",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-03-07T00:00:00",
        "Screening Study Started": "2018-12-06T00:00:00",
        "Screening Study Complete": "2019-01-18T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2021-01-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2022-12-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 75,
      "raw": {
        "INR": "21INR0221",
        "Project Name": "Samson Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Samson Solar Energy LLC",
        "POI Location": "tap both 345kV 1685 FarmersVl - 1695 Moses ckts",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-13T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-01-04T00:00:00",
        "FIS Requested": "2019-05-03T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-08-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-08-26T00:00:00",
        "Meets All Planning": "2020-10-15T00:00:00",
        "Unnamed: 25": "2020-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-06-30T00:00:00",
        "Approved for Synchronization": "2021-08-31T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0221",
        "Project Name": "Samson Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Samson Solar Energy LLC",
        "POI Location": "tap both 345kV 1685 FarmersVl - 1695 Moses ckts",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-13T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-01-04T00:00:00",
        "FIS Requested": "2019-05-03T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-08-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-08-26T00:00:00",
        "Meets All Planning": "2020-10-15T00:00:00",
        "Unnamed: 25": "2020-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-06-30T00:00:00",
        "Approved for Synchronization": "2021-08-31T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 76,
      "raw": {
        "INR": "21INR0223",
        "Project Name": "Tulsita Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Ray Ranch Solar LLC",
        "POI Location": "Tap 138kV 8590 Tuleta - 8595 Euler",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 256.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-20T00:00:00",
        "Screening Study Started": "2018-12-05T00:00:00",
        "Screening Study Complete": "2019-02-21T00:00:00",
        "FIS Requested": "2019-05-17T00:00:00",
        "FIS Approved": "2024-03-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-09-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-10-03T00:00:00",
        "Meets All Planning": "2024-02-02T00:00:00",
        "Unnamed: 25": "2024-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-22T00:00:00",
        "Approved for Synchronization": "2024-10-30T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0223",
        "Project Name": "Tulsita Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Ray Ranch Solar LLC",
        "POI Location": "Tap 138kV 8590 Tuleta - 8595 Euler",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 256.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-20T00:00:00",
        "Screening Study Started": "2018-12-05T00:00:00",
        "Screening Study Complete": "2019-02-21T00:00:00",
        "FIS Requested": "2019-05-17T00:00:00",
        "FIS Approved": "2024-03-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-09-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-10-03T00:00:00",
        "Meets All Planning": "2024-02-02T00:00:00",
        "Unnamed: 25": "2024-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-22T00:00:00",
        "Approved for Synchronization": "2024-10-30T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 77,
      "raw": {
        "INR": "21INR0240",
        "Project Name": "La Casa Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "LA CASA WIND, LLC",
        "POI Location": "New switching station:  138kV Graham Plant Switch - Breckenridge - Leon Switch ",
        "County": "Stephens",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 148.4,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-12-28T00:00:00",
        "Screening Study Complete": "2019-03-12T00:00:00",
        "FIS Requested": "2018-12-29T00:00:00",
        "FIS Approved": "2023-09-22T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-09-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-01-04T00:00:00",
        "Meets All Planning": "2024-04-29T00:00:00",
        "Unnamed: 25": "2024-04-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-10-31T00:00:00",
        "Approved for Synchronization": "2025-11-14T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0240",
        "Project Name": "La Casa Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "LA CASA WIND, LLC",
        "POI Location": "New switching station:  138kV Graham Plant Switch - Breckenridge - Leon Switch ",
        "County": "Stephens",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 148.4,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2018-12-28T00:00:00",
        "Screening Study Complete": "2019-03-12T00:00:00",
        "FIS Requested": "2018-12-29T00:00:00",
        "FIS Approved": "2023-09-22T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-09-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-01-04T00:00:00",
        "Meets All Planning": "2024-04-29T00:00:00",
        "Unnamed: 25": "2024-04-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-10-31T00:00:00",
        "Approved for Synchronization": "2025-11-14T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 78,
      "raw": {
        "INR": "21INR0247",
        "Project Name": "Anson Solar Center, Phase III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anson Solar Center 3, LLC",
        "POI Location": "tap 345kV 68000 WShack - 68001 Clayton",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0247",
        "Project Name": "Anson Solar Center, Phase III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anson Solar Center 3, LLC",
        "POI Location": "tap 345kV 68000 WShack - 68001 Clayton",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2017-06-23T00:00:00",
        "Screening Study Complete": "2017-08-07T00:00:00",
        "FIS Requested": "2018-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 79,
      "raw": {
        "INR": "21INR0253",
        "Project Name": "Ulysses Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BNB Tennyson Solar LLC",
        "POI Location": "60072 Odysseus Substation 345 kV",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 151.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-05-14T00:00:00",
        "Screening Study Started": "2019-01-25T00:00:00",
        "Screening Study Complete": "2019-04-05T00:00:00",
        "FIS Requested": "2019-05-10T00:00:00",
        "FIS Approved": "2025-12-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-10-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-12-05T00:00:00",
        "Meets All Planning": "2026-01-21T00:00:00",
        "Unnamed: 25": "2026-01-21T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-18T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0253",
        "Project Name": "Ulysses Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BNB Tennyson Solar LLC",
        "POI Location": "60072 Odysseus Substation 345 kV",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 151.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-05-14T00:00:00",
        "Screening Study Started": "2019-01-25T00:00:00",
        "Screening Study Complete": "2019-04-05T00:00:00",
        "FIS Requested": "2019-05-10T00:00:00",
        "FIS Approved": "2025-12-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-10-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-12-05T00:00:00",
        "Meets All Planning": "2026-01-21T00:00:00",
        "Unnamed: 25": "2026-01-21T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-18T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 80,
      "raw": {
        "INR": "21INR0258",
        "Project Name": "Mercury Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mercury Storage, LLC",
        "POI Location": "68092 Liberty Station 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-07T00:00:00",
        "Screening Study Started": "2019-02-14T00:00:00",
        "Screening Study Complete": "2019-05-03T00:00:00",
        "FIS Requested": "2019-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0258",
        "Project Name": "Mercury Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mercury Storage, LLC",
        "POI Location": "68092 Liberty Station 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-07T00:00:00",
        "Screening Study Started": "2019-02-14T00:00:00",
        "Screening Study Complete": "2019-05-03T00:00:00",
        "FIS Requested": "2019-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 81,
      "raw": {
        "INR": "21INR0260",
        "Project Name": "Chariot Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Chariot Storage LLC",
        "POI Location": "tap 69kV 99 Ben Hur - 107 Prairie Hill ",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-19T00:00:00",
        "Screening Study Started": "2019-03-06T00:00:00",
        "Screening Study Complete": "2019-05-24T00:00:00",
        "FIS Requested": "2019-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0260",
        "Project Name": "Chariot Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Chariot Storage LLC",
        "POI Location": "tap 69kV 99 Ben Hur - 107 Prairie Hill ",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-19T00:00:00",
        "Screening Study Started": "2019-03-06T00:00:00",
        "Screening Study Complete": "2019-05-24T00:00:00",
        "FIS Requested": "2019-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 82,
      "raw": {
        "INR": "21INR0262",
        "Project Name": "Grandfalls Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "King Mountain Storage LLC",
        "POI Location": "tap 345kV 11028 Odessa - 76000 North McCamey ",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 175.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-14T00:00:00",
        "Screening Study Started": "2019-03-25T00:00:00",
        "Screening Study Complete": "2019-06-17T00:00:00",
        "FIS Requested": "2019-02-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2023-05-22T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0262",
        "Project Name": "Grandfalls Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "King Mountain Storage LLC",
        "POI Location": "tap 345kV 11028 Odessa - 76000 North McCamey ",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 175.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-14T00:00:00",
        "Screening Study Started": "2019-03-25T00:00:00",
        "Screening Study Complete": "2019-06-17T00:00:00",
        "FIS Requested": "2019-02-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2023-05-22T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 83,
      "raw": {
        "INR": "21INR0263",
        "Project Name": "Monarch Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MONARCH CREEK WIND, LLC",
        "POI Location": "11419 Coody Crossing Switch 345kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 283.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-28T00:00:00",
        "Screening Study Started": "2019-04-25T00:00:00",
        "Screening Study Complete": "2019-07-19T00:00:00",
        "FIS Requested": "2019-08-05T00:00:00",
        "FIS Approved": "2025-11-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-08-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-12-22T00:00:00",
        "Meets All Planning": "2026-01-26T00:00:00",
        "Unnamed: 25": "2026-01-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0263",
        "Project Name": "Monarch Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MONARCH CREEK WIND, LLC",
        "POI Location": "11419 Coody Crossing Switch 345kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 283.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-28T00:00:00",
        "Screening Study Started": "2019-04-25T00:00:00",
        "Screening Study Complete": "2019-07-19T00:00:00",
        "FIS Requested": "2019-08-05T00:00:00",
        "FIS Approved": "2025-11-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-08-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-12-22T00:00:00",
        "Meets All Planning": "2026-01-26T00:00:00",
        "Unnamed: 25": "2026-01-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 84,
      "raw": {
        "INR": "21INR0265",
        "Project Name": "Sisters Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Oberon Solar LLC",
        "POI Location": "tapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010) ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-23T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-28T00:00:00",
        "Screening Study Started": "2019-02-28T00:00:00",
        "Screening Study Complete": "2019-03-29T00:00:00",
        "FIS Requested": "2019-02-20T00:00:00",
        "FIS Approved": "2025-06-20T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0265",
        "Project Name": "Sisters Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Oberon Solar LLC",
        "POI Location": "tapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf Switching Station (Bus# 11010) ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-23T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-02-28T00:00:00",
        "Screening Study Started": "2019-02-28T00:00:00",
        "Screening Study Complete": "2019-03-29T00:00:00",
        "FIS Requested": "2019-02-20T00:00:00",
        "FIS Approved": "2025-06-20T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 85,
      "raw": {
        "INR": "21INR0268",
        "Project Name": "Greyhound Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rockhound Solar 2, LLC dba \"Greyhound Solar\"",
        "POI Location": "Tap 345kV 11010 Wolf - 1018 Moss",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 335.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-03-14T00:00:00",
        "Screening Study Started": "2019-03-28T00:00:00",
        "Screening Study Complete": "2019-06-05T00:00:00",
        "FIS Requested": "2019-03-21T00:00:00",
        "FIS Approved": "2024-10-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-01-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-11-04T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-11-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-26T00:00:00",
        "Approved for Synchronization": "2026-04-24T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0268",
        "Project Name": "Greyhound Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rockhound Solar 2, LLC dba \"Greyhound Solar\"",
        "POI Location": "Tap 345kV 11010 Wolf - 1018 Moss",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 335.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-03-14T00:00:00",
        "Screening Study Started": "2019-03-28T00:00:00",
        "Screening Study Complete": "2019-06-05T00:00:00",
        "FIS Requested": "2019-03-21T00:00:00",
        "FIS Approved": "2024-10-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-01-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-11-04T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-11-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-26T00:00:00",
        "Approved for Synchronization": "2026-04-24T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 86,
      "raw": {
        "INR": "21INR0294",
        "Project Name": "Mountaineer Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mustang Mountaineer Solar LLC",
        "POI Location": "1444 Brown 345 kV",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 329.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-11T00:00:00",
        "Screening Study Started": "2019-04-16T00:00:00",
        "Screening Study Complete": "2019-06-11T00:00:00",
        "FIS Requested": "2019-12-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0294",
        "Project Name": "Mountaineer Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mustang Mountaineer Solar LLC",
        "POI Location": "1444 Brown 345 kV",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 329.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-11T00:00:00",
        "Screening Study Started": "2019-04-16T00:00:00",
        "Screening Study Complete": "2019-06-11T00:00:00",
        "FIS Requested": "2019-12-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 87,
      "raw": {
        "INR": "21INR0324",
        "Project Name": "Board Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Limestone Wind Project, LLC",
        "POI Location": "345kV 3386 Outlaw Switch",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 299.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-08T00:00:00",
        "Screening Study Started": "2019-04-24T00:00:00",
        "Screening Study Complete": "2019-07-22T00:00:00",
        "FIS Requested": "2019-11-05T00:00:00",
        "FIS Approved": "2022-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-08-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-04-05T00:00:00",
        "Meets All Planning": "2022-04-21T00:00:00",
        "Unnamed: 25": "2022-04-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-09-19T00:00:00",
        "Approved for Synchronization": "2022-10-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0324",
        "Project Name": "Board Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Limestone Wind Project, LLC",
        "POI Location": "345kV 3386 Outlaw Switch",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 299.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-08T00:00:00",
        "Screening Study Started": "2019-04-24T00:00:00",
        "Screening Study Complete": "2019-07-22T00:00:00",
        "FIS Requested": "2019-11-05T00:00:00",
        "FIS Approved": "2022-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-08-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-04-05T00:00:00",
        "Meets All Planning": "2022-04-21T00:00:00",
        "Unnamed: 25": "2022-04-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-09-19T00:00:00",
        "Approved for Synchronization": "2022-10-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 88,
      "raw": {
        "INR": "21INR0334",
        "Project Name": "Nightfall Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BDPU SOLAR NIGHTFALL, LLC ",
        "POI Location": "138 kV Tap 8707 Dryfrio - 8234 Uvalde (new 138 kV Meil station)",
        "County": "Uvalde",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-24T00:00:00",
        "Screening Study Started": "2019-05-10T00:00:00",
        "Screening Study Complete": "2019-07-31T00:00:00",
        "FIS Requested": "2020-01-24T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-14T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-22T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0334",
        "Project Name": "Nightfall Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BDPU SOLAR NIGHTFALL, LLC ",
        "POI Location": "138 kV Tap 8707 Dryfrio - 8234 Uvalde (new 138 kV Meil station)",
        "County": "Uvalde",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-24T00:00:00",
        "Screening Study Started": "2019-05-10T00:00:00",
        "Screening Study Complete": "2019-07-31T00:00:00",
        "FIS Requested": "2020-01-24T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-14T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-22T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 89,
      "raw": {
        "INR": "21INR0341",
        "Project Name": "Space City Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Apollo Solar Ranch, LLC",
        "POI Location": "44200 Hillje 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 366,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-28T00:00:00",
        "Screening Study Started": "2019-11-01T00:00:00",
        "Screening Study Complete": "2020-03-06T00:00:00",
        "FIS Requested": "2019-10-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-01-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0341",
        "Project Name": "Space City Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Apollo Solar Ranch, LLC",
        "POI Location": "44200 Hillje 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 366,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-28T00:00:00",
        "Screening Study Started": "2019-11-01T00:00:00",
        "Screening Study Complete": "2020-03-06T00:00:00",
        "FIS Requested": "2019-10-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-01-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 90,
      "raw": {
        "INR": "21INR0362",
        "Project Name": "Oystercatcher Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Oystercatcher Solar, LLC",
        "POI Location": "tap 345kV 1906 Venus - 68091 Navarro",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-01-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 198.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-15T00:00:00",
        "Screening Study Started": "2019-05-30T00:00:00",
        "Screening Study Complete": "2019-08-07T00:00:00",
        "FIS Requested": "2019-12-20T00:00:00",
        "FIS Approved": "2025-11-13T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2021-08-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-09T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-02T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0362",
        "Project Name": "Oystercatcher Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Oystercatcher Solar, LLC",
        "POI Location": "tap 345kV 1906 Venus - 68091 Navarro",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-01-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 198.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-15T00:00:00",
        "Screening Study Started": "2019-05-30T00:00:00",
        "Screening Study Complete": "2019-08-07T00:00:00",
        "FIS Requested": "2019-12-20T00:00:00",
        "FIS Approved": "2025-11-13T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2021-08-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-09T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-02T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 91,
      "raw": {
        "INR": "21INR0371",
        "Project Name": "Pecan Prairie South",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ConnectGen Operating LLC",
        "POI Location": "CTT Yellow Wolf, bus # 79007",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 132.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-27T00:00:00",
        "Screening Study Started": "2019-08-16T00:00:00",
        "Screening Study Complete": "2019-11-05T00:00:00",
        "FIS Requested": "2019-08-22T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-24T00:00:00",
        "Meets All Planning": "2026-05-19T00:00:00",
        "Unnamed: 25": "2026-04-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0371",
        "Project Name": "Pecan Prairie South",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ConnectGen Operating LLC",
        "POI Location": "CTT Yellow Wolf, bus # 79007",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 132.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-27T00:00:00",
        "Screening Study Started": "2019-08-16T00:00:00",
        "Screening Study Complete": "2019-11-05T00:00:00",
        "FIS Requested": "2019-08-22T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-24T00:00:00",
        "Meets All Planning": "2026-05-19T00:00:00",
        "Unnamed: 25": "2026-04-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 92,
      "raw": {
        "INR": "21INR0391",
        "Project Name": "Grandslam Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Grandslam Solar, L.L.C.",
        "POI Location": "5700 Miracle Lake 138kV",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 121.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-09-03T00:00:00",
        "Screening Study Started": "2019-07-29T00:00:00",
        "Screening Study Complete": "2019-10-30T00:00:00",
        "FIS Requested": "2019-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2021-01-29T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0391",
        "Project Name": "Grandslam Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Grandslam Solar, L.L.C.",
        "POI Location": "5700 Miracle Lake 138kV",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 121.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-09-03T00:00:00",
        "Screening Study Started": "2019-07-29T00:00:00",
        "Screening Study Complete": "2019-10-30T00:00:00",
        "FIS Requested": "2019-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2021-01-29T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 93,
      "raw": {
        "INR": "21INR0421",
        "Project Name": "Armadillo Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Armadillo Solar Center, LLC ",
        "POI Location": "3387 Revolution 138kV",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.48,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-09-05T00:00:00",
        "Screening Study Started": "2019-08-28T00:00:00",
        "Screening Study Complete": "2019-11-22T00:00:00",
        "FIS Requested": "2019-08-28T00:00:00",
        "FIS Approved": "2025-10-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-31T00:00:00",
        "Unnamed: 25": "2025-10-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-27T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0421",
        "Project Name": "Armadillo Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Armadillo Solar Center, LLC ",
        "POI Location": "3387 Revolution 138kV",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.48,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2019-09-05T00:00:00",
        "Screening Study Started": "2019-08-28T00:00:00",
        "Screening Study Complete": "2019-11-22T00:00:00",
        "FIS Requested": "2019-08-28T00:00:00",
        "FIS Approved": "2025-10-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-31T00:00:00",
        "Unnamed: 25": "2025-10-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-27T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 94,
      "raw": {
        "INR": "21INR0428",
        "Project Name": "Pecan Prairie North",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CG Leon County II LLC",
        "POI Location": "CTT Yellow Wolf, bus # 79007",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 324.11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-16T00:00:00",
        "Screening Study Started": "2019-09-23T00:00:00",
        "Screening Study Complete": "2019-12-10T00:00:00",
        "FIS Requested": "2019-09-11T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-20T00:00:00",
        "Meets All Planning": "2026-05-19T00:00:00",
        "Unnamed: 25": "2026-04-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0428",
        "Project Name": "Pecan Prairie North",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CG Leon County II LLC",
        "POI Location": "CTT Yellow Wolf, bus # 79007",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 324.11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-08-16T00:00:00",
        "Screening Study Started": "2019-09-23T00:00:00",
        "Screening Study Complete": "2019-12-10T00:00:00",
        "FIS Requested": "2019-09-11T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-20T00:00:00",
        "Meets All Planning": "2026-05-19T00:00:00",
        "Unnamed: 25": "2026-04-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 95,
      "raw": {
        "INR": "21INR0444",
        "Project Name": "Long Point Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Long Point Storage, LLC",
        "POI Location": "138 KV  (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430)  ckt 02 ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-17T00:00:00",
        "Screening Study Started": "2019-11-01T00:00:00",
        "Screening Study Complete": "2020-02-05T00:00:00",
        "FIS Requested": "2020-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0444",
        "Project Name": "Long Point Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Long Point Storage, LLC",
        "POI Location": "138 KV  (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430)  ckt 02 ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-17T00:00:00",
        "Screening Study Started": "2019-11-01T00:00:00",
        "Screening Study Complete": "2020-02-05T00:00:00",
        "FIS Requested": "2020-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 96,
      "raw": {
        "INR": "21INR0455",
        "Project Name": "Independence Trail Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 16, LLC",
        "POI Location": "60501 Tesla 345kV",
        "County": "Childress",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-11T00:00:00",
        "Screening Study Started": "2019-12-03T00:00:00",
        "Screening Study Complete": "2020-02-24T00:00:00",
        "FIS Requested": "2019-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0455",
        "Project Name": "Independence Trail Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 16, LLC",
        "POI Location": "60501 Tesla 345kV",
        "County": "Childress",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-11T00:00:00",
        "Screening Study Started": "2019-12-03T00:00:00",
        "Screening Study Complete": "2020-02-24T00:00:00",
        "FIS Requested": "2019-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 97,
      "raw": {
        "INR": "21INR0456",
        "Project Name": "Maleza Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brush Storage, LLC ",
        "POI Location": "tap Blue – Hillje 345 kv Ckt.#27",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-24T00:00:00",
        "Screening Study Started": "2019-10-31T00:00:00",
        "Screening Study Complete": "2020-01-24T00:00:00",
        "FIS Requested": "2020-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0456",
        "Project Name": "Maleza Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brush Storage, LLC ",
        "POI Location": "tap Blue – Hillje 345 kv Ckt.#27",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-24T00:00:00",
        "Screening Study Started": "2019-10-31T00:00:00",
        "Screening Study Complete": "2020-01-24T00:00:00",
        "FIS Requested": "2020-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 98,
      "raw": {
        "INR": "21INR0483",
        "Project Name": "Morrow Lake Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Morrow Lake Storage, LLC",
        "POI Location": "Morrow Lake Switch 138kV (5896)\n",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-10T00:00:00",
        "Screening Study Started": "2020-02-07T00:00:00",
        "Screening Study Complete": "2020-04-30T00:00:00",
        "FIS Requested": "2020-10-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0483",
        "Project Name": "Morrow Lake Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Morrow Lake Storage, LLC",
        "POI Location": "Morrow Lake Switch 138kV (5896)\n",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-10T00:00:00",
        "Screening Study Started": "2020-02-07T00:00:00",
        "Screening Study Complete": "2020-04-30T00:00:00",
        "FIS Requested": "2020-10-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 99,
      "raw": {
        "INR": "21INR0490",
        "Project Name": "Samson Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Samson Solar Energy II LLC",
        "POI Location": "345 kV TTRSW 11688",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-14T00:00:00",
        "Screening Study Started": "2020-01-13T00:00:00",
        "Screening Study Complete": "2019-01-04T00:00:00",
        "FIS Requested": "2020-01-13T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-04-12T00:00:00",
        "Meets All Planning": "2022-08-12T00:00:00",
        "Unnamed: 25": "2022-08-12T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-08-19T00:00:00",
        "Approved for Synchronization": "2024-10-14T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0490",
        "Project Name": "Samson Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Samson Solar Energy II LLC",
        "POI Location": "345 kV TTRSW 11688",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-14T00:00:00",
        "Screening Study Started": "2020-01-13T00:00:00",
        "Screening Study Complete": "2019-01-04T00:00:00",
        "FIS Requested": "2020-01-13T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-04-12T00:00:00",
        "Meets All Planning": "2022-08-12T00:00:00",
        "Unnamed: 25": "2022-08-12T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-08-19T00:00:00",
        "Approved for Synchronization": "2024-10-14T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 100,
      "raw": {
        "INR": "21INR0491",
        "Project Name": "Samson Solar 3",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Samson Solar Energy III LLC",
        "POI Location": "tap both 345kV 1685 FarmersVl - 1695 Moses ckts",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-14T00:00:00",
        "Screening Study Started": "2020-01-13T00:00:00",
        "Screening Study Complete": "2019-01-04T00:00:00",
        "FIS Requested": "2020-01-13T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-08-27T00:00:00",
        "Meets All Planning": "2020-10-15T00:00:00",
        "Unnamed: 25": "2020-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-06-30T00:00:00",
        "Approved for Synchronization": "2021-10-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0491",
        "Project Name": "Samson Solar 3",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Samson Solar Energy III LLC",
        "POI Location": "tap both 345kV 1685 FarmersVl - 1695 Moses ckts",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-14T00:00:00",
        "Screening Study Started": "2020-01-13T00:00:00",
        "Screening Study Complete": "2019-01-04T00:00:00",
        "FIS Requested": "2020-01-13T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-08-27T00:00:00",
        "Meets All Planning": "2020-10-15T00:00:00",
        "Unnamed: 25": "2020-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-06-30T00:00:00",
        "Approved for Synchronization": "2021-10-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 101,
      "raw": {
        "INR": "21INR0492",
        "Project Name": "Stockyard Grid Batt",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Stockyard Grid, LLC",
        "POI Location": "2082 Hicks 138kV ",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-02-05T00:00:00",
        "Screening Study Started": "2020-01-13T00:00:00",
        "Screening Study Complete": "2020-03-30T00:00:00",
        "FIS Requested": "2020-01-13T00:00:00",
        "FIS Approved": "2022-07-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2022-10-26T00:00:00",
        "Meets All Planning": "2022-10-26T00:00:00",
        "Unnamed: 25": "2022-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0492",
        "Project Name": "Stockyard Grid Batt",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Stockyard Grid, LLC",
        "POI Location": "2082 Hicks 138kV ",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-02-05T00:00:00",
        "Screening Study Started": "2020-01-13T00:00:00",
        "Screening Study Complete": "2020-03-30T00:00:00",
        "FIS Requested": "2020-01-13T00:00:00",
        "FIS Approved": "2022-07-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2022-10-26T00:00:00",
        "Meets All Planning": "2022-10-26T00:00:00",
        "Unnamed: 25": "2022-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 102,
      "raw": {
        "INR": "21INR0505",
        "Project Name": "Ramsey Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hecate Energy Ramsey Storage LLC",
        "POI Location": "44200 Hillje 345kV ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-20T00:00:00",
        "Screening Study Started": "2020-05-20T00:00:00",
        "Screening Study Complete": "2020-07-30T00:00:00",
        "FIS Requested": "2020-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-08-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2023-08-18T00:00:00",
        "Meets All Planning": "2024-01-02T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0505",
        "Project Name": "Ramsey Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hecate Energy Ramsey Storage LLC",
        "POI Location": "44200 Hillje 345kV ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-20T00:00:00",
        "Screening Study Started": "2020-05-20T00:00:00",
        "Screening Study Complete": "2020-07-30T00:00:00",
        "FIS Requested": "2020-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-08-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2023-08-18T00:00:00",
        "Meets All Planning": "2024-01-02T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 103,
      "raw": {
        "INR": "21INR0509",
        "Project Name": "McClure Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "McClure Solar LLC",
        "POI Location": "tap 69kV 785 Oran - 343 Morris Sheppard",
        "County": "Palo Pinto",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-18T00:00:00",
        "Screening Study Started": "2020-06-03T00:00:00",
        "Screening Study Complete": "2020-08-18T00:00:00",
        "FIS Requested": "2021-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0509",
        "Project Name": "McClure Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "McClure Solar LLC",
        "POI Location": "tap 69kV 785 Oran - 343 Morris Sheppard",
        "County": "Palo Pinto",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-18T00:00:00",
        "Screening Study Started": "2020-06-03T00:00:00",
        "Screening Study Complete": "2020-08-18T00:00:00",
        "FIS Requested": "2021-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 104,
      "raw": {
        "INR": "21INR0520",
        "Project Name": "Yellow Viking Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Yellow Viking Development One, LLC",
        "POI Location": "Tap 345kV 1900 Comanche Peak - 11886 Timberview Switch",
        "County": "Somervell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-09T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2020-08-20T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-10-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0520",
        "Project Name": "Yellow Viking Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Yellow Viking Development One, LLC",
        "POI Location": "Tap 345kV 1900 Comanche Peak - 11886 Timberview Switch",
        "County": "Somervell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-09T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2020-08-20T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-10-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 105,
      "raw": {
        "INR": "21INR0527",
        "Project Name": "Hays Energy Unit 3 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Hays 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-02-09T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-30T00:00:00",
        "FIS Requested": "2021-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2020-11-05T00:00:00",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0527",
        "Project Name": "Hays Energy Unit 3 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Hays 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-02-09T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-30T00:00:00",
        "FIS Requested": "2021-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2020-11-05T00:00:00",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 106,
      "raw": {
        "INR": "21INR0532",
        "Project Name": "Brazos Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BRAZOS WIND VENTURES, LLC ",
        "POI Location": "1064 Sun 138kV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-11-14T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 22.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-18T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-10T00:00:00",
        "FIS Requested": "2020-11-30T00:00:00",
        "FIS Approved": "2022-04-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-08-03T00:00:00",
        "Meets All Planning": "2022-10-21T00:00:00",
        "Unnamed: 25": "2023-02-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-04-25T00:00:00",
        "Approved for Synchronization": "2023-07-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0532",
        "Project Name": "Brazos Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BRAZOS WIND VENTURES, LLC ",
        "POI Location": "1064 Sun 138kV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-11-14T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 22.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-18T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-10T00:00:00",
        "FIS Requested": "2020-11-30T00:00:00",
        "FIS Approved": "2022-04-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-08-03T00:00:00",
        "Meets All Planning": "2022-10-21T00:00:00",
        "Unnamed: 25": "2023-02-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-04-25T00:00:00",
        "Approved for Synchronization": "2023-07-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 107,
      "raw": {
        "INR": "21INR0534",
        "Project Name": "Midlothian Unit 2 repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MIDLOTHIAN ENERGY, LLC",
        "POI Location": "1939 Midlothian ELP 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-03T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-30T00:00:00",
        "FIS Requested": "2021-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0534",
        "Project Name": "Midlothian Unit 2 repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MIDLOTHIAN ENERGY, LLC",
        "POI Location": "1939 Midlothian ELP 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-03T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-30T00:00:00",
        "FIS Requested": "2021-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 108,
      "raw": {
        "INR": "21INR0538",
        "Project Name": "Blue Jay Solar II ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blue Jay Solar I, LLC",
        "POI Location": "4 Iola 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 68.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2021-04-13T00:00:00",
        "Screening Study Complete": "2021-04-14T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2021-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2020-12-02T00:00:00",
        "Meets All Planning": "2021-04-26T00:00:00",
        "Unnamed: 25": "2021-04-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-11-11T00:00:00",
        "Approved for Synchronization": "2021-11-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0538",
        "Project Name": "Blue Jay Solar II ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blue Jay Solar I, LLC",
        "POI Location": "4 Iola 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 68.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2018-02-15T00:00:00",
        "Screening Study Started": "2021-04-13T00:00:00",
        "Screening Study Complete": "2021-04-14T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2021-04-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2020-12-02T00:00:00",
        "Meets All Planning": "2021-04-26T00:00:00",
        "Unnamed: 25": "2021-04-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-11-11T00:00:00",
        "Approved for Synchronization": "2021-11-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 109,
      "raw": {
        "INR": "21INR0546",
        "Project Name": "Anchor Wind III",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RANCHLAND WIND PROJECT LLC",
        "POI Location": "345 kV Aspire Station (68011)",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-12-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-06-26T00:00:00",
        "Screening Study Started": "2021-12-03T00:00:00",
        "Screening Study Complete": "2022-03-01T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2021-04-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-11-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-12-02T00:00:00",
        "Meets All Planning": "2021-04-30T00:00:00",
        "Unnamed: 25": "2021-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-11-29T00:00:00",
        "Approved for Synchronization": "2022-12-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "21INR0546",
        "Project Name": "Anchor Wind III",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RANCHLAND WIND PROJECT LLC",
        "POI Location": "345 kV Aspire Station (68011)",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2025-12-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-06-26T00:00:00",
        "Screening Study Started": "2021-12-03T00:00:00",
        "Screening Study Complete": "2022-03-01T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2021-04-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-11-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-12-02T00:00:00",
        "Meets All Planning": "2021-04-30T00:00:00",
        "Unnamed: 25": "2021-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2021-11-29T00:00:00",
        "Approved for Synchronization": "2022-12-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 110,
      "raw": {
        "INR": "22INR0202",
        "Project Name": "Delilah Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Delilah Solar Energy LLC",
        "POI Location": "tap both 345kV 1685 FarmersVl - 1695 Moses ckts",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-13T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-01-03T00:00:00",
        "FIS Requested": "2019-05-03T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-23T00:00:00",
        "Meets All Planning": "2021-03-23T00:00:00",
        "Unnamed: 25": "2021-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-07-11T00:00:00",
        "Approved for Synchronization": "2024-03-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0202",
        "Project Name": "Delilah Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Delilah Solar Energy LLC",
        "POI Location": "tap both 345kV 1685 FarmersVl - 1695 Moses ckts",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-13T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-01-03T00:00:00",
        "FIS Requested": "2019-05-03T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-23T00:00:00",
        "Meets All Planning": "2021-03-23T00:00:00",
        "Unnamed: 25": "2021-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-07-11T00:00:00",
        "Approved for Synchronization": "2024-03-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 111,
      "raw": {
        "INR": "22INR0203",
        "Project Name": "Delilah Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Delilah Solar Energy II LLC",
        "POI Location": "345 kV TTRSW 11688",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 317.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-13T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-01-03T00:00:00",
        "FIS Requested": "2019-05-03T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-23T00:00:00",
        "Meets All Planning": "2022-08-12T00:00:00",
        "Unnamed: 25": "2022-08-12T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-29T00:00:00",
        "Approved for Synchronization": "2025-01-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0203",
        "Project Name": "Delilah Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Delilah Solar Energy II LLC",
        "POI Location": "345 kV TTRSW 11688",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 317.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-13T00:00:00",
        "Screening Study Started": "2018-11-20T00:00:00",
        "Screening Study Complete": "2019-01-03T00:00:00",
        "FIS Requested": "2019-05-03T00:00:00",
        "FIS Approved": "2020-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-03-23T00:00:00",
        "Meets All Planning": "2022-08-12T00:00:00",
        "Unnamed: 25": "2022-08-12T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-29T00:00:00",
        "Approved for Synchronization": "2025-01-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 112,
      "raw": {
        "INR": "22INR0205",
        "Project Name": "Sbranch Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bernard Creek Solar, LLC",
        "POI Location": "Tap 138kV 44190 East Bernard - 44130 Caney",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 233.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-01T00:00:00",
        "Screening Study Started": "2019-01-03T00:00:00",
        "Screening Study Complete": "2019-03-13T00:00:00",
        "FIS Requested": "2019-03-29T00:00:00",
        "FIS Approved": "2021-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-07-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-10-07T00:00:00",
        "Meets All Planning": "2021-07-06T00:00:00",
        "Unnamed: 25": "2021-07-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-09-12T00:00:00",
        "Approved for Synchronization": "2023-11-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0205",
        "Project Name": "Sbranch Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bernard Creek Solar, LLC",
        "POI Location": "Tap 138kV 44190 East Bernard - 44130 Caney",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 233.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-04-01T00:00:00",
        "Screening Study Started": "2019-01-03T00:00:00",
        "Screening Study Complete": "2019-03-13T00:00:00",
        "FIS Requested": "2019-03-29T00:00:00",
        "FIS Approved": "2021-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2020-07-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2020-10-07T00:00:00",
        "Meets All Planning": "2021-07-06T00:00:00",
        "Unnamed: 25": "2021-07-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-09-12T00:00:00",
        "Approved for Synchronization": "2023-11-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 113,
      "raw": {
        "INR": "22INR0209",
        "Project Name": "Felix North Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crescent Solar, LLC",
        "POI Location": "6101 Riley 345kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-09-23T00:00:00",
        "Screening Study Started": "2019-01-17T00:00:00",
        "Screening Study Complete": "2019-04-02T00:00:00",
        "FIS Requested": "2019-09-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0209",
        "Project Name": "Felix North Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crescent Solar, LLC",
        "POI Location": "6101 Riley 345kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-09-23T00:00:00",
        "Screening Study Started": "2019-01-17T00:00:00",
        "Screening Study Complete": "2019-04-02T00:00:00",
        "FIS Requested": "2019-09-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 114,
      "raw": {
        "INR": "22INR0215",
        "Project Name": "TEXAS SOLAR NOVA 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Solar Nova 1, LLC",
        "POI Location": "tap 345kV 11305 Dermott - 59904 Cottonwood",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-28T00:00:00",
        "Screening Study Started": "2019-06-24T00:00:00",
        "Screening Study Complete": "2015-12-30T00:00:00",
        "FIS Requested": "2019-06-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0215",
        "Project Name": "TEXAS SOLAR NOVA 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Solar Nova 1, LLC",
        "POI Location": "tap 345kV 11305 Dermott - 59904 Cottonwood",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-28T00:00:00",
        "Screening Study Started": "2019-06-24T00:00:00",
        "Screening Study Complete": "2015-12-30T00:00:00",
        "FIS Requested": "2019-06-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 115,
      "raw": {
        "INR": "22INR0218",
        "Project Name": "Velociraptor Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor Solar I, LLC",
        "POI Location": "#10012 METEOR 5 Substation 345kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 241.67,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-23T00:00:00",
        "Screening Study Started": "2019-05-14T00:00:00",
        "Screening Study Complete": "2019-08-05T00:00:00",
        "FIS Requested": "2019-05-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0218",
        "Project Name": "Velociraptor Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor Solar I, LLC",
        "POI Location": "#10012 METEOR 5 Substation 345kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 241.67,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-23T00:00:00",
        "Screening Study Started": "2019-05-14T00:00:00",
        "Screening Study Complete": "2019-08-05T00:00:00",
        "FIS Requested": "2019-05-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 116,
      "raw": {
        "INR": "22INR0220",
        "Project Name": "Lamkin Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Commanche Solar, LLC",
        "POI Location": "tap 69kV 258 Hamilton - 273 Gustine",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.5,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-05-11T00:00:00",
        "Screening Study Started": "2019-06-24T00:00:00",
        "Screening Study Complete": "2019-09-18T00:00:00",
        "FIS Requested": "2020-03-13T00:00:00",
        "FIS Approved": "2022-07-11T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-23T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0220",
        "Project Name": "Lamkin Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Commanche Solar, LLC",
        "POI Location": "tap 69kV 258 Hamilton - 273 Gustine",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.5,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-05-11T00:00:00",
        "Screening Study Started": "2019-06-24T00:00:00",
        "Screening Study Complete": "2019-09-18T00:00:00",
        "FIS Requested": "2020-03-13T00:00:00",
        "FIS Approved": "2022-07-11T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-23T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 117,
      "raw": {
        "INR": "22INR0237",
        "Project Name": "Dragan Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Comanche Solar LLC",
        "POI Location": "1440 Comanche 345kV",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 411,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-11T00:00:00",
        "Screening Study Started": "2019-11-11T00:00:00",
        "Screening Study Complete": "2020-02-17T00:00:00",
        "FIS Requested": "2019-08-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0237",
        "Project Name": "Dragan Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Comanche Solar LLC",
        "POI Location": "1440 Comanche 345kV",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 411,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-11T00:00:00",
        "Screening Study Started": "2019-11-11T00:00:00",
        "Screening Study Complete": "2020-02-17T00:00:00",
        "FIS Requested": "2019-08-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 118,
      "raw": {
        "INR": "22INR0239",
        "Project Name": "Rockefeller Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mittel Rockefeller Storage LLC",
        "POI Location": "76003 Big Hill 345kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-20T00:00:00",
        "Screening Study Started": "2019-10-31T00:00:00",
        "Screening Study Complete": "2020-01-24T00:00:00",
        "FIS Requested": "2020-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-09-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0239",
        "Project Name": "Rockefeller Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mittel Rockefeller Storage LLC",
        "POI Location": "76003 Big Hill 345kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-20T00:00:00",
        "Screening Study Started": "2019-10-31T00:00:00",
        "Screening Study Complete": "2020-01-24T00:00:00",
        "FIS Requested": "2020-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-09-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 119,
      "raw": {
        "INR": "22INR0251",
        "Project Name": "Shaula I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Shaula Energy Project, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-27T00:00:00",
        "Screening Study Started": "2019-12-03T00:00:00",
        "Screening Study Complete": "2020-03-08T00:00:00",
        "FIS Requested": "2019-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-02-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-03-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0251",
        "Project Name": "Shaula I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Shaula Energy Project, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-11-27T00:00:00",
        "Screening Study Started": "2019-12-03T00:00:00",
        "Screening Study Complete": "2020-03-08T00:00:00",
        "FIS Requested": "2019-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-02-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-03-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 120,
      "raw": {
        "INR": "22INR0257",
        "Project Name": "Corazon Solar Phase II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BAYWA R.E. SOLAR PROJECTS",
        "POI Location": "80219 Lobo 345kV",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-16T00:00:00",
        "Screening Study Started": "2019-12-19T00:00:00",
        "Screening Study Complete": "2020-03-12T00:00:00",
        "FIS Requested": "2019-12-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0257",
        "Project Name": "Corazon Solar Phase II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BAYWA R.E. SOLAR PROJECTS",
        "POI Location": "80219 Lobo 345kV",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-16T00:00:00",
        "Screening Study Started": "2019-12-19T00:00:00",
        "Screening Study Complete": "2020-03-12T00:00:00",
        "FIS Requested": "2019-12-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2020-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 121,
      "raw": {
        "INR": "22INR0262",
        "Project Name": "Sequoia II Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ENBRIDGE SOLAR SEQUOIA II LLC",
        "POI Location": "68051 Reata 345kV",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-01-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 417.47,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-09-02T00:00:00",
        "Screening Study Started": "2020-01-22T00:00:00",
        "Screening Study Complete": "2020-04-08T00:00:00",
        "FIS Requested": "2020-08-27T00:00:00",
        "FIS Approved": "2026-03-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-08-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-22T00:00:00",
        "Meets All Planning": "2026-04-28T00:00:00",
        "Unnamed: 25": "2026-04-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0262",
        "Project Name": "Sequoia II Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ENBRIDGE SOLAR SEQUOIA II LLC",
        "POI Location": "68051 Reata 345kV",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-01-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 417.47,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-09-02T00:00:00",
        "Screening Study Started": "2020-01-22T00:00:00",
        "Screening Study Complete": "2020-04-08T00:00:00",
        "FIS Requested": "2020-08-27T00:00:00",
        "FIS Approved": "2026-03-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-08-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-22T00:00:00",
        "Meets All Planning": "2026-04-28T00:00:00",
        "Unnamed: 25": "2026-04-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 122,
      "raw": {
        "INR": "22INR0267",
        "Project Name": "Shaula II Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Shaula Energy Project II, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-27T00:00:00",
        "Screening Study Started": "2019-12-18T00:00:00",
        "Screening Study Complete": "2020-03-12T00:00:00",
        "FIS Requested": "2019-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-04-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-03-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0267",
        "Project Name": "Shaula II Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Shaula Energy Project II, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-27T00:00:00",
        "Screening Study Started": "2019-12-18T00:00:00",
        "Screening Study Complete": "2020-03-12T00:00:00",
        "FIS Requested": "2019-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-04-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-03-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 123,
      "raw": {
        "INR": "22INR0274",
        "Project Name": "Crowded Star Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jones City Solar II, LLC",
        "POI Location": "tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 189.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-23T00:00:00",
        "Screening Study Started": "2020-03-26T00:00:00",
        "Screening Study Complete": "2020-06-05T00:00:00",
        "FIS Requested": "2021-03-24T00:00:00",
        "FIS Approved": "2024-11-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-12-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-22T00:00:00",
        "Approved for Synchronization": "2026-07-08T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0274",
        "Project Name": "Crowded Star Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jones City Solar II, LLC",
        "POI Location": "tap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substation: Open Sky 68014)",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 189.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-05-23T00:00:00",
        "Screening Study Started": "2020-03-26T00:00:00",
        "Screening Study Complete": "2020-06-05T00:00:00",
        "FIS Requested": "2021-03-24T00:00:00",
        "FIS Approved": "2024-11-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-12-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-22T00:00:00",
        "Approved for Synchronization": "2026-07-08T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 124,
      "raw": {
        "INR": "22INR0279",
        "Project Name": "Clutch City Solar Phase I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HZ Solar I, LLC",
        "POI Location": "tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-03-16T00:00:00",
        "Screening Study Started": "2020-01-22T00:00:00",
        "Screening Study Complete": "2020-04-08T00:00:00",
        "FIS Requested": "2020-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-09-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0279",
        "Project Name": "Clutch City Solar Phase I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HZ Solar I, LLC",
        "POI Location": "tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-03-16T00:00:00",
        "Screening Study Started": "2020-01-22T00:00:00",
        "Screening Study Complete": "2020-04-08T00:00:00",
        "FIS Requested": "2020-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-09-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 125,
      "raw": {
        "INR": "22INR0281",
        "Project Name": "Pink Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Pink Solar, LLC",
        "POI Location": "971 Pruitt 138kV",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.41,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-21T00:00:00",
        "Screening Study Started": "2020-01-30T00:00:00",
        "Screening Study Complete": "2020-04-20T00:00:00",
        "FIS Requested": "2020-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-08-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0281",
        "Project Name": "Pink Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Pink Solar, LLC",
        "POI Location": "971 Pruitt 138kV",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.41,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-21T00:00:00",
        "Screening Study Started": "2020-01-30T00:00:00",
        "Screening Study Complete": "2020-04-20T00:00:00",
        "FIS Requested": "2020-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-08-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 126,
      "raw": {
        "INR": "22INR0301",
        "Project Name": "Fortuna Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables Development, LLC",
        "POI Location": "Tap 345kV 1429 Jacksboro -  1730 WKrum",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 295.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-18T00:00:00",
        "Screening Study Started": "2020-03-06T00:00:00",
        "Screening Study Complete": "2020-05-27T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": "2024-05-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0301",
        "Project Name": "Fortuna Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables Development, LLC",
        "POI Location": "Tap 345kV 1429 Jacksboro -  1730 WKrum",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 295.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-18T00:00:00",
        "Screening Study Started": "2020-03-06T00:00:00",
        "Screening Study Complete": "2020-05-27T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": "2024-05-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 127,
      "raw": {
        "INR": "22INR0314",
        "Project Name": "Lan Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BR Solar, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – 1692 Paris Switch",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 182.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-12T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-07T00:00:00",
        "FIS Requested": "2021-01-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0314",
        "Project Name": "Lan Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BR Solar, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – 1692 Paris Switch",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 182.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-12T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-07T00:00:00",
        "FIS Requested": "2021-01-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 128,
      "raw": {
        "INR": "22INR0330",
        "Project Name": "Old Aqueduct Batt",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Old Aqueduct LLC",
        "POI Location": "23920 Blackwater 345kV ",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-07-24T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-13T00:00:00",
        "FIS Requested": "2020-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0330",
        "Project Name": "Old Aqueduct Batt",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Old Aqueduct LLC",
        "POI Location": "23920 Blackwater 345kV ",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-07-24T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-13T00:00:00",
        "FIS Requested": "2020-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 129,
      "raw": {
        "INR": "22INR0332",
        "Project Name": "Brantley Branch Batt",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brantley Branch LLC",
        "POI Location": "Mt. Enterprise (Bus # 3116) – Martin Lake 345kv Line (Bus # 3100",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 302.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-07T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-15T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0332",
        "Project Name": "Brantley Branch Batt",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brantley Branch LLC",
        "POI Location": "Mt. Enterprise (Bus # 3116) – Martin Lake 345kv Line (Bus # 3100",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 302.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-07T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-15T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 130,
      "raw": {
        "INR": "22INR0342",
        "Project Name": "Matagorda Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Matagorda Solar Farm, LLC",
        "POI Location": "5555 Shropshire 69kV ",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-08T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-15T00:00:00",
        "FIS Requested": "2020-11-05T00:00:00",
        "FIS Approved": "2021-09-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-06-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0342",
        "Project Name": "Matagorda Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Matagorda Solar Farm, LLC",
        "POI Location": "5555 Shropshire 69kV ",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-08T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-15T00:00:00",
        "FIS Requested": "2020-11-05T00:00:00",
        "FIS Approved": "2021-09-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-06-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 131,
      "raw": {
        "INR": "22INR0347",
        "Project Name": "Crater BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Crater BESS LLC",
        "POI Location": "Tap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-05-18T00:00:00",
        "Screening Study Started": "2020-05-20T00:00:00",
        "Screening Study Complete": "2020-07-30T00:00:00",
        "FIS Requested": "2020-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0347",
        "Project Name": "Crater BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Crater BESS LLC",
        "POI Location": "Tap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-05-18T00:00:00",
        "Screening Study Started": "2020-05-20T00:00:00",
        "Screening Study Complete": "2020-07-30T00:00:00",
        "FIS Requested": "2020-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 132,
      "raw": {
        "INR": "22INR0350",
        "Project Name": "Sandow Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sandow Lakes Ranch Solar I, LLC",
        "POI Location": "tap one 345kV 7040 Austrop - 13429 Sandow line",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 287.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-24T00:00:00",
        "Screening Study Started": "2020-09-11T00:00:00",
        "Screening Study Complete": "2021-02-08T00:00:00",
        "FIS Requested": "2020-05-28T00:00:00",
        "FIS Approved": "2024-07-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-11-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0350",
        "Project Name": "Sandow Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sandow Lakes Ranch Solar I, LLC",
        "POI Location": "tap one 345kV 7040 Austrop - 13429 Sandow line",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 287.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-24T00:00:00",
        "Screening Study Started": "2020-09-11T00:00:00",
        "Screening Study Complete": "2021-02-08T00:00:00",
        "FIS Requested": "2020-05-28T00:00:00",
        "FIS Approved": "2024-07-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-11-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 133,
      "raw": {
        "INR": "22INR0357",
        "Project Name": "Loma Pinta Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Loma Pinta Wind Energy, LLC",
        "POI Location": "5705 Fowlerton 138kV",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-08T00:00:00",
        "Screening Study Started": "2020-06-03T00:00:00",
        "Screening Study Complete": "2020-08-18T00:00:00",
        "FIS Requested": "2020-05-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0357",
        "Project Name": "Loma Pinta Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Loma Pinta Wind Energy, LLC",
        "POI Location": "5705 Fowlerton 138kV",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-08T00:00:00",
        "Screening Study Started": "2020-06-03T00:00:00",
        "Screening Study Complete": "2020-08-18T00:00:00",
        "FIS Requested": "2020-05-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 134,
      "raw": {
        "INR": "22INR0365",
        "Project Name": "Mensa BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Mensa BESS LLC",
        "POI Location": "60718 Pecos Valley 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 308.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-07-03T00:00:00",
        "Screening Study Started": "2020-06-26T00:00:00",
        "Screening Study Complete": "2020-09-14T00:00:00",
        "FIS Requested": "2020-06-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0365",
        "Project Name": "Mensa BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Mensa BESS LLC",
        "POI Location": "60718 Pecos Valley 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 308.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-07-03T00:00:00",
        "Screening Study Started": "2020-06-26T00:00:00",
        "Screening Study Complete": "2020-09-14T00:00:00",
        "FIS Requested": "2020-06-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 135,
      "raw": {
        "INR": "22INR0374",
        "Project Name": "Inertia Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Inertia Solar Project, LLC",
        "POI Location": "tap 345kV 60515 Clear Crossing - 6104 Smoky Hill",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 202.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-26T00:00:00",
        "Screening Study Started": "2021-02-02T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2020-10-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-05-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0374",
        "Project Name": "Inertia Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Inertia Solar Project, LLC",
        "POI Location": "tap 345kV 60515 Clear Crossing - 6104 Smoky Hill",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 202.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-26T00:00:00",
        "Screening Study Started": "2021-02-02T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2020-10-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-05-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 136,
      "raw": {
        "INR": "22INR0383",
        "Project Name": "BRP Musca BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Musca BESS LLC ",
        "POI Location": "60361 Santa Rita 138kV",
        "County": "Reagan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-13T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0383",
        "Project Name": "BRP Musca BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Musca BESS LLC ",
        "POI Location": "60361 Santa Rita 138kV",
        "County": "Reagan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-13T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 137,
      "raw": {
        "INR": "22INR0385",
        "Project Name": "BRP Pictor BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Pictor BESS LLC",
        "POI Location": "60400 Lynx 138kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.07,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-08-13T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0385",
        "Project Name": "BRP Pictor BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Pictor BESS LLC",
        "POI Location": "60400 Lynx 138kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.07,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-08-13T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 138,
      "raw": {
        "INR": "22INR0386",
        "Project Name": "BRP Octans BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP OCTANS BESS LLC ",
        "POI Location": "6671 Tombstone 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 129.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-13T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0386",
        "Project Name": "BRP Octans BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP OCTANS BESS LLC ",
        "POI Location": "6671 Tombstone 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 129.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-13T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 139,
      "raw": {
        "INR": "22INR0387",
        "Project Name": "Val Vista Grid BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Val Vista Grid, LLC",
        "POI Location": "Tap 345kV 8383 North Edinburg - 80137 Stewart Road",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-04T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-16T00:00:00",
        "FIS Requested": "2020-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0387",
        "Project Name": "Val Vista Grid BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Val Vista Grid, LLC",
        "POI Location": "Tap 345kV 8383 North Edinburg - 80137 Stewart Road",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-04T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-16T00:00:00",
        "FIS Requested": "2020-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 140,
      "raw": {
        "INR": "22INR0392",
        "Project Name": "Kalina Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "8606 Goddard 345kV ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-31T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0392",
        "Project Name": "Kalina Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "8606 Goddard 345kV ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-31T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 141,
      "raw": {
        "INR": "22INR0400",
        "Project Name": "Dragan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Grid Dragan Storage LLC",
        "POI Location": "1440 Comanche 345kV",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 408.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-02T00:00:00",
        "Screening Study Started": "2020-08-21T00:00:00",
        "Screening Study Complete": "2020-11-04T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0400",
        "Project Name": "Dragan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Grid Dragan Storage LLC",
        "POI Location": "1440 Comanche 345kV",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 408.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-02T00:00:00",
        "Screening Study Started": "2020-08-21T00:00:00",
        "Screening Study Complete": "2020-11-04T00:00:00",
        "FIS Requested": "2020-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 142,
      "raw": {
        "INR": "22INR0401",
        "Project Name": "Eval Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hecate Grid East Valley Storage LLC",
        "POI Location": "80229 Cavazos 138kV ",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-29T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2020-11-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-02-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-14T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0401",
        "Project Name": "Eval Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hecate Grid East Valley Storage LLC",
        "POI Location": "80229 Cavazos 138kV ",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-29T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2020-11-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-02-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-14T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 143,
      "raw": {
        "INR": "22INR0402",
        "Project Name": "Frye Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Frye Storage LLC",
        "POI Location": "new 345kV sub Kress connecting both 23912 Ogallala - 23914 Tule Canyon circuits",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 503.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-26T00:00:00",
        "Screening Study Started": "2020-09-02T00:00:00",
        "Screening Study Complete": "2020-11-19T00:00:00",
        "FIS Requested": "2020-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0402",
        "Project Name": "Frye Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Frye Storage LLC",
        "POI Location": "new 345kV sub Kress connecting both 23912 Ogallala - 23914 Tule Canyon circuits",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 503.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-26T00:00:00",
        "Screening Study Started": "2020-09-02T00:00:00",
        "Screening Study Complete": "2020-11-19T00:00:00",
        "FIS Requested": "2020-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 144,
      "raw": {
        "INR": "22INR0423",
        "Project Name": "Quela BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Quela BESS LLC",
        "POI Location": "Tap 138kV 5110 J.T. Deely - 5294 Martinez ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.41,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-25T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0423",
        "Project Name": "Quela BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Quela BESS LLC",
        "POI Location": "Tap 138kV 5110 J.T. Deely - 5294 Martinez ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.41,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-25T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 145,
      "raw": {
        "INR": "22INR0425",
        "Project Name": "MAKALU SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green X LLC",
        "POI Location": "Tap 138kV 977 Pruitt - 971 Greenville ",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-17T00:00:00",
        "Screening Study Started": "2021-01-21T00:00:00",
        "Screening Study Complete": "2021-01-28T00:00:00",
        "FIS Requested": "2021-08-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0425",
        "Project Name": "MAKALU SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green X LLC",
        "POI Location": "Tap 138kV 977 Pruitt - 971 Greenville ",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-17T00:00:00",
        "Screening Study Started": "2021-01-21T00:00:00",
        "Screening Study Complete": "2021-01-28T00:00:00",
        "FIS Requested": "2021-08-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 146,
      "raw": {
        "INR": "22INR0426",
        "Project Name": "LUBIO SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BDPU Solar Lubio LLC",
        "POI Location": "tap 138kV 2727 Crandall - 2724 Kaufman Northwest",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 54.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-01T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2021-06-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-11-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0426",
        "Project Name": "LUBIO SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BDPU Solar Lubio LLC",
        "POI Location": "tap 138kV 2727 Crandall - 2724 Kaufman Northwest",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 54.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-01T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2021-06-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-11-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 147,
      "raw": {
        "INR": "22INR0427",
        "Project Name": "BRP Kabru BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Kabru BESS LLC",
        "POI Location": "1159 Andrew North - 11284 Blackbird 138kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-28T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2020-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0427",
        "Project Name": "BRP Kabru BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Kabru BESS LLC",
        "POI Location": "1159 Andrew North - 11284 Blackbird 138kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-28T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2020-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 148,
      "raw": {
        "INR": "22INR0437",
        "Project Name": "TORMES SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BDPU SOLAR TORMES LLC",
        "POI Location": "tap 345kV 1906 Venus - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 356.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-26T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2021-07-19T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-04-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0437",
        "Project Name": "TORMES SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BDPU SOLAR TORMES LLC",
        "POI Location": "tap 345kV 1906 Venus - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 356.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-26T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2021-07-19T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-04-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 149,
      "raw": {
        "INR": "22INR0443",
        "Project Name": "Bowstring BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Longbow Energy Storage, LLC",
        "POI Location": "138kV 8961 WHITEPT4A - 8418 RINCON4A",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-01T00:00:00",
        "Screening Study Started": "2020-11-18T00:00:00",
        "Screening Study Complete": "2021-02-09T00:00:00",
        "FIS Requested": "2021-03-24T00:00:00",
        "FIS Approved": "2023-05-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-09-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-23T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0443",
        "Project Name": "Bowstring BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Longbow Energy Storage, LLC",
        "POI Location": "138kV 8961 WHITEPT4A - 8418 RINCON4A",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-01T00:00:00",
        "Screening Study Started": "2020-11-18T00:00:00",
        "Screening Study Complete": "2021-02-09T00:00:00",
        "FIS Requested": "2021-03-24T00:00:00",
        "FIS Approved": "2023-05-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-09-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-23T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 150,
      "raw": {
        "INR": "22INR0454",
        "Project Name": "Wallace Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Delaware Ranch Solar, LLC",
        "POI Location": "Delaware River SW (11112)",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-04T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-10T00:00:00",
        "FIS Requested": "2020-12-17T00:00:00",
        "FIS Approved": "2026-03-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-02-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-18T00:00:00",
        "Meets All Planning": "2026-04-22T00:00:00",
        "Unnamed: 25": "2026-04-22T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0454",
        "Project Name": "Wallace Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Delaware Ranch Solar, LLC",
        "POI Location": "Delaware River SW (11112)",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-04T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-10T00:00:00",
        "FIS Requested": "2020-12-17T00:00:00",
        "FIS Approved": "2026-03-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-02-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-18T00:00:00",
        "Meets All Planning": "2026-04-22T00:00:00",
        "Unnamed: 25": "2026-04-22T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 151,
      "raw": {
        "INR": "22INR0455",
        "Project Name": "Blue Sky Sol",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Blue Sky Solar LLC",
        "POI Location": "6562 Friends Ranch 138kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-09T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-16T00:00:00",
        "FIS Requested": "2020-11-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-02-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-02-07T00:00:00",
        "Meets All Planning": "2023-07-31T00:00:00",
        "Unnamed: 25": "2023-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0455",
        "Project Name": "Blue Sky Sol",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Blue Sky Solar LLC",
        "POI Location": "6562 Friends Ranch 138kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-09T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-16T00:00:00",
        "FIS Requested": "2020-11-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-02-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-02-07T00:00:00",
        "Meets All Planning": "2023-07-31T00:00:00",
        "Unnamed: 25": "2023-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 152,
      "raw": {
        "INR": "22INR0457",
        "Project Name": "Anson BAT",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Anson II Storage LLC",
        "POI Location": "tap 345 kV 68004 Phantom Hill station ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-03T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-19T00:00:00",
        "FIS Requested": "2022-02-23T00:00:00",
        "FIS Approved": "2025-03-19T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0457",
        "Project Name": "Anson BAT",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Anson II Storage LLC",
        "POI Location": "tap 345 kV 68004 Phantom Hill station ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-03T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-19T00:00:00",
        "FIS Requested": "2022-02-23T00:00:00",
        "FIS Approved": "2025-03-19T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 153,
      "raw": {
        "INR": "22INR0462",
        "Project Name": "Old Aqueduct Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Old Aqueduct Solar ",
        "POI Location": "23920 Blackwater 345kV",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 511.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-09T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-19T00:00:00",
        "FIS Requested": "2021-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0462",
        "Project Name": "Old Aqueduct Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Old Aqueduct Solar ",
        "POI Location": "23920 Blackwater 345kV",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 511.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-09T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-19T00:00:00",
        "FIS Requested": "2021-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 154,
      "raw": {
        "INR": "22INR0467",
        "Project Name": "Bird Dog Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "VESI 37 LLC",
        "POI Location": "5669 Argenta 69kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-10-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-02T00:00:00",
        "Screening Study Started": "2021-02-04T00:00:00",
        "Screening Study Complete": "2021-04-19T00:00:00",
        "FIS Requested": "2022-05-19T00:00:00",
        "FIS Approved": "2025-06-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-02-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-02-16T00:00:00",
        "Meets All Planning": "2025-08-07T00:00:00",
        "Unnamed: 25": "2025-09-22T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-05T00:00:00",
        "Approved for Synchronization": "2026-08-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0467",
        "Project Name": "Bird Dog Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "VESI 37 LLC",
        "POI Location": "5669 Argenta 69kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-10-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-02T00:00:00",
        "Screening Study Started": "2021-02-04T00:00:00",
        "Screening Study Complete": "2021-04-19T00:00:00",
        "FIS Requested": "2022-05-19T00:00:00",
        "FIS Approved": "2025-06-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-02-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-02-16T00:00:00",
        "Meets All Planning": "2025-08-07T00:00:00",
        "Unnamed: 25": "2025-09-22T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-05T00:00:00",
        "Approved for Synchronization": "2026-08-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 155,
      "raw": {
        "INR": "22INR0469",
        "Project Name": "Harper Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VESI 31 LLC",
        "POI Location": "Tap 138kV 8314 La Palma - 80229 Villa Cavazos",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 82.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-10T00:00:00",
        "Screening Study Started": "2021-12-03T00:00:00",
        "Screening Study Complete": "2022-03-01T00:00:00",
        "FIS Requested": "2022-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0469",
        "Project Name": "Harper Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VESI 31 LLC",
        "POI Location": "Tap 138kV 8314 La Palma - 80229 Villa Cavazos",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 82.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-10T00:00:00",
        "Screening Study Started": "2021-12-03T00:00:00",
        "Screening Study Complete": "2022-03-01T00:00:00",
        "FIS Requested": "2022-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 156,
      "raw": {
        "INR": "22INR0473",
        "Project Name": "TAIN SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green VII LLC",
        "POI Location": "tap 138kV 7216 Lockhart - 7224 Luling City",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 37.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-02T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-17T00:00:00",
        "FIS Requested": "2021-10-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0473",
        "Project Name": "TAIN SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green VII LLC",
        "POI Location": "tap 138kV 7216 Lockhart - 7224 Luling City",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 37.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-02T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-17T00:00:00",
        "FIS Requested": "2021-10-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 157,
      "raw": {
        "INR": "22INR0480",
        "Project Name": "Pachanga Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pachanga Wind LLC ",
        "POI Location": "tap 345kV 5966 Palmito - 80137 Stewart Rd",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-04-08T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-28T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-04-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0480",
        "Project Name": "Pachanga Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pachanga Wind LLC ",
        "POI Location": "tap 345kV 5966 Palmito - 80137 Stewart Rd",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-04-08T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-28T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-04-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 158,
      "raw": {
        "INR": "22INR0488",
        "Project Name": "Venture Hill Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 24, LLC",
        "POI Location": "7336 Gilleland Creek 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 70.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-08T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2020-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0488",
        "Project Name": "Venture Hill Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 24, LLC",
        "POI Location": "7336 Gilleland Creek 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 70.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-08T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2020-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 159,
      "raw": {
        "INR": "22INR0497",
        "Project Name": "TEXPO",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oklaunion Power Station, LLC",
        "POI Location": "6101 Riley 345 kV ",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "ST",
        "Capacity (MW)": 680,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-30T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2022-05-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0497",
        "Project Name": "TEXPO",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oklaunion Power Station, LLC",
        "POI Location": "6101 Riley 345 kV ",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "ST",
        "Capacity (MW)": 680,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-30T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2022-05-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 160,
      "raw": {
        "INR": "22INR0499",
        "Project Name": "Aquilla Lake 3 Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Aquilla Lake 3 Wind",
        "POI Location": "tap 345 kV 68040 Kopperl to 68091 Navarro",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-20T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-05T00:00:00",
        "Screening Study Started": "2021-03-08T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-02-18T00:00:00",
        "FIS Approved": "2025-09-10T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-01-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-10T00:00:00",
        "Meets All Planning": "2025-09-10T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-02T00:00:00",
        "Approved for Synchronization": "2026-07-14T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0499",
        "Project Name": "Aquilla Lake 3 Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Aquilla Lake 3 Wind",
        "POI Location": "tap 345 kV 68040 Kopperl to 68091 Navarro",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-20T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-05T00:00:00",
        "Screening Study Started": "2021-03-08T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-02-18T00:00:00",
        "FIS Approved": "2025-09-10T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-01-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-10T00:00:00",
        "Meets All Planning": "2025-09-10T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-02T00:00:00",
        "Approved for Synchronization": "2026-07-14T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 161,
      "raw": {
        "INR": "22INR0503",
        "Project Name": "Tidwell Prairie II Batt",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tidwell Prairie IIA LLC",
        "POI Location": "Tap 345kV 3400 Twin Oak - 39950 TNP One",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.62,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-03-02T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-02-17T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-01T00:00:00",
        "Meets All Planning": "2025-08-01T00:00:00",
        "Unnamed: 25": "2025-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0503",
        "Project Name": "Tidwell Prairie II Batt",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tidwell Prairie IIA LLC",
        "POI Location": "Tap 345kV 3400 Twin Oak - 39950 TNP One",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.62,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-03-02T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-02-17T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-01T00:00:00",
        "Meets All Planning": "2025-08-01T00:00:00",
        "Unnamed: 25": "2025-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 162,
      "raw": {
        "INR": "22INR0504",
        "Project Name": "Barton Branch IA",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Barton Branch IA LLC",
        "POI Location": "Tap 345kV 3400 Twin Oak - 39950 TNP One",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-02T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-02-17T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-06-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-01T00:00:00",
        "Meets All Planning": "2025-08-01T00:00:00",
        "Unnamed: 25": "2025-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0504",
        "Project Name": "Barton Branch IA",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Barton Branch IA LLC",
        "POI Location": "Tap 345kV 3400 Twin Oak - 39950 TNP One",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-02T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-02-17T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-06-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-01T00:00:00",
        "Meets All Planning": "2025-08-01T00:00:00",
        "Unnamed: 25": "2025-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 163,
      "raw": {
        "INR": "22INR0506",
        "Project Name": "Roseland Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Enel Green Power Roseland Solar, LLC",
        "POI Location": "tap 345kV 3390 Jewett - 3399 Ratsnake",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-11-05T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2019-02-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2021-10-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-12-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-26T00:00:00",
        "Meets All Planning": "2021-10-26T00:00:00",
        "Unnamed: 25": "2021-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-06-07T00:00:00",
        "Approved for Synchronization": "2022-09-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0506",
        "Project Name": "Roseland Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Enel Green Power Roseland Solar, LLC",
        "POI Location": "tap 345kV 3390 Jewett - 3399 Ratsnake",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2018-11-05T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2019-02-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": "2021-10-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2020-12-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-26T00:00:00",
        "Meets All Planning": "2021-10-26T00:00:00",
        "Unnamed: 25": "2021-10-26T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2022-06-07T00:00:00",
        "Approved for Synchronization": "2022-09-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 164,
      "raw": {
        "INR": "22INR0514",
        "Project Name": "Wang Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Yixin Solar, LLC",
        "POI Location": "tap 345kV 3409 LakeCr1 - 3414 TempSS",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-06-09T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0514",
        "Project Name": "Wang Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Yixin Solar, LLC",
        "POI Location": "tap 345kV 3409 LakeCr1 - 3414 TempSS",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-06-09T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 165,
      "raw": {
        "INR": "22INR0517",
        "Project Name": "Lane City Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Clean Energy, LLC",
        "POI Location": "44040 Bailey 345kV \n",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 199.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-05T00:00:00",
        "Screening Study Started": "2021-04-26T00:00:00",
        "Screening Study Complete": "2021-07-28T00:00:00",
        "FIS Requested": "2021-04-26T00:00:00",
        "FIS Approved": "2024-07-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-05-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-08-01T00:00:00",
        "Meets All Planning": "2024-08-01T00:00:00",
        "Unnamed: 25": "2024-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-12T00:00:00",
        "Approved for Synchronization": "2025-07-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0517",
        "Project Name": "Lane City Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Clean Energy, LLC",
        "POI Location": "44040 Bailey 345kV \n",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 199.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-05T00:00:00",
        "Screening Study Started": "2021-04-26T00:00:00",
        "Screening Study Complete": "2021-07-28T00:00:00",
        "FIS Requested": "2021-04-26T00:00:00",
        "FIS Approved": "2024-07-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-05-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-08-01T00:00:00",
        "Meets All Planning": "2024-08-01T00:00:00",
        "Unnamed: 25": "2024-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-12T00:00:00",
        "Approved for Synchronization": "2025-07-28T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 166,
      "raw": {
        "INR": "22INR0523",
        "Project Name": "Midlothian 4 repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MIDLOTHIAN ENERGY, LLC",
        "POI Location": "1940 Midlothian ANP 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-03T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-04-26T00:00:00",
        "Screening Study Complete": "2021-07-28T00:00:00",
        "FIS Requested": "2021-04-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0523",
        "Project Name": "Midlothian 4 repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MIDLOTHIAN ENERGY, LLC",
        "POI Location": "1940 Midlothian ANP 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-03T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-04-26T00:00:00",
        "Screening Study Complete": "2021-07-28T00:00:00",
        "FIS Requested": "2021-04-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 167,
      "raw": {
        "INR": "22INR0541",
        "Project Name": "ALWEST BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Castleman Power",
        "POI Location": "3114 Paltalco 138kV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-17T00:00:00",
        "Screening Study Started": "2021-08-24T00:00:00",
        "Screening Study Complete": "2021-11-15T00:00:00",
        "FIS Requested": "2021-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0541",
        "Project Name": "ALWEST BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Castleman Power",
        "POI Location": "3114 Paltalco 138kV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-17T00:00:00",
        "Screening Study Started": "2021-08-24T00:00:00",
        "Screening Study Complete": "2021-11-15T00:00:00",
        "FIS Requested": "2021-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 168,
      "raw": {
        "INR": "22INR0543",
        "Project Name": "Midlothian Unit 3 repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MIDLOTHIAN ENERGY, LLC",
        "POI Location": "1940 Midlothian ELP 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-03T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-05-21T00:00:00",
        "Screening Study Started": "2021-05-24T00:00:00",
        "Screening Study Complete": "2021-08-06T00:00:00",
        "FIS Requested": "2021-05-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0543",
        "Project Name": "Midlothian Unit 3 repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MIDLOTHIAN ENERGY, LLC",
        "POI Location": "1940 Midlothian ELP 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-03T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-05-21T00:00:00",
        "Screening Study Started": "2021-05-24T00:00:00",
        "Screening Study Complete": "2021-08-06T00:00:00",
        "FIS Requested": "2021-05-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 169,
      "raw": {
        "INR": "22INR0546",
        "Project Name": "Enchanted Rock NEWPP",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Generate ER-NG, LLC",
        "POI Location": "40475 Deusen 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 30,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-01T00:00:00",
        "Screening Study Started": "2021-11-10T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": "2024-04-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-04-25T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2024-04-30T00:00:00",
        "Meets Planning": "2024-05-01T00:00:00",
        "Meets All Planning": "2024-05-01T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0546",
        "Project Name": "Enchanted Rock NEWPP",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Generate ER-NG, LLC",
        "POI Location": "40475 Deusen 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 30,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-01T00:00:00",
        "Screening Study Started": "2021-11-10T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": "2024-04-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-04-25T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2024-04-30T00:00:00",
        "Meets Planning": "2024-05-01T00:00:00",
        "Meets All Planning": "2024-05-01T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 170,
      "raw": {
        "INR": "22INR0552",
        "Project Name": "Sowers Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sowers Energy Storage LLC",
        "POI Location": "6894 Rose Hill_RC Sub 138 kV",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-17T00:00:00",
        "Screening Study Started": "2021-08-18T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2021-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-04-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2022-12-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0552",
        "Project Name": "Sowers Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sowers Energy Storage LLC",
        "POI Location": "6894 Rose Hill_RC Sub 138 kV",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-17T00:00:00",
        "Screening Study Started": "2021-08-18T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2021-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-04-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2022-12-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 171,
      "raw": {
        "INR": "22INR0558",
        "Project Name": "Callisto II Energy Center",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Callisto II Energy Center LLC",
        "POI Location": "47150 HO Clarke 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-10-07T00:00:00",
        "Screening Study Started": "2021-10-07T00:00:00",
        "Screening Study Complete": "2021-12-08T00:00:00",
        "FIS Requested": "2021-09-29T00:00:00",
        "FIS Approved": "2025-08-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-22T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-09-11T00:00:00",
        "Unnamed: 25": "2025-10-23T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0558",
        "Project Name": "Callisto II Energy Center",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Callisto II Energy Center LLC",
        "POI Location": "47150 HO Clarke 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-10-07T00:00:00",
        "Screening Study Started": "2021-10-07T00:00:00",
        "Screening Study Complete": "2021-12-08T00:00:00",
        "FIS Requested": "2021-09-29T00:00:00",
        "FIS Approved": "2025-08-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-22T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-09-11T00:00:00",
        "Unnamed: 25": "2025-10-23T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 172,
      "raw": {
        "INR": "22INR0559",
        "Project Name": "Honeycomb Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Honeycomb Solar, LLC",
        "POI Location": "69 kV Tynan Substation (#8107)",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-02-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 61.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-10-26T00:00:00",
        "Screening Study Started": "2021-11-16T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": "2025-03-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-14T00:00:00",
        "Meets All Planning": "2025-07-25T00:00:00",
        "Unnamed: 25": "2025-07-25T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0559",
        "Project Name": "Honeycomb Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Honeycomb Solar, LLC",
        "POI Location": "69 kV Tynan Substation (#8107)",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-02-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 61.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-10-26T00:00:00",
        "Screening Study Started": "2021-11-16T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": "2025-03-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-14T00:00:00",
        "Meets All Planning": "2025-07-25T00:00:00",
        "Unnamed: 25": "2025-07-25T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 173,
      "raw": {
        "INR": "22INR0586",
        "Project Name": "Hays Energy Unit 2 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Haysen 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-12-01T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-21T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0586",
        "Project Name": "Hays Energy Unit 2 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Haysen 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-12-01T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-21T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 174,
      "raw": {
        "INR": "22INR0605",
        "Project Name": "Camino Santiago Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Solar Project, LLC",
        "POI Location": "345 kV Herndon Switch Substation (#3804)",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 196.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-08T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-01-05T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-06-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "22INR0605",
        "Project Name": "Camino Santiago Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Solar Project, LLC",
        "POI Location": "345 kV Herndon Switch Substation (#3804)",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 196.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-08T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-01-05T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-06-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 175,
      "raw": {
        "INR": "23INR0006",
        "Project Name": "Sierra Madre Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sierra Madre Solar LLC",
        "POI Location": "tap 345kV 80307 Del Sol - 80225 Cenizo",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 255.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-07T00:00:00",
        "Screening Study Started": "2020-01-22T00:00:00",
        "Screening Study Complete": "2020-04-08T00:00:00",
        "FIS Requested": "2020-10-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0006",
        "Project Name": "Sierra Madre Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sierra Madre Solar LLC",
        "POI Location": "tap 345kV 80307 Del Sol - 80225 Cenizo",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 255.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-07T00:00:00",
        "Screening Study Started": "2020-01-22T00:00:00",
        "Screening Study Complete": "2020-04-08T00:00:00",
        "FIS Requested": "2020-10-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 176,
      "raw": {
        "INR": "23INR0008",
        "Project Name": "Harley Hand Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HECTATE ENERGY HARLEY HAND SOLAR LLC",
        "POI Location": "11420 Sweetwater East 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 505.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-12T00:00:00",
        "Screening Study Started": "2019-12-16T00:00:00",
        "Screening Study Complete": "2020-03-11T00:00:00",
        "FIS Requested": "2019-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0008",
        "Project Name": "Harley Hand Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HECTATE ENERGY HARLEY HAND SOLAR LLC",
        "POI Location": "11420 Sweetwater East 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 505.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-12-12T00:00:00",
        "Screening Study Started": "2019-12-16T00:00:00",
        "Screening Study Complete": "2020-03-11T00:00:00",
        "FIS Requested": "2019-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 177,
      "raw": {
        "INR": "23INR0009",
        "Project Name": "Shaula III Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shaula Energy Project III, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-12-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-13T00:00:00",
        "Screening Study Started": "2019-12-18T00:00:00",
        "Screening Study Complete": "2020-03-11T00:00:00",
        "FIS Requested": "2019-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0009",
        "Project Name": "Shaula III Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shaula Energy Project III, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-12-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-01-13T00:00:00",
        "Screening Study Started": "2019-12-18T00:00:00",
        "Screening Study Complete": "2020-03-11T00:00:00",
        "FIS Requested": "2019-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 178,
      "raw": {
        "INR": "23INR0015",
        "Project Name": "Scarlet Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Innovative Solar 416, LLC",
        "POI Location": "tap 345kV 23912 Ogallala - 23910 Windmill",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2025-08-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-16T00:00:00",
        "Screening Study Started": "2019-12-11T00:00:00",
        "Screening Study Complete": "2020-03-06T00:00:00",
        "FIS Requested": "2020-08-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0015",
        "Project Name": "Scarlet Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Innovative Solar 416, LLC",
        "POI Location": "tap 345kV 23912 Ogallala - 23910 Windmill",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2025-08-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-16T00:00:00",
        "Screening Study Started": "2019-12-11T00:00:00",
        "Screening Study Complete": "2020-03-06T00:00:00",
        "FIS Requested": "2020-08-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 179,
      "raw": {
        "INR": "23INR0026",
        "Project Name": "Baker Branch Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mockingbird Solar Center, LLC",
        "POI Location": "tap 345kV 1692 Paris - 1690 Valley",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 469.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-04-09T00:00:00",
        "Screening Study Started": "2020-03-26T00:00:00",
        "Screening Study Complete": "2020-06-04T00:00:00",
        "FIS Requested": "2020-03-05T00:00:00",
        "FIS Approved": "2023-10-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-02-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-03T00:00:00",
        "Meets All Planning": "2023-10-30T00:00:00",
        "Unnamed: 25": "2023-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-04-01T00:00:00",
        "Approved for Synchronization": "2024-04-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0026",
        "Project Name": "Baker Branch Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mockingbird Solar Center, LLC",
        "POI Location": "tap 345kV 1692 Paris - 1690 Valley",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 469.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-04-09T00:00:00",
        "Screening Study Started": "2020-03-26T00:00:00",
        "Screening Study Complete": "2020-06-04T00:00:00",
        "FIS Requested": "2020-03-05T00:00:00",
        "FIS Approved": "2023-10-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-02-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-03T00:00:00",
        "Meets All Planning": "2023-10-30T00:00:00",
        "Unnamed: 25": "2023-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-04-01T00:00:00",
        "Approved for Synchronization": "2024-04-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 180,
      "raw": {
        "INR": "23INR0027",
        "Project Name": "Clear Fork Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Clear Fork Creek Solar LLC",
        "POI Location": "Tap 345KV 5133 Elm Creek - 5323 Old Hickory",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 602.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-19T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-13T00:00:00",
        "FIS Requested": "2020-08-17T00:00:00",
        "FIS Approved": "2026-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-11-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-29T00:00:00",
        "Meets All Planning": "2026-07-28T00:00:00",
        "Unnamed: 25": "2026-07-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0027",
        "Project Name": "Clear Fork Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Clear Fork Creek Solar LLC",
        "POI Location": "Tap 345KV 5133 Elm Creek - 5323 Old Hickory",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 602.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-19T00:00:00",
        "Screening Study Started": "2020-05-01T00:00:00",
        "Screening Study Complete": "2020-07-13T00:00:00",
        "FIS Requested": "2020-08-17T00:00:00",
        "FIS Approved": "2026-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-11-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-29T00:00:00",
        "Meets All Planning": "2026-07-28T00:00:00",
        "Unnamed: 25": "2026-07-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 181,
      "raw": {
        "INR": "23INR0029",
        "Project Name": "Cedar Bayou 5 (TEF - Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "NRG Cedar Bayou 5 LLC",
        "POI Location": "40000 Cedar Bayou 345kV",
        "County": "Chambers",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 697,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-03-31T00:00:00",
        "Screening Study Started": "2020-03-26T00:00:00",
        "Screening Study Complete": "2020-06-04T00:00:00",
        "FIS Requested": "2020-03-18T00:00:00",
        "FIS Approved": "2025-05-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-01-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2021-03-17T00:00:00",
        "GHG Permit": "2021-03-17T00:00:00",
        "Water Availability": "2024-06-07T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0029",
        "Project Name": "Cedar Bayou 5 (TEF - Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "NRG Cedar Bayou 5 LLC",
        "POI Location": "40000 Cedar Bayou 345kV",
        "County": "Chambers",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 697,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2020-03-31T00:00:00",
        "Screening Study Started": "2020-03-26T00:00:00",
        "Screening Study Complete": "2020-06-04T00:00:00",
        "FIS Requested": "2020-03-18T00:00:00",
        "FIS Approved": "2025-05-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-01-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2021-03-17T00:00:00",
        "GHG Permit": "2021-03-17T00:00:00",
        "Water Availability": "2024-06-07T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 182,
      "raw": {
        "INR": "23INR0031",
        "Project Name": "Solace Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP QUANTUM, LLC.",
        "POI Location": "tap 345kV 1430 Graham - 1048 Tonkawas",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-04-21T00:00:00",
        "Screening Study Started": "2020-04-22T00:00:00",
        "Screening Study Complete": "2020-07-09T00:00:00",
        "FIS Requested": "2020-04-03T00:00:00",
        "FIS Approved": "2023-10-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-01-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-07T00:00:00",
        "Meets All Planning": "2025-07-25T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-01-30T00:00:00",
        "Approved for Synchronization": "2026-03-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0031",
        "Project Name": "Solace Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP QUANTUM, LLC.",
        "POI Location": "tap 345kV 1430 Graham - 1048 Tonkawas",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-04-21T00:00:00",
        "Screening Study Started": "2020-04-22T00:00:00",
        "Screening Study Complete": "2020-07-09T00:00:00",
        "FIS Requested": "2020-04-03T00:00:00",
        "FIS Approved": "2023-10-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-01-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-07T00:00:00",
        "Meets All Planning": "2025-07-25T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-01-30T00:00:00",
        "Approved for Synchronization": "2026-03-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 183,
      "raw": {
        "INR": "23INR0040",
        "Project Name": "Dori BQ Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunnyside Energy, LLC",
        "POI Location": "tap 138kV 47210 Holmes – 42680 Garden Villas ",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-10T00:00:00",
        "Screening Study Started": "2020-06-09T00:00:00",
        "Screening Study Complete": "2020-08-18T00:00:00",
        "FIS Requested": "2021-01-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-12-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0040",
        "Project Name": "Dori BQ Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunnyside Energy, LLC",
        "POI Location": "tap 138kV 47210 Holmes – 42680 Garden Villas ",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-10T00:00:00",
        "Screening Study Started": "2020-06-09T00:00:00",
        "Screening Study Complete": "2020-08-18T00:00:00",
        "FIS Requested": "2021-01-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-12-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 184,
      "raw": {
        "INR": "23INR0045",
        "Project Name": "Caney Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HEP Aquamarine Holdings LLC",
        "POI Location": "Tap 138kV 6829 Glen Pine - 6833 Explorer",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 121.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-02-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2021-02-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2021-12-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-12-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0045",
        "Project Name": "Caney Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HEP Aquamarine Holdings LLC",
        "POI Location": "Tap 138kV 6829 Glen Pine - 6833 Explorer",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 121.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2016-02-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2021-02-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2021-12-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-12-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 185,
      "raw": {
        "INR": "23INR0047",
        "Project Name": "Charger Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "AP Solar 4, LLC",
        "POI Location": "tap 345kV 8249 Angstrom – 5915 STP",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 397.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-07-29T00:00:00",
        "Screening Study Started": "2020-06-19T00:00:00",
        "Screening Study Complete": "2020-09-08T00:00:00",
        "FIS Requested": "2020-06-07T00:00:00",
        "FIS Approved": "2025-09-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-06-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-04-04T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2026-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-30T00:00:00",
        "Approved for Synchronization": "2026-07-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0047",
        "Project Name": "Charger Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "AP Solar 4, LLC",
        "POI Location": "tap 345kV 8249 Angstrom – 5915 STP",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 397.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-07-29T00:00:00",
        "Screening Study Started": "2020-06-19T00:00:00",
        "Screening Study Complete": "2020-09-08T00:00:00",
        "FIS Requested": "2020-06-07T00:00:00",
        "FIS Approved": "2025-09-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-06-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2022-04-04T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2026-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-30T00:00:00",
        "Approved for Synchronization": "2026-07-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 186,
      "raw": {
        "INR": "23INR0054",
        "Project Name": "Tanglewood Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Brazoria Solar, LLC",
        "POI Location": "345kV Seabreeze Substation",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-15T00:00:00",
        "Screening Study Started": "2020-07-10T00:00:00",
        "Screening Study Complete": "2020-09-28T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": "2024-06-03T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2022-11-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-02-10T00:00:00",
        "Meets All Planning": "2024-11-07T00:00:00",
        "Unnamed: 25": "2024-11-07T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-08-05T00:00:00",
        "Approved for Synchronization": "2025-08-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0054",
        "Project Name": "Tanglewood Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Brazoria Solar, LLC",
        "POI Location": "345kV Seabreeze Substation",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-15T00:00:00",
        "Screening Study Started": "2020-07-10T00:00:00",
        "Screening Study Complete": "2020-09-28T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": "2024-06-03T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2022-11-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-02-10T00:00:00",
        "Meets All Planning": "2024-11-07T00:00:00",
        "Unnamed: 25": "2024-11-07T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-08-05T00:00:00",
        "Approved for Synchronization": "2025-08-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 187,
      "raw": {
        "INR": "23INR0055",
        "Project Name": "Tabor Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quanah Solar LLC",
        "POI Location": "Tap 345kV 60504 Tesla - 61001 Jim Treece",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 506.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-31T00:00:00",
        "Screening Study Started": "2020-09-02T00:00:00",
        "Screening Study Complete": "2020-11-19T00:00:00",
        "FIS Requested": "2020-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0055",
        "Project Name": "Tabor Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quanah Solar LLC",
        "POI Location": "Tap 345kV 60504 Tesla - 61001 Jim Treece",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 506.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-31T00:00:00",
        "Screening Study Started": "2020-09-02T00:00:00",
        "Screening Study Complete": "2020-11-19T00:00:00",
        "FIS Requested": "2020-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 188,
      "raw": {
        "INR": "23INR0056",
        "Project Name": "Caliche Mound Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CIG DS1 LLC",
        "POI Location": "Mule Deer Switch 23921 (tap 345kV 23906 AJSwope -  23910 Windmill)",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-10-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 406.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-27T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-09-08T00:00:00",
        "FIS Requested": "2020-07-07T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0056",
        "Project Name": "Caliche Mound Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CIG DS1 LLC",
        "POI Location": "Mule Deer Switch 23921 (tap 345kV 23906 AJSwope -  23910 Windmill)",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-10-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 406.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-27T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-09-08T00:00:00",
        "FIS Requested": "2020-07-07T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 189,
      "raw": {
        "INR": "23INR0057",
        "Project Name": "Duffy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Duffy Project Co LLC",
        "POI Location": "Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-05T00:00:00",
        "Screening Study Started": "2020-09-11T00:00:00",
        "Screening Study Complete": "2020-11-19T00:00:00",
        "FIS Requested": "2021-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-04-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-05-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0057",
        "Project Name": "Duffy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Duffy Project Co LLC",
        "POI Location": "Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-05T00:00:00",
        "Screening Study Started": "2020-09-11T00:00:00",
        "Screening Study Complete": "2020-11-19T00:00:00",
        "FIS Requested": "2021-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-04-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-05-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 190,
      "raw": {
        "INR": "23INR0058",
        "Project Name": "Erin Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Erin Solar LLC",
        "POI Location": "44040 Bailey 345 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 208.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-15T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2021-01-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-03-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0058",
        "Project Name": "Erin Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Erin Solar LLC",
        "POI Location": "44040 Bailey 345 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 208.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-15T00:00:00",
        "Screening Study Started": "2020-07-24T00:00:00",
        "Screening Study Complete": "2020-10-08T00:00:00",
        "FIS Requested": "2021-01-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-03-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 191,
      "raw": {
        "INR": "23INR0059",
        "Project Name": "Briggs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Quantum III, LLC",
        "POI Location": "tap 345kV 60515 Clear Crossing - 60507 Pendulo",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 323.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-15T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0059",
        "Project Name": "Briggs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Quantum III, LLC",
        "POI Location": "tap 345kV 60515 Clear Crossing - 60507 Pendulo",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 323.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-15T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 192,
      "raw": {
        "INR": "23INR0061",
        "Project Name": "Noria Solar DCC",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Noria Hondo Solar LLC",
        "POI Location": "85000 Nelson Sharpe 345kV  ",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 145,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-15T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0061",
        "Project Name": "Noria Solar DCC",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Noria Hondo Solar LLC",
        "POI Location": "85000 Nelson Sharpe 345kV  ",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 145,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-15T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 193,
      "raw": {
        "INR": "23INR0062",
        "Project Name": "Noria Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Noria Hondo Solar LLC",
        "POI Location": "85000 Nelson Sharpe 345kV ",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-01T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-04-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0062",
        "Project Name": "Noria Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Noria Hondo Solar LLC",
        "POI Location": "85000 Nelson Sharpe 345kV ",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-01T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2021-03-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-04-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 194,
      "raw": {
        "INR": "23INR0066",
        "Project Name": "Accalia Point Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Accalia Point Solar LLC",
        "POI Location": "Tap 345kV 8383 North Edingburg – 79501 Kingfisher",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 190.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-10T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2021-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0066",
        "Project Name": "Accalia Point Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Accalia Point Solar LLC",
        "POI Location": "Tap 345kV 8383 North Edingburg – 79501 Kingfisher",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 190.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-10T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2021-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 195,
      "raw": {
        "INR": "23INR0070",
        "Project Name": "Chillingham Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Chillingham Solar LLC",
        "POI Location": "3687 Bell County East 345kV",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 352.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-02T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2020-08-26T00:00:00",
        "FIS Approved": "2024-01-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-02-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-01-30T00:00:00",
        "Meets All Planning": "2024-01-30T00:00:00",
        "Unnamed: 25": "2024-01-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-08-19T00:00:00",
        "Approved for Synchronization": "2024-09-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0070",
        "Project Name": "Chillingham Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Chillingham Solar LLC",
        "POI Location": "3687 Bell County East 345kV",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 352.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-02T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2020-08-26T00:00:00",
        "FIS Approved": "2024-01-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-02-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-01-30T00:00:00",
        "Meets All Planning": "2024-01-30T00:00:00",
        "Unnamed: 25": "2024-01-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-08-19T00:00:00",
        "Approved for Synchronization": "2024-09-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 196,
      "raw": {
        "INR": "23INR0071",
        "Project Name": "BRP Volans BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Volans BESS LLC",
        "POI Location": "11189 Quarry Field SW -  1074 Wink 138kV",
        "County": "Winkler",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-26T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2020-08-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0071",
        "Project Name": "BRP Volans BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Volans BESS LLC",
        "POI Location": "11189 Quarry Field SW -  1074 Wink 138kV",
        "County": "Winkler",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-26T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2020-08-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 197,
      "raw": {
        "INR": "23INR0074",
        "Project Name": "BRP Ampato BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Ampato BESS LLC",
        "POI Location": "10002 NS Crane Switch 138kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 121.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-26T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2020-08-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0074",
        "Project Name": "BRP Ampato BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Ampato BESS LLC",
        "POI Location": "10002 NS Crane Switch 138kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 121.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-26T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-10-28T00:00:00",
        "FIS Requested": "2020-08-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 198,
      "raw": {
        "INR": "23INR0075",
        "Project Name": "BRP Rhine BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Rhine BESS LLC",
        "POI Location": "Tap 345kV 11188  QUARRYFLD - 11010 WOLF",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-22T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-11-02T00:00:00",
        "FIS Requested": "2020-09-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0075",
        "Project Name": "BRP Rhine BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Rhine BESS LLC",
        "POI Location": "Tap 345kV 11188  QUARRYFLD - 11010 WOLF",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-22T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-11-02T00:00:00",
        "FIS Requested": "2020-09-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 199,
      "raw": {
        "INR": "23INR0077",
        "Project Name": "Cachena Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clear Fork Creek Solar LLC",
        "POI Location": "Tap 345KV 5133 Elmcreek - 5323 Old Hickory",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-21T00:00:00",
        "Screening Study Started": "2020-08-21T00:00:00",
        "Screening Study Complete": "2020-10-16T00:00:00",
        "FIS Requested": "2020-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0077",
        "Project Name": "Cachena Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clear Fork Creek Solar LLC",
        "POI Location": "Tap 345KV 5133 Elmcreek - 5323 Old Hickory",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-21T00:00:00",
        "Screening Study Started": "2020-08-21T00:00:00",
        "Screening Study Complete": "2020-10-16T00:00:00",
        "FIS Requested": "2020-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 200,
      "raw": {
        "INR": "23INR0078",
        "Project Name": "Shaw Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rio Lago Solar, LLC",
        "POI Location": "Tap 138kV 7146 Verde Creek - 7438 Bandera",
        "County": "Bandera",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-10-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 124.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-21T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2021-05-11T00:00:00",
        "FIS Approved": "2025-03-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-02-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-26T00:00:00",
        "Meets All Planning": "2025-04-30T00:00:00",
        "Unnamed: 25": "2025-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-04T00:00:00",
        "Approved for Synchronization": "2026-07-31T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0078",
        "Project Name": "Shaw Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rio Lago Solar, LLC",
        "POI Location": "Tap 138kV 7146 Verde Creek - 7438 Bandera",
        "County": "Bandera",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-10-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 124.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-21T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-01-12T00:00:00",
        "FIS Requested": "2021-05-11T00:00:00",
        "FIS Approved": "2025-03-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-02-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-26T00:00:00",
        "Meets All Planning": "2025-04-30T00:00:00",
        "Unnamed: 25": "2025-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-04T00:00:00",
        "Approved for Synchronization": "2026-07-31T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 201,
      "raw": {
        "INR": "23INR0080",
        "Project Name": "Soda Lake Solar 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane II Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-08T00:00:00",
        "Screening Study Started": "2020-09-11T00:00:00",
        "Screening Study Complete": "2020-11-30T00:00:00",
        "FIS Requested": "2020-08-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-03-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0080",
        "Project Name": "Soda Lake Solar 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane II Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-08T00:00:00",
        "Screening Study Started": "2020-09-11T00:00:00",
        "Screening Study Complete": "2020-11-30T00:00:00",
        "FIS Requested": "2020-08-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-03-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 202,
      "raw": {
        "INR": "23INR0086",
        "Project Name": "Hanson Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hanson Solar, LLC",
        "POI Location": "tap 345kV 1444 Brown - 11406 Central Bluff",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-08-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 398.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-30T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2021-03-25T00:00:00",
        "FIS Approved": "2026-03-26T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-09-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-07-29T00:00:00",
        "Unnamed: 25": "2026-07-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0086",
        "Project Name": "Hanson Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hanson Solar, LLC",
        "POI Location": "tap 345kV 1444 Brown - 11406 Central Bluff",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-08-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 398.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-30T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2021-03-25T00:00:00",
        "FIS Approved": "2026-03-26T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-09-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-07-29T00:00:00",
        "Unnamed: 25": "2026-07-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 203,
      "raw": {
        "INR": "23INR0087",
        "Project Name": "Kinenos Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Encino del Sol Energy, LLC",
        "POI Location": "tap 345kV 8905 North Edinburg - 8455 Lon Hill",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-28T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-10T00:00:00",
        "FIS Requested": "2020-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0087",
        "Project Name": "Kinenos Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Encino del Sol Energy, LLC",
        "POI Location": "tap 345kV 8905 North Edinburg - 8455 Lon Hill",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-08-28T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-10T00:00:00",
        "FIS Requested": "2020-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 204,
      "raw": {
        "INR": "23INR0088",
        "Project Name": "Nockenut Springs Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 STP ckt 1",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": "2025-07-07T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2023-11-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0088",
        "Project Name": "Nockenut Springs Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 STP ckt 1",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": "2025-07-07T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2023-11-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 205,
      "raw": {
        "INR": "23INR0089",
        "Project Name": "Donegal Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HE-Cottonwood Solar LLC",
        "POI Location": "59904 Cottonwood 345kV",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-08T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-07-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-14T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0089",
        "Project Name": "Donegal Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HE-Cottonwood Solar LLC",
        "POI Location": "59904 Cottonwood 345kV",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-08T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-07-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-14T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 206,
      "raw": {
        "INR": "23INR0090",
        "Project Name": "Iguala Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Iguala Solar LLC",
        "POI Location": "AEP South Texas Project (#5915) to Static (#8676) 345kV line",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-11T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2021-06-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-29T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0090",
        "Project Name": "Iguala Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Iguala Solar LLC",
        "POI Location": "AEP South Texas Project (#5915) to Static (#8676) 345kV line",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-11T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-28T00:00:00",
        "FIS Requested": "2021-06-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-29T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 207,
      "raw": {
        "INR": "23INR0091",
        "Project Name": "Cascade Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cascade Solar Energy, LLC",
        "POI Location": "43180 SAVANAH 345 kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-05T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-04-28T00:00:00",
        "FIS Approved": "2025-09-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-04-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-12-07T00:00:00",
        "Meets All Planning": "2025-10-31T00:00:00",
        "Unnamed: 25": "2025-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0091",
        "Project Name": "Cascade Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cascade Solar Energy, LLC",
        "POI Location": "43180 SAVANAH 345 kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-05T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-04-28T00:00:00",
        "FIS Approved": "2025-09-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-04-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-12-07T00:00:00",
        "Meets All Planning": "2025-10-31T00:00:00",
        "Unnamed: 25": "2025-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 208,
      "raw": {
        "INR": "23INR0094",
        "Project Name": "BRP Pyxis BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Pyxis BESS LLC",
        "POI Location": "tap 138kV 1009 Yucca - 11197 Sand Tank Pod ",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0094",
        "Project Name": "BRP Pyxis BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Pyxis BESS LLC",
        "POI Location": "tap 138kV 1009 Yucca - 11197 Sand Tank Pod ",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 209,
      "raw": {
        "INR": "23INR0104",
        "Project Name": "BRP Kamet BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Kamet BESS LLC",
        "POI Location": "Andrews North – McKenzie Draw Switch 138 kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-28T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-30T00:00:00",
        "FIS Requested": "2020-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0104",
        "Project Name": "BRP Kamet BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Kamet BESS LLC",
        "POI Location": "Andrews North – McKenzie Draw Switch 138 kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2025-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-28T00:00:00",
        "Screening Study Started": "2020-10-07T00:00:00",
        "Screening Study Complete": "2020-12-30T00:00:00",
        "FIS Requested": "2020-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 210,
      "raw": {
        "INR": "23INR0111",
        "Project Name": "PHOTON SOLAR 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 109.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-03T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": "2022-11-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-05T00:00:00",
        "Meets All Planning": "2023-01-27T00:00:00",
        "Unnamed: 25": "2023-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-05-17T00:00:00",
        "Approved for Synchronization": "2024-10-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0111",
        "Project Name": "PHOTON SOLAR 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 109.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-03T00:00:00",
        "Screening Study Started": "2020-10-23T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2020-11-24T00:00:00",
        "FIS Approved": "2022-11-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-05T00:00:00",
        "Meets All Planning": "2023-01-27T00:00:00",
        "Unnamed: 25": "2023-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-05-17T00:00:00",
        "Approved for Synchronization": "2024-10-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 211,
      "raw": {
        "INR": "23INR0116",
        "Project Name": "Cantaloupe Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Saragosa Del Sol Energy, LLC",
        "POI Location": "60716 Saragosa 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 307,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-28T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-09T00:00:00",
        "FIS Requested": "2020-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-28T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0116",
        "Project Name": "Cantaloupe Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Saragosa Del Sol Energy, LLC",
        "POI Location": "60716 Saragosa 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 307,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-10-28T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-09T00:00:00",
        "FIS Requested": "2020-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-28T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 212,
      "raw": {
        "INR": "23INR0123",
        "Project Name": "Vaca Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Long Mount Storage, LLC",
        "POI Location": "138kV 8723 Cangrejo",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-01T00:00:00",
        "Screening Study Started": "2021-03-26T00:00:00",
        "Screening Study Complete": "2021-06-14T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0123",
        "Project Name": "Vaca Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Long Mount Storage, LLC",
        "POI Location": "138kV 8723 Cangrejo",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-01T00:00:00",
        "Screening Study Started": "2021-03-26T00:00:00",
        "Screening Study Complete": "2021-06-14T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 213,
      "raw": {
        "INR": "23INR0126",
        "Project Name": "Sigma Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AES Distributed Energy, Inc",
        "POI Location": "40460 Deepwater 138kV ",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 408.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-17T00:00:00",
        "Screening Study Started": "2021-05-11T00:00:00",
        "Screening Study Complete": "2021-07-30T00:00:00",
        "FIS Requested": "2022-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2028-05-01T00:00:00",
        "Construction End": "2029-05-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0126",
        "Project Name": "Sigma Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AES Distributed Energy, Inc",
        "POI Location": "40460 Deepwater 138kV ",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 408.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-17T00:00:00",
        "Screening Study Started": "2021-05-11T00:00:00",
        "Screening Study Complete": "2021-07-30T00:00:00",
        "FIS Requested": "2022-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2028-05-01T00:00:00",
        "Construction End": "2029-05-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 214,
      "raw": {
        "INR": "23INR0127",
        "Project Name": "Beacon Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AES Distributed Energy, Inc",
        "POI Location": "40450 Deepwater 345kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 408.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-23T00:00:00",
        "Screening Study Started": "2021-05-05T00:00:00",
        "Screening Study Complete": "2021-07-27T00:00:00",
        "FIS Requested": "2022-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2028-05-01T00:00:00",
        "Construction End": "2029-05-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0127",
        "Project Name": "Beacon Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AES Distributed Energy, Inc",
        "POI Location": "40450 Deepwater 345kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 408.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-23T00:00:00",
        "Screening Study Started": "2021-05-05T00:00:00",
        "Screening Study Complete": "2021-07-27T00:00:00",
        "FIS Requested": "2022-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2028-05-01T00:00:00",
        "Construction End": "2029-05-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 215,
      "raw": {
        "INR": "23INR0135",
        "Project Name": "Elbus BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Elbus BESS LLC ",
        "POI Location": "9075 Lytton 138kV",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-30T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-18T00:00:00",
        "FIS Requested": "2020-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0135",
        "Project Name": "Elbus BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Elbus BESS LLC ",
        "POI Location": "9075 Lytton 138kV",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-30T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-18T00:00:00",
        "FIS Requested": "2020-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 216,
      "raw": {
        "INR": "23INR0137",
        "Project Name": "Diran BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BRP Diran BESS LLC",
        "POI Location": "43190 South Lane City 138kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-30T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-18T00:00:00",
        "FIS Requested": "2020-11-25T00:00:00",
        "FIS Approved": "2025-10-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-07-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0137",
        "Project Name": "Diran BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BRP Diran BESS LLC",
        "POI Location": "43190 South Lane City 138kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-30T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-18T00:00:00",
        "FIS Requested": "2020-11-25T00:00:00",
        "FIS Approved": "2025-10-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-07-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 217,
      "raw": {
        "INR": "23INR0140",
        "Project Name": "Seine BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BRP Seine BESS LLC",
        "POI Location": "60500 Edith Clarke 345kV",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 308.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-30T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-19T00:00:00",
        "FIS Requested": "2020-11-27T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0140",
        "Project Name": "Seine BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BRP Seine BESS LLC",
        "POI Location": "60500 Edith Clarke 345kV",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 308.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-30T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-19T00:00:00",
        "FIS Requested": "2020-11-27T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 218,
      "raw": {
        "INR": "23INR0143",
        "Project Name": "Sepik BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Sepik BESS LLC",
        "POI Location": "tap 138kV 11342 Loraine South – 10050 Ranger Camp",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-08T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-15T00:00:00",
        "FIS Requested": "2020-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0143",
        "Project Name": "Sepik BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Sepik BESS LLC",
        "POI Location": "tap 138kV 11342 Loraine South – 10050 Ranger Camp",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-08T00:00:00",
        "Screening Study Started": "2020-12-22T00:00:00",
        "Screening Study Complete": "2021-03-15T00:00:00",
        "FIS Requested": "2020-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 219,
      "raw": {
        "INR": "23INR0150",
        "Project Name": "Cradle Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cradle Solar LLC",
        "POI Location": "tap 345kV 42500 Dow - 43035 Oasis ckt 18",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-26T00:00:00",
        "Screening Study Started": "2021-02-04T00:00:00",
        "Screening Study Complete": "2021-04-21T00:00:00",
        "FIS Requested": "2021-03-15T00:00:00",
        "FIS Approved": "2025-03-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-03-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-04-30T00:00:00",
        "Unnamed: 25": "2025-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0150",
        "Project Name": "Cradle Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cradle Solar LLC",
        "POI Location": "tap 345kV 42500 Dow - 43035 Oasis ckt 18",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-26T00:00:00",
        "Screening Study Started": "2021-02-04T00:00:00",
        "Screening Study Complete": "2021-04-21T00:00:00",
        "FIS Requested": "2021-03-15T00:00:00",
        "FIS Approved": "2025-03-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-03-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-04-30T00:00:00",
        "Unnamed: 25": "2025-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 220,
      "raw": {
        "INR": "23INR0163",
        "Project Name": "Ringtail Ridge Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 26, LLC",
        "POI Location": "7150 Kendall 138kV",
        "County": "Kendall",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-08T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2020-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0163",
        "Project Name": "Ringtail Ridge Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 26, LLC",
        "POI Location": "7150 Kendall 138kV",
        "County": "Kendall",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-08T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2020-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 221,
      "raw": {
        "INR": "23INR0164",
        "Project Name": "Steppe Reserve Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 25, LLC",
        "POI Location": "8283 Asherton 138 kV ",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-08T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2020-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0164",
        "Project Name": "Steppe Reserve Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 25, LLC",
        "POI Location": "8283 Asherton 138 kV ",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-08T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2020-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 222,
      "raw": {
        "INR": "23INR0171",
        "Project Name": "Goodalta Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GoodAlta Power Center LLC",
        "POI Location": "tap 138kV 3127 Trinidad - 212 Winkler",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-03T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-12T00:00:00",
        "FIS Requested": "2021-01-07T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0171",
        "Project Name": "Goodalta Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GoodAlta Power Center LLC",
        "POI Location": "tap 138kV 3127 Trinidad - 212 Winkler",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-03T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-12T00:00:00",
        "FIS Requested": "2021-01-07T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 223,
      "raw": {
        "INR": "23INR0174",
        "Project Name": "Campsey Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "tap 345kV 1458 Cobb - 1429 Jacksboro",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 238.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-28T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-09-01T00:00:00",
        "FIS Approved": "2025-05-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0174",
        "Project Name": "Campsey Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "tap 345kV 1458 Cobb - 1429 Jacksboro",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 238.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-28T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-09-01T00:00:00",
        "FIS Approved": "2025-05-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 224,
      "raw": {
        "INR": "23INR0180",
        "Project Name": "Jackalope Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Peacock Energy Project, LLC",
        "POI Location": "8173 Gibbs 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-02-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 155.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-29T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-02-02T00:00:00",
        "FIS Approved": "2021-11-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-09-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-18T00:00:00",
        "Meets All Planning": "2022-10-24T00:00:00",
        "Unnamed: 25": "2023-10-19T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-07-30T00:00:00",
        "Approved for Synchronization": "2024-09-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0180",
        "Project Name": "Jackalope Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Peacock Energy Project, LLC",
        "POI Location": "8173 Gibbs 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-02-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 155.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-29T00:00:00",
        "Screening Study Started": "2021-02-09T00:00:00",
        "Screening Study Complete": "2021-05-06T00:00:00",
        "FIS Requested": "2021-02-02T00:00:00",
        "FIS Approved": "2021-11-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-09-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-10-18T00:00:00",
        "Meets All Planning": "2022-10-24T00:00:00",
        "Unnamed: 25": "2023-10-19T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-07-30T00:00:00",
        "Approved for Synchronization": "2024-09-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 225,
      "raw": {
        "INR": "23INR0183",
        "Project Name": "Pradera Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pradera Storage, LLC",
        "POI Location": "tap 345 kV Lobo 80219 - Fowlerton 5709 ckt #2",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-18T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2021-10-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0183",
        "Project Name": "Pradera Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pradera Storage, LLC",
        "POI Location": "tap 345 kV Lobo 80219 - Fowlerton 5709 ckt #2",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-18T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2021-10-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 226,
      "raw": {
        "INR": "23INR0194",
        "Project Name": "Pequin Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pequin Energy Storage, LLC",
        "POI Location": "39500 TN West Columbia 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-29T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2021-06-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0194",
        "Project Name": "Pequin Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pequin Energy Storage, LLC",
        "POI Location": "39500 TN West Columbia 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-29T00:00:00",
        "Screening Study Started": "2021-01-25T00:00:00",
        "Screening Study Complete": "2021-04-16T00:00:00",
        "FIS Requested": "2021-06-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 227,
      "raw": {
        "INR": "23INR0200",
        "Project Name": "Paradiso BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "VESI 13",
        "POI Location": "8203 Pleasanton 138kV",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-03T00:00:00",
        "Screening Study Started": "2021-03-01T00:00:00",
        "Screening Study Complete": "2021-05-13T00:00:00",
        "FIS Requested": "2021-08-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0200",
        "Project Name": "Paradiso BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "VESI 13",
        "POI Location": "8203 Pleasanton 138kV",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-03T00:00:00",
        "Screening Study Started": "2021-03-01T00:00:00",
        "Screening Study Complete": "2021-05-13T00:00:00",
        "FIS Requested": "2021-08-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 228,
      "raw": {
        "INR": "23INR0202",
        "Project Name": "Erath County Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Erath County Solar, LLC",
        "POI Location": "tap 345kV 68020 Romney1E - 68030 KopperlW",
        "County": "Erath",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 207.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-20T00:00:00",
        "Screening Study Started": "2021-03-08T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-06-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0202",
        "Project Name": "Erath County Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Erath County Solar, LLC",
        "POI Location": "tap 345kV 68020 Romney1E - 68030 KopperlW",
        "County": "Erath",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 207.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-01-20T00:00:00",
        "Screening Study Started": "2021-03-08T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-06-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 229,
      "raw": {
        "INR": "23INR0207",
        "Project Name": "El Patrimonio Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Heritage Solar, LLC",
        "POI Location": "tap 138kV 5429 Trumbo - 5260 Leon Creek ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-02T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": "2024-10-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-05-01T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0207",
        "Project Name": "El Patrimonio Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Heritage Solar, LLC",
        "POI Location": "tap 138kV 5429 Trumbo - 5260 Leon Creek ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-02T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": "2024-10-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-05-01T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 230,
      "raw": {
        "INR": "23INR0209",
        "Project Name": "Outpost Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Outpost Storage LLC",
        "POI Location": "345kv Avanzada7A (80235)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 508.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-15T00:00:00",
        "Screening Study Started": "2021-03-01T00:00:00",
        "Screening Study Complete": "2021-05-13T00:00:00",
        "FIS Requested": "2021-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0209",
        "Project Name": "Outpost Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Outpost Storage LLC",
        "POI Location": "345kv Avanzada7A (80235)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 508.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-02-15T00:00:00",
        "Screening Study Started": "2021-03-01T00:00:00",
        "Screening Study Complete": "2021-05-13T00:00:00",
        "FIS Requested": "2021-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 231,
      "raw": {
        "INR": "23INR0214",
        "Project Name": "Harley Hand Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Harley Hand Storage LLC ",
        "POI Location": "11420 Sweetwater East 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 503.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2021-03-01T00:00:00",
        "Screening Study Complete": "2021-05-13T00:00:00",
        "FIS Requested": "2022-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0214",
        "Project Name": "Harley Hand Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Harley Hand Storage LLC ",
        "POI Location": "11420 Sweetwater East 345kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 503.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2021-03-01T00:00:00",
        "Screening Study Complete": "2021-05-13T00:00:00",
        "FIS Requested": "2022-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 232,
      "raw": {
        "INR": "23INR0215",
        "Project Name": "Big River Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Grande River Solar LLC",
        "POI Location": "tap 138kV 8299 Zapata - 8957 Lopeno4A",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 104.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-09T00:00:00",
        "Screening Study Started": "2021-05-04T00:00:00",
        "Screening Study Complete": "2021-07-27T00:00:00",
        "FIS Requested": "2021-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0215",
        "Project Name": "Big River Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Grande River Solar LLC",
        "POI Location": "tap 138kV 8299 Zapata - 8957 Lopeno4A",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 104.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-09T00:00:00",
        "Screening Study Started": "2021-05-04T00:00:00",
        "Screening Study Complete": "2021-07-27T00:00:00",
        "FIS Requested": "2021-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 233,
      "raw": {
        "INR": "23INR0216",
        "Project Name": "Venus Mill Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "AIH Texas Acquisitions, LLC",
        "POI Location": "138 kV Tap #442 Rail Port - #1905 Griffith",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-11T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-09T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0216",
        "Project Name": "Venus Mill Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "AIH Texas Acquisitions, LLC",
        "POI Location": "138 kV Tap #442 Rail Port - #1905 Griffith",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-11T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-09T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 234,
      "raw": {
        "INR": "23INR0222",
        "Project Name": "Sunbelt Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rose Hill Solar LLC",
        "POI Location": "tap 138kV 6902 Talty - 6801 Patton",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-05T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-09-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0222",
        "Project Name": "Sunbelt Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rose Hill Solar LLC",
        "POI Location": "tap 138kV 6902 Talty - 6801 Patton",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-05T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-09-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 235,
      "raw": {
        "INR": "23INR0224",
        "Project Name": "Morning Glory Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Armadillo Solar, LLC",
        "POI Location": "tap 345kV 7077 Amos Creek - 76009 Twin Buttes",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 122.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2021-06-16T00:00:00",
        "Screening Study Complete": "2021-09-07T00:00:00",
        "FIS Requested": "2022-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0224",
        "Project Name": "Morning Glory Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Armadillo Solar, LLC",
        "POI Location": "tap 345kV 7077 Amos Creek - 76009 Twin Buttes",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 122.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2021-06-16T00:00:00",
        "Screening Study Complete": "2021-09-07T00:00:00",
        "FIS Requested": "2022-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 236,
      "raw": {
        "INR": "23INR0225",
        "Project Name": "MRG GOODY SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MRG GOODY SOLAR PROJECT, LLC",
        "POI Location": "Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693) ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 170.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2022-03-22T00:00:00",
        "FIS Approved": "2025-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-02-06T00:00:00",
        "Approved for Synchronization": "2026-03-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0225",
        "Project Name": "MRG GOODY SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MRG GOODY SOLAR PROJECT, LLC",
        "POI Location": "Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693) ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 170.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2022-03-22T00:00:00",
        "FIS Approved": "2025-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-02-06T00:00:00",
        "Approved for Synchronization": "2026-03-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 237,
      "raw": {
        "INR": "23INR0227",
        "Project Name": "Maleza Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brush Solar, LLC",
        "POI Location": "tap Blue – Hillje 345 kv Ckt.#27",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-24T00:00:00",
        "Screening Study Started": "2021-04-06T00:00:00",
        "Screening Study Complete": "2021-06-24T00:00:00",
        "FIS Requested": "2021-05-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0227",
        "Project Name": "Maleza Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brush Solar, LLC",
        "POI Location": "tap Blue – Hillje 345 kv Ckt.#27",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 254.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-05-24T00:00:00",
        "Screening Study Started": "2021-04-06T00:00:00",
        "Screening Study Complete": "2021-06-24T00:00:00",
        "FIS Requested": "2021-05-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 238,
      "raw": {
        "INR": "23INR0228",
        "Project Name": "Hiru Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Hazel LLC",
        "POI Location": "Tap 345kV 6111 Riley - 1730 West Krum ckt 1",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 603.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-08T00:00:00",
        "Screening Study Started": "2021-04-21T00:00:00",
        "Screening Study Complete": "2021-07-14T00:00:00",
        "FIS Requested": "2021-08-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0228",
        "Project Name": "Hiru Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Hazel LLC",
        "POI Location": "Tap 345kV 6111 Riley - 1730 West Krum ckt 1",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 603.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-08T00:00:00",
        "Screening Study Started": "2021-04-21T00:00:00",
        "Screening Study Complete": "2021-07-14T00:00:00",
        "FIS Requested": "2021-08-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 239,
      "raw": {
        "INR": "23INR0229",
        "Project Name": "CH Solterra LLC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CH Solterra LLC",
        "POI Location": "Tap 138kV 11796 White Oak POI - 11797 Brinker POI",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 143,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-17T00:00:00",
        "Screening Study Started": "2021-03-19T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2021-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0229",
        "Project Name": "CH Solterra LLC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CH Solterra LLC",
        "POI Location": "Tap 138kV 11796 White Oak POI - 11797 Brinker POI",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 143,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-03-17T00:00:00",
        "Screening Study Started": "2021-03-19T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2021-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 240,
      "raw": {
        "INR": "23INR0231",
        "Project Name": "Hoke Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hoke Solar Project, LLC",
        "POI Location": "tap 138kV 7595 Deer Creek - 7621 Nixon",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-07-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 95.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-04-22T00:00:00",
        "Screening Study Complete": "2021-07-14T00:00:00",
        "FIS Requested": "2021-04-22T00:00:00",
        "FIS Approved": "2026-07-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": "2026-07-27T00:00:00",
        "Unnamed: 25": "2026-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0231",
        "Project Name": "Hoke Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hoke Solar Project, LLC",
        "POI Location": "tap 138kV 7595 Deer Creek - 7621 Nixon",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-07-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 95.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-04-22T00:00:00",
        "Screening Study Complete": "2021-07-14T00:00:00",
        "FIS Requested": "2021-04-22T00:00:00",
        "FIS Approved": "2026-07-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": "2026-07-27T00:00:00",
        "Unnamed: 25": "2026-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 241,
      "raw": {
        "INR": "23INR0232",
        "Project Name": "Hoke Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hoke Solar Project, LLC ",
        "POI Location": "tap 138kV 7595 Deer Creek - 7621 Nixon",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-07-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 33.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-04-22T00:00:00",
        "Screening Study Complete": "2021-07-14T00:00:00",
        "FIS Requested": "2021-04-22T00:00:00",
        "FIS Approved": "2026-07-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-04-20T00:00:00",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-07-27T00:00:00",
        "Unnamed: 25": "2026-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0232",
        "Project Name": "Hoke Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hoke Solar Project, LLC ",
        "POI Location": "tap 138kV 7595 Deer Creek - 7621 Nixon",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-07-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 33.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-28T00:00:00",
        "Screening Study Started": "2021-04-22T00:00:00",
        "Screening Study Complete": "2021-07-14T00:00:00",
        "FIS Requested": "2021-04-22T00:00:00",
        "FIS Approved": "2026-07-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-04-20T00:00:00",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-07-27T00:00:00",
        "Unnamed: 25": "2026-08-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 242,
      "raw": {
        "INR": "23INR0233",
        "Project Name": "Earthwise Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quanah Solar 2",
        "POI Location": "Tap 345kV 60504 Tesla - 61001 Jim Treece",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 370.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-23T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-09T00:00:00",
        "FIS Requested": "2022-02-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0233",
        "Project Name": "Earthwise Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quanah Solar 2",
        "POI Location": "Tap 345kV 60504 Tesla - 61001 Jim Treece",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 370.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-23T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-09T00:00:00",
        "FIS Requested": "2022-02-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 243,
      "raw": {
        "INR": "23INR0235",
        "Project Name": "Hoyte Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Milano Solar LLC",
        "POI Location": "(3707) Cannon Switch 138kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 206.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-02T00:00:00",
        "Screening Study Started": "2021-04-01T00:00:00",
        "Screening Study Complete": "2021-07-02T00:00:00",
        "FIS Requested": "2021-03-25T00:00:00",
        "FIS Approved": "2026-03-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-10-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": "2025-08-11T00:00:00",
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0235",
        "Project Name": "Hoyte Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Milano Solar LLC",
        "POI Location": "(3707) Cannon Switch 138kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 206.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-02T00:00:00",
        "Screening Study Started": "2021-04-01T00:00:00",
        "Screening Study Complete": "2021-07-02T00:00:00",
        "FIS Requested": "2021-03-25T00:00:00",
        "FIS Approved": "2026-03-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-10-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": "2025-08-11T00:00:00",
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 244,
      "raw": {
        "INR": "23INR0237",
        "Project Name": "Big River BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Grande River Solar LLC",
        "POI Location": "tap 138kV 8299 Zapata - 8957 Lopeno4A",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-09T00:00:00",
        "Screening Study Started": "2021-05-04T00:00:00",
        "Screening Study Complete": "2021-07-27T00:00:00",
        "FIS Requested": "2021-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0237",
        "Project Name": "Big River BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Grande River Solar LLC",
        "POI Location": "tap 138kV 8299 Zapata - 8957 Lopeno4A",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-04-09T00:00:00",
        "Screening Study Started": "2021-05-04T00:00:00",
        "Screening Study Complete": "2021-07-27T00:00:00",
        "FIS Requested": "2021-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 245,
      "raw": {
        "INR": "23INR0244",
        "Project Name": "Tiger Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Vaca Del Sol, LLC",
        "POI Location": "68004 PHANTOM HILL 345KV ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.9,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-04-21T00:00:00",
        "Screening Study Started": "2021-04-29T00:00:00",
        "Screening Study Complete": "2021-07-22T00:00:00",
        "FIS Requested": "2021-04-29T00:00:00",
        "FIS Approved": "2025-12-15T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-01-30T00:00:00",
        "Unnamed: 25": "2026-01-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0244",
        "Project Name": "Tiger Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Vaca Del Sol, LLC",
        "POI Location": "68004 PHANTOM HILL 345KV ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.9,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-04-21T00:00:00",
        "Screening Study Started": "2021-04-29T00:00:00",
        "Screening Study Complete": "2021-07-22T00:00:00",
        "FIS Requested": "2021-04-29T00:00:00",
        "FIS Approved": "2025-12-15T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-01-30T00:00:00",
        "Unnamed: 25": "2026-01-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 246,
      "raw": {
        "INR": "23INR0248",
        "Project Name": "Limewood Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Limewood Bell Renewables LLC",
        "POI Location": "3420 Temple Pecan Creek 138kV",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-03T00:00:00",
        "Screening Study Started": "2021-04-30T00:00:00",
        "Screening Study Complete": "2021-07-22T00:00:00",
        "FIS Requested": "2021-10-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-02-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-05-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0248",
        "Project Name": "Limewood Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Limewood Bell Renewables LLC",
        "POI Location": "3420 Temple Pecan Creek 138kV",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-03T00:00:00",
        "Screening Study Started": "2021-04-30T00:00:00",
        "Screening Study Complete": "2021-07-22T00:00:00",
        "FIS Requested": "2021-10-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-02-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-05-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 247,
      "raw": {
        "INR": "23INR0249",
        "Project Name": "Limewood Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Limewood Bell Renewables, LLC",
        "POI Location": "3420 Temple Pecan Creek 138kV",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 204.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-03T00:00:00",
        "Screening Study Started": "2021-04-30T00:00:00",
        "Screening Study Complete": "2021-07-22T00:00:00",
        "FIS Requested": "2021-10-06T00:00:00",
        "FIS Approved": "2025-03-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-02-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2025-05-01T00:00:00",
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-10T00:00:00",
        "Approved for Synchronization": "2026-09-15T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0249",
        "Project Name": "Limewood Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Limewood Bell Renewables, LLC",
        "POI Location": "3420 Temple Pecan Creek 138kV",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 204.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-03T00:00:00",
        "Screening Study Started": "2021-04-30T00:00:00",
        "Screening Study Complete": "2021-07-22T00:00:00",
        "FIS Requested": "2021-10-06T00:00:00",
        "FIS Approved": "2025-03-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-02-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2025-05-01T00:00:00",
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-10T00:00:00",
        "Approved for Synchronization": "2026-09-15T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 248,
      "raw": {
        "INR": "23INR0273",
        "Project Name": "Poco Trail Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Eastern Trail Solar Center, LLC",
        "POI Location": "Tap 345kV 6101 Riley - 1422 Bowman\nByrd Road Switch",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 438.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-02T00:00:00",
        "Screening Study Started": "2021-09-14T00:00:00",
        "Screening Study Complete": "2021-11-30T00:00:00",
        "FIS Requested": "2021-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0273",
        "Project Name": "Poco Trail Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Eastern Trail Solar Center, LLC",
        "POI Location": "Tap 345kV 6101 Riley - 1422 Bowman\nByrd Road Switch",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 438.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-02T00:00:00",
        "Screening Study Started": "2021-09-14T00:00:00",
        "Screening Study Complete": "2021-11-30T00:00:00",
        "FIS Requested": "2021-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 249,
      "raw": {
        "INR": "23INR0278",
        "Project Name": "Tucana BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BRP Tucana BESS LLC",
        "POI Location": "1157 Andrews County South 138kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-01T00:00:00",
        "Screening Study Started": "2021-06-03T00:00:00",
        "Screening Study Complete": "2021-08-19T00:00:00",
        "FIS Requested": "2021-05-10T00:00:00",
        "FIS Approved": "2025-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0278",
        "Project Name": "Tucana BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BRP Tucana BESS LLC",
        "POI Location": "1157 Andrews County South 138kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-01T00:00:00",
        "Screening Study Started": "2021-06-03T00:00:00",
        "Screening Study Complete": "2021-08-19T00:00:00",
        "FIS Requested": "2021-05-10T00:00:00",
        "FIS Approved": "2025-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 250,
      "raw": {
        "INR": "23INR0279",
        "Project Name": "Trivor BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Trivor BESS LLC",
        "POI Location": "1272 Fullerton 138kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-01T00:00:00",
        "Screening Study Started": "2021-06-03T00:00:00",
        "Screening Study Complete": "2022-03-15T00:00:00",
        "FIS Requested": "2021-05-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0279",
        "Project Name": "Trivor BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Trivor BESS LLC",
        "POI Location": "1272 Fullerton 138kV",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-01T00:00:00",
        "Screening Study Started": "2021-06-03T00:00:00",
        "Screening Study Complete": "2022-03-15T00:00:00",
        "FIS Requested": "2021-05-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 251,
      "raw": {
        "INR": "23INR0283",
        "Project Name": "Kota Battery ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kota Storage, LLC",
        "POI Location": "23900 Alibates 345kV",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-02T00:00:00",
        "Screening Study Started": "2021-06-07T00:00:00",
        "Screening Study Complete": "2021-08-27T00:00:00",
        "FIS Requested": "2021-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0283",
        "Project Name": "Kota Battery ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kota Storage, LLC",
        "POI Location": "23900 Alibates 345kV",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-02T00:00:00",
        "Screening Study Started": "2021-06-07T00:00:00",
        "Screening Study Complete": "2021-08-27T00:00:00",
        "FIS Requested": "2021-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 252,
      "raw": {
        "INR": "23INR0284",
        "Project Name": "Las Moras Battery ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Moras Storage, LLC",
        "POI Location": "8252 Brackett 138kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-01T00:00:00",
        "Screening Study Started": "2021-06-07T00:00:00",
        "Screening Study Complete": "2021-08-27T00:00:00",
        "FIS Requested": "2021-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0284",
        "Project Name": "Las Moras Battery ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Moras Storage, LLC",
        "POI Location": "8252 Brackett 138kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-01T00:00:00",
        "Screening Study Started": "2021-06-07T00:00:00",
        "Screening Study Complete": "2021-08-27T00:00:00",
        "FIS Requested": "2021-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 253,
      "raw": {
        "INR": "23INR0286",
        "Project Name": "Dry Creek Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "OAK HILL SOLAR LLC",
        "POI Location": "tap 345kV 3100 Martin Lake - 3105 Elkton\n(Dorsett 345kV Switching Station)",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2021-08-18T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2022-03-30T00:00:00",
        "FIS Approved": "2024-06-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-10-29T00:00:00",
        "Meets All Planning": "2024-10-29T00:00:00",
        "Unnamed: 25": "2024-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-05-08T00:00:00",
        "Approved for Synchronization": "2025-05-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0286",
        "Project Name": "Dry Creek Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "OAK HILL SOLAR LLC",
        "POI Location": "tap 345kV 3100 Martin Lake - 3105 Elkton\n(Dorsett 345kV Switching Station)",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2021-08-18T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2022-03-30T00:00:00",
        "FIS Approved": "2024-06-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-10-29T00:00:00",
        "Meets All Planning": "2024-10-29T00:00:00",
        "Unnamed: 25": "2024-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-05-08T00:00:00",
        "Approved for Synchronization": "2025-05-19T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 254,
      "raw": {
        "INR": "23INR0289",
        "Project Name": "Skull Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Skull Creek Solar, LLC",
        "POI Location": "Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot\nMassey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 136.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-01-10T00:00:00",
        "Screening Study Started": "2021-05-28T00:00:00",
        "Screening Study Complete": "2021-08-19T00:00:00",
        "FIS Requested": "2021-12-16T00:00:00",
        "FIS Approved": "2026-09-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0289",
        "Project Name": "Skull Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Skull Creek Solar, LLC",
        "POI Location": "Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot\nMassey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 136.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-01-10T00:00:00",
        "Screening Study Started": "2021-05-28T00:00:00",
        "Screening Study Complete": "2021-08-19T00:00:00",
        "FIS Requested": "2021-12-16T00:00:00",
        "FIS Approved": "2026-09-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 255,
      "raw": {
        "INR": "23INR0290",
        "Project Name": "Zeya BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BRP Zeya BESS LLC",
        "POI Location": "38740 Heights 138kV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 255.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-02T00:00:00",
        "Screening Study Started": "2021-05-31T00:00:00",
        "Screening Study Complete": "2022-03-09T00:00:00",
        "FIS Requested": "2021-05-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-01-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0290",
        "Project Name": "Zeya BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BRP Zeya BESS LLC",
        "POI Location": "38740 Heights 138kV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 255.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-02T00:00:00",
        "Screening Study Started": "2021-05-31T00:00:00",
        "Screening Study Complete": "2022-03-09T00:00:00",
        "FIS Requested": "2021-05-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-01-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 256,
      "raw": {
        "INR": "23INR0300",
        "Project Name": "Holzer Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Greater Bryant G Solar, LLC",
        "POI Location": "11165 Sloan Switch 138kV",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 17.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-09T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2021-06-16T00:00:00",
        "FIS Approved": "2025-04-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-07-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-06-18T00:00:00",
        "Meets All Planning": "2025-10-10T00:00:00",
        "Unnamed: 25": "2025-10-10T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-11T00:00:00",
        "Approved for Synchronization": "2026-07-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0300",
        "Project Name": "Holzer Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Greater Bryant G Solar, LLC",
        "POI Location": "11165 Sloan Switch 138kV",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 17.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-06-09T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2021-06-16T00:00:00",
        "FIS Approved": "2025-04-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-07-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-06-18T00:00:00",
        "Meets All Planning": "2025-10-10T00:00:00",
        "Unnamed: 25": "2025-10-10T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-11T00:00:00",
        "Approved for Synchronization": "2026-07-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 257,
      "raw": {
        "INR": "23INR0308",
        "Project Name": "Fowler Ranch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Crane BESS, LLC",
        "POI Location": "76025 Castle Mountain 138kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 26.07,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-03T00:00:00",
        "Screening Study Started": "2021-06-21T00:00:00",
        "Screening Study Complete": "2021-09-07T00:00:00",
        "FIS Requested": "2022-05-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0308",
        "Project Name": "Fowler Ranch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Crane BESS, LLC",
        "POI Location": "76025 Castle Mountain 138kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 26.07,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-03T00:00:00",
        "Screening Study Started": "2021-06-21T00:00:00",
        "Screening Study Complete": "2021-09-07T00:00:00",
        "FIS Requested": "2022-05-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 258,
      "raw": {
        "INR": "23INR0310",
        "Project Name": "Dunkel BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Momentum Energy Storage Partners",
        "POI Location": "59156 Yellow House Canyon 115kV",
        "County": "Lubbock",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-11-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 226.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-10T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-22T00:00:00",
        "FIS Requested": "2022-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0310",
        "Project Name": "Dunkel BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Momentum Energy Storage Partners",
        "POI Location": "59156 Yellow House Canyon 115kV",
        "County": "Lubbock",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-11-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 226.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-10T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-22T00:00:00",
        "FIS Requested": "2022-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 259,
      "raw": {
        "INR": "23INR0312",
        "Project Name": "Hofbrau BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Momentum Hofbrau LLC",
        "POI Location": "6442 Redcreek 138kV",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-22T00:00:00",
        "Screening Study Started": "2021-09-22T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2021-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0312",
        "Project Name": "Hofbrau BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Momentum Hofbrau LLC",
        "POI Location": "6442 Redcreek 138kV",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-22T00:00:00",
        "Screening Study Started": "2021-09-22T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2021-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 260,
      "raw": {
        "INR": "23INR0318",
        "Project Name": "Marcelina Storage ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Marcelina Solar, LLC ",
        "POI Location": "Tap 345 kV 5133 Elm Creek - 5901 San Miguel",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-03T00:00:00",
        "Screening Study Started": "2021-08-09T00:00:00",
        "Screening Study Complete": "2021-10-29T00:00:00",
        "FIS Requested": "2022-04-22T00:00:00",
        "FIS Approved": "2024-01-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0318",
        "Project Name": "Marcelina Storage ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Marcelina Solar, LLC ",
        "POI Location": "Tap 345 kV 5133 Elm Creek - 5901 San Miguel",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-03T00:00:00",
        "Screening Study Started": "2021-08-09T00:00:00",
        "Screening Study Complete": "2021-10-29T00:00:00",
        "FIS Requested": "2022-04-22T00:00:00",
        "FIS Approved": "2024-01-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 261,
      "raw": {
        "INR": "23INR0324",
        "Project Name": "Lumberjack Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "EDP Renewables North America LLC",
        "POI Location": "138 kV Tap 3110 Stryker Creek -  3147 Troup ",
        "County": "Cherokee",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2021-08-12T00:00:00",
        "Screening Study Complete": "2021-10-29T00:00:00",
        "FIS Requested": "2022-04-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-03-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0324",
        "Project Name": "Lumberjack Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "EDP Renewables North America LLC",
        "POI Location": "138 kV Tap 3110 Stryker Creek -  3147 Troup ",
        "County": "Cherokee",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2021-08-12T00:00:00",
        "Screening Study Complete": "2021-10-29T00:00:00",
        "FIS Requested": "2022-04-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-03-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 262,
      "raw": {
        "INR": "23INR0330",
        "Project Name": "BRP Snowdon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP SNOWDON BESS LLC",
        "POI Location": "23914 Tule Canyon Substation 345kV ",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 410.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-15T00:00:00",
        "Screening Study Started": "2021-09-15T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2021-09-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0330",
        "Project Name": "BRP Snowdon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP SNOWDON BESS LLC",
        "POI Location": "23914 Tule Canyon Substation 345kV ",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 410.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-15T00:00:00",
        "Screening Study Started": "2021-09-15T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2021-09-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 263,
      "raw": {
        "INR": "23INR0331",
        "Project Name": "Orange Grove BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Talitha Energy Project, LLC",
        "POI Location": "5660 Orange Grove Switching Station 138 kV",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 61.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-20T00:00:00",
        "Screening Study Started": "2021-07-15T00:00:00",
        "Screening Study Complete": "2021-09-28T00:00:00",
        "FIS Requested": "2021-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-11-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-04-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0331",
        "Project Name": "Orange Grove BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Talitha Energy Project, LLC",
        "POI Location": "5660 Orange Grove Switching Station 138 kV",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 61.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-20T00:00:00",
        "Screening Study Started": "2021-07-15T00:00:00",
        "Screening Study Complete": "2021-09-28T00:00:00",
        "FIS Requested": "2021-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-11-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-04-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 264,
      "raw": {
        "INR": "23INR0334",
        "Project Name": "Liberty Senate Energy Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Senate Solar LLC",
        "POI Location": "1445 Burwick 345kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-16T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2021-12-08T00:00:00",
        "FIS Requested": "2021-10-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0334",
        "Project Name": "Liberty Senate Energy Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Senate Solar LLC",
        "POI Location": "1445 Burwick 345kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-16T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2021-12-08T00:00:00",
        "FIS Requested": "2021-10-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 265,
      "raw": {
        "INR": "23INR0342",
        "Project Name": "Brizo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BRP Brizo BESS LLC",
        "POI Location": "138 kV Loop 463 Substation (#5680)",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 144.22,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-05T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2021-12-22T00:00:00",
        "FIS Requested": "2021-09-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0342",
        "Project Name": "Brizo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BRP Brizo BESS LLC",
        "POI Location": "138 kV Loop 463 Substation (#5680)",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 144.22,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-05T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2021-12-22T00:00:00",
        "FIS Requested": "2021-09-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 266,
      "raw": {
        "INR": "23INR0344",
        "Project Name": "Hermes Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bell 1 Solar, LLC",
        "POI Location": "Tap 345kV 3687 Bell County East Switch -  39950 TNP One Plant Ckt 2",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-06-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-14T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-06-01T00:00:00",
        "FIS Approved": "2024-04-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-01-31T00:00:00",
        "Meets All Planning": "2025-01-31T00:00:00",
        "Unnamed: 25": "2025-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-02-23T00:00:00",
        "Approved for Synchronization": "2026-04-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0344",
        "Project Name": "Hermes Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bell 1 Solar, LLC",
        "POI Location": "Tap 345kV 3687 Bell County East Switch -  39950 TNP One Plant Ckt 2",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-06-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-14T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-06-01T00:00:00",
        "FIS Approved": "2024-04-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-01-31T00:00:00",
        "Meets All Planning": "2025-01-31T00:00:00",
        "Unnamed: 25": "2025-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-02-23T00:00:00",
        "Approved for Synchronization": "2026-04-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 267,
      "raw": {
        "INR": "23INR0349",
        "Project Name": "Tokio Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gransolar Texas Eight, LLC",
        "POI Location": "Tap 138kV 3592 Waco Atco - 170 Cotton Belt",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 170.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-04T00:00:00",
        "Screening Study Started": "2021-08-12T00:00:00",
        "Screening Study Complete": "2021-11-01T00:00:00",
        "FIS Requested": "2022-04-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-11-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0349",
        "Project Name": "Tokio Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gransolar Texas Eight, LLC",
        "POI Location": "Tap 138kV 3592 Waco Atco - 170 Cotton Belt",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 170.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-04T00:00:00",
        "Screening Study Started": "2021-08-12T00:00:00",
        "Screening Study Complete": "2021-11-01T00:00:00",
        "FIS Requested": "2022-04-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-11-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 268,
      "raw": {
        "INR": "23INR0354",
        "Project Name": "Bordertown BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bordertown BESS LLC",
        "POI Location": "8796 Roma 138kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-17T00:00:00",
        "Screening Study Started": "2021-09-01T00:00:00",
        "Screening Study Complete": "2021-11-22T00:00:00",
        "FIS Requested": "2021-08-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-04-03T00:00:00",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0354",
        "Project Name": "Bordertown BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bordertown BESS LLC",
        "POI Location": "8796 Roma 138kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-17T00:00:00",
        "Screening Study Started": "2021-09-01T00:00:00",
        "Screening Study Complete": "2021-11-22T00:00:00",
        "FIS Requested": "2021-08-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2022-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-04-03T00:00:00",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 269,
      "raw": {
        "INR": "23INR0359",
        "Project Name": "Crios BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Crios BESS LLC",
        "POI Location": "Tap 138 kV 1649 HASSE_P8 - 1684 SABANA_8",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-18T00:00:00",
        "Screening Study Started": "2021-10-18T00:00:00",
        "Screening Study Complete": "2022-01-07T00:00:00",
        "FIS Requested": "2021-09-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0359",
        "Project Name": "Crios BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Crios BESS LLC",
        "POI Location": "Tap 138 kV 1649 HASSE_P8 - 1684 SABANA_8",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-18T00:00:00",
        "Screening Study Started": "2021-10-18T00:00:00",
        "Screening Study Complete": "2022-01-07T00:00:00",
        "FIS Requested": "2021-09-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 270,
      "raw": {
        "INR": "23INR0361",
        "Project Name": "Third Coast BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Third Coast BESS LLC",
        "POI Location": "8125 Lolita substation 138kV",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-16T00:00:00",
        "Screening Study Started": "2021-08-24T00:00:00",
        "Screening Study Complete": "2021-11-16T00:00:00",
        "FIS Requested": "2021-09-01T00:00:00",
        "FIS Approved": "2024-12-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-01-29T00:00:00",
        "Meets All Planning": "2025-01-29T00:00:00",
        "Unnamed: 25": "2025-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0361",
        "Project Name": "Third Coast BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Third Coast BESS LLC",
        "POI Location": "8125 Lolita substation 138kV",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-16T00:00:00",
        "Screening Study Started": "2021-08-24T00:00:00",
        "Screening Study Complete": "2021-11-16T00:00:00",
        "FIS Requested": "2021-09-01T00:00:00",
        "FIS Approved": "2024-12-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-01-29T00:00:00",
        "Meets All Planning": "2025-01-29T00:00:00",
        "Unnamed: 25": "2025-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 271,
      "raw": {
        "INR": "23INR0367",
        "Project Name": "Fewell Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Fewell Solar LLC",
        "POI Location": "Tap 138kV 3597 Groesbeck - 3634 Groesbeck Main",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-28T00:00:00",
        "Screening Study Started": "2021-08-19T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2022-02-17T00:00:00",
        "FIS Approved": "2023-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-08-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-08-28T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0367",
        "Project Name": "Fewell Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Fewell Solar LLC",
        "POI Location": "Tap 138kV 3597 Groesbeck - 3634 Groesbeck Main",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-28T00:00:00",
        "Screening Study Started": "2021-08-19T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2022-02-17T00:00:00",
        "FIS Approved": "2023-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-08-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-08-28T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 272,
      "raw": {
        "INR": "23INR0368",
        "Project Name": "Rocking X Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "7100 Tin Top LLC",
        "POI Location": "Tap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 602.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-19T00:00:00",
        "FIS Requested": "2023-09-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0368",
        "Project Name": "Rocking X Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "7100 Tin Top LLC",
        "POI Location": "Tap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 602.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-19T00:00:00",
        "FIS Requested": "2023-09-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 273,
      "raw": {
        "INR": "23INR0376",
        "Project Name": "Cascade Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oyster Creek LLC",
        "POI Location": "345kV Oasis (43035) – Seabreeze circuit 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-09T00:00:00",
        "Screening Study Started": "2021-09-09T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2021-09-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0376",
        "Project Name": "Cascade Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oyster Creek LLC",
        "POI Location": "345kV Oasis (43035) – Seabreeze circuit 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-09T00:00:00",
        "Screening Study Started": "2021-09-09T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2021-09-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 274,
      "raw": {
        "INR": "23INR0382",
        "Project Name": "Outer Loop BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "40700 Greens Bayou 345kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-02T00:00:00",
        "Screening Study Started": "2021-09-29T00:00:00",
        "Screening Study Complete": "2021-12-06T00:00:00",
        "FIS Requested": "2022-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0382",
        "Project Name": "Outer Loop BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "40700 Greens Bayou 345kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-02T00:00:00",
        "Screening Study Started": "2021-09-29T00:00:00",
        "Screening Study Complete": "2021-12-06T00:00:00",
        "FIS Requested": "2022-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 275,
      "raw": {
        "INR": "23INR0392",
        "Project Name": "Honeycomb Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Honeycomb BESS, LLC",
        "POI Location": "69 kV Tynan Substation (#8107)",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-26T00:00:00",
        "Screening Study Started": "2021-11-16T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": "2025-03-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-14T00:00:00",
        "Meets All Planning": "2025-07-25T00:00:00",
        "Unnamed: 25": "2025-07-25T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0392",
        "Project Name": "Honeycomb Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Honeycomb BESS, LLC",
        "POI Location": "69 kV Tynan Substation (#8107)",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-26T00:00:00",
        "Screening Study Started": "2021-11-16T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": "2025-03-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-14T00:00:00",
        "Meets All Planning": "2025-07-25T00:00:00",
        "Unnamed: 25": "2025-07-25T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 276,
      "raw": {
        "INR": "23INR0409",
        "Project Name": "Sunbelt Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rose Hill Solar LLC",
        "POI Location": "Tap 138kV 6902 Talty - 6894 Rose Hill\n\n",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-09T00:00:00",
        "Screening Study Started": "2021-11-12T00:00:00",
        "Screening Study Complete": "2022-02-08T00:00:00",
        "FIS Requested": "2021-11-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0409",
        "Project Name": "Sunbelt Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rose Hill Solar LLC",
        "POI Location": "Tap 138kV 6902 Talty - 6894 Rose Hill\n\n",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-09T00:00:00",
        "Screening Study Started": "2021-11-12T00:00:00",
        "Screening Study Complete": "2022-02-08T00:00:00",
        "FIS Requested": "2021-11-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 277,
      "raw": {
        "INR": "23INR0421",
        "Project Name": "Bee Branch IA",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bee Branch IA LLCBee Branch IA LLC",
        "POI Location": "Tap TNP ONE 39950 and Twin Oak 3400",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-15T00:00:00",
        "Screening Study Started": "2021-11-15T00:00:00",
        "Screening Study Complete": "2022-02-11T00:00:00",
        "FIS Requested": "2021-11-09T00:00:00",
        "FIS Approved": "2026-06-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0421",
        "Project Name": "Bee Branch IA",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bee Branch IA LLCBee Branch IA LLC",
        "POI Location": "Tap TNP ONE 39950 and Twin Oak 3400",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-15T00:00:00",
        "Screening Study Started": "2021-11-15T00:00:00",
        "Screening Study Complete": "2022-02-11T00:00:00",
        "FIS Requested": "2021-11-09T00:00:00",
        "FIS Approved": "2026-06-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 278,
      "raw": {
        "INR": "23INR0425",
        "Project Name": "Coneflower Storage Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Coneflower Storage Project LLC",
        "POI Location": "40855 JORDON 138 kV ",
        "County": "Chambers",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 170.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-11T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-11T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": "2026-03-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-03-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-04-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0425",
        "Project Name": "Coneflower Storage Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Coneflower Storage Project LLC",
        "POI Location": "40855 JORDON 138 kV ",
        "County": "Chambers",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 170.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-11T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-11T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": "2026-03-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-03-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-04-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 279,
      "raw": {
        "INR": "23INR0439",
        "Project Name": "Lumen Farm Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Neches Solar, LLC",
        "POI Location": "Tap 138kV 3325 Blackburn Switch – 3272 Palestine ",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-29T00:00:00",
        "Screening Study Started": "2022-01-06T00:00:00",
        "Screening Study Complete": "2022-03-31T00:00:00",
        "FIS Requested": "2021-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0439",
        "Project Name": "Lumen Farm Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Neches Solar, LLC",
        "POI Location": "Tap 138kV 3325 Blackburn Switch – 3272 Palestine ",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-29T00:00:00",
        "Screening Study Started": "2022-01-06T00:00:00",
        "Screening Study Complete": "2022-03-31T00:00:00",
        "FIS Requested": "2021-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 280,
      "raw": {
        "INR": "23INR0441",
        "Project Name": "Bug Tussle Wind Project ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bug Tussle Wind, LLC",
        "POI Location": "Tap 1729 Valley South and 1692 Paris",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 396.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-30T00:00:00",
        "Screening Study Started": "2022-01-13T00:00:00",
        "Screening Study Complete": "2022-04-11T00:00:00",
        "FIS Requested": "2022-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-07-10T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0441",
        "Project Name": "Bug Tussle Wind Project ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bug Tussle Wind, LLC",
        "POI Location": "Tap 1729 Valley South and 1692 Paris",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 396.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-30T00:00:00",
        "Screening Study Started": "2022-01-13T00:00:00",
        "Screening Study Complete": "2022-04-11T00:00:00",
        "FIS Requested": "2022-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-07-10T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 281,
      "raw": {
        "INR": "23INR0455",
        "Project Name": "Bessie Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bessie Energy Storage, LLC",
        "POI Location": "Charly Egner Substation Tap 345kV 80355 Del Sol - 80368 LV4 Bridge",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-08T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-19T00:00:00",
        "FIS Requested": "2022-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0455",
        "Project Name": "Bessie Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bessie Energy Storage, LLC",
        "POI Location": "Charly Egner Substation Tap 345kV 80355 Del Sol - 80368 LV4 Bridge",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-08T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-19T00:00:00",
        "FIS Requested": "2022-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 282,
      "raw": {
        "INR": "23INR0456",
        "Project Name": "Bronze Quinta Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 28, LLC",
        "POI Location": "S_MCALLN 8371 (S. McAllen 138kV Substation)",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-12T00:00:00",
        "Screening Study Started": "2022-01-13T00:00:00",
        "Screening Study Complete": "2022-04-11T00:00:00",
        "FIS Requested": "2022-01-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0456",
        "Project Name": "Bronze Quinta Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KCE TX 28, LLC",
        "POI Location": "S_MCALLN 8371 (S. McAllen 138kV Substation)",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-12T00:00:00",
        "Screening Study Started": "2022-01-13T00:00:00",
        "Screening Study Complete": "2022-04-11T00:00:00",
        "FIS Requested": "2022-01-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 283,
      "raw": {
        "INR": "23INR0462",
        "Project Name": "Palladium Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palladium Energy Storage LLC",
        "POI Location": "Tap 138 kV 8656 Luna - 8033 Pantera ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.33,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0462",
        "Project Name": "Palladium Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palladium Energy Storage LLC",
        "POI Location": "Tap 138 kV 8656 Luna - 8033 Pantera ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.33,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 284,
      "raw": {
        "INR": "23INR0464",
        "Project Name": "Sloan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sloan Energy Storage LLC",
        "POI Location": "3179 Pauline 138kV",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-03-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-13T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-21T00:00:00",
        "FIS Requested": "2022-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0464",
        "Project Name": "Sloan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sloan Energy Storage LLC",
        "POI Location": "3179 Pauline 138kV",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-03-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-13T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-21T00:00:00",
        "FIS Requested": "2022-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 285,
      "raw": {
        "INR": "23INR0466",
        "Project Name": "Shoshana Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shoshana Storage Project LLC",
        "POI Location": "Tap STP – Refuge ckt 27 ",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 221,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-26T00:00:00",
        "FIS Requested": "2022-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0466",
        "Project Name": "Shoshana Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shoshana Storage Project LLC",
        "POI Location": "Tap STP – Refuge ckt 27 ",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 221,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-26T00:00:00",
        "FIS Requested": "2022-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 286,
      "raw": {
        "INR": "23INR0467",
        "Project Name": "Lavender Storage Project",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Lavender Storage Project LLC",
        "POI Location": "Tap 138kV Deely (bus 5110) - Laredo (bus 5255)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-03T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-06-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0467",
        "Project Name": "Lavender Storage Project",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Lavender Storage Project LLC",
        "POI Location": "Tap 138kV Deely (bus 5110) - Laredo (bus 5255)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-03T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-06-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 287,
      "raw": {
        "INR": "23INR0468",
        "Project Name": "Petunia Storage Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Petunia Storage Project LLC",
        "POI Location": "138kV Tap 3675 Rogers - 3485 Tin Roof Pod",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-14T00:00:00",
        "Screening Study Started": "2022-03-12T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0468",
        "Project Name": "Petunia Storage Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Petunia Storage Project LLC",
        "POI Location": "138kV Tap 3675 Rogers - 3485 Tin Roof Pod",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-14T00:00:00",
        "Screening Study Started": "2022-03-12T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 288,
      "raw": {
        "INR": "23INR0469",
        "Project Name": "Big Elm Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Big Elm Storage, LLC",
        "POI Location": "3404 Belfalls 345kV ",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-25T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-08T00:00:00",
        "FIS Requested": "2022-10-11T00:00:00",
        "FIS Approved": "2024-02-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-05-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0469",
        "Project Name": "Big Elm Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Big Elm Storage, LLC",
        "POI Location": "3404 Belfalls 345kV ",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-25T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-08T00:00:00",
        "FIS Requested": "2022-10-11T00:00:00",
        "FIS Approved": "2024-02-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-05-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 289,
      "raw": {
        "INR": "23INR0471",
        "Project Name": "Ophelia Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ophelia Solar",
        "POI Location": "Tap 138 kV Raceway Switch #18663 - Shin Oak POD #11128 ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 110.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-15T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0471",
        "Project Name": "Ophelia Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ophelia Solar",
        "POI Location": "Tap 138 kV Raceway Switch #18663 - Shin Oak POD #11128 ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 110.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-15T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 290,
      "raw": {
        "INR": "23INR0473",
        "Project Name": "Sepanta Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BREG - Belgian Renewable Energy Group",
        "POI Location": "10198 ESKOTA_9 138kV\n\n (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV)\nProperty is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198.  POI would simply be on the other side of the fence of the switch.",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 218,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-13T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0473",
        "Project Name": "Sepanta Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BREG - Belgian Renewable Energy Group",
        "POI Location": "10198 ESKOTA_9 138kV\n\n (PSS/E BUS #10198, Station Name: ESKOTA_8, kV: 138 kV)\nProperty is adjacent (West) to the Oncor Sweetwater Eskota Switch #10198.  POI would simply be on the other side of the fence of the switch.",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 218,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-13T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 291,
      "raw": {
        "INR": "23INR0474",
        "Project Name": "AP Greenport",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "AP Greenport ",
        "POI Location": "Austrop – Lost Pines 345 kV transmission line (Bus #7040 – 9041)",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-14T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-06-24T00:00:00",
        "FIS Approved": "2023-09-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0474",
        "Project Name": "AP Greenport",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "AP Greenport ",
        "POI Location": "Austrop – Lost Pines 345 kV transmission line (Bus #7040 – 9041)",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-14T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-06-24T00:00:00",
        "FIS Approved": "2023-09-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 292,
      "raw": {
        "INR": "23INR0478",
        "Project Name": "Rhoda Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Milam Energy, LLC",
        "POI Location": "Tap 138kV 32 Robertson - 64  Milano",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 141.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-31T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-15T00:00:00",
        "FIS Requested": "2022-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0478",
        "Project Name": "Rhoda Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Milam Energy, LLC",
        "POI Location": "Tap 138kV 32 Robertson - 64  Milano",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 141.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-31T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-15T00:00:00",
        "FIS Requested": "2022-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 293,
      "raw": {
        "INR": "23INR0479",
        "Project Name": "Taormina Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Taormina Storage Project LLC",
        "POI Location": "Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-08T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-15T00:00:00",
        "FIS Requested": "2022-10-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-06-20T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0479",
        "Project Name": "Taormina Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Taormina Storage Project LLC",
        "POI Location": "Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-08T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-15T00:00:00",
        "FIS Requested": "2022-10-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-06-20T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 294,
      "raw": {
        "INR": "23INR0480",
        "Project Name": "Camellia Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Camellia Storage Project LLC",
        "POI Location": "Tap 138 kV 8358\nNORTH MERCEDES -\n8327 HARLINGEN 138 kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 90.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-12T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0480",
        "Project Name": "Camellia Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Camellia Storage Project LLC",
        "POI Location": "Tap 138 kV 8358\nNORTH MERCEDES -\n8327 HARLINGEN 138 kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 90.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-12T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 295,
      "raw": {
        "INR": "23INR0485",
        "Project Name": "Hacienda Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galveston Energy Storage LLC",
        "POI Location": "38745 Attwater 138kV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0485",
        "Project Name": "Hacienda Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galveston Energy Storage LLC",
        "POI Location": "38745 Attwater 138kV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 296,
      "raw": {
        "INR": "23INR0486",
        "Project Name": "Lamar Unit 1 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "La Frontera Holdings, LLC",
        "POI Location": "1692 Paris Switch Station 345kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-18T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2023-05-15T20:24:38.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0486",
        "Project Name": "Lamar Unit 1 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "La Frontera Holdings, LLC",
        "POI Location": "1692 Paris Switch Station 345kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-18T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2023-05-15T20:24:38.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 297,
      "raw": {
        "INR": "23INR0487",
        "Project Name": "Brightside Solar Alt POI",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Brightside Solar, LLC",
        "POI Location": "8156 Charter Substation 138kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2020-06-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0487",
        "Project Name": "Brightside Solar Alt POI",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Brightside Solar, LLC",
        "POI Location": "8156 Charter Substation 138kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2020-06-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 298,
      "raw": {
        "INR": "23INR0494",
        "Project Name": "Cartwheel BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": " Cartwheel BESS, LLC",
        "POI Location": "Tap 345kV 1697 Sulphur Springs Switch –  2464 Cash Switch",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-20T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-05-10T00:00:00",
        "FIS Approved": "2024-04-12T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-11-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-11-04T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-26T00:00:00",
        "Approved for Synchronization": "2025-09-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0494",
        "Project Name": "Cartwheel BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": " Cartwheel BESS, LLC",
        "POI Location": "Tap 345kV 1697 Sulphur Springs Switch –  2464 Cash Switch",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-20T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-05-10T00:00:00",
        "FIS Approved": "2024-04-12T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-11-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-11-04T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-26T00:00:00",
        "Approved for Synchronization": "2025-09-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 299,
      "raw": {
        "INR": "23INR0495",
        "Project Name": "Cartwheel BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Renewables",
        "POI Location": "Tap 345kV 1697 Sulphur Springs Switch –  2464 Cash Switch",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-20T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-05-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0495",
        "Project Name": "Cartwheel BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Renewables",
        "POI Location": "Tap 345kV 1697 Sulphur Springs Switch –  2464 Cash Switch",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-20T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-05-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 300,
      "raw": {
        "INR": "23INR0502",
        "Project Name": "Adelite Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Adelite Storage Project LLC",
        "POI Location": "Tap 138kV Thorndale North (bus #3659) – Rookie Switch (bus #3701) ",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.88,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-22T00:00:00",
        "FIS Requested": "2022-09-09T00:00:00",
        "FIS Approved": "2024-05-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0502",
        "Project Name": "Adelite Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Adelite Storage Project LLC",
        "POI Location": "Tap 138kV Thorndale North (bus #3659) – Rookie Switch (bus #3701) ",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 231.88,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-22T00:00:00",
        "FIS Requested": "2022-09-09T00:00:00",
        "FIS Approved": "2024-05-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 301,
      "raw": {
        "INR": "23INR0503",
        "Project Name": "Ardesia Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ardesia Storage Project LLC",
        "POI Location": "Tap 138kV 7325 Mendoza - 7216 Lockhart ",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-29T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0503",
        "Project Name": "Ardesia Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ardesia Storage Project LLC",
        "POI Location": "Tap 138kV 7325 Mendoza - 7216 Lockhart ",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-29T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 302,
      "raw": {
        "INR": "23INR0538",
        "Project Name": "Roadrunner Crossing BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roadrunner Crossing BESS",
        "POI Location": "68051 Reata 354kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-23T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-10T00:00:00",
        "FIS Requested": "2022-10-28T00:00:00",
        "FIS Approved": "2025-03-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-02-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-04-25T00:00:00",
        "Meets Planning": "2025-04-28T00:00:00",
        "Meets All Planning": "2025-05-30T00:00:00",
        "Unnamed: 25": "2025-04-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-14T00:00:00",
        "Approved for Synchronization": "2025-12-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0538",
        "Project Name": "Roadrunner Crossing BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roadrunner Crossing BESS",
        "POI Location": "68051 Reata 354kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-23T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-10T00:00:00",
        "FIS Requested": "2022-10-28T00:00:00",
        "FIS Approved": "2025-03-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-02-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-04-25T00:00:00",
        "Meets Planning": "2025-04-28T00:00:00",
        "Meets All Planning": "2025-05-30T00:00:00",
        "Unnamed: 25": "2025-04-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-14T00:00:00",
        "Approved for Synchronization": "2025-12-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 303,
      "raw": {
        "INR": "23INR0561",
        "Project Name": "Cascabel Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307).",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0561",
        "Project Name": "Cascabel Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307).",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 304,
      "raw": {
        "INR": "23INR0637",
        "Project Name": "Goodnight Wind II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "FGE Goodnight II, LLC",
        "POI Location": "tap 345kV 23900 Alibates - 23914 Tule Canyon CKT2",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-06-06T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 261.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-28T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-04-19T00:00:00",
        "FIS Requested": "2023-05-01T00:00:00",
        "FIS Approved": "2026-06-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-08-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-05-01T00:00:00",
        "Meets All Planning": "2023-05-01T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0637",
        "Project Name": "Goodnight Wind II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "FGE Goodnight II, LLC",
        "POI Location": "tap 345kV 23900 Alibates - 23914 Tule Canyon CKT2",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-06-06T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 261.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-28T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-04-19T00:00:00",
        "FIS Requested": "2023-05-01T00:00:00",
        "FIS Approved": "2026-06-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-08-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-05-01T00:00:00",
        "Meets All Planning": "2023-05-01T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 305,
      "raw": {
        "INR": "23INR0794",
        "Project Name": "Invictus Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GSA Land Holdings",
        "POI Location": "6390 FIREROCK4A 138kV",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 140.53,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-21T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-28T00:00:00",
        "FIS Requested": "2024-06-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "23INR0794",
        "Project Name": "Invictus Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GSA Land Holdings",
        "POI Location": "6390 FIREROCK4A 138kV",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 140.53,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-21T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-28T00:00:00",
        "FIS Requested": "2024-06-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 306,
      "raw": {
        "INR": "24INR0003",
        "Project Name": "Stem Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Innovative Solar 134, LLC",
        "POI Location": "tap 345kV 23914 Tule Canyon - 23912 Ogallala",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2025-08-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-03T00:00:00",
        "Screening Study Started": "2020-02-04T00:00:00",
        "Screening Study Complete": "2020-04-27T00:00:00",
        "FIS Requested": "2020-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0003",
        "Project Name": "Stem Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Innovative Solar 134, LLC",
        "POI Location": "tap 345kV 23914 Tule Canyon - 23912 Ogallala",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2025-08-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-12-03T00:00:00",
        "Screening Study Started": "2020-02-04T00:00:00",
        "Screening Study Complete": "2020-04-27T00:00:00",
        "FIS Requested": "2020-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 307,
      "raw": {
        "INR": "24INR0007",
        "Project Name": "Nockenut Springs Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 STP ckt 1",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-11-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0007",
        "Project Name": "Nockenut Springs Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 STP ckt 1",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-11-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 308,
      "raw": {
        "INR": "24INR0011",
        "Project Name": "Pinnington Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Longhorn Storage LLC",
        "POI Location": "tap both 345kV 1430 Graham - 1436 Parker 345kV lines",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 502.67,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-10T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-17T00:00:00",
        "FIS Requested": "2020-11-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0011",
        "Project Name": "Pinnington Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Longhorn Storage LLC",
        "POI Location": "tap both 345kV 1430 Graham - 1436 Parker 345kV lines",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 502.67,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-11-10T00:00:00",
        "Screening Study Started": "2020-12-03T00:00:00",
        "Screening Study Complete": "2021-02-17T00:00:00",
        "FIS Requested": "2020-11-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 309,
      "raw": {
        "INR": "24INR0020",
        "Project Name": "Percy Farm Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Percy Farm Solar 1, LLC",
        "POI Location": "Tap 345kV 8123 Blessing - 5915 STP",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 198.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-05T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2021-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0020",
        "Project Name": "Percy Farm Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Percy Farm Solar 1, LLC",
        "POI Location": "Tap 345kV 8123 Blessing - 5915 STP",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 198.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-05T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2021-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 310,
      "raw": {
        "INR": "24INR0023",
        "Project Name": "Compadre Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hill Solar I, LLC",
        "POI Location": "tap 345kV 68090 Sam Switch - 1907 Venus",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 405.7,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-03-29T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-03-08T00:00:00",
        "FIS Approved": "2024-01-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-11-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-02-01T00:00:00",
        "Meets All Planning": "2024-02-01T00:00:00",
        "Unnamed: 25": "2024-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-30T00:00:00",
        "Approved for Synchronization": "2024-11-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0023",
        "Project Name": "Compadre Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hill Solar I, LLC",
        "POI Location": "tap 345kV 68090 Sam Switch - 1907 Venus",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 405.7,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2021-03-29T00:00:00",
        "Screening Study Started": "2021-03-16T00:00:00",
        "Screening Study Complete": "2021-05-28T00:00:00",
        "FIS Requested": "2021-03-08T00:00:00",
        "FIS Approved": "2024-01-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2022-11-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-02-01T00:00:00",
        "Meets All Planning": "2024-02-01T00:00:00",
        "Unnamed: 25": "2024-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-30T00:00:00",
        "Approved for Synchronization": "2024-11-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 311,
      "raw": {
        "INR": "24INR0031",
        "Project Name": "Stoneridge Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Stoneridge Solar, LLC",
        "POI Location": "Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP\nBeulah Switch to tap above line",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-14T00:00:00",
        "Screening Study Started": "2021-10-08T00:00:00",
        "Screening Study Complete": "2022-01-03T00:00:00",
        "FIS Requested": "2022-01-31T00:00:00",
        "FIS Approved": "2024-05-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-07-18T00:00:00",
        "Meets All Planning": "2024-07-18T00:00:00",
        "Unnamed: 25": "2024-07-18T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-01-10T00:00:00",
        "Approved for Synchronization": "2025-04-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0031",
        "Project Name": "Stoneridge Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Stoneridge Solar, LLC",
        "POI Location": "Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP\nBeulah Switch to tap above line",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-14T00:00:00",
        "Screening Study Started": "2021-10-08T00:00:00",
        "Screening Study Complete": "2022-01-03T00:00:00",
        "FIS Requested": "2022-01-31T00:00:00",
        "FIS Approved": "2024-05-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-05-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-07-18T00:00:00",
        "Meets All Planning": "2024-07-18T00:00:00",
        "Unnamed: 25": "2024-07-18T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-01-10T00:00:00",
        "Approved for Synchronization": "2025-04-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 312,
      "raw": {
        "INR": "24INR0038",
        "Project Name": "Jaguar Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "PP Jaguar Solar LLC",
        "POI Location": "Tap 345kV 13405 Tradinghouse SES - 68090 Sam Switch",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-23T00:00:00",
        "Screening Study Started": "2021-03-18T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2021-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-09-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-08-25T00:00:00",
        "Meets All Planning": "2024-01-23T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0038",
        "Project Name": "Jaguar Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "PP Jaguar Solar LLC",
        "POI Location": "Tap 345kV 13405 Tradinghouse SES - 68090 Sam Switch",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-23T00:00:00",
        "Screening Study Started": "2021-03-18T00:00:00",
        "Screening Study Complete": "2021-06-11T00:00:00",
        "FIS Requested": "2021-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2022-09-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2023-08-25T00:00:00",
        "Meets All Planning": "2024-01-23T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 313,
      "raw": {
        "INR": "24INR0040",
        "Project Name": "Rosebud Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rosebud Solar, LLC",
        "POI Location": "Tap 69kV 67 BAGGINS - 69 BARCLAY",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 130,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-12T00:00:00",
        "Screening Study Started": "2021-04-13T00:00:00",
        "Screening Study Complete": "2021-07-06T00:00:00",
        "FIS Requested": "2022-01-10T00:00:00",
        "FIS Approved": "2025-10-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0040",
        "Project Name": "Rosebud Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rosebud Solar, LLC",
        "POI Location": "Tap 69kV 67 BAGGINS - 69 BARCLAY",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 130,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-12T00:00:00",
        "Screening Study Started": "2021-04-13T00:00:00",
        "Screening Study Complete": "2021-07-06T00:00:00",
        "FIS Requested": "2022-01-10T00:00:00",
        "FIS Approved": "2025-10-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 314,
      "raw": {
        "INR": "24INR0041",
        "Project Name": "Rock N' Roll Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rock N’ Roll Solar, LLC",
        "POI Location": "tap 138kV 44600 Rosharon - 44531 Winmil ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 151.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-10T00:00:00",
        "Screening Study Started": "2021-05-10T00:00:00",
        "Screening Study Complete": "2021-07-30T00:00:00",
        "FIS Requested": "2022-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0041",
        "Project Name": "Rock N' Roll Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rock N’ Roll Solar, LLC",
        "POI Location": "tap 138kV 44600 Rosharon - 44531 Winmil ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 151.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-10T00:00:00",
        "Screening Study Started": "2021-05-10T00:00:00",
        "Screening Study Complete": "2021-07-30T00:00:00",
        "FIS Requested": "2022-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 315,
      "raw": {
        "INR": "24INR0042",
        "Project Name": "Yaupon Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Yaupon Solar, LLC",
        "POI Location": "Tap 345 kV Gibson Switch (3706) – TNP One (39950)",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-07T00:00:00",
        "Screening Study Started": "2021-03-30T00:00:00",
        "Screening Study Complete": "2021-06-17T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": "2025-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-09-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": "2025-10-24T00:00:00",
        "Unnamed: 25": "2025-10-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-27T00:00:00",
        "Approved for Synchronization": "2026-08-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0042",
        "Project Name": "Yaupon Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Yaupon Solar, LLC",
        "POI Location": "Tap 345 kV Gibson Switch (3706) – TNP One (39950)",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-07T00:00:00",
        "Screening Study Started": "2021-03-30T00:00:00",
        "Screening Study Complete": "2021-06-17T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": "2025-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-09-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": "2025-10-24T00:00:00",
        "Unnamed: 25": "2025-10-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-27T00:00:00",
        "Approved for Synchronization": "2026-08-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 316,
      "raw": {
        "INR": "24INR0058",
        "Project Name": "Briggs Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Quantum III, LLC",
        "POI Location": "tap 345kV 60515 Clear Crossing - 60507 Pendulo",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 336,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-18T00:00:00",
        "Screening Study Started": "2021-05-31T00:00:00",
        "Screening Study Complete": "2021-08-18T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0058",
        "Project Name": "Briggs Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Quantum III, LLC",
        "POI Location": "tap 345kV 60515 Clear Crossing - 60507 Pendulo",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 336,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-18T00:00:00",
        "Screening Study Started": "2021-05-31T00:00:00",
        "Screening Study Complete": "2021-08-18T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 317,
      "raw": {
        "INR": "24INR0059",
        "Project Name": "Cuchillas Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Gransolar Texas Two, LLC",
        "POI Location": "80219 Lobo 345kV",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 305.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-24T00:00:00",
        "Screening Study Started": "2021-06-02T00:00:00",
        "Screening Study Complete": "2021-08-18T00:00:00",
        "FIS Requested": "2022-02-11T00:00:00",
        "FIS Approved": "2025-05-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-06-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0059",
        "Project Name": "Cuchillas Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Gransolar Texas Two, LLC",
        "POI Location": "80219 Lobo 345kV",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 305.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-24T00:00:00",
        "Screening Study Started": "2021-06-02T00:00:00",
        "Screening Study Complete": "2021-08-18T00:00:00",
        "FIS Requested": "2022-02-11T00:00:00",
        "FIS Approved": "2025-05-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-06-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 318,
      "raw": {
        "INR": "24INR0065",
        "Project Name": "Keys Hollow Solar Phase II SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "345kV Tap 8164 Coleto Creek - 8673  RAPTOR7A",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-25T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2021-07-29T00:00:00",
        "FIS Approved": "2026-09-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0065",
        "Project Name": "Keys Hollow Solar Phase II SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "345kV Tap 8164 Coleto Creek - 8673  RAPTOR7A",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-08-25T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2021-07-29T00:00:00",
        "FIS Approved": "2026-09-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 319,
      "raw": {
        "INR": "24INR0066",
        "Project Name": "Keys Hollow Storage Phase II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "345kV Tap 8164 Coleto Creek - 8673  RAPTOR7A",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-20T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2022-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0066",
        "Project Name": "Keys Hollow Storage Phase II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "345kV Tap 8164 Coleto Creek - 8673  RAPTOR7A",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-20T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2022-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 320,
      "raw": {
        "INR": "24INR0067",
        "Project Name": "KEYS HOLLOW SOLAR SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "TAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-10T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": "2026-09-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0067",
        "Project Name": "KEYS HOLLOW SOLAR SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "TAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-10T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": "2026-09-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 321,
      "raw": {
        "INR": "24INR0068",
        "Project Name": "KEYS HOLLOW STORAGE SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "TAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-10T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0068",
        "Project Name": "KEYS HOLLOW STORAGE SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Keys Hollow Solar, LLC",
        "POI Location": "TAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-10T00:00:00",
        "Screening Study Started": "2021-06-17T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2022-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-10-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 322,
      "raw": {
        "INR": "24INR0069",
        "Project Name": "Triple B Solar Alt#2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Triple B Solar LLC",
        "POI Location": "Tap 138kV 7066 Adamsville - 7064 Lampasas",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-06-10T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2021-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0069",
        "Project Name": "Triple B Solar Alt#2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Triple B Solar LLC",
        "POI Location": "Tap 138kV 7066 Adamsville - 7064 Lampasas",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-06-10T00:00:00",
        "Screening Study Complete": "2021-09-01T00:00:00",
        "FIS Requested": "2021-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 323,
      "raw": {
        "INR": "24INR0070",
        "Project Name": "Sypert Branch Solar Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sypert Branch Solar LLC",
        "POI Location": "Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 261.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-10T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-06T00:00:00",
        "FIS Requested": "2022-04-28T00:00:00",
        "FIS Approved": "2024-10-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-18T00:00:00",
        "Meets All Planning": "2025-04-17T00:00:00",
        "Unnamed: 25": "2025-04-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-10T00:00:00",
        "Approved for Synchronization": "2025-12-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0070",
        "Project Name": "Sypert Branch Solar Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sypert Branch Solar LLC",
        "POI Location": "Tap 345kV #3751 Scooter Switch - #3687 Bell County East Switch Ckt 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 261.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-10T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-06T00:00:00",
        "FIS Requested": "2022-04-28T00:00:00",
        "FIS Approved": "2024-10-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-18T00:00:00",
        "Meets All Planning": "2025-04-17T00:00:00",
        "Unnamed: 25": "2025-04-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-10T00:00:00",
        "Approved for Synchronization": "2025-12-12T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 324,
      "raw": {
        "INR": "24INR0073",
        "Project Name": "Hyacinth Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hyacinth Storage, LLC",
        "POI Location": "46500 Tomball 345 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-12-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-02T00:00:00",
        "Screening Study Started": "2021-07-02T00:00:00",
        "Screening Study Complete": "2021-09-22T00:00:00",
        "FIS Requested": "2022-03-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0073",
        "Project Name": "Hyacinth Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hyacinth Storage, LLC",
        "POI Location": "46500 Tomball 345 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-12-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-02T00:00:00",
        "Screening Study Started": "2021-07-02T00:00:00",
        "Screening Study Complete": "2021-09-22T00:00:00",
        "FIS Requested": "2022-03-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 325,
      "raw": {
        "INR": "24INR0075",
        "Project Name": "Blue Bird Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gigawatt Solar LLC",
        "POI Location": "tap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch ",
        "County": "Johnson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 425.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-10T00:00:00",
        "Screening Study Started": "2021-11-10T00:00:00",
        "Screening Study Complete": "2022-02-07T00:00:00",
        "FIS Requested": "2021-07-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-01-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0075",
        "Project Name": "Blue Bird Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gigawatt Solar LLC",
        "POI Location": "tap 345kV 1880 Rocky Creek - 1898 Mitchell Bend Switch ",
        "County": "Johnson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 425.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-10T00:00:00",
        "Screening Study Started": "2021-11-10T00:00:00",
        "Screening Study Complete": "2022-02-07T00:00:00",
        "FIS Requested": "2021-07-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-01-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 326,
      "raw": {
        "INR": "24INR0077",
        "Project Name": "Quarter Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Three LLC",
        "POI Location": "80223 Cenizo Substation 345kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 154.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-28T00:00:00",
        "Screening Study Started": "2021-07-13T00:00:00",
        "Screening Study Complete": "2021-09-28T00:00:00",
        "FIS Requested": "2022-03-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0077",
        "Project Name": "Quarter Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Three LLC",
        "POI Location": "80223 Cenizo Substation 345kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 154.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-28T00:00:00",
        "Screening Study Started": "2021-07-13T00:00:00",
        "Screening Study Complete": "2021-09-28T00:00:00",
        "FIS Requested": "2022-03-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 327,
      "raw": {
        "INR": "24INR0081",
        "Project Name": "SANJAC BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Castleman Power",
        "POI Location": "40270 Riverside 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-04-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-08T00:00:00",
        "Screening Study Started": "2021-07-08T00:00:00",
        "Screening Study Complete": "2021-09-28T00:00:00",
        "FIS Requested": "2021-07-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0081",
        "Project Name": "SANJAC BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Castleman Power",
        "POI Location": "40270 Riverside 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-04-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-07-08T00:00:00",
        "Screening Study Started": "2021-07-08T00:00:00",
        "Screening Study Complete": "2021-09-28T00:00:00",
        "FIS Requested": "2021-07-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 328,
      "raw": {
        "INR": "24INR0086",
        "Project Name": "Pisgah Ridge Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pisgah Ridge Solar 2, LLC",
        "POI Location": "Tap 345kV 68091 Navarro - 46020 Limestone",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-07T00:00:00",
        "Screening Study Started": "2021-07-14T00:00:00",
        "Screening Study Complete": "2021-10-07T00:00:00",
        "FIS Requested": "2021-08-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0086",
        "Project Name": "Pisgah Ridge Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pisgah Ridge Solar 2, LLC",
        "POI Location": "Tap 345kV 68091 Navarro - 46020 Limestone",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-07T00:00:00",
        "Screening Study Started": "2021-07-14T00:00:00",
        "Screening Study Complete": "2021-10-07T00:00:00",
        "FIS Requested": "2021-08-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 329,
      "raw": {
        "INR": "24INR0087",
        "Project Name": "Pisgah Ridge Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pisgah Ridge 3, LLC",
        "POI Location": "Tap 345kV 68091 Navarro - 46020 Limestone",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-07T00:00:00",
        "Screening Study Started": "2021-07-14T00:00:00",
        "Screening Study Complete": "2021-10-07T00:00:00",
        "FIS Requested": "2021-08-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0087",
        "Project Name": "Pisgah Ridge Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pisgah Ridge 3, LLC",
        "POI Location": "Tap 345kV 68091 Navarro - 46020 Limestone",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-07T00:00:00",
        "Screening Study Started": "2021-07-14T00:00:00",
        "Screening Study Complete": "2021-10-07T00:00:00",
        "FIS Requested": "2021-08-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 330,
      "raw": {
        "INR": "24INR0094",
        "Project Name": "Dovetail Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Solar 1 LLC",
        "POI Location": "Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 666.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-23T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0094",
        "Project Name": "Dovetail Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Solar 1 LLC",
        "POI Location": "Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 666.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-23T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 331,
      "raw": {
        "INR": "24INR0095",
        "Project Name": "Dovetail Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Solar 2 LLC",
        "POI Location": "Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 666.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-29T00:00:00",
        "Screening Study Started": "2021-10-26T00:00:00",
        "Screening Study Complete": "2022-01-21T00:00:00",
        "FIS Requested": "2022-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0095",
        "Project Name": "Dovetail Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Solar 2 LLC",
        "POI Location": "Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 666.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-29T00:00:00",
        "Screening Study Started": "2021-10-26T00:00:00",
        "Screening Study Complete": "2022-01-21T00:00:00",
        "FIS Requested": "2022-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 332,
      "raw": {
        "INR": "24INR0097",
        "Project Name": "Dovetail Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Solar Holdings LLC",
        "POI Location": "Tap 345kV 1421 Willow Creek – 11523 THOMPRIC",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 666.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-29T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-02-08T00:00:00",
        "FIS Requested": "2022-08-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0097",
        "Project Name": "Dovetail Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Solar Holdings LLC",
        "POI Location": "Tap 345kV 1421 Willow Creek – 11523 THOMPRIC",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 666.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-29T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-02-08T00:00:00",
        "FIS Requested": "2022-08-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 333,
      "raw": {
        "INR": "24INR0098",
        "Project Name": "Dovetail Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Storage LLC",
        "POI Location": "Tap 345 KV 1421 Willow Creek-60515 Clear Crossing CKT#2",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 508.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-09-28T00:00:00",
        "Screening Study Complete": "2021-12-03T00:00:00",
        "FIS Requested": "2022-05-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0098",
        "Project Name": "Dovetail Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Dovetail Storage LLC",
        "POI Location": "Tap 345 KV 1421 Willow Creek-60515 Clear Crossing CKT#2",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 508.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-09-28T00:00:00",
        "Screening Study Complete": "2021-12-03T00:00:00",
        "FIS Requested": "2022-05-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 334,
      "raw": {
        "INR": "24INR0102",
        "Project Name": "Val Vista Grid BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Val Vista Grid, LLC",
        "POI Location": "Tap 345kV 8383 North Edinburg - 80137 Stewart Road",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-30T00:00:00",
        "Screening Study Started": "2021-10-01T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2021-10-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0102",
        "Project Name": "Val Vista Grid BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Val Vista Grid, LLC",
        "POI Location": "Tap 345kV 8383 North Edinburg - 80137 Stewart Road",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-30T00:00:00",
        "Screening Study Started": "2021-10-01T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2021-10-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 335,
      "raw": {
        "INR": "24INR0104",
        "Project Name": "Braswell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Nine, LLC",
        "POI Location": "Tap 69kV 147 Lorena - 3580 Eddy Substation (Will be converted to 138kV line before 3/14/25 per TSP)",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 42.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2021-08-30T00:00:00",
        "Screening Study Complete": "2021-11-18T00:00:00",
        "FIS Requested": "2022-04-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0104",
        "Project Name": "Braswell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Nine, LLC",
        "POI Location": "Tap 69kV 147 Lorena - 3580 Eddy Substation (Will be converted to 138kV line before 3/14/25 per TSP)",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 42.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2021-08-30T00:00:00",
        "Screening Study Complete": "2021-11-18T00:00:00",
        "FIS Requested": "2022-04-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 336,
      "raw": {
        "INR": "24INR0106",
        "Project Name": "Payne Battlecreek",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gransolar Texas Ten, LLC",
        "POI Location": "tap 138kV 213 Haney - 3515 Hubbard",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 84.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-23T00:00:00",
        "Screening Study Started": "2021-08-12T00:00:00",
        "Screening Study Complete": "2021-10-29T00:00:00",
        "FIS Requested": "2022-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-02-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0106",
        "Project Name": "Payne Battlecreek",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gransolar Texas Ten, LLC",
        "POI Location": "tap 138kV 213 Haney - 3515 Hubbard",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 84.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-23T00:00:00",
        "Screening Study Started": "2021-08-12T00:00:00",
        "Screening Study Complete": "2021-10-29T00:00:00",
        "FIS Requested": "2022-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-02-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 337,
      "raw": {
        "INR": "24INR0108",
        "Project Name": "Louisa Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "VESI 49 LLC",
        "POI Location": "138 kV Helotes (#5200)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-16T00:00:00",
        "Screening Study Started": "2021-11-16T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2021-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-02-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0108",
        "Project Name": "Louisa Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "VESI 49 LLC",
        "POI Location": "138 kV Helotes (#5200)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-16T00:00:00",
        "Screening Study Started": "2021-11-16T00:00:00",
        "Screening Study Complete": "2022-01-17T00:00:00",
        "FIS Requested": "2021-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-02-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 338,
      "raw": {
        "INR": "24INR0115",
        "Project Name": "Aster Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aster Solar",
        "POI Location": "7042 Zorn 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 160.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-16T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-05-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0115",
        "Project Name": "Aster Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aster Solar",
        "POI Location": "7042 Zorn 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 160.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-16T00:00:00",
        "Screening Study Started": "2021-09-21T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-05-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 339,
      "raw": {
        "INR": "24INR0117",
        "Project Name": "Utley Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Palmera Solar Development, LLC",
        "POI Location": "Tap 345kV 3381 Big Brown Switch - 3391 Jewett",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-23T00:00:00",
        "Screening Study Started": "2021-09-07T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2022-03-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0117",
        "Project Name": "Utley Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Palmera Solar Development, LLC",
        "POI Location": "Tap 345kV 3381 Big Brown Switch - 3391 Jewett",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-23T00:00:00",
        "Screening Study Started": "2021-09-07T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2022-03-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 340,
      "raw": {
        "INR": "24INR0118",
        "Project Name": "Possum Kingdom Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "PK Solar, LLC",
        "POI Location": "Tap 345kV 1421 Willow Creek Switch – 11523 Thomas Price",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 262.22,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-02T00:00:00",
        "Screening Study Started": "2021-09-13T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2022-05-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-05-01T00:00:00",
        "Construction End": "2026-05-08T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0118",
        "Project Name": "Possum Kingdom Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "PK Solar, LLC",
        "POI Location": "Tap 345kV 1421 Willow Creek Switch – 11523 Thomas Price",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 262.22,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-02T00:00:00",
        "Screening Study Started": "2021-09-13T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2022-05-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-05-01T00:00:00",
        "Construction End": "2026-05-08T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 341,
      "raw": {
        "INR": "24INR0120",
        "Project Name": "Eytcheson Ranches Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Fourteen, LLC",
        "POI Location": "Tap 69kV 186 Navarro Mills – 107 Prairie Hill",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 76.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2021-09-14T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2022-05-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0120",
        "Project Name": "Eytcheson Ranches Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Fourteen, LLC",
        "POI Location": "Tap 69kV 186 Navarro Mills – 107 Prairie Hill",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 76.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2021-09-14T00:00:00",
        "Screening Study Complete": "2021-11-29T00:00:00",
        "FIS Requested": "2022-05-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 342,
      "raw": {
        "INR": "24INR0124",
        "Project Name": "High Noon Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "High Noon Solar Project, LLC",
        "POI Location": "Tap 138kV 445 Yates - 444 Covington",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 182,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-02T00:00:00",
        "Screening Study Started": "2021-11-03T00:00:00",
        "Screening Study Complete": "2021-12-29T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-05-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0124",
        "Project Name": "High Noon Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "High Noon Solar Project, LLC",
        "POI Location": "Tap 138kV 445 Yates - 444 Covington",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 182,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-02T00:00:00",
        "Screening Study Started": "2021-11-03T00:00:00",
        "Screening Study Complete": "2021-12-29T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-05-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 343,
      "raw": {
        "INR": "24INR0125",
        "Project Name": "Grasshopper Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grasshopper Solar LLC",
        "POI Location": "Smoky Hill 345kV Sub (Bus #6104) Locational coordinates : 33.34414; 99.624637",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 407.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-28T00:00:00",
        "Screening Study Started": "2021-09-28T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2021-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0125",
        "Project Name": "Grasshopper Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grasshopper Solar LLC",
        "POI Location": "Smoky Hill 345kV Sub (Bus #6104) Locational coordinates : 33.34414; 99.624637",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 407.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-09-28T00:00:00",
        "Screening Study Started": "2021-09-28T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2021-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 344,
      "raw": {
        "INR": "24INR0126",
        "Project Name": "High Noon Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "High Noon Solar Project, LLC",
        "POI Location": "Tap 138kV 445 Yates - 444 Covington",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-02T00:00:00",
        "Screening Study Started": "2021-11-03T00:00:00",
        "Screening Study Complete": "2021-12-29T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-05-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0126",
        "Project Name": "High Noon Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "High Noon Solar Project, LLC",
        "POI Location": "Tap 138kV 445 Yates - 444 Covington",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-02T00:00:00",
        "Screening Study Started": "2021-11-03T00:00:00",
        "Screening Study Complete": "2021-12-29T00:00:00",
        "FIS Requested": "2021-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-05-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 345,
      "raw": {
        "INR": "24INR0127",
        "Project Name": "Naduah Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Fifteen, LLC",
        "POI Location": "Tap 69kV Ben Hur (99) - Prairie Hill (107) \n",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 77.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-17T00:00:00",
        "Screening Study Started": "2021-09-27T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0127",
        "Project Name": "Naduah Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Fifteen, LLC",
        "POI Location": "Tap 69kV Ben Hur (99) - Prairie Hill (107) \n",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 77.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-17T00:00:00",
        "Screening Study Started": "2021-09-27T00:00:00",
        "Screening Study Complete": "2021-12-09T00:00:00",
        "FIS Requested": "2022-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 346,
      "raw": {
        "INR": "24INR0131",
        "Project Name": "Zelus BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Zelus BESS LLC",
        "POI Location": "the 138 kV Zapata Substation (#8299; AEP)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-16T00:00:00",
        "FIS Requested": "2021-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0131",
        "Project Name": "Zelus BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Zelus BESS LLC",
        "POI Location": "the 138 kV Zapata Substation (#8299; AEP)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-16T00:00:00",
        "FIS Requested": "2021-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 347,
      "raw": {
        "INR": "24INR0134",
        "Project Name": "BRP Hemera BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Hemera BESS LLC",
        "POI Location": "345 kV Deaf Smith Substation (#23908, Oncor)",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-20T00:00:00",
        "Screening Study Started": "2021-12-29T00:00:00",
        "Screening Study Complete": "2022-03-25T00:00:00",
        "FIS Requested": "2021-12-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0134",
        "Project Name": "BRP Hemera BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Hemera BESS LLC",
        "POI Location": "345 kV Deaf Smith Substation (#23908, Oncor)",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-20T00:00:00",
        "Screening Study Started": "2021-12-29T00:00:00",
        "Screening Study Complete": "2022-03-25T00:00:00",
        "FIS Requested": "2021-12-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 348,
      "raw": {
        "INR": "24INR0135",
        "Project Name": "BRP Mekong BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Mekong BESS LLC",
        "POI Location": "Tap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950) ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-16T00:00:00",
        "FIS Requested": "2021-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0135",
        "Project Name": "BRP Mekong BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Mekong BESS LLC",
        "POI Location": "Tap 345 kV line from Twin Oak Switch (#3400) to TPN One Plant Switchyard (#39950) ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-16T00:00:00",
        "FIS Requested": "2021-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 349,
      "raw": {
        "INR": "24INR0136",
        "Project Name": "Eagle Springs Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Eagle Springs BESS LLC",
        "POI Location": "Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line",
        "County": "Delta",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 33.94,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-10-18T00:00:00",
        "Screening Study Complete": "2022-01-12T00:00:00",
        "FIS Requested": "2022-06-13T00:00:00",
        "FIS Approved": "2025-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-10-30T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0136",
        "Project Name": "Eagle Springs Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Eagle Springs BESS LLC",
        "POI Location": "Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line",
        "County": "Delta",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 33.94,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-10-18T00:00:00",
        "Screening Study Complete": "2022-01-12T00:00:00",
        "FIS Requested": "2022-06-13T00:00:00",
        "FIS Approved": "2025-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-10-30T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 350,
      "raw": {
        "INR": "24INR0137",
        "Project Name": "Eagle Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Eagle Springs Solar, LLC",
        "POI Location": "Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line",
        "County": "Delta",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 77.21,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-10-18T00:00:00",
        "Screening Study Complete": "2022-01-12T00:00:00",
        "FIS Requested": "2022-06-13T00:00:00",
        "FIS Approved": "2025-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-10-30T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0137",
        "Project Name": "Eagle Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Eagle Springs Solar, LLC",
        "POI Location": "Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line",
        "County": "Delta",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 77.21,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-10-18T00:00:00",
        "Screening Study Complete": "2022-01-12T00:00:00",
        "FIS Requested": "2022-06-13T00:00:00",
        "FIS Approved": "2025-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-10-30T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 351,
      "raw": {
        "INR": "24INR0142",
        "Project Name": "De Los Santos",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP De Los Santos BESS LLC",
        "POI Location": "78016 Sunglow Substation 138kV",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-09T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0142",
        "Project Name": "De Los Santos",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP De Los Santos BESS LLC",
        "POI Location": "78016 Sunglow Substation 138kV",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-09T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 352,
      "raw": {
        "INR": "24INR0145",
        "Project Name": "Calpine Guadalupe Peakers",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guadalupe Peaking Energy Center, LLC",
        "POI Location": "7044 Marion 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 450,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-26T00:00:00",
        "Screening Study Started": "2021-11-15T00:00:00",
        "Screening Study Complete": "2022-02-11T00:00:00",
        "FIS Requested": "2021-10-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0145",
        "Project Name": "Calpine Guadalupe Peakers",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guadalupe Peaking Energy Center, LLC",
        "POI Location": "7044 Marion 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 450,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-10-26T00:00:00",
        "Screening Study Started": "2021-11-15T00:00:00",
        "Screening Study Complete": "2022-02-11T00:00:00",
        "FIS Requested": "2021-10-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 353,
      "raw": {
        "INR": "24INR0150",
        "Project Name": "Lupinus Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lupinus Solar, LLC",
        "POI Location": "Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES \n",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 162.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-23T00:00:00",
        "Screening Study Started": "2021-12-08T00:00:00",
        "Screening Study Complete": "2022-03-04T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-06-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0150",
        "Project Name": "Lupinus Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lupinus Solar, LLC",
        "POI Location": "Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES \n",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 162.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-23T00:00:00",
        "Screening Study Started": "2021-12-08T00:00:00",
        "Screening Study Complete": "2022-03-04T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-06-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 354,
      "raw": {
        "INR": "24INR0153",
        "Project Name": "Lupinus Storage 1",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lupinus Solar, LLC",
        "POI Location": "Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES ",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 84.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-23T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-09-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0153",
        "Project Name": "Lupinus Storage 1",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lupinus Solar, LLC",
        "POI Location": "Tap 345 kV 11699 Woodard Switch - 1695 Monticello SES ",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 84.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-23T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-09-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 355,
      "raw": {
        "INR": "24INR0154",
        "Project Name": "Lupinus Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lupinus Solar 2, LLC",
        "POI Location": "Hagansport Switch (old Monticello Tap bus# 1794)",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-23T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-22T00:00:00",
        "Meets All Planning": "2026-04-22T00:00:00",
        "Unnamed: 25": "2026-04-09T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0154",
        "Project Name": "Lupinus Solar 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lupinus Solar 2, LLC",
        "POI Location": "Hagansport Switch (old Monticello Tap bus# 1794)",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-23T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-22T00:00:00",
        "Meets All Planning": "2026-04-22T00:00:00",
        "Unnamed: 25": "2026-04-09T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 356,
      "raw": {
        "INR": "24INR0155",
        "Project Name": "Lupinus Storage 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lupinus Solar 2, LLC",
        "POI Location": "Hagansport Switch (old Monticello Tap bus# 1794)",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 124.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-03T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-04-22T00:00:00",
        "Meets All Planning": "2026-04-22T00:00:00",
        "Unnamed: 25": "2026-04-09T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0155",
        "Project Name": "Lupinus Storage 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lupinus Solar 2, LLC",
        "POI Location": "Hagansport Switch (old Monticello Tap bus# 1794)",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 124.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-03T00:00:00",
        "Screening Study Started": "2021-12-13T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-05-11T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-04-22T00:00:00",
        "Meets All Planning": "2026-04-22T00:00:00",
        "Unnamed: 25": "2026-04-09T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 357,
      "raw": {
        "INR": "24INR0156",
        "Project Name": "Moonstone Solar Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Moon Stone Solar Farm, LLC",
        "POI Location": "Tap 138kV Eagle Creek (5132) to Floresville (5155)",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 174.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-10-27T00:00:00",
        "Screening Study Complete": "2022-01-24T00:00:00",
        "FIS Requested": "2022-06-07T00:00:00",
        "FIS Approved": "2024-01-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-02-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0156",
        "Project Name": "Moonstone Solar Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Moon Stone Solar Farm, LLC",
        "POI Location": "Tap 138kV Eagle Creek (5132) to Floresville (5155)",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 174.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-20T00:00:00",
        "Screening Study Started": "2021-10-27T00:00:00",
        "Screening Study Complete": "2022-01-24T00:00:00",
        "FIS Requested": "2022-06-07T00:00:00",
        "FIS Approved": "2024-01-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-02-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 358,
      "raw": {
        "INR": "24INR0157",
        "Project Name": "Merope BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Merope BESS LLC",
        "POI Location": "345 kV Corn Trail Switch Substation (#11441)",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 402.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-13T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-16T00:00:00",
        "FIS Requested": "2021-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0157",
        "Project Name": "Merope BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Merope BESS LLC",
        "POI Location": "345 kV Corn Trail Switch Substation (#11441)",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 402.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-13T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-16T00:00:00",
        "FIS Requested": "2021-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 359,
      "raw": {
        "INR": "24INR0160",
        "Project Name": "Huisache Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Huisache Solar, LLC",
        "POI Location": "Tapping the Elm Creek to Shaula circuit 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.59,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2022-07-11T00:00:00",
        "Screening Study Started": "2021-12-03T00:00:00",
        "Screening Study Complete": "2022-03-01T00:00:00",
        "FIS Requested": "2022-06-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0160",
        "Project Name": "Huisache Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Huisache Solar, LLC",
        "POI Location": "Tapping the Elm Creek to Shaula circuit 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.59,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2022-07-11T00:00:00",
        "Screening Study Started": "2021-12-03T00:00:00",
        "Screening Study Complete": "2022-03-01T00:00:00",
        "FIS Requested": "2022-06-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 360,
      "raw": {
        "INR": "24INR0161",
        "Project Name": "Miranda Solar Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Miranda Solar Project, LLC",
        "POI Location": "Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1",
        "County": "McMullen",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 261.67,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2022-06-27T00:00:00",
        "Screening Study Started": "2021-11-03T00:00:00",
        "Screening Study Complete": "2022-01-07T00:00:00",
        "FIS Requested": "2022-06-22T00:00:00",
        "FIS Approved": "2024-09-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-07-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0161",
        "Project Name": "Miranda Solar Project",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Miranda Solar Project, LLC",
        "POI Location": "Tap 345kV 5709 Fowlerton - 5901 San Miguel Ckt 1",
        "County": "McMullen",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 261.67,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2022-06-27T00:00:00",
        "Screening Study Started": "2021-11-03T00:00:00",
        "Screening Study Complete": "2022-01-07T00:00:00",
        "FIS Requested": "2022-06-22T00:00:00",
        "FIS Approved": "2024-09-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-07-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 361,
      "raw": {
        "INR": "24INR0167",
        "Project Name": "OCI SunRoper",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "OCI SunRoper LLC",
        "POI Location": "tap138kV #43190 South Lane City to #42985 Dyann  CKT#60",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 265.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-18T00:00:00",
        "Screening Study Started": "2021-11-24T00:00:00",
        "Screening Study Complete": "2022-02-19T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": "2026-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0167",
        "Project Name": "OCI SunRoper",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "OCI SunRoper LLC",
        "POI Location": "tap138kV #43190 South Lane City to #42985 Dyann  CKT#60",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 265.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-18T00:00:00",
        "Screening Study Started": "2021-11-24T00:00:00",
        "Screening Study Complete": "2022-02-19T00:00:00",
        "FIS Requested": "2021-11-23T00:00:00",
        "FIS Approved": "2026-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 362,
      "raw": {
        "INR": "24INR0168",
        "Project Name": "Tejano Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tejano Storage, LLC",
        "POI Location": "Tap 138kV 8125 Lolita - 8172 Victoria ",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 152.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-06T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-26T00:00:00",
        "FIS Requested": "2022-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0168",
        "Project Name": "Tejano Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tejano Storage, LLC",
        "POI Location": "Tap 138kV 8125 Lolita - 8172 Victoria ",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 152.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-06T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-26T00:00:00",
        "FIS Requested": "2022-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 363,
      "raw": {
        "INR": "24INR0169",
        "Project Name": "Yaupon Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Yaupon Solar, LLC",
        "POI Location": "to Tap 345 kV Gibson Switch (3706) – TNP One (39950)",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-12T00:00:00",
        "Screening Study Started": "2021-11-10T00:00:00",
        "Screening Study Complete": "2022-02-08T00:00:00",
        "FIS Requested": "2022-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-09-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0169",
        "Project Name": "Yaupon Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Yaupon Solar, LLC",
        "POI Location": "to Tap 345 kV Gibson Switch (3706) – TNP One (39950)",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-12T00:00:00",
        "Screening Study Started": "2021-11-10T00:00:00",
        "Screening Study Complete": "2022-02-08T00:00:00",
        "FIS Requested": "2022-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-09-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 364,
      "raw": {
        "INR": "24INR0172",
        "Project Name": "Smith Lake Solar DC",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Smith Lake Solar",
        "POI Location": "TAP 345 KV  44645 SINGLETON - 44900 ZENITH Ckt #99",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-30T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-06T00:00:00",
        "FIS Requested": "2022-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0172",
        "Project Name": "Smith Lake Solar DC",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Smith Lake Solar",
        "POI Location": "TAP 345 KV  44645 SINGLETON - 44900 ZENITH Ckt #99",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-30T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-06T00:00:00",
        "FIS Requested": "2022-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 365,
      "raw": {
        "INR": "24INR0174",
        "Project Name": "Solar Star North Herty Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Solar Star North Herty Storage, LLC",
        "POI Location": "3307 Redland Switch 138 kV",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-09T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-21T00:00:00",
        "FIS Requested": "2022-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0174",
        "Project Name": "Solar Star North Herty Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Solar Star North Herty Storage, LLC",
        "POI Location": "3307 Redland Switch 138 kV",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-09T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-21T00:00:00",
        "FIS Requested": "2022-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 366,
      "raw": {
        "INR": "24INR0178",
        "Project Name": "Cumulus Grid BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cumulus Grid, LLC",
        "POI Location": "1906 Venus Switch Substation 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-01T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-04-18T00:00:00",
        "FIS Requested": "2022-10-18T00:00:00",
        "FIS Approved": "2025-01-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-06-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0178",
        "Project Name": "Cumulus Grid BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cumulus Grid, LLC",
        "POI Location": "1906 Venus Switch Substation 345kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-01T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-04-18T00:00:00",
        "FIS Requested": "2022-10-18T00:00:00",
        "FIS Approved": "2025-01-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-06-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 367,
      "raw": {
        "INR": "24INR0184",
        "Project Name": "Slate Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ignis TX Solar Three LLC",
        "POI Location": "Tap 138kV 8646 Rio Bravo - 8985 San Ygancio",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 104.89,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0184",
        "Project Name": "Slate Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ignis TX Solar Three LLC",
        "POI Location": "Tap 138kV 8646 Rio Bravo - 8985 San Ygancio",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 104.89,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 368,
      "raw": {
        "INR": "24INR0186",
        "Project Name": "Rowdy Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rowdy Creek Solar LLC",
        "POI Location": "Woodfin Switch (#1465) 345kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 351.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-13T00:00:00",
        "Screening Study Started": "2022-01-28T00:00:00",
        "Screening Study Complete": "2022-04-27T00:00:00",
        "FIS Requested": "2022-01-25T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-07-29T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0186",
        "Project Name": "Rowdy Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rowdy Creek Solar LLC",
        "POI Location": "Woodfin Switch (#1465) 345kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 351.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-13T00:00:00",
        "Screening Study Started": "2022-01-28T00:00:00",
        "Screening Study Complete": "2022-04-27T00:00:00",
        "FIS Requested": "2022-01-25T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-07-29T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 369,
      "raw": {
        "INR": "24INR0188",
        "Project Name": "Tehuacana Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tehuacana Creek Solar LLC",
        "POI Location": "Tap 345kV 3381 Big Brown – 68091 Navarro circuit ",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 505.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2021-12-09T00:00:00",
        "FIS Approved": "2026-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-11-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-04-23T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0188",
        "Project Name": "Tehuacana Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tehuacana Creek Solar LLC",
        "POI Location": "Tap 345kV 3381 Big Brown – 68091 Navarro circuit ",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 505.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-12-15T00:00:00",
        "Screening Study Started": "2021-12-20T00:00:00",
        "Screening Study Complete": "2022-03-10T00:00:00",
        "FIS Requested": "2021-12-09T00:00:00",
        "FIS Approved": "2026-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-11-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-04-23T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 370,
      "raw": {
        "INR": "24INR0196",
        "Project Name": "Dori BQ BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunnyside Energy LLC",
        "POI Location": "138kV line Holmes (#47210) - Garden Villas (#42680); CNP",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-05T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-06T00:00:00",
        "FIS Requested": "2022-01-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-05-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0196",
        "Project Name": "Dori BQ BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunnyside Energy LLC",
        "POI Location": "138kV line Holmes (#47210) - Garden Villas (#42680); CNP",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-05T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-06T00:00:00",
        "FIS Requested": "2022-01-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-05-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 371,
      "raw": {
        "INR": "24INR0198",
        "Project Name": "Two Forks BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Two Forks LLC",
        "POI Location": "684 SPRING 138kV",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 309.8,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-10-23T00:00:00",
        "Screening Study Started": "2022-01-28T00:00:00",
        "Screening Study Complete": "2022-04-26T00:00:00",
        "FIS Requested": "2022-10-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-05-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-06T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0198",
        "Project Name": "Two Forks BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Two Forks LLC",
        "POI Location": "684 SPRING 138kV",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 309.8,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-10-23T00:00:00",
        "Screening Study Started": "2022-01-28T00:00:00",
        "Screening Study Complete": "2022-04-26T00:00:00",
        "FIS Requested": "2022-10-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-05-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-06T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 372,
      "raw": {
        "INR": "24INR0200",
        "Project Name": "White Tail Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mule Deer Solar LLC",
        "POI Location": "Tap 345kV Windmill (23910) – AJ Swope (23906)",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 226.8,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-11-09T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-07T00:00:00",
        "FIS Requested": "2022-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0200",
        "Project Name": "White Tail Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mule Deer Solar LLC",
        "POI Location": "Tap 345kV Windmill (23910) – AJ Swope (23906)",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 226.8,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-11-09T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-07T00:00:00",
        "FIS Requested": "2022-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 373,
      "raw": {
        "INR": "24INR0201",
        "Project Name": "Short Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wichita Solar I, LLC",
        "POI Location": "Tap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 627.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-17T00:00:00",
        "Screening Study Started": "2022-01-20T00:00:00",
        "Screening Study Complete": "2022-04-18T00:00:00",
        "FIS Requested": "2022-10-12T00:00:00",
        "FIS Approved": "2026-09-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0201",
        "Project Name": "Short Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wichita Solar I, LLC",
        "POI Location": "Tap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 627.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-17T00:00:00",
        "Screening Study Started": "2022-01-20T00:00:00",
        "Screening Study Complete": "2022-04-18T00:00:00",
        "FIS Requested": "2022-10-12T00:00:00",
        "FIS Approved": "2026-09-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 374,
      "raw": {
        "INR": "24INR0205",
        "Project Name": "Wensowitch Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Wensowitch LLC",
        "POI Location": "Tapping 138 kV line Telico (192) to Montfort Switch (3454)",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 146.08,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-08-15T00:00:00",
        "Screening Study Started": "2022-01-07T00:00:00",
        "Screening Study Complete": "2022-04-01T00:00:00",
        "FIS Requested": "2022-07-25T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0205",
        "Project Name": "Wensowitch Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Wensowitch LLC",
        "POI Location": "Tapping 138 kV line Telico (192) to Montfort Switch (3454)",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 146.08,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-08-15T00:00:00",
        "Screening Study Started": "2022-01-07T00:00:00",
        "Screening Study Complete": "2022-04-01T00:00:00",
        "FIS Requested": "2022-07-25T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 375,
      "raw": {
        "INR": "24INR0206",
        "Project Name": "Glasgow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Glasgow Solar LLC",
        "POI Location": "Tap 345kV #2466 Big Onion  - #68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-03T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-07T00:00:00",
        "FIS Requested": "2022-01-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0206",
        "Project Name": "Glasgow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Glasgow Solar LLC",
        "POI Location": "Tap 345kV #2466 Big Onion  - #68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-03T00:00:00",
        "Screening Study Started": "2022-02-07T00:00:00",
        "Screening Study Complete": "2022-05-07T00:00:00",
        "FIS Requested": "2022-01-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 376,
      "raw": {
        "INR": "24INR0207",
        "Project Name": "Glasgow Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Glasgow Solar LLC",
        "POI Location": "Tap 345kV #2466 Big Onion  - #68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-07T00:00:00",
        "FIS Requested": "2022-02-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0207",
        "Project Name": "Glasgow Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Glasgow Solar LLC",
        "POI Location": "Tap 345kV #2466 Big Onion  - #68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-07T00:00:00",
        "FIS Requested": "2022-02-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 377,
      "raw": {
        "INR": "24INR0208",
        "Project Name": "Eastbell Milam Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cattlemen Solar Park II LLC",
        "POI Location": "345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-02-07T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-02-03T00:00:00",
        "FIS Approved": "2024-02-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-10-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2024-02-01T00:00:00",
        "Meets All Planning": "2024-02-01T00:00:00",
        "Unnamed: 25": "2024-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-09-13T00:00:00",
        "Approved for Synchronization": "2024-11-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0208",
        "Project Name": "Eastbell Milam Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cattlemen Solar Park II LLC",
        "POI Location": "345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-02-07T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-02-03T00:00:00",
        "FIS Approved": "2024-02-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-10-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2024-02-01T00:00:00",
        "Meets All Planning": "2024-02-01T00:00:00",
        "Unnamed: 25": "2024-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-09-13T00:00:00",
        "Approved for Synchronization": "2024-11-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 378,
      "raw": {
        "INR": "24INR0210",
        "Project Name": "Raven Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Raven Storage, LLC",
        "POI Location": "Tap 138kV 44740 Wallis - 44190 East Bernard CKT#65",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.53,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-01T00:00:00",
        "Screening Study Started": "2022-01-28T00:00:00",
        "Screening Study Complete": "2022-04-26T00:00:00",
        "FIS Requested": "2022-10-18T00:00:00",
        "FIS Approved": "2025-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-10-28T00:00:00",
        "Meets All Planning": "2025-10-29T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0210",
        "Project Name": "Raven Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Raven Storage, LLC",
        "POI Location": "Tap 138kV 44740 Wallis - 44190 East Bernard CKT#65",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.53,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-01T00:00:00",
        "Screening Study Started": "2022-01-28T00:00:00",
        "Screening Study Complete": "2022-04-26T00:00:00",
        "FIS Requested": "2022-10-18T00:00:00",
        "FIS Approved": "2025-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-10-28T00:00:00",
        "Meets All Planning": "2025-10-29T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 379,
      "raw": {
        "INR": "24INR0234",
        "Project Name": "Rock N' Roll Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rock N’ Roll Solar, LLC",
        "POI Location": "tap 138kV 44600 Rosharon - 44531 Winmil",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-10T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0234",
        "Project Name": "Rock N' Roll Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rock N’ Roll Solar, LLC",
        "POI Location": "tap 138kV 44600 Rosharon - 44531 Winmil",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-10T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 380,
      "raw": {
        "INR": "24INR0235",
        "Project Name": "Rock N' Roll Storage Two",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rock N’ Roll Solar, LLC",
        "POI Location": "tap 138kV 44600 Rosharon - 44531 Winmil",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-24T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0235",
        "Project Name": "Rock N' Roll Storage Two",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rock N’ Roll Solar, LLC",
        "POI Location": "tap 138kV 44600 Rosharon - 44531 Winmil",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-24T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 381,
      "raw": {
        "INR": "24INR0238",
        "Project Name": "Appaloosa Run BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "APPALOOSA RUN STORAGE, LLC",
        "POI Location": "New Palouse 138kV (#60278)",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-11T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-03-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2024-02-09T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0238",
        "Project Name": "Appaloosa Run BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "APPALOOSA RUN STORAGE, LLC",
        "POI Location": "New Palouse 138kV (#60278)",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-11T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-03-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2024-02-09T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 382,
      "raw": {
        "INR": "24INR0239",
        "Project Name": "Trojan BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trojan BESS",
        "POI Location": "11735 Cedar Elm Switch 345kV",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-17T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0239",
        "Project Name": "Trojan BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trojan BESS",
        "POI Location": "11735 Cedar Elm Switch 345kV",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-17T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 383,
      "raw": {
        "INR": "24INR0256",
        "Project Name": "Kennedy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kennedy Bypass Solar LLC",
        "POI Location": "Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-11T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0256",
        "Project Name": "Kennedy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kennedy Bypass Solar LLC",
        "POI Location": "Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-11T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 384,
      "raw": {
        "INR": "24INR0258",
        "Project Name": "Zeissel Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "ZSS Power, LLC ",
        "POI Location": "#60094 Joule 345kV",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 451.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-19T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-02-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0258",
        "Project Name": "Zeissel Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "ZSS Power, LLC ",
        "POI Location": "#60094 Joule 345kV",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 451.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-19T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-02-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 385,
      "raw": {
        "INR": "24INR0262",
        "Project Name": "Lan Battery SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BR Solar, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – 1692 Paris Switch",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-04-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0262",
        "Project Name": "Lan Battery SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BR Solar, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – 1692 Paris Switch",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-04T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-04-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 386,
      "raw": {
        "INR": "24INR0269",
        "Project Name": "Bar Candela Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bar Candela Solar Project LLC",
        "POI Location": "Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.3,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-12-16T00:00:00",
        "Screening Study Started": "2022-03-21T00:00:00",
        "Screening Study Complete": "2022-06-13T00:00:00",
        "FIS Requested": "2022-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-05-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0269",
        "Project Name": "Bar Candela Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bar Candela Solar Project LLC",
        "POI Location": "Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.3,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-12-16T00:00:00",
        "Screening Study Started": "2022-03-21T00:00:00",
        "Screening Study Complete": "2022-06-13T00:00:00",
        "FIS Requested": "2022-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-05-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 387,
      "raw": {
        "INR": "24INR0271",
        "Project Name": "Bar Candela Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bar Candela Storage Project LLC",
        "POI Location": "Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-12-16T00:00:00",
        "Screening Study Started": "2022-03-21T00:00:00",
        "Screening Study Complete": "2022-06-13T00:00:00",
        "FIS Requested": "2022-12-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-05-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0271",
        "Project Name": "Bar Candela Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bar Candela Storage Project LLC",
        "POI Location": "Long Lake Sub (Bus 3280) – Long Lake Tap Switch (Bus 3279)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-12-16T00:00:00",
        "Screening Study Started": "2022-03-21T00:00:00",
        "Screening Study Complete": "2022-06-13T00:00:00",
        "FIS Requested": "2022-12-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-05-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 388,
      "raw": {
        "INR": "24INR0274",
        "Project Name": "Bufflehead BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Boxcar Energy Storage, LLC",
        "POI Location": "2475 Lavon Switch 138kV",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-02-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-25T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-02-28T00:00:00",
        "FIS Approved": "2026-02-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-04-10T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-04-27T00:00:00",
        "Meets All Planning": "2026-04-27T00:00:00",
        "Unnamed: 25": "2026-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0274",
        "Project Name": "Bufflehead BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Boxcar Energy Storage, LLC",
        "POI Location": "2475 Lavon Switch 138kV",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-02-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-25T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-02-28T00:00:00",
        "FIS Approved": "2026-02-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-04-10T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-04-27T00:00:00",
        "Meets All Planning": "2026-04-27T00:00:00",
        "Unnamed: 25": "2026-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 389,
      "raw": {
        "INR": "24INR0275",
        "Project Name": "Picadillo BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "23837 Buffalo 138kV",
        "County": "Martin",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-25T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-02-28T00:00:00",
        "FIS Approved": "2023-06-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-01-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0275",
        "Project Name": "Picadillo BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "23837 Buffalo 138kV",
        "County": "Martin",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-25T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-06-02T00:00:00",
        "FIS Requested": "2022-02-28T00:00:00",
        "FIS Approved": "2023-06-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-01-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 390,
      "raw": {
        "INR": "24INR0281",
        "Project Name": "Red Egret BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Red Egret LLC",
        "POI Location": "38820 FREEWAY PARK 138KV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-11-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-23T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-09T00:00:00",
        "FIS Requested": "2022-10-13T00:00:00",
        "FIS Approved": "2025-08-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-06-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-08-08T00:00:00",
        "Meets All Planning": "2024-08-13T00:00:00",
        "Unnamed: 25": "2025-10-14T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0281",
        "Project Name": "Red Egret BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Red Egret LLC",
        "POI Location": "38820 FREEWAY PARK 138KV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-11-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-23T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-09T00:00:00",
        "FIS Requested": "2022-10-13T00:00:00",
        "FIS Approved": "2025-08-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-06-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-08-08T00:00:00",
        "Meets All Planning": "2024-08-13T00:00:00",
        "Unnamed: 25": "2025-10-14T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 391,
      "raw": {
        "INR": "24INR0282",
        "Project Name": "Royal River BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Royal River LLC",
        "POI Location": "Tap 138kV 42110 Angleton - 43381 West Columbia",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-08T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-27T00:00:00",
        "FIS Requested": "2022-12-19T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-07-15T00:00:00",
        "Meets All Planning": "2026-07-28T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0282",
        "Project Name": "Royal River BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Royal River LLC",
        "POI Location": "Tap 138kV 42110 Angleton - 43381 West Columbia",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-08T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-27T00:00:00",
        "FIS Requested": "2022-12-19T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-07-15T00:00:00",
        "Meets All Planning": "2026-07-28T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 392,
      "raw": {
        "INR": "24INR0285",
        "Project Name": "APV Plumwood Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "APV Lonestar Energy LLC",
        "POI Location": "Tap 138kV 40171 Baytown - 40015Cedar Bayou Plant",
        "County": "Chambers",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-18T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-26T00:00:00",
        "FIS Requested": "2022-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-09-03T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0285",
        "Project Name": "APV Plumwood Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "APV Lonestar Energy LLC",
        "POI Location": "Tap 138kV 40171 Baytown - 40015Cedar Bayou Plant",
        "County": "Chambers",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-18T00:00:00",
        "Screening Study Started": "2022-03-30T00:00:00",
        "Screening Study Complete": "2022-06-26T00:00:00",
        "FIS Requested": "2022-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-09-03T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 393,
      "raw": {
        "INR": "24INR0287",
        "Project Name": "Rockridge Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Magnolia Solar Development, LLC",
        "POI Location": "7225 Hickory Forest 138kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 211.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-10T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-12T00:00:00",
        "FIS Requested": "2022-08-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0287",
        "Project Name": "Rockridge Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Magnolia Solar Development, LLC",
        "POI Location": "7225 Hickory Forest 138kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 211.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-10T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-12T00:00:00",
        "FIS Requested": "2022-08-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 394,
      "raw": {
        "INR": "24INR0289",
        "Project Name": "Ratcliff Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Ratcliff",
        "POI Location": "Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 85.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-22T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-23T00:00:00",
        "FIS Requested": "2022-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0289",
        "Project Name": "Ratcliff Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Ratcliff",
        "POI Location": "Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 85.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-22T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-23T00:00:00",
        "FIS Requested": "2022-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 395,
      "raw": {
        "INR": "24INR0291",
        "Project Name": "Rubicon Alpha Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Throckmorton Wind, LLC",
        "POI Location": "60507 pendulo7A 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 222.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-28T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-15T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-05-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-04-30T00:00:00",
        "Unnamed: 25": "2026-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0291",
        "Project Name": "Rubicon Alpha Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Throckmorton Wind, LLC",
        "POI Location": "60507 pendulo7A 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 222.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-28T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-15T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-05-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-04-30T00:00:00",
        "Unnamed: 25": "2026-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 396,
      "raw": {
        "INR": "24INR0298",
        "Project Name": "Leighton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Lavender Solar LLC",
        "POI Location": "98 Fernleaf 138 kV",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-27T00:00:00",
        "Screening Study Started": "2022-05-11T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-03-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-05-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0298",
        "Project Name": "Leighton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Lavender Solar LLC",
        "POI Location": "98 Fernleaf 138 kV",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-27T00:00:00",
        "Screening Study Started": "2022-05-11T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-03-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-05-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 397,
      "raw": {
        "INR": "24INR0303",
        "Project Name": "Erika Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Erika Solar, LLC",
        "POI Location": "Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-02T00:00:00",
        "Screening Study Started": "2022-07-25T00:00:00",
        "Screening Study Complete": "2022-10-18T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": "2025-09-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-14T00:00:00",
        "Approved for Synchronization": "2026-08-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0303",
        "Project Name": "Erika Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Erika Solar, LLC",
        "POI Location": "Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-11-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-02T00:00:00",
        "Screening Study Started": "2022-07-25T00:00:00",
        "Screening Study Complete": "2022-10-18T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": "2025-09-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-14T00:00:00",
        "Approved for Synchronization": "2026-08-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 398,
      "raw": {
        "INR": "24INR0305",
        "Project Name": "MRG Goody Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MRG Goody Solar Project LLC",
        "POI Location": "Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693) ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 52.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-07T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-04-11T00:00:00",
        "FIS Approved": "2025-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-02-06T00:00:00",
        "Approved for Synchronization": "2026-03-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0305",
        "Project Name": "MRG Goody Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "MRG Goody Solar Project LLC",
        "POI Location": "Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693) ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 52.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-07T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-04-11T00:00:00",
        "FIS Approved": "2025-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-02-06T00:00:00",
        "Approved for Synchronization": "2026-03-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 399,
      "raw": {
        "INR": "24INR0306",
        "Project Name": "Arroyo Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BT Cantwell Solar, LLC",
        "POI Location": "Tap 345kV 8318 Rio Hondo - 8317 La Palma (New Gulch Substation )",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-10-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 183.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-03T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-04-26T00:00:00",
        "FIS Approved": "2024-04-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-08-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-06-24T00:00:00",
        "Meets All Planning": "2024-06-24T00:00:00",
        "Unnamed: 25": "2024-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-08T00:00:00",
        "Approved for Synchronization": "2026-06-25T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0306",
        "Project Name": "Arroyo Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BT Cantwell Solar, LLC",
        "POI Location": "Tap 345kV 8318 Rio Hondo - 8317 La Palma (New Gulch Substation )",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-10-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 183.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-03T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-05T00:00:00",
        "FIS Requested": "2022-04-26T00:00:00",
        "FIS Approved": "2024-04-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-08-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-06-24T00:00:00",
        "Meets All Planning": "2024-06-24T00:00:00",
        "Unnamed: 25": "2024-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-08T00:00:00",
        "Approved for Synchronization": "2026-06-25T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 400,
      "raw": {
        "INR": "24INR0308",
        "Project Name": "Forts Trail Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "JC Central Bluff, LLC",
        "POI Location": "11406 Central Bluff Switch 345kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-07T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0308",
        "Project Name": "Forts Trail Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "JC Central Bluff, LLC",
        "POI Location": "11406 Central Bluff Switch 345kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-07T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 401,
      "raw": {
        "INR": "24INR0313",
        "Project Name": "Backbone Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Backbone Creek BESS LLC",
        "POI Location": "7351 STARCKE 138kV",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 124.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-09T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-08T00:00:00",
        "FIS Requested": "2022-04-27T00:00:00",
        "FIS Approved": "2025-09-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2023-12-22T00:00:00",
        "Meets All Planning": "2025-10-29T00:00:00",
        "Unnamed: 25": "2025-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-04T00:00:00",
        "Approved for Synchronization": "2026-09-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0313",
        "Project Name": "Backbone Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Backbone Creek BESS LLC",
        "POI Location": "7351 STARCKE 138kV",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 124.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-09T00:00:00",
        "Screening Study Started": "2022-04-18T00:00:00",
        "Screening Study Complete": "2022-07-08T00:00:00",
        "FIS Requested": "2022-04-27T00:00:00",
        "FIS Approved": "2025-09-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2023-12-22T00:00:00",
        "Meets All Planning": "2025-10-29T00:00:00",
        "Unnamed: 25": "2025-10-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-04T00:00:00",
        "Approved for Synchronization": "2026-09-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 402,
      "raw": {
        "INR": "24INR0319",
        "Project Name": "Burro Loco Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VESI",
        "POI Location": "8626 Resaca 69kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 25.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0319",
        "Project Name": "Burro Loco Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VESI",
        "POI Location": "8626 Resaca 69kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 25.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 403,
      "raw": {
        "INR": "24INR0326",
        "Project Name": "Blarney Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blarney Solar Project LLC",
        "POI Location": "138 kV Ridgeway Switch",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-04-21T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0326",
        "Project Name": "Blarney Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blarney Solar Project LLC",
        "POI Location": "138 kV Ridgeway Switch",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-20T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-04-21T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 404,
      "raw": {
        "INR": "24INR0331",
        "Project Name": "Chisme Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Blue Heron Solar, LLC",
        "POI Location": "Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-11T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-11T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0331",
        "Project Name": "Chisme Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Blue Heron Solar, LLC",
        "POI Location": "Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-11T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-11T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 405,
      "raw": {
        "INR": "24INR0333",
        "Project Name": "Chisme Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Blue Heron Solar, LLC",
        "POI Location": "Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 147,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-11T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-11T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-16T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0333",
        "Project Name": "Chisme Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Blue Heron Solar, LLC",
        "POI Location": "Tap 345 kV 1444 BROWN SWITCH - 3424 BUCKHORN SWITCH",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 147,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-11T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-11T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-16T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 406,
      "raw": {
        "INR": "24INR0337",
        "Project Name": "Eldora Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Eldora Energy LLC",
        "POI Location": "Tap 345 kV 5915 South Texas Project – 44200 Hillje Ckt 1",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-12-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0337",
        "Project Name": "Eldora Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Eldora Energy LLC",
        "POI Location": "Tap 345 kV 5915 South Texas Project – 44200 Hillje Ckt 1",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-05-31T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-12-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 407,
      "raw": {
        "INR": "24INR0338",
        "Project Name": "Eldora BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Eldora Energy LLC",
        "POI Location": "345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transmission Line Ckt 1",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-03T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-06-01T00:00:00",
        "FIS Approved": "2023-12-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-11-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-12-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0338",
        "Project Name": "Eldora BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Eldora Energy LLC",
        "POI Location": "345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transmission Line Ckt 1",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-03T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-06-01T00:00:00",
        "FIS Approved": "2023-12-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-11-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2023-12-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 408,
      "raw": {
        "INR": "24INR0339",
        "Project Name": "Mystic Springs Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mystic Spring Renewable Energy LLC",
        "POI Location": "Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 258.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-11-28T00:00:00",
        "FIS Approved": "2025-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-10-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0339",
        "Project Name": "Mystic Springs Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mystic Spring Renewable Energy LLC",
        "POI Location": "Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 258.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-11-28T00:00:00",
        "FIS Approved": "2025-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-10-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 409,
      "raw": {
        "INR": "24INR0340",
        "Project Name": "Mystic Springs Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Mystic Spring Renewable Energy LLC ",
        "POI Location": "Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-11-28T00:00:00",
        "FIS Approved": "2025-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0340",
        "Project Name": "Mystic Springs Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Mystic Spring Renewable Energy LLC ",
        "POI Location": "Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-11-28T00:00:00",
        "FIS Approved": "2025-04-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 410,
      "raw": {
        "INR": "24INR0341",
        "Project Name": "Forts Trail BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "JC Central Bluff, LLC",
        "POI Location": "11406 Central Bluff Switch 345kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-06T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0341",
        "Project Name": "Forts Trail BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "JC Central Bluff, LLC",
        "POI Location": "11406 Central Bluff Switch 345kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-06T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 411,
      "raw": {
        "INR": "24INR0355",
        "Project Name": "Anatole Renewable Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Anatole Renewable Energy LLC",
        "POI Location": "(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn Electric Cooperative)",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-12-02T00:00:00",
        "FIS Approved": "2026-09-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-06-01T00:00:00",
        "Construction End": "2027-04-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0355",
        "Project Name": "Anatole Renewable Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Anatole Renewable Energy LLC",
        "POI Location": "(Bus# 6951) Eustace Southeast 138kV Substation (owned by Rayburn Electric Cooperative)",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-30T00:00:00",
        "FIS Requested": "2022-12-02T00:00:00",
        "FIS Approved": "2026-09-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-06-01T00:00:00",
        "Construction End": "2027-04-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 412,
      "raw": {
        "INR": "24INR0356",
        "Project Name": "Cibeles Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Elawan Cibeles Solar, LLC",
        "POI Location": "3379 Tiger Creek Switch (TIGERCREEK_5) 345 kV Substation",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-31T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2023-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-02-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0356",
        "Project Name": "Cibeles Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Elawan Cibeles Solar, LLC",
        "POI Location": "3379 Tiger Creek Switch (TIGERCREEK_5) 345 kV Substation",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-31T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2023-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-02-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 413,
      "raw": {
        "INR": "24INR0365",
        "Project Name": "Hermes Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bell 1 Storage LLC",
        "POI Location": "Tap 345kV 3687 Bell County East Switch -  39950 TNP One Plant Ckt 2",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-12T00:00:00",
        "FIS Requested": "2022-06-30T00:00:00",
        "FIS Approved": "2024-04-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-01-31T00:00:00",
        "Meets All Planning": "2025-01-31T00:00:00",
        "Unnamed: 25": "2025-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-03T00:00:00",
        "Approved for Synchronization": "2026-04-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0365",
        "Project Name": "Hermes Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Bell 1 Storage LLC",
        "POI Location": "Tap 345kV 3687 Bell County East Switch -  39950 TNP One Plant Ckt 2",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-08-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-12T00:00:00",
        "FIS Requested": "2022-06-30T00:00:00",
        "FIS Approved": "2024-04-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-01-31T00:00:00",
        "Meets All Planning": "2025-01-31T00:00:00",
        "Unnamed: 25": "2025-01-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-03T00:00:00",
        "Approved for Synchronization": "2026-04-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 414,
      "raw": {
        "INR": "24INR0372",
        "Project Name": "GIGA AUSTIN SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GIGA TEXAS ENERGY LLC",
        "POI Location": "7047 HORNSBY Substation 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-03-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": -53.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-09T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0372",
        "Project Name": "GIGA AUSTIN SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GIGA TEXAS ENERGY LLC",
        "POI Location": "7047 HORNSBY Substation 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-03-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": -53.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-09T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 415,
      "raw": {
        "INR": "24INR0375",
        "Project Name": "Possum Kingdom BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "PK Solar, LLC",
        "POI Location": "Tap 345kV 1421 Willow Creek – 11523 Thomas Price",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.86,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-31T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2023-05-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-06-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-05-01T00:00:00",
        "Construction End": "2026-05-08T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0375",
        "Project Name": "Possum Kingdom BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "PK Solar, LLC",
        "POI Location": "Tap 345kV 1421 Willow Creek – 11523 Thomas Price",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.86,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-31T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2023-05-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-06-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-05-01T00:00:00",
        "Construction End": "2026-05-08T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 416,
      "raw": {
        "INR": "24INR0376",
        "Project Name": "Huisache BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Huisache Solar, LLC",
        "POI Location": "Tapping the Elm Creek to Shaula circuit 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.67,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-01-11T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2022-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0376",
        "Project Name": "Huisache BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Huisache Solar, LLC",
        "POI Location": "Tapping the Elm Creek to Shaula circuit 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.67,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-01-11T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2022-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 417,
      "raw": {
        "INR": "24INR0378",
        "Project Name": "Solara BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "60387 Hendrick 138kV ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-08T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0378",
        "Project Name": "Solara BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "60387 Hendrick 138kV ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-08T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 418,
      "raw": {
        "INR": "24INR0379",
        "Project Name": "Solara BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "60387 Hendrick 138kV",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-08T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0379",
        "Project Name": "Solara BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "60387 Hendrick 138kV",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-08T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 419,
      "raw": {
        "INR": "24INR0383",
        "Project Name": "Soda Lake BESS 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane II Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0383",
        "Project Name": "Soda Lake BESS 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane II Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 420,
      "raw": {
        "INR": "24INR0386",
        "Project Name": "Black & Gold Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Black & Gold Energy Storage, LLC",
        "POI Location": "6364 Yellow Jacket Sub 138kV",
        "County": "Menard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-08-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0386",
        "Project Name": "Black & Gold Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Black & Gold Energy Storage, LLC",
        "POI Location": "6364 Yellow Jacket Sub 138kV",
        "County": "Menard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-08-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 421,
      "raw": {
        "INR": "24INR0387",
        "Project Name": "PaleAle BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Momentum Energy Storage Partners,LLC",
        "POI Location": "Tap 138 kV Bus 7506 L_CEDAVA8_1Y - Bus 7507 L_FRIEND8_1Y \n ",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-13T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-12-06T00:00:00",
        "FIS Approved": "2026-04-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0387",
        "Project Name": "PaleAle BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Momentum Energy Storage Partners,LLC",
        "POI Location": "Tap 138 kV Bus 7506 L_CEDAVA8_1Y - Bus 7507 L_FRIEND8_1Y \n ",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-13T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-12-06T00:00:00",
        "FIS Approved": "2026-04-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 422,
      "raw": {
        "INR": "24INR0391",
        "Project Name": "Kennedy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kennedy Bypass Solar LLC",
        "POI Location": "Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 25.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-06T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-12T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0391",
        "Project Name": "Kennedy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kennedy Bypass Solar LLC",
        "POI Location": "Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 25.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-06T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-12T00:00:00",
        "FIS Requested": "2022-07-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 423,
      "raw": {
        "INR": "24INR0392",
        "Project Name": "Riverwalk BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "RWE Solar Developement, LLC",
        "POI Location": "5294 Martinez Substation 138kV ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-08-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0392",
        "Project Name": "Riverwalk BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "RWE Solar Developement, LLC",
        "POI Location": "5294 Martinez Substation 138kV ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-08-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 424,
      "raw": {
        "INR": "24INR0393",
        "Project Name": "ELECTRODE BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "76040 Castillo 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-18T00:00:00",
        "Screening Study Started": "2022-07-25T00:00:00",
        "Screening Study Complete": "2022-10-21T00:00:00",
        "FIS Requested": "2022-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0393",
        "Project Name": "ELECTRODE BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "76040 Castillo 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-18T00:00:00",
        "Screening Study Started": "2022-07-25T00:00:00",
        "Screening Study Complete": "2022-10-21T00:00:00",
        "FIS Requested": "2022-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 425,
      "raw": {
        "INR": "24INR0394",
        "Project Name": "CATHODE BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "76635 King Mountain 138kV\n\n",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-25T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2022-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0394",
        "Project Name": "CATHODE BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CED Development Inc.",
        "POI Location": "76635 King Mountain 138kV\n\n",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-25T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2022-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 426,
      "raw": {
        "INR": "24INR0399",
        "Project Name": "Buzios Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roaring Springs Solar, LLC",
        "POI Location": "Tap between Cottonwood (#59904) and White River (#23922)",
        "County": "Motley",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2026-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-08-04T00:00:00",
        "FIS Approved": "2025-03-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-11T00:00:00",
        "Meets All Planning": "2025-04-30T00:00:00",
        "Unnamed: 25": "2025-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-08-27T00:00:00",
        "Approved for Synchronization": "2025-10-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0399",
        "Project Name": "Buzios Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roaring Springs Solar, LLC",
        "POI Location": "Tap between Cottonwood (#59904) and White River (#23922)",
        "County": "Motley",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2026-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-08-04T00:00:00",
        "FIS Approved": "2025-03-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-11T00:00:00",
        "Meets All Planning": "2025-04-30T00:00:00",
        "Unnamed: 25": "2025-04-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-08-27T00:00:00",
        "Approved for Synchronization": "2025-10-01T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 427,
      "raw": {
        "INR": "24INR0404",
        "Project Name": "Tres Rios Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LectricWind LLC",
        "POI Location": "76008 Twelvemile 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 508,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-04T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-04-26T19:05:28.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0404",
        "Project Name": "Tres Rios Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LectricWind LLC",
        "POI Location": "76008 Twelvemile 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 508,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-04T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-04-26T19:05:28.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 428,
      "raw": {
        "INR": "24INR0405",
        "Project Name": "Crowned Heron BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables",
        "POI Location": "WA Parish 345 kV Bus #44000",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-10-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-12T00:00:00",
        "FIS Approved": "2023-05-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-06-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-01T00:00:00",
        "Meets All Planning": "2024-05-01T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-08T00:00:00",
        "Approved for Synchronization": "2026-01-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0405",
        "Project Name": "Crowned Heron BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables",
        "POI Location": "WA Parish 345 kV Bus #44000",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-10-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-14T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-14T00:00:00",
        "FIS Requested": "2022-07-12T00:00:00",
        "FIS Approved": "2023-05-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2023-06-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-01T00:00:00",
        "Meets All Planning": "2024-05-01T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-08T00:00:00",
        "Approved for Synchronization": "2026-01-21T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 429,
      "raw": {
        "INR": "24INR0407",
        "Project Name": "Mercury Solar III",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mercury Solar",
        "POI Location": "68092 Liberty Station 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-02T00:00:00",
        "Screening Study Started": "2022-08-16T00:00:00",
        "Screening Study Complete": "2022-11-11T00:00:00",
        "FIS Requested": "2022-08-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0407",
        "Project Name": "Mercury Solar III",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mercury Solar",
        "POI Location": "68092 Liberty Station 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-02T00:00:00",
        "Screening Study Started": "2022-08-16T00:00:00",
        "Screening Study Complete": "2022-11-11T00:00:00",
        "FIS Requested": "2022-08-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 430,
      "raw": {
        "INR": "24INR0410",
        "Project Name": "NRG Greens Bayou 6 (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "NRG Greens Bayou 6 LLC",
        "POI Location": "Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 445,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-21T00:00:00",
        "Screening Study Started": "2022-08-16T00:00:00",
        "Screening Study Complete": "2022-11-11T00:00:00",
        "FIS Requested": "2022-07-21T00:00:00",
        "FIS Approved": "2025-08-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-02-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2023-09-15T00:00:00",
        "GHG Permit": "2023-09-15T00:00:00",
        "Water Availability": "2024-06-26T00:00:00",
        "Meets Planning": "2026-07-01T00:00:00",
        "Meets All Planning": "2026-08-24T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0410",
        "Project Name": "NRG Greens Bayou 6 (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "NRG Greens Bayou 6 LLC",
        "POI Location": "Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 445,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-21T00:00:00",
        "Screening Study Started": "2022-08-16T00:00:00",
        "Screening Study Complete": "2022-11-11T00:00:00",
        "FIS Requested": "2022-07-21T00:00:00",
        "FIS Approved": "2025-08-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-02-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2023-09-15T00:00:00",
        "GHG Permit": "2023-09-15T00:00:00",
        "Water Availability": "2024-06-26T00:00:00",
        "Meets Planning": "2026-07-01T00:00:00",
        "Meets All Planning": "2026-08-24T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 431,
      "raw": {
        "INR": "24INR0412",
        "Project Name": "Camino Ranch Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Ranch Solar Project LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 296.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-01T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2023-01-03T00:00:00",
        "FIS Requested": "2023-06-22T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0412",
        "Project Name": "Camino Ranch Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Ranch Solar Project LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 296.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-01T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2023-01-03T00:00:00",
        "FIS Requested": "2023-06-22T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 432,
      "raw": {
        "INR": "24INR0413",
        "Project Name": "Furay Battery Energy Storage System",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Blue Topaz 1, LLC",
        "POI Location": "Tap 138kV 45660 Jonte substation – 46332 Scenic Woods\n\nTapping both radial lines.",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 304,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-31T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0413",
        "Project Name": "Furay Battery Energy Storage System",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Blue Topaz 1, LLC",
        "POI Location": "Tap 138kV 45660 Jonte substation – 46332 Scenic Woods\n\nTapping both radial lines.",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 304,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-31T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 433,
      "raw": {
        "INR": "24INR0419",
        "Project Name": "High Plains Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ROBP Holdings, LLC",
        "POI Location": "45880 Hockley 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-18T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0419",
        "Project Name": "High Plains Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ROBP Holdings, LLC",
        "POI Location": "45880 Hockley 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-18T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 434,
      "raw": {
        "INR": "24INR0420",
        "Project Name": "Camino Ranch Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Solar Ranch, LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 298.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-04T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-03T00:00:00",
        "FIS Requested": "2023-06-22T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0420",
        "Project Name": "Camino Ranch Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Solar Ranch, LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 298.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-04T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-03T00:00:00",
        "FIS Requested": "2023-06-22T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 435,
      "raw": {
        "INR": "24INR0422",
        "Project Name": "Hollow Branch Creek Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hollow Branch Creek Solar LLC",
        "POI Location": "Tap 345kV 3390 Jewett - 44645 Singleton",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 460,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-06T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0422",
        "Project Name": "Hollow Branch Creek Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hollow Branch Creek Solar LLC",
        "POI Location": "Tap 345kV 3390 Jewett - 44645 Singleton",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 460,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-06T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-22T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 436,
      "raw": {
        "INR": "24INR0424",
        "Project Name": "Cascabel Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0424",
        "Project Name": "Cascabel Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 437,
      "raw": {
        "INR": "24INR0425",
        "Project Name": "Two Brothers ESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BRP Blue Topaz 2, LLC",
        "POI Location": "8911 BLKBYU4A 138kV",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-09-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-04-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0425",
        "Project Name": "Two Brothers ESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BRP Blue Topaz 2, LLC",
        "POI Location": "8911 BLKBYU4A 138kV",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-09-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-04-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 438,
      "raw": {
        "INR": "24INR0427",
        "Project Name": "CPS AvR CT1 Rotor Replacement",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5475 Braunig 345kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 11.3,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-08-30T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": "2022-09-20T00:00:00",
        "FIS Approved": "2023-04-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2018-06-01T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2023-04-21T00:00:00",
        "Meets Planning": "2023-04-18T00:00:00",
        "Meets All Planning": "2023-04-18T00:00:00",
        "Unnamed: 25": "2023-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2023-12-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0427",
        "Project Name": "CPS AvR CT1 Rotor Replacement",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5475 Braunig 345kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 11.3,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-08-30T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": "2022-09-20T00:00:00",
        "FIS Approved": "2023-04-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2018-06-01T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2023-04-21T00:00:00",
        "Meets Planning": "2023-04-18T00:00:00",
        "Meets All Planning": "2023-04-18T00:00:00",
        "Unnamed: 25": "2023-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2023-12-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 439,
      "raw": {
        "INR": "24INR0440",
        "Project Name": "Starling Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Starling Solar, LLC",
        "POI Location": "138-kV Birdhouse (7255)\nStarling Solar Phase II is a an addition of 42.24MW to the 23INR0035 (solar) filed in 2020. 23INR0181 (storage) was filed in 2021. ",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 144.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-21T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-28T00:00:00",
        "FIS Requested": "2023-06-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-02-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0440",
        "Project Name": "Starling Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Starling Solar, LLC",
        "POI Location": "138-kV Birdhouse (7255)\nStarling Solar Phase II is a an addition of 42.24MW to the 23INR0035 (solar) filed in 2020. 23INR0181 (storage) was filed in 2021. ",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 144.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-21T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-28T00:00:00",
        "FIS Requested": "2023-06-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-02-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 440,
      "raw": {
        "INR": "24INR0442",
        "Project Name": "Midnight Sun Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Midnight Sun Energy Storage, LLC",
        "POI Location": "6601 Rio Pecos 138kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 523.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-04T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-07-29T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0442",
        "Project Name": "Midnight Sun Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Midnight Sun Energy Storage, LLC",
        "POI Location": "6601 Rio Pecos 138kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 523.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-04T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-07-29T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 441,
      "raw": {
        "INR": "24INR0444",
        "Project Name": "Hiru Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Hazel LLC",
        "POI Location": "Tap 345kV 6111 Riley - 1730 West Krum ckt 1",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 503.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-22T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-10T00:00:00",
        "FIS Requested": "2023-08-19T00:07:49",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0444",
        "Project Name": "Hiru Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Hazel LLC",
        "POI Location": "Tap 345kV 6111 Riley - 1730 West Krum ckt 1",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 503.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-22T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-10T00:00:00",
        "FIS Requested": "2023-08-19T00:07:49",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 442,
      "raw": {
        "INR": "24INR0445",
        "Project Name": "PSE Flores TX Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "TAP 138KV 8793 RIO GRANDE CITY - 8798 LAGRULLA",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-01T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2023-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0445",
        "Project Name": "PSE Flores TX Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "TAP 138KV 8793 RIO GRANDE CITY - 8798 LAGRULLA",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-01T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2023-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 443,
      "raw": {
        "INR": "24INR0446",
        "Project Name": "PSE Gongora Hill TX Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "Tap 138kV 8796 Roma – 7870 Escobares",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2022-11-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0446",
        "Project Name": "PSE Gongora Hill TX Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "Tap 138kV 8796 Roma – 7870 Escobares",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2022-11-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 444,
      "raw": {
        "INR": "24INR0447",
        "Project Name": "PSE Chihuahua TX Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "Tap 138kV 8392 Bates – 8394 Liston",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2023-09-15T00:00:00",
        "FIS Approved": "2025-10-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0447",
        "Project Name": "PSE Chihuahua TX Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "Tap 138kV 8392 Bates – 8394 Liston",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2023-09-15T00:00:00",
        "FIS Approved": "2025-10-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 445,
      "raw": {
        "INR": "24INR0448",
        "Project Name": "PSE Minnesota TX Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "Tap 138kV 8372 North Pharr – 8906 North Alamo",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2023-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0448",
        "Project Name": "PSE Minnesota TX Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PureSky Development Inc",
        "POI Location": "Tap 138kV 8372 North Pharr – 8906 North Alamo",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2023-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 446,
      "raw": {
        "INR": "24INR0449",
        "Project Name": "PSE Richardson TX Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "PureSky Development Inc.",
        "POI Location": "TAP 138KV 8374 SOUTH EAST EDINBURG - 8029 CLOSNER",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-28T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2023-09-15T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0449",
        "Project Name": "PSE Richardson TX Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "PureSky Development Inc.",
        "POI Location": "TAP 138KV 8374 SOUTH EAST EDINBURG - 8029 CLOSNER",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-28T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2023-09-15T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 447,
      "raw": {
        "INR": "24INR0450",
        "Project Name": "Lumen Farm BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Neches Solar, LLC",
        "POI Location": "Tap 138kV 3325 Blackburn Switch – 3272 Palestine ",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-11T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2022-10-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0450",
        "Project Name": "Lumen Farm BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Neches Solar, LLC",
        "POI Location": "Tap 138kV 3325 Blackburn Switch – 3272 Palestine ",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-11T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2022-10-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 448,
      "raw": {
        "INR": "24INR0452",
        "Project Name": "Longfellow Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38431 TNCENTRY1_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 178.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0452",
        "Project Name": "Longfellow Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38431 TNCENTRY1_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 178.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 449,
      "raw": {
        "INR": "24INR0453",
        "Project Name": "Longfellow BESS I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38432 TNCENTRY1_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 54.99,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-04-25T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-04-29T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0453",
        "Project Name": "Longfellow BESS I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38432 TNCENTRY1_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 54.99,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-04-25T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-04-29T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 450,
      "raw": {
        "INR": "24INR0454",
        "Project Name": "Longfellow Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38432 TNCENTRY2_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 207.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-25T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0454",
        "Project Name": "Longfellow Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38432 TNCENTRY2_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 207.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-25T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 451,
      "raw": {
        "INR": "24INR0455",
        "Project Name": "Longfellow BESS II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38432 TNCENTRY2_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 105.75,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-04-29T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0455",
        "Project Name": "Longfellow BESS II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CENTURY GAS PROCESSING, LLC",
        "POI Location": "38432 TNCENTRY2_1 138 KV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 105.75,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-04-29T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 452,
      "raw": {
        "INR": "24INR0461",
        "Project Name": " Augie BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BRP Blue Topaz 5, LLC",
        "POI Location": "46560 Waller 138kV",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-01T00:00:00",
        "Screening Study Started": "2023-01-23T00:00:00",
        "Screening Study Complete": "2023-04-22T00:00:00",
        "FIS Requested": "2023-01-18T00:00:00",
        "FIS Approved": "2024-01-24T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0461",
        "Project Name": " Augie BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BRP Blue Topaz 5, LLC",
        "POI Location": "46560 Waller 138kV",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-01T00:00:00",
        "Screening Study Started": "2023-01-23T00:00:00",
        "Screening Study Complete": "2023-04-22T00:00:00",
        "FIS Requested": "2023-01-18T00:00:00",
        "FIS Approved": "2024-01-24T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 453,
      "raw": {
        "INR": "24INR0472",
        "Project Name": "Amador Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BT Amador Storage, LLC",
        "POI Location": "6833 Explorer Switching Station 138kV",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.41,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-11-15T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": "2024-12-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-03T00:00:00",
        "Meets All Planning": "2025-02-03T00:00:00",
        "Unnamed: 25": "2025-02-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0472",
        "Project Name": "Amador Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BT Amador Storage, LLC",
        "POI Location": "6833 Explorer Switching Station 138kV",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.41,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2022-11-15T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": "2024-12-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-11-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-03T00:00:00",
        "Meets All Planning": "2025-02-03T00:00:00",
        "Unnamed: 25": "2025-02-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 454,
      "raw": {
        "INR": "24INR0485",
        "Project Name": "Rutile BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rutile BESS, LLC",
        "POI Location": " Tap 138kV 6340 BALLINGER - 60399 WEISS",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2023-01-23T00:00:00",
        "Screening Study Complete": "2023-04-22T00:00:00",
        "FIS Requested": "2023-04-19T00:00:00",
        "FIS Approved": "2025-10-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0485",
        "Project Name": "Rutile BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rutile BESS, LLC",
        "POI Location": " Tap 138kV 6340 BALLINGER - 60399 WEISS",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2023-01-23T00:00:00",
        "Screening Study Complete": "2023-04-22T00:00:00",
        "FIS Requested": "2023-04-19T00:00:00",
        "FIS Approved": "2025-10-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-05T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 455,
      "raw": {
        "INR": "24INR0488",
        "Project Name": "Forts Trail BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "JC Central Bluff, LLC",
        "POI Location": "11406 Central Bluff Switch 345 kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-15T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-20T00:00:00",
        "FIS Requested": "2023-02-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0488",
        "Project Name": "Forts Trail BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "JC Central Bluff, LLC",
        "POI Location": "11406 Central Bluff Switch 345 kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-15T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-20T00:00:00",
        "FIS Requested": "2023-02-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 456,
      "raw": {
        "INR": "24INR0491",
        "Project Name": "Gunnar BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Gunnar Reliability Project LLC",
        "POI Location": "8029 CLOSNER4A 138kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.75,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-02-01T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-05T00:00:00",
        "FIS Requested": "2023-01-30T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-09-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-06T00:00:00",
        "Meets All Planning": "2025-10-29T00:00:00",
        "Unnamed: 25": "2025-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-28T00:00:00",
        "Approved for Synchronization": "2026-09-08T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0491",
        "Project Name": "Gunnar BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Gunnar Reliability Project LLC",
        "POI Location": "8029 CLOSNER4A 138kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.75,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-02-01T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-05T00:00:00",
        "FIS Requested": "2023-01-30T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-09-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-06T00:00:00",
        "Meets All Planning": "2025-10-29T00:00:00",
        "Unnamed: 25": "2025-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-28T00:00:00",
        "Approved for Synchronization": "2026-09-08T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 457,
      "raw": {
        "INR": "24INR0493",
        "Project Name": "Crowned Heron BESS 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables",
        "POI Location": "WA Parish 345 kV Bus #44000",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-10-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-22T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": "2024-01-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-10-10T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-11-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-01-27T00:00:00",
        "Approved for Synchronization": "2026-04-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0493",
        "Project Name": "Crowned Heron BESS 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Renewables",
        "POI Location": "WA Parish 345 kV Bus #44000",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-10-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-22T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": "2024-01-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2024-10-10T00:00:00",
        "Meets All Planning": "2024-11-04T00:00:00",
        "Unnamed: 25": "2024-11-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-01-27T00:00:00",
        "Approved for Synchronization": "2026-04-06T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 458,
      "raw": {
        "INR": "24INR0494",
        "Project Name": "Hana Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II LLC",
        "POI Location": "7064 LAMPASAS 138KV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-22T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0494",
        "Project Name": "Hana Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II LLC",
        "POI Location": "7064 LAMPASAS 138KV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-22T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 459,
      "raw": {
        "INR": "24INR0496",
        "Project Name": "Indigo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-16T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2023-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0496",
        "Project Name": "Indigo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-16T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2023-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 460,
      "raw": {
        "INR": "24INR0500",
        "Project Name": "Claire BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Blue Topaz 3, LLC",
        "POI Location": "40011 Cedar Bayou 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 406.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-30T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-08T00:00:00",
        "FIS Requested": "2023-01-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0500",
        "Project Name": "Claire BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Blue Topaz 3, LLC",
        "POI Location": "40011 Cedar Bayou 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 406.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-30T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-08T00:00:00",
        "FIS Requested": "2023-01-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 461,
      "raw": {
        "INR": "24INR0505",
        "Project Name": "Corralitos Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 196.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0505",
        "Project Name": "Corralitos Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 196.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 462,
      "raw": {
        "INR": "24INR0506",
        "Project Name": "Corralitos Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 195.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0506",
        "Project Name": "Corralitos Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Wind Energy, LLC",
        "POI Location": "Tap 345kV 80225 CENIZO7C - 80307 DELSOL7C (New ETT Tiempo Substation)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 195.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 463,
      "raw": {
        "INR": "24INR0508",
        "Project Name": "White Oak King Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KSK Wind Farm 1, LLC",
        "POI Location": "345 kV Gauss ( Bus # 60701)",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 606.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2023-03-09T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0508",
        "Project Name": "White Oak King Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KSK Wind Farm 1, LLC",
        "POI Location": "345 kV Gauss ( Bus # 60701)",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 606.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2023-03-09T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 464,
      "raw": {
        "INR": "24INR0514",
        "Project Name": "Rogers Draw BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ROGERS DRAW ENERGY STORAGE, LLC",
        "POI Location": "7751 Headwaters substation 138kV",
        "County": "Gillespie",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 148.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-10T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2023-01-09T00:00:00",
        "FIS Approved": "2025-09-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-10-28T00:00:00",
        "Meets All Planning": "2025-10-28T00:00:00",
        "Unnamed: 25": "2025-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0514",
        "Project Name": "Rogers Draw BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ROGERS DRAW ENERGY STORAGE, LLC",
        "POI Location": "7751 Headwaters substation 138kV",
        "County": "Gillespie",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 148.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-10T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2023-01-09T00:00:00",
        "FIS Approved": "2025-09-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-10-28T00:00:00",
        "Meets All Planning": "2025-10-28T00:00:00",
        "Unnamed: 25": "2025-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 465,
      "raw": {
        "INR": "24INR0516",
        "Project Name": "French Riviera Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Arana Creek Battery Storage LLC",
        "POI Location": "5646 Riviera Substation 69kV ",
        "County": "Kleberg",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-05T00:00:00",
        "FIS Requested": "2023-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0516",
        "Project Name": "French Riviera Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Arana Creek Battery Storage LLC",
        "POI Location": "5646 Riviera Substation 69kV ",
        "County": "Kleberg",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-05T00:00:00",
        "FIS Requested": "2023-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 466,
      "raw": {
        "INR": "24INR0519",
        "Project Name": "Roost Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bluff Creek Energy Storage LLC",
        "POI Location": "the Knapp Sub (bus# 1310) – Union Switch (bus# 18555)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0519",
        "Project Name": "Roost Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bluff Creek Energy Storage LLC",
        "POI Location": "the Knapp Sub (bus# 1310) – Union Switch (bus# 18555)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 467,
      "raw": {
        "INR": "24INR0528",
        "Project Name": "Blanquilla BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Blanquilla BESS LLC",
        "POI Location": "Tap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A\n",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-14T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-08T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-09-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0528",
        "Project Name": "Blanquilla BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Blanquilla BESS LLC",
        "POI Location": "Tap 138kV 8452 LON_HILL4A - 8441 NUECES_B4A\n",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-14T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-08T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-09-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2025-07-31T00:00:00",
        "Unnamed: 25": "2025-07-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 468,
      "raw": {
        "INR": "24INR0530",
        "Project Name": "Southside Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Southside Energy, LLC",
        "POI Location": "Tap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-01T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-05-26T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0530",
        "Project Name": "Southside Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Southside Energy, LLC",
        "POI Location": "Tap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-01T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-05-26T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 469,
      "raw": {
        "INR": "24INR0532",
        "Project Name": "Timber Cove Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Freestone Solar, LLC",
        "POI Location": "Tap 138 kV 212 Winkler - 3510 Pin Oak ",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-02T00:00:00",
        "Screening Study Started": "2023-05-22T00:00:00",
        "Screening Study Complete": "2023-08-17T00:00:00",
        "FIS Requested": "2023-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0532",
        "Project Name": "Timber Cove Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Freestone Solar, LLC",
        "POI Location": "Tap 138 kV 212 Winkler - 3510 Pin Oak ",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-02T00:00:00",
        "Screening Study Started": "2023-05-22T00:00:00",
        "Screening Study Complete": "2023-08-17T00:00:00",
        "FIS Requested": "2023-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 470,
      "raw": {
        "INR": "24INR0534",
        "Project Name": "Lyford Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lyford Energy, LLC",
        "POI Location": "5745 E Raymondville 138kV ",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0534",
        "Project Name": "Lyford Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lyford Energy, LLC",
        "POI Location": "5745 E Raymondville 138kV ",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 471,
      "raw": {
        "INR": "24INR0538",
        "Project Name": "FLIFER Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FLIFER LLC",
        "POI Location": "Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-08T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-04-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0538",
        "Project Name": "FLIFER Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FLIFER LLC",
        "POI Location": "Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-08T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-04-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 472,
      "raw": {
        "INR": "24INR0541",
        "Project Name": "Kinney County Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kinney County Energy,  LLC",
        "POI Location": "Tap 138kV 8252 Brackett4A - 78255  L_PINTCR8_1Y ",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-10T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-10-24T15:45:16",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0541",
        "Project Name": "Kinney County Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kinney County Energy,  LLC",
        "POI Location": "Tap 138kV 8252 Brackett4A - 78255  L_PINTCR8_1Y ",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-10T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-10-24T15:45:16",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 473,
      "raw": {
        "INR": "24INR0543",
        "Project Name": "Thomas Cameron BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Thomas Cameron BESS LLC",
        "POI Location": "Tap 345kV 3424 BUCKHORN SWITCH - 3422 KILLEEN SWITCH",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-01T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-06-02T00:00:00",
        "FIS Approved": "2024-07-23T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-09-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0543",
        "Project Name": "Thomas Cameron BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Thomas Cameron BESS LLC",
        "POI Location": "Tap 345kV 3424 BUCKHORN SWITCH - 3422 KILLEEN SWITCH",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-01T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-06-02T00:00:00",
        "FIS Approved": "2024-07-23T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-09-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 474,
      "raw": {
        "INR": "24INR0544",
        "Project Name": "Wetzel BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brown ESS, LLC",
        "POI Location": "Tap 138kV 1654 Zephyr – 1655 Brownwood Switch",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 185.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-14T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-20T00:00:00",
        "FIS Requested": "2023-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0544",
        "Project Name": "Wetzel BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brown ESS, LLC",
        "POI Location": "Tap 138kV 1654 Zephyr – 1655 Brownwood Switch",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 185.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-14T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-20T00:00:00",
        "FIS Requested": "2023-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 475,
      "raw": {
        "INR": "24INR0555",
        "Project Name": "Shaula I BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shaula Energy Project LLC",
        "POI Location": "5380 Shaula 345kV",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-19T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0555",
        "Project Name": "Shaula I BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shaula Energy Project LLC",
        "POI Location": "5380 Shaula 345kV",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-19T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 476,
      "raw": {
        "INR": "24INR0567",
        "Project Name": "Wolf Hollow III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wolf Hollow II Power LLC",
        "POI Location": "1877 Mitchell Bend 345KV",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 306.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-18T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0567",
        "Project Name": "Wolf Hollow III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wolf Hollow II Power LLC",
        "POI Location": "1877 Mitchell Bend 345KV",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 306.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-18T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 477,
      "raw": {
        "INR": "24INR0569",
        "Project Name": "Hadrian Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Hadrian Energy Storage, LLC",
        "POI Location": "Line Tap 138kV #43012 NEWGLF60T3_8 - #43190 S_LANE_B138",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": "2025-02-12T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0569",
        "Project Name": "Hadrian Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Hadrian Energy Storage, LLC",
        "POI Location": "Line Tap 138kV #43012 NEWGLF60T3_8 - #43190 S_LANE_B138",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": "2025-02-12T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 478,
      "raw": {
        "INR": "24INR0570",
        "Project Name": "Marcus Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Marcus Energy Storage, LLC",
        "POI Location": "Tap 138kV 39500 West Columbia Main - 110505 Sweeny Co-Gen LP Ckt 1",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-31T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": "2024-09-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0570",
        "Project Name": "Marcus Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Marcus Energy Storage, LLC",
        "POI Location": "Tap 138kV 39500 West Columbia Main - 110505 Sweeny Co-Gen LP Ckt 1",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-31T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-10-24T00:00:00",
        "FIS Approved": "2024-09-30T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 479,
      "raw": {
        "INR": "24INR0572",
        "Project Name": "Megacharge BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Harlingen III LLC",
        "POI Location": "8320 WEST HARLINGEN 69kV ",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 110,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0572",
        "Project Name": "Megacharge BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Harlingen III LLC",
        "POI Location": "8320 WEST HARLINGEN 69kV ",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 110,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 480,
      "raw": {
        "INR": "24INR0576",
        "Project Name": "Boling Generation (TEF-Due Diligience)",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Boling Generation",
        "POI Location": "43340 Gulftie 138kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-11T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": "2025-08-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0576",
        "Project Name": "Boling Generation (TEF-Due Diligience)",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Boling Generation",
        "POI Location": "43340 Gulftie 138kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-11T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": "2025-08-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 481,
      "raw": {
        "INR": "24INR0578",
        "Project Name": "Panther Creek 1 Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Panther Creek Wind Farm I&II, LLC",
        "POI Location": "1058 Longshore 345kV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-06-21T00:00:00",
        "FIS Approved": "2024-05-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-21T00:00:00",
        "Meets All Planning": "2024-06-21T00:00:00",
        "Unnamed: 25": "2024-05-06T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-10-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0578",
        "Project Name": "Panther Creek 1 Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Panther Creek Wind Farm I&II, LLC",
        "POI Location": "1058 Longshore 345kV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-06-21T00:00:00",
        "FIS Approved": "2024-05-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-21T00:00:00",
        "Meets All Planning": "2024-06-21T00:00:00",
        "Unnamed: 25": "2024-05-06T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-10-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 482,
      "raw": {
        "INR": "24INR0582",
        "Project Name": "Panther Creek 2 Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Panther Creek Wind Farm I&II, LLC",
        "POI Location": "Longshore 345kV [Bus# 1058]",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-06-27T00:00:00",
        "FIS Approved": "2024-05-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-21T00:00:00",
        "Meets All Planning": "2024-06-21T00:00:00",
        "Unnamed: 25": "2024-05-06T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-10-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0582",
        "Project Name": "Panther Creek 2 Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Panther Creek Wind Farm I&II, LLC",
        "POI Location": "Longshore 345kV [Bus# 1058]",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-06-27T00:00:00",
        "FIS Approved": "2024-05-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-06-21T00:00:00",
        "Meets All Planning": "2024-06-21T00:00:00",
        "Unnamed: 25": "2024-05-06T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-10-02T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 483,
      "raw": {
        "INR": "24INR0584",
        "Project Name": "Kegans BESS (Houston IV BESS)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "SMT Houston IV LLC",
        "POI Location": "44140 CLODINE 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-09-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 164.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-30T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2023-06-27T00:00:00",
        "FIS Approved": "2025-07-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2025-09-18T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-28T00:00:00",
        "Unnamed: 25": "2025-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-06T00:00:00",
        "Approved for Synchronization": "2026-06-08T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0584",
        "Project Name": "Kegans BESS (Houston IV BESS)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "SMT Houston IV LLC",
        "POI Location": "44140 CLODINE 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-09-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 164.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-30T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2023-06-27T00:00:00",
        "FIS Approved": "2025-07-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2025-09-18T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-28T00:00:00",
        "Unnamed: 25": "2025-10-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-06T00:00:00",
        "Approved for Synchronization": "2026-06-08T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 484,
      "raw": {
        "INR": "24INR0605",
        "Project Name": "TEXAS GULF SULPHUR REPOWER",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wharton County Generation, LLC",
        "POI Location": "43340 Gulftie 138 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-03-27T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 16.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-22T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-27T00:00:00",
        "FIS Approved": "2024-02-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-03-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2025-06-03T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2024-01-30T00:00:00",
        "Meets Planning": "2024-01-31T00:00:00",
        "Meets All Planning": "2024-01-31T00:00:00",
        "Unnamed: 25": "2024-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2025-02-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0605",
        "Project Name": "TEXAS GULF SULPHUR REPOWER",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wharton County Generation, LLC",
        "POI Location": "43340 Gulftie 138 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-03-27T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 16.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-22T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-27T00:00:00",
        "FIS Approved": "2024-02-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2022-03-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2025-06-03T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2024-01-30T00:00:00",
        "Meets Planning": "2024-01-31T00:00:00",
        "Meets All Planning": "2024-01-31T00:00:00",
        "Unnamed: 25": "2024-02-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2025-02-17T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 485,
      "raw": {
        "INR": "24INR0617",
        "Project Name": "Serrano Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Maverick ESS, LLC",
        "POI Location": "8267 GANSO Substation 138kV",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 185.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-11T00:00:00",
        "Screening Study Started": "2023-09-23T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2023-08-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0617",
        "Project Name": "Serrano Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Maverick ESS, LLC",
        "POI Location": "8267 GANSO Substation 138kV",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 185.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-11T00:00:00",
        "Screening Study Started": "2023-09-23T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2023-08-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 486,
      "raw": {
        "INR": "24INR0627",
        "Project Name": "Champion Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Champion Wind Farm, LLC",
        "POI Location": "Bus# 1048 - Tonkawa",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-13T00:00:00",
        "Screening Study Started": "2023-09-25T00:00:00",
        "Screening Study Complete": "2023-12-21T00:00:00",
        "FIS Requested": "2023-09-13T00:00:00",
        "FIS Approved": "2024-04-26T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2007-01-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-07-29T00:00:00",
        "Meets All Planning": "2024-07-30T00:00:00",
        "Unnamed: 25": "2024-07-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2025-01-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0627",
        "Project Name": "Champion Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Champion Wind Farm, LLC",
        "POI Location": "Bus# 1048 - Tonkawa",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-13T00:00:00",
        "Screening Study Started": "2023-09-25T00:00:00",
        "Screening Study Complete": "2023-12-21T00:00:00",
        "FIS Requested": "2023-09-13T00:00:00",
        "FIS Approved": "2024-04-26T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2007-01-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-07-29T00:00:00",
        "Meets All Planning": "2024-07-30T00:00:00",
        "Unnamed: 25": "2024-07-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2025-01-13T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 487,
      "raw": {
        "INR": "24INR0763",
        "Project Name": "Team Ranch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BAF Storage, LLC",
        "POI Location": "1869 Benbrook Switch 345kV\n",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 307.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-05T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "24INR0763",
        "Project Name": "Team Ranch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BAF Storage, LLC",
        "POI Location": "1869 Benbrook Switch 345kV\n",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 307.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-05T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 488,
      "raw": {
        "INR": "25INR0002",
        "Project Name": "Barcelona TxHSR TPSS HN-4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "tap 138kV 45885 HocklyC - 46220 Peters",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-11T00:00:00",
        "Screening Study Started": "2019-01-30T00:00:00",
        "Screening Study Complete": "2019-04-17T00:00:00",
        "FIS Requested": "2019-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0002",
        "Project Name": "Barcelona TxHSR TPSS HN-4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "tap 138kV 45885 HocklyC - 46220 Peters",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-11T00:00:00",
        "Screening Study Started": "2019-01-30T00:00:00",
        "Screening Study Complete": "2019-04-17T00:00:00",
        "FIS Requested": "2019-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 489,
      "raw": {
        "INR": "25INR0005",
        "Project Name": "Tokyo TxHSR TPSS EW-1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "tap 138kV 2241 Ennis W - 2321 Waxahachie",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-09-13T00:00:00",
        "Screening Study Started": "2019-01-30T00:00:00",
        "Screening Study Complete": "2019-04-17T00:00:00",
        "FIS Requested": "2019-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0005",
        "Project Name": "Tokyo TxHSR TPSS EW-1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "tap 138kV 2241 Ennis W - 2321 Waxahachie",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-09-13T00:00:00",
        "Screening Study Started": "2019-01-30T00:00:00",
        "Screening Study Complete": "2019-04-17T00:00:00",
        "FIS Requested": "2019-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 490,
      "raw": {
        "INR": "25INR0006",
        "Project Name": "Atlanta TxHSR TPSS DS-1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "tap 138kV 2429 Watermill E - 3083 Wilmer",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-11T00:00:00",
        "Screening Study Started": "2019-01-30T00:00:00",
        "Screening Study Complete": "2019-04-17T00:00:00",
        "FIS Requested": "2019-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0006",
        "Project Name": "Atlanta TxHSR TPSS DS-1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "tap 138kV 2429 Watermill E - 3083 Wilmer",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-11T00:00:00",
        "Screening Study Started": "2019-01-30T00:00:00",
        "Screening Study Complete": "2019-04-17T00:00:00",
        "FIS Requested": "2019-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 491,
      "raw": {
        "INR": "25INR0008",
        "Project Name": "BasRanch (TEF - Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CPV Basin Ranch, LLC",
        "POI Location": "tap 345kV Riverton Switch - Sand Lake Switch",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1350,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-24T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-11-02T00:00:00",
        "FIS Requested": "2021-10-28T00:00:00",
        "FIS Approved": "2025-05-05T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-11-25T00:00:00",
        "GHG Permit": "2024-11-25T00:00:00",
        "Water Availability": "2025-09-05T00:00:00",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0008",
        "Project Name": "BasRanch (TEF - Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CPV Basin Ranch, LLC",
        "POI Location": "tap 345kV Riverton Switch - Sand Lake Switch",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1350,
        "Unnamed: 11": null,
        "Unnamed: 12": "2021-11-24T00:00:00",
        "Screening Study Started": "2020-08-04T00:00:00",
        "Screening Study Complete": "2020-11-02T00:00:00",
        "FIS Requested": "2021-10-28T00:00:00",
        "FIS Approved": "2025-05-05T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-11-25T00:00:00",
        "GHG Permit": "2024-11-25T00:00:00",
        "Water Availability": "2025-09-05T00:00:00",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 492,
      "raw": {
        "INR": "25INR0010",
        "Project Name": "Nockenut Springs Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 STP ckt 1",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0010",
        "Project Name": "Nockenut Springs Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "tap 345kV 5133 Elm Creek - 5915 STP ckt 1",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2020-09-23T00:00:00",
        "Screening Study Started": "2020-09-25T00:00:00",
        "Screening Study Complete": "2020-12-16T00:00:00",
        "FIS Requested": "2020-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 493,
      "raw": {
        "INR": "25INR0018",
        "Project Name": "Yellow Cat Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Yellow Cat Wind LLC",
        "POI Location": "Tap 345kV 1906 Venus - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-05T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 262,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-18T00:00:00",
        "Screening Study Started": "2021-08-17T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2022-03-07T00:00:00",
        "FIS Approved": "2025-12-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-01-27T00:00:00",
        "Unnamed: 25": "2026-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0018",
        "Project Name": "Yellow Cat Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Yellow Cat Wind LLC",
        "POI Location": "Tap 345kV 1906 Venus - 68091 Navarro",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-03-05T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 262,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-18T00:00:00",
        "Screening Study Started": "2021-08-17T00:00:00",
        "Screening Study Complete": "2021-11-05T00:00:00",
        "FIS Requested": "2022-03-07T00:00:00",
        "FIS Approved": "2025-12-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-01-27T00:00:00",
        "Unnamed: 25": "2026-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 494,
      "raw": {
        "INR": "25INR0021",
        "Project Name": "Findley Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adon Texas Sixteen LLC",
        "POI Location": "Tap 69kV #107 Prairie Hill - #99 Ben Hur ",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-05T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2021-12-10T00:00:00",
        "FIS Requested": "2022-05-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0021",
        "Project Name": "Findley Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adon Texas Sixteen LLC",
        "POI Location": "Tap 69kV #107 Prairie Hill - #99 Ben Hur ",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-05T00:00:00",
        "Screening Study Started": "2021-10-05T00:00:00",
        "Screening Study Complete": "2021-12-10T00:00:00",
        "FIS Requested": "2022-05-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 495,
      "raw": {
        "INR": "25INR0029",
        "Project Name": "Whistle Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Nineteen, LLC",
        "POI Location": "Tap 138kV 213 Haney – 3478 Navarro ",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 56.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-10T00:00:00",
        "Screening Study Started": "2021-11-23T00:00:00",
        "Screening Study Complete": "2022-02-18T00:00:00",
        "FIS Requested": "2022-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0029",
        "Project Name": "Whistle Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Nineteen, LLC",
        "POI Location": "Tap 138kV 213 Haney – 3478 Navarro ",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 56.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-10T00:00:00",
        "Screening Study Started": "2021-11-23T00:00:00",
        "Screening Study Complete": "2022-02-18T00:00:00",
        "FIS Requested": "2022-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 496,
      "raw": {
        "INR": "25INR0039",
        "Project Name": "Borderland ESC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FRESH AIR ENERGY II, LLC",
        "POI Location": "tap 138kV 8380 NEDIN4A – 8632 NMCALLEN4C",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-08T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-22T00:00:00",
        "FIS Requested": "2022-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0039",
        "Project Name": "Borderland ESC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FRESH AIR ENERGY II, LLC",
        "POI Location": "tap 138kV 8380 NEDIN4A – 8632 NMCALLEN4C",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-02-08T00:00:00",
        "Screening Study Started": "2022-02-21T00:00:00",
        "Screening Study Complete": "2022-05-22T00:00:00",
        "FIS Requested": "2022-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 497,
      "raw": {
        "INR": "25INR0040",
        "Project Name": "McMEXICO STORAGE",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FRESH AIR ENERGY II, LLC",
        "POI Location": "8644 Trade Zone 138kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-28T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0040",
        "Project Name": "McMEXICO STORAGE",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FRESH AIR ENERGY II, LLC",
        "POI Location": "8644 Trade Zone 138kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-01-28T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 498,
      "raw": {
        "INR": "25INR0045",
        "Project Name": "Smith Lake Storage DC",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Smith Lake Solar",
        "POI Location": "Tap 345kV 44645 Singleton - 44900 Zenith Ckt #99",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-30T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-05-06T00:00:00",
        "FIS Requested": "2022-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0045",
        "Project Name": "Smith Lake Storage DC",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Smith Lake Solar",
        "POI Location": "Tap 345kV 44645 Singleton - 44900 Zenith Ckt #99",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-30T00:00:00",
        "Screening Study Started": "2022-03-07T00:00:00",
        "Screening Study Complete": "2022-05-06T00:00:00",
        "FIS Requested": "2022-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 499,
      "raw": {
        "INR": "25INR0046",
        "Project Name": "Blue Skies BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "ACTX BESS Project LLC",
        "POI Location": "68090 SAM SW 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-02T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-06-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0046",
        "Project Name": "Blue Skies BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "ACTX BESS Project LLC",
        "POI Location": "68090 SAM SW 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-02T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-06-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 500,
      "raw": {
        "INR": "25INR0052",
        "Project Name": "SanPat Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CGRP 04, LLC",
        "POI Location": "Tap 345kV 8249 Angstrom – 8659 Naismith",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 256.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-29T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-07-15T00:00:00",
        "FIS Approved": "2026-07-09T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2023-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0052",
        "Project Name": "SanPat Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "CGRP 04, LLC",
        "POI Location": "Tap 345kV 8249 Angstrom – 8659 Naismith",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 256.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-29T00:00:00",
        "Screening Study Started": "2022-02-28T00:00:00",
        "Screening Study Complete": "2022-05-27T00:00:00",
        "FIS Requested": "2022-07-15T00:00:00",
        "FIS Approved": "2026-07-09T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2023-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 501,
      "raw": {
        "INR": "25INR0060",
        "Project Name": "Argenta Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Charter Oak Solar, LLC",
        "POI Location": "Tap 345kV 8689 Tango - 8606 Goddard",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 310,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-27T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2022-07-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0060",
        "Project Name": "Argenta Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Charter Oak Solar, LLC",
        "POI Location": "Tap 345kV 8689 Tango - 8606 Goddard",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 310,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-27T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2022-07-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 502,
      "raw": {
        "INR": "25INR0061",
        "Project Name": "Argenta Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Charter Oak Storage, LLC",
        "POI Location": "Tap 345kV 8689 Tango - 8606 Goddard",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 192,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-21T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-04-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0061",
        "Project Name": "Argenta Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Charter Oak Storage, LLC",
        "POI Location": "Tap 345kV 8689 Tango - 8606 Goddard",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 192,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-21T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-04-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 503,
      "raw": {
        "INR": "25INR0071",
        "Project Name": "Albatross BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Albatross Solar, LLC",
        "POI Location": "From Bus #165 Windsor Switch To Bus #161 McGregor",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.4,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-01-27T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2022-10-25T00:00:00",
        "FIS Approved": "2025-10-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-09-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0071",
        "Project Name": "Albatross BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Albatross Solar, LLC",
        "POI Location": "From Bus #165 Windsor Switch To Bus #161 McGregor",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.4,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-01-27T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2022-10-25T00:00:00",
        "FIS Approved": "2025-10-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-09-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 504,
      "raw": {
        "INR": "25INR0076",
        "Project Name": "Violet Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VIOLET STORAGE",
        "POI Location": "McKenzie Road (8858) 138 kV Substation",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 151,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-13T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0076",
        "Project Name": "Violet Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VIOLET STORAGE",
        "POI Location": "McKenzie Road (8858) 138 kV Substation",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 151,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-04-13T00:00:00",
        "Screening Study Started": "2022-05-10T00:00:00",
        "Screening Study Complete": "2022-08-06T00:00:00",
        "FIS Requested": "2022-04-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 505,
      "raw": {
        "INR": "25INR0080",
        "Project Name": "Meitner Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Meitner, LLC ",
        "POI Location": "345 kV Gray (Bus# 79000)",
        "County": "Gray",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 702.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-26T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2022-07-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-01-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0080",
        "Project Name": "Meitner Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Meitner, LLC ",
        "POI Location": "345 kV Gray (Bus# 79000)",
        "County": "Gray",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 702.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-26T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2022-07-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-01-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 506,
      "raw": {
        "INR": "25INR0081",
        "Project Name": "SanPat Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Padre Solar LLC",
        "POI Location": "Tap 345kV 8249 Angstrom – 8659 Naismith",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 308.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-29T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-12T00:00:00",
        "FIS Requested": "2022-07-15T00:00:00",
        "FIS Approved": "2026-07-09T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2023-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0081",
        "Project Name": "SanPat Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Padre Solar LLC",
        "POI Location": "Tap 345kV 8249 Angstrom – 8659 Naismith",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 308.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-29T00:00:00",
        "Screening Study Started": "2022-07-18T00:00:00",
        "Screening Study Complete": "2022-10-12T00:00:00",
        "FIS Requested": "2022-07-15T00:00:00",
        "FIS Approved": "2026-07-09T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2023-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 507,
      "raw": {
        "INR": "25INR0082",
        "Project Name": "Reis Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Reis LLC",
        "POI Location": "Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-19T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-29T00:00:00",
        "FIS Requested": "2022-09-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0082",
        "Project Name": "Reis Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Reis LLC",
        "POI Location": "Tapping into 138 kV line (5689) Choke Canyon AEP to (5902) San Miguel Gen",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-19T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-29T00:00:00",
        "FIS Requested": "2022-09-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 508,
      "raw": {
        "INR": "25INR0097",
        "Project Name": "Soleil Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Soleil Solar, LLC",
        "POI Location": "Tap 345 kV 1730 Krum West Switch - 6111 Riley ckt 2",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 451.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-31T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0097",
        "Project Name": "Soleil Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Soleil Solar, LLC",
        "POI Location": "Tap 345 kV 1730 Krum West Switch - 6111 Riley ckt 2",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 451.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-31T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-29T00:00:00",
        "FIS Requested": "2022-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 509,
      "raw": {
        "INR": "25INR0100",
        "Project Name": "Goldeneye BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "3423 KILLEEN Switch 138 KV ",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": "2023-08-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-02-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0100",
        "Project Name": "Goldeneye BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "3423 KILLEEN Switch 138 KV ",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-03T00:00:00",
        "Screening Study Started": "2022-06-10T00:00:00",
        "Screening Study Complete": "2022-09-06T00:00:00",
        "FIS Requested": "2022-07-13T00:00:00",
        "FIS Approved": "2023-08-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-02-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-02T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 510,
      "raw": {
        "INR": "25INR0101",
        "Project Name": "Drake BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mallard Energy Storage LLC",
        "POI Location": " #833 Wylie Switch 138kV",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-01-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-22T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-29T00:00:00",
        "FIS Requested": "2022-06-17T00:00:00",
        "FIS Approved": "2025-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-07-16T00:00:00",
        "Meets All Planning": "2025-07-17T00:00:00",
        "Unnamed: 25": "2025-07-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0101",
        "Project Name": "Drake BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mallard Energy Storage LLC",
        "POI Location": " #833 Wylie Switch 138kV",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-01-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-06-22T00:00:00",
        "Screening Study Started": "2022-06-02T00:00:00",
        "Screening Study Complete": "2022-08-29T00:00:00",
        "FIS Requested": "2022-06-17T00:00:00",
        "FIS Approved": "2025-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-07-16T00:00:00",
        "Meets All Planning": "2025-07-17T00:00:00",
        "Unnamed: 25": "2025-07-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 511,
      "raw": {
        "INR": "25INR0102",
        "Project Name": "Austin Bayou Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-15T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-11-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0102",
        "Project Name": "Austin Bayou Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-15T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2022-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2023-11-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 512,
      "raw": {
        "INR": "25INR0103",
        "Project Name": "Elio BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Elio Energy LLC",
        "POI Location": "138 kV Weinbrenner Station (Bus #42990)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.28,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2023-05-19T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2023-05-15T00:00:00",
        "FIS Approved": "2024-10-31T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0103",
        "Project Name": "Elio BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Elio Energy LLC",
        "POI Location": "138 kV Weinbrenner Station (Bus #42990)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.28,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2023-05-19T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2023-05-15T00:00:00",
        "FIS Approved": "2024-10-31T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 513,
      "raw": {
        "INR": "25INR0106",
        "Project Name": "Luthor Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TREX US Luthor LLC",
        "POI Location": "Tap 138kV 23831 Luther Station – 10032 Little Luther ",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2023-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0106",
        "Project Name": "Luthor Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TREX US Luthor LLC",
        "POI Location": "Tap 138kV 23831 Luther Station – 10032 Little Luther ",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2022-06-27T00:00:00",
        "Screening Study Complete": "2022-09-21T00:00:00",
        "FIS Requested": "2023-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 514,
      "raw": {
        "INR": "25INR0112",
        "Project Name": "August Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "August Draw Solar Holdings, LLC",
        "POI Location": "Tap 138kV 60207 Verhalen – 60808 Hoefs Road",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-22T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2023-06-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-09-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0112",
        "Project Name": "August Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "August Draw Solar Holdings, LLC",
        "POI Location": "Tap 138kV 60207 Verhalen – 60808 Hoefs Road",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-22T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2023-06-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-09-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 515,
      "raw": {
        "INR": "25INR0122",
        "Project Name": "Vial BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gransolar Texas Eleven LLC",
        "POI Location": "Chatt(234) - Pecan Street (3352) 138kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 135.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2023-03-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-08-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-08-18T00:00:00",
        "Meets Planning": "2025-08-28T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0122",
        "Project Name": "Vial BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gransolar Texas Eleven LLC",
        "POI Location": "Chatt(234) - Pecan Street (3352) 138kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 135.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2022-07-05T00:00:00",
        "Screening Study Complete": "2022-10-01T00:00:00",
        "FIS Requested": "2023-03-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-08-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-08-18T00:00:00",
        "Meets Planning": "2025-08-28T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 516,
      "raw": {
        "INR": "25INR0129",
        "Project Name": "Demeter Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Demeter Solar, LLC",
        "POI Location": "Tap 138kV 7224 LULING - 7216 LOCKHART",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0129",
        "Project Name": "Demeter Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Demeter Solar, LLC",
        "POI Location": "Tap 138kV 7224 LULING - 7216 LOCKHART",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 517,
      "raw": {
        "INR": "25INR0130",
        "Project Name": "Demeter Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Demeter Solar, LLC",
        "POI Location": "Tap 138kV 7224 LULING - 7216 Lockhart",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0130",
        "Project Name": "Demeter Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Demeter Solar, LLC",
        "POI Location": "Tap 138kV 7224 LULING - 7216 Lockhart",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 518,
      "raw": {
        "INR": "25INR0131",
        "Project Name": "SOSA Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sosa Energy Center, LLC",
        "POI Location": "Tap 138kV 25 North Zulch - 47 Hilltop Lakes",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-21T00:00:00",
        "Screening Study Started": "2022-07-25T00:00:00",
        "Screening Study Complete": "2022-10-20T00:00:00",
        "FIS Requested": "2022-07-21T00:00:00",
        "FIS Approved": "2026-07-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0131",
        "Project Name": "SOSA Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sosa Energy Center, LLC",
        "POI Location": "Tap 138kV 25 North Zulch - 47 Hilltop Lakes",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-07-21T00:00:00",
        "Screening Study Started": "2022-07-25T00:00:00",
        "Screening Study Complete": "2022-10-20T00:00:00",
        "FIS Requested": "2022-07-21T00:00:00",
        "FIS Approved": "2026-07-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 519,
      "raw": {
        "INR": "25INR0133",
        "Project Name": "Rose Quartz BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rose Quartz BESS, LLC",
        "POI Location": "Tap 138kV 8283 Asherton - 8613 Bigwells",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.41,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-27T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2022-10-14T00:00:00",
        "FIS Approved": "2025-04-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-07-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0133",
        "Project Name": "Rose Quartz BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rose Quartz BESS, LLC",
        "POI Location": "Tap 138kV 8283 Asherton - 8613 Bigwells",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.41,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-27T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2022-10-14T00:00:00",
        "FIS Approved": "2025-04-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-07-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 520,
      "raw": {
        "INR": "25INR0135",
        "Project Name": "Hayrick BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Gransolar Texas Five LLC",
        "POI Location": "6351 Nicole 138kV",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 113.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-31T00:00:00",
        "Screening Study Started": "2022-08-16T00:00:00",
        "Screening Study Complete": "2022-11-11T00:00:00",
        "FIS Requested": "2023-05-18T00:00:00",
        "FIS Approved": "2025-12-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0135",
        "Project Name": "Hayrick BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Gransolar Texas Five LLC",
        "POI Location": "6351 Nicole 138kV",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 113.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-31T00:00:00",
        "Screening Study Started": "2022-08-16T00:00:00",
        "Screening Study Complete": "2022-11-11T00:00:00",
        "FIS Requested": "2023-05-18T00:00:00",
        "FIS Approved": "2025-12-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 521,
      "raw": {
        "INR": "25INR0138",
        "Project Name": "Champaign BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Champaign BESS, LLC",
        "POI Location": "Tap 138kV Shaw POD (18664) – Desert Wind Sub (11283)\nnew station Potterson Lake Switch",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-30T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-29T00:00:00",
        "FIS Approved": "2024-08-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0138",
        "Project Name": "Champaign BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Champaign BESS, LLC",
        "POI Location": "Tap 138kV Shaw POD (18664) – Desert Wind Sub (11283)\nnew station Potterson Lake Switch",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-30T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-29T00:00:00",
        "FIS Approved": "2024-08-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 522,
      "raw": {
        "INR": "25INR0139",
        "Project Name": "Dolce BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Dolce BESS, LLC",
        "POI Location": "Tap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-30T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-21T00:00:00",
        "FIS Requested": "2023-03-28T00:00:00",
        "FIS Approved": "2026-02-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0139",
        "Project Name": "Dolce BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Dolce BESS, LLC",
        "POI Location": "Tap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-30T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-21T00:00:00",
        "FIS Requested": "2023-03-28T00:00:00",
        "FIS Approved": "2026-02-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 523,
      "raw": {
        "INR": "25INR0140",
        "Project Name": "Seragio BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Seragio BESS, LLC",
        "POI Location": "11140 ECTRCNTYN_8 138kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-27T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-12-29T00:00:00",
        "FIS Approved": "2026-04-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0140",
        "Project Name": "Seragio BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Seragio BESS, LLC",
        "POI Location": "11140 ECTRCNTYN_8 138kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-27T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-12-29T00:00:00",
        "FIS Approved": "2026-04-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 524,
      "raw": {
        "INR": "25INR0142",
        "Project Name": "Sagewood BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sagewood BESS, LLC",
        "POI Location": "tap McDonald Road Switch (1333) – Pastores Switch (10121) ckt 1",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-30T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0142",
        "Project Name": "Sagewood BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sagewood BESS, LLC",
        "POI Location": "tap McDonald Road Switch (1333) – Pastores Switch (10121) ckt 1",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-30T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 525,
      "raw": {
        "INR": "25INR0143",
        "Project Name": "Ariji BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Ariji BESS, LLC",
        "POI Location": "Tap 138kV 1394 GTTYVTAP_8 - 1322 BIGSPRIG_8",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-19T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2023-06-09T00:00:00",
        "FIS Approved": "2025-03-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-08-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0143",
        "Project Name": "Ariji BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Ariji BESS, LLC",
        "POI Location": "Tap 138kV 1394 GTTYVTAP_8 - 1322 BIGSPRIG_8",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-19T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2023-06-09T00:00:00",
        "FIS Approved": "2025-03-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-08-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 526,
      "raw": {
        "INR": "25INR0144",
        "Project Name": "Jasper BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jasper BESS, LLC",
        "POI Location": "Tap 138kV 71230 Pleasant Farms - 1236 Pegasus South ",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2023-03-28T00:00:00",
        "FIS Approved": "2026-04-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-07-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0144",
        "Project Name": "Jasper BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jasper BESS, LLC",
        "POI Location": "Tap 138kV 71230 Pleasant Farms - 1236 Pegasus South ",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2023-03-28T00:00:00",
        "FIS Approved": "2026-04-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-07-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 527,
      "raw": {
        "INR": "25INR0146",
        "Project Name": "Blue Heron BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Blue Heron BESS, LLC",
        "POI Location": "Tap 138kV MANSON (1094) - Riverton (11083)",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": "2023-04-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-07-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0146",
        "Project Name": "Blue Heron BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Blue Heron BESS, LLC",
        "POI Location": "Tap 138kV MANSON (1094) - Riverton (11083)",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": "2023-04-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-07-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 528,
      "raw": {
        "INR": "25INR0154",
        "Project Name": "Nymphaea Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Nymphaea Solar, LLC",
        "POI Location": "Tap 345kV 1730 Krum West Swtich - 6111 Riley7B",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-05-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0154",
        "Project Name": "Nymphaea Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Nymphaea Solar, LLC",
        "POI Location": "Tap 345kV 1730 Krum West Swtich - 6111 Riley7B",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-05-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 529,
      "raw": {
        "INR": "25INR0155",
        "Project Name": "Nymphaea Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Nymphaea Solar, LLC",
        "POI Location": "Tap 345kV 1730 Krum West Swtich - 6111 Riley7B",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-13T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-05-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-06-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0155",
        "Project Name": "Nymphaea Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Nymphaea Solar, LLC",
        "POI Location": "Tap 345kV 1730 Krum West Swtich - 6111 Riley7B",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-13T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-05-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-06-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 530,
      "raw": {
        "INR": "25INR0164",
        "Project Name": "Star Dairy Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Star Dairy Solar LLC",
        "POI Location": "Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 115.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-18T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-09T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0164",
        "Project Name": "Star Dairy Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Star Dairy Solar LLC",
        "POI Location": "Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 115.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-18T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-09T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 531,
      "raw": {
        "INR": "25INR0165",
        "Project Name": "Timberlakes Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donegalsol ",
        "POI Location": "59904 Cottonwood 345kV",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-11-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-26T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-09-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0165",
        "Project Name": "Timberlakes Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donegalsol ",
        "POI Location": "59904 Cottonwood 345kV",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-11-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-26T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-09-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 532,
      "raw": {
        "INR": "25INR0166",
        "Project Name": "Compadre Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hill Solar II, LLC",
        "POI Location": "Tap 345kV 68090 Sam Switch – 3389 Fort Smith",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-04T00:00:00",
        "Meets All Planning": "2025-12-16T00:00:00",
        "Unnamed: 25": "2025-12-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-04-27T00:00:00",
        "Approved for Synchronization": "2026-07-16T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0166",
        "Project Name": "Compadre Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hill Solar II, LLC",
        "POI Location": "Tap 345kV 68090 Sam Switch – 3389 Fort Smith",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-04T00:00:00",
        "Meets All Planning": "2025-12-16T00:00:00",
        "Unnamed: 25": "2025-12-16T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-04-27T00:00:00",
        "Approved for Synchronization": "2026-07-16T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 533,
      "raw": {
        "INR": "25INR0168",
        "Project Name": "Piedra Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Piedra Solar, LLC",
        "POI Location": "Tap 345-kV line Navarro (68091) – Limestone (46020)) ",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 281.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2025-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-17T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-27T00:00:00",
        "Approved for Synchronization": "2026-08-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0168",
        "Project Name": "Piedra Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Piedra Solar, LLC",
        "POI Location": "Tap 345-kV line Navarro (68091) – Limestone (46020)) ",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 281.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2025-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-17T00:00:00",
        "Meets All Planning": "2025-10-30T00:00:00",
        "Unnamed: 25": "2025-10-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-27T00:00:00",
        "Approved for Synchronization": "2026-08-26T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 534,
      "raw": {
        "INR": "25INR0169",
        "Project Name": "Piedra BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Piedra Solar, LLC",
        "POI Location": "Tap 345-kV line Navarro (68091) – Limestone (46020)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2025-09-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-07-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2025-09-19T00:00:00",
        "Meets Planning": "2025-09-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0169",
        "Project Name": "Piedra BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Piedra Solar, LLC",
        "POI Location": "Tap 345-kV line Navarro (68091) – Limestone (46020)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2025-09-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-07-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2025-09-19T00:00:00",
        "Meets Planning": "2025-09-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 535,
      "raw": {
        "INR": "25INR0170",
        "Project Name": "Pinewood Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Brazoria Solar II, LLC",
        "POI Location": "43020 Seabreeze 345kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-03T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0170",
        "Project Name": "Pinewood Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Brazoria Solar II, LLC",
        "POI Location": "43020 Seabreeze 345kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-03T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2023-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 536,
      "raw": {
        "INR": "25INR0172",
        "Project Name": "Wolf Spring Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wolf Spring Solar, LLC",
        "POI Location": "Tap 345kV 59904 Cotton Wood - 23922 White River Ckt 1",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-30T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0172",
        "Project Name": "Wolf Spring Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wolf Spring Solar, LLC",
        "POI Location": "Tap 345kV 59904 Cotton Wood - 23922 White River Ckt 1",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-30T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 537,
      "raw": {
        "INR": "25INR0173",
        "Project Name": "Wolf Spring Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wolf Spring Solar, LLC",
        "POI Location": "Tap 345kV 59904 Cotton Wood - 23922 White River Ckt 1",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2022-12-07T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0173",
        "Project Name": "Wolf Spring Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wolf Spring Solar, LLC",
        "POI Location": "Tap 345kV 59904 Cotton Wood - 23922 White River Ckt 1",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2022-12-07T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 538,
      "raw": {
        "INR": "25INR0174",
        "Project Name": "Concho Pearl Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Concho Pearl Solar, LLC",
        "POI Location": "Tap 345kV 76009 Twin Buttes - 7077 Amos Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-07-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0174",
        "Project Name": "Concho Pearl Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Concho Pearl Solar, LLC",
        "POI Location": "Tap 345kV 76009 Twin Buttes - 7077 Amos Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-05T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-07-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 539,
      "raw": {
        "INR": "25INR0175",
        "Project Name": "Concho Pearl Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Concho Pearl Solar, LLC",
        "POI Location": "Tap 345kV 76009 Twin Buttes - 7077 Amos Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 162.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-08T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2022-12-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-07-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0175",
        "Project Name": "Concho Pearl Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Concho Pearl Solar, LLC",
        "POI Location": "Tap 345kV 76009 Twin Buttes - 7077 Amos Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 162.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-08T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-13T00:00:00",
        "FIS Requested": "2022-12-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-07-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 540,
      "raw": {
        "INR": "25INR0176",
        "Project Name": "Masava Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Savannah Oaks Solar Project, LLC",
        "POI Location": "tap 345 kV 46020 Limestone Plant - 967 Gibbons Creek ckt 18",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-23T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2022-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0176",
        "Project Name": "Masava Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Savannah Oaks Solar Project, LLC",
        "POI Location": "tap 345 kV 46020 Limestone Plant - 967 Gibbons Creek ckt 18",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-23T00:00:00",
        "Screening Study Started": "2022-09-02T00:00:00",
        "Screening Study Complete": "2022-11-30T00:00:00",
        "FIS Requested": "2022-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 541,
      "raw": {
        "INR": "25INR0177",
        "Project Name": "Triangle Ranch Alpha",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Triangle Ranch Wind",
        "POI Location": "Edith Clark 345 kV (#60500)",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-04T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-29T00:00:00",
        "FIS Requested": "2022-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0177",
        "Project Name": "Triangle Ranch Alpha",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Triangle Ranch Wind",
        "POI Location": "Edith Clark 345 kV (#60500)",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-04T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-29T00:00:00",
        "FIS Requested": "2022-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 542,
      "raw": {
        "INR": "25INR0178",
        "Project Name": "Triangle Ranch Bravo",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Triangle Ranch Wind",
        "POI Location": "Edith Clark 345 kV (#60500) ",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 200.22,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-04T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-29T00:00:00",
        "FIS Requested": "2022-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0178",
        "Project Name": "Triangle Ranch Bravo",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Triangle Ranch Wind",
        "POI Location": "Edith Clark 345 kV (#60500) ",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 200.22,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-04T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-29T00:00:00",
        "FIS Requested": "2022-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 543,
      "raw": {
        "INR": "25INR0184",
        "Project Name": "Legato BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Legato Storage, LLC",
        "POI Location": "138kV #608 Crafton Substation - #620 Bowie Substation",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-20T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-21T00:00:00",
        "FIS Requested": "2023-02-09T01:22:37",
        "FIS Approved": "2024-09-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0184",
        "Project Name": "Legato BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Legato Storage, LLC",
        "POI Location": "138kV #608 Crafton Substation - #620 Bowie Substation",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-20T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-21T00:00:00",
        "FIS Requested": "2023-02-09T01:22:37",
        "FIS Approved": "2024-09-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 544,
      "raw": {
        "INR": "25INR0186",
        "Project Name": "Moonlight Sonata BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Samsung Solar Energy 2, LLC",
        "POI Location": "Altair (78118) – Nada (78103) 138KV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-01T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-22T00:00:00",
        "FIS Requested": "2023-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0186",
        "Project Name": "Moonlight Sonata BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Samsung Solar Energy 2, LLC",
        "POI Location": "Altair (78118) – Nada (78103) 138KV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-01T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-22T00:00:00",
        "FIS Requested": "2023-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 545,
      "raw": {
        "INR": "25INR0189",
        "Project Name": "Staccato BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Staccato Storage, LLC",
        "POI Location": "138kV WARDA #7312. ",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-05T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-12-15T00:00:00",
        "FIS Approved": "2026-03-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-05-01T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0189",
        "Project Name": "Staccato BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Staccato Storage, LLC",
        "POI Location": "138kV WARDA #7312. ",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-05T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-12-15T00:00:00",
        "FIS Approved": "2026-03-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-05-01T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 546,
      "raw": {
        "INR": "25INR0190",
        "Project Name": "Fortissimo BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Fortissimo BESS, LCC",
        "POI Location": "741 Dyemound 138kV",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-28T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-13T00:00:00",
        "FIS Requested": "2023-02-09T01:31:22.999000",
        "FIS Approved": "2024-09-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0190",
        "Project Name": "Fortissimo BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Fortissimo BESS, LCC",
        "POI Location": "741 Dyemound 138kV",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-28T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-13T00:00:00",
        "FIS Requested": "2023-02-09T01:31:22.999000",
        "FIS Approved": "2024-09-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 547,
      "raw": {
        "INR": "25INR0192",
        "Project Name": "Palmvalley Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palm Valley BESS LLC",
        "POI Location": "Frontera (#8980)",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-26T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-21T00:00:00",
        "FIS Requested": "2022-09-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0192",
        "Project Name": "Palmvalley Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palm Valley BESS LLC",
        "POI Location": "Frontera (#8980)",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-08-26T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-21T00:00:00",
        "FIS Requested": "2022-09-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 548,
      "raw": {
        "INR": "25INR0193",
        "Project Name": "Nockenut Springs Solar 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "The 345 kV Elm Creek - South Texas Project Line (Bus #5133 - #5915)",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-08-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0193",
        "Project Name": "Nockenut Springs Solar 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "The 345 kV Elm Creek - South Texas Project Line (Bus #5133 - #5915)",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-13T00:00:00",
        "Screening Study Started": "2022-09-15T00:00:00",
        "Screening Study Complete": "2022-12-13T00:00:00",
        "FIS Requested": "2022-08-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 549,
      "raw": {
        "INR": "25INR0196",
        "Project Name": "Inadale Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Inadale Solar, LLC",
        "POI Location": "Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 281.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-19T00:00:00",
        "FIS Requested": "2023-02-08T00:00:00",
        "FIS Approved": "2026-08-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0196",
        "Project Name": "Inadale Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Inadale Solar, LLC",
        "POI Location": "Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 281.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-19T00:00:00",
        "FIS Requested": "2023-02-08T00:00:00",
        "FIS Approved": "2026-08-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 550,
      "raw": {
        "INR": "25INR0197",
        "Project Name": "Inadale BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Inadale BESS, LLC",
        "POI Location": "Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 287.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-19T00:00:00",
        "FIS Requested": "2023-02-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0197",
        "Project Name": "Inadale BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Inadale BESS, LLC",
        "POI Location": "Tap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 287.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-19T00:00:00",
        "FIS Requested": "2023-02-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 551,
      "raw": {
        "INR": "25INR0199",
        "Project Name": "Bonham Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "J&J Solar Ranch LLC",
        "POI Location": "TAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 138.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-09T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2022-10-31T00:00:00",
        "FIS Approved": "2026-06-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-09T00:00:00",
        "Meets All Planning": "2026-07-20T00:00:00",
        "Unnamed: 25": "2026-07-20T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0199",
        "Project Name": "Bonham Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "J&J Solar Ranch LLC",
        "POI Location": "TAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-04-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 138.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-09T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2022-10-31T00:00:00",
        "FIS Approved": "2026-06-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-09T00:00:00",
        "Meets All Planning": "2026-07-20T00:00:00",
        "Unnamed: 25": "2026-07-20T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 552,
      "raw": {
        "INR": "25INR0202",
        "Project Name": "East West BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "East West Energy Storage, LLC ",
        "POI Location": "7750 LCRA MOUNTAIN HOME SUB",
        "County": "Kerr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-28T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-29T00:00:00",
        "FIS Requested": "2022-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-07-12T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0202",
        "Project Name": "East West BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "East West Energy Storage, LLC ",
        "POI Location": "7750 LCRA MOUNTAIN HOME SUB",
        "County": "Kerr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-28T00:00:00",
        "Screening Study Started": "2022-10-06T00:00:00",
        "Screening Study Complete": "2022-12-29T00:00:00",
        "FIS Requested": "2022-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-07-12T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 553,
      "raw": {
        "INR": "25INR0204",
        "Project Name": "Cedar Range Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cedar Range, LLC",
        "POI Location": "“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts Creek 345 kV Line",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-06T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-11-03T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-02T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0204",
        "Project Name": "Cedar Range Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cedar Range, LLC",
        "POI Location": "“Sweet Tea” 345 kV switchyard that taps the Allen Switch – Stouts Creek 345 kV Line",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-06T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-11-03T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-02T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 554,
      "raw": {
        "INR": "25INR0207",
        "Project Name": "Shadow Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "LectricWind LLC",
        "POI Location": "842 King Mountain 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 807.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-24T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2023-01-12T00:00:00",
        "FIS Requested": "2023-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0207",
        "Project Name": "Shadow Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "LectricWind LLC",
        "POI Location": "842 King Mountain 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 807.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-24T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2023-01-12T00:00:00",
        "FIS Requested": "2023-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 555,
      "raw": {
        "INR": "25INR0214",
        "Project Name": "Burgos Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Twin Oaks Solar, LLC",
        "POI Location": "3701 Rookie Switch 138 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-13T00:00:00",
        "FIS Requested": "2023-03-03T00:00:00",
        "FIS Approved": "2026-05-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0214",
        "Project Name": "Burgos Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Twin Oaks Solar, LLC",
        "POI Location": "3701 Rookie Switch 138 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-13T00:00:00",
        "FIS Requested": "2023-03-03T00:00:00",
        "FIS Approved": "2026-05-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 556,
      "raw": {
        "INR": "25INR0216",
        "Project Name": "Blue Sky Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " UKA North America, LLC",
        "POI Location": "138 kV Friend Ranch (Bus# 6562)",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-17T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-22T00:00:00",
        "FIS Requested": "2022-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0216",
        "Project Name": "Blue Sky Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " UKA North America, LLC",
        "POI Location": "138 kV Friend Ranch (Bus# 6562)",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-17T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-22T00:00:00",
        "FIS Requested": "2022-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 557,
      "raw": {
        "INR": "25INR0220",
        "Project Name": "Hector Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hector Solar, LLC",
        "POI Location": "Haney (213) - Hubbard_8 (3515) 138kV Line",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0220",
        "Project Name": "Hector Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hector Solar, LLC",
        "POI Location": "Haney (213) - Hubbard_8 (3515) 138kV Line",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 558,
      "raw": {
        "INR": "25INR0221",
        "Project Name": "Hector Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hector Solar, LLC",
        "POI Location": "Haney (213) - Hubbard_8 (3515) 138kV Line",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 42.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": "2023-01-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0221",
        "Project Name": "Hector Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hector Solar, LLC",
        "POI Location": "Haney (213) - Hubbard_8 (3515) 138kV Line",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 42.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2022-10-24T00:00:00",
        "Screening Study Complete": "2023-01-20T00:00:00",
        "FIS Requested": "2023-01-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 559,
      "raw": {
        "INR": "25INR0225",
        "Project Name": "Lucy Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Concho County Solar 1 LLC",
        "POI Location": "Tap 345kV 7077 Amos Creek - 6444 San Angelo Red Creek and 7077 Amos Creek - 76009 Twin Buttes",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 352.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-08T00:00:00",
        "FIS Approved": "2026-06-08T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-05-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-15T00:00:00",
        "Meets All Planning": "2026-07-15T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0225",
        "Project Name": "Lucy Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Concho County Solar 1 LLC",
        "POI Location": "Tap 345kV 7077 Amos Creek - 6444 San Angelo Red Creek and 7077 Amos Creek - 76009 Twin Buttes",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 352.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-08T00:00:00",
        "FIS Approved": "2026-06-08T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-05-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-15T00:00:00",
        "Meets All Planning": "2026-07-15T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 560,
      "raw": {
        "INR": "25INR0227",
        "Project Name": "SERENGETI SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Abei Energy Green XIV LLC",
        "POI Location": "Tap 138kV Enloe Tap (bus# 11806) – Delta sub (bus# 1802)",
        "County": "Delta",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 76.18,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2022-11-08T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": "2026-04-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0227",
        "Project Name": "SERENGETI SOLAR",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Abei Energy Green XIV LLC",
        "POI Location": "Tap 138kV Enloe Tap (bus# 11806) – Delta sub (bus# 1802)",
        "County": "Delta",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 76.18,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2022-11-08T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-18T00:00:00",
        "FIS Approved": "2026-04-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 561,
      "raw": {
        "INR": "25INR0229",
        "Project Name": "OCI Cobb Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hillsboro Solar Project LLC",
        "POI Location": "tap 345kV 1907 Venus - 68090 Sam Sw",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-11T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2022-11-09T00:00:00",
        "FIS Approved": "2024-05-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-06-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0229",
        "Project Name": "OCI Cobb Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hillsboro Solar Project LLC",
        "POI Location": "tap 345kV 1907 Venus - 68090 Sam Sw",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-11T00:00:00",
        "Screening Study Started": "2022-11-15T00:00:00",
        "Screening Study Complete": "2023-02-09T00:00:00",
        "FIS Requested": "2022-11-09T00:00:00",
        "FIS Approved": "2024-05-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-06-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 562,
      "raw": {
        "INR": "25INR0230",
        "Project Name": "Great Rock BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Great Rock Storage LLC",
        "POI Location": "Tap 345kV 46020 Limestone - 967 Gibbon Creek Ckt 18",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-19T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-04T00:00:00",
        "FIS Requested": "2022-10-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-10-20T00:00:00",
        "Construction End": "2027-12-20T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0230",
        "Project Name": "Great Rock BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Great Rock Storage LLC",
        "POI Location": "Tap 345kV 46020 Limestone - 967 Gibbon Creek Ckt 18",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-19T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-04T00:00:00",
        "FIS Requested": "2022-10-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-10-20T00:00:00",
        "Construction End": "2027-12-20T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 563,
      "raw": {
        "INR": "25INR0231",
        "Project Name": "Apache Hill BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "APACHE HILL ENERGY CENTER",
        "POI Location": "363 Hood 138kV",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-25T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-10-25T00:00:00",
        "FIS Approved": "2026-03-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-07-17T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-18T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0231",
        "Project Name": "Apache Hill BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "APACHE HILL ENERGY CENTER",
        "POI Location": "363 Hood 138kV",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-25T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-10-25T00:00:00",
        "FIS Approved": "2026-03-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-07-17T00:00:00",
        "Meets All Planning": "2026-05-01T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-18T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 564,
      "raw": {
        "INR": "25INR0232",
        "Project Name": "Isaac Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Industrial Bravo Project LLC",
        "POI Location": "8114 Conoco 138kV ",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-24T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-10-27T00:00:00",
        "FIS Approved": "2025-12-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-31T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0232",
        "Project Name": "Isaac Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Industrial Bravo Project LLC",
        "POI Location": "8114 Conoco 138kV ",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 50.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-10-24T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-03T00:00:00",
        "FIS Requested": "2022-10-27T00:00:00",
        "FIS Approved": "2025-12-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2023-10-31T00:00:00",
        "Meets All Planning": "2026-01-29T00:00:00",
        "Unnamed: 25": "2026-01-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 565,
      "raw": {
        "INR": "25INR0233",
        "Project Name": "OCI Cobb Creek ESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hillsboro Solar Project LLC",
        "POI Location": "tap 345kV 1907 Venus - 68090 Sam Sw",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-04T00:00:00",
        "FIS Requested": "2022-11-23T00:00:00",
        "FIS Approved": "2024-05-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-06-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0233",
        "Project Name": "OCI Cobb Creek ESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hillsboro Solar Project LLC",
        "POI Location": "tap 345kV 1907 Venus - 68090 Sam Sw",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-04T00:00:00",
        "FIS Requested": "2022-11-23T00:00:00",
        "FIS Approved": "2024-05-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-06-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 566,
      "raw": {
        "INR": "25INR0235",
        "Project Name": "Austin Bayou Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0235",
        "Project Name": "Austin Bayou Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 567,
      "raw": {
        "INR": "25INR0236",
        "Project Name": "Austin Bayou Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0236",
        "Project Name": "Austin Bayou Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345 kV Line",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 568,
      "raw": {
        "INR": "25INR0237",
        "Project Name": "Austin Bayou Storage III",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0237",
        "Project Name": "Austin Bayou Storage III",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Austin Bayou Solar, LLC",
        "POI Location": "Tap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 569,
      "raw": {
        "INR": "25INR0238",
        "Project Name": "Little Ridge Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS B LLC",
        "POI Location": "Tap 138kV Swindell (812) - Olinger (818)",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-04T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0238",
        "Project Name": "Little Ridge Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS B LLC",
        "POI Location": "Tap 138kV Swindell (812) - Olinger (818)",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-04T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 570,
      "raw": {
        "INR": "25INR0239",
        "Project Name": "Big Five Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS 3 LLC",
        "POI Location": "Tap 138kV (5784) Redgtss - (8380) Nedina \n",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-24T00:00:00",
        "Screening Study Started": "2023-05-26T00:00:00",
        "Screening Study Complete": "2023-08-17T00:00:00",
        "FIS Requested": "2023-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2027-07-01T00:00:00",
        "Construction End": "2027-09-06T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0239",
        "Project Name": "Big Five Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS 3 LLC",
        "POI Location": "Tap 138kV (5784) Redgtss - (8380) Nedina \n",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-24T00:00:00",
        "Screening Study Started": "2023-05-26T00:00:00",
        "Screening Study Complete": "2023-08-17T00:00:00",
        "FIS Requested": "2023-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2027-07-01T00:00:00",
        "Construction End": "2027-09-06T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 571,
      "raw": {
        "INR": "25INR0241",
        "Project Name": "Halcon Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS A LLC",
        "POI Location": "Tap 138kV 8957 Central Lopeno - 80106 Falcon Dam\n",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 132.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-15T00:00:00",
        "Screening Study Started": "2023-05-22T00:00:00",
        "Screening Study Complete": "2023-08-17T00:00:00",
        "FIS Requested": "2023-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0241",
        "Project Name": "Halcon Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS A LLC",
        "POI Location": "Tap 138kV 8957 Central Lopeno - 80106 Falcon Dam\n",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 132.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-15T00:00:00",
        "Screening Study Started": "2023-05-22T00:00:00",
        "Screening Study Complete": "2023-08-17T00:00:00",
        "FIS Requested": "2023-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 572,
      "raw": {
        "INR": "25INR0242",
        "Project Name": "Pato Blanco Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "TX BESS 4, LLC",
        "POI Location": "Tap 138 kV 44010 W A Parish - 42980 NASH___S02_8",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 71.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-25T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-24T00:00:00",
        "FIS Approved": "2025-09-12T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0242",
        "Project Name": "Pato Blanco Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "TX BESS 4, LLC",
        "POI Location": "Tap 138 kV 44010 W A Parish - 42980 NASH___S02_8",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 71.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-25T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-24T00:00:00",
        "FIS Approved": "2025-09-12T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 573,
      "raw": {
        "INR": "25INR0246",
        "Project Name": "VALDIVIAN SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Abei Energy Green III LLC",
        "POI Location": "138kV 1816 Commerce Switch - 1809 Wolf City ",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 74.9,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-05-26T00:00:00",
        "FIS Requested": "2023-02-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0246",
        "Project Name": "VALDIVIAN SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Abei Energy Green III LLC",
        "POI Location": "138kV 1816 Commerce Switch - 1809 Wolf City ",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 74.9,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-05-26T00:00:00",
        "FIS Requested": "2023-02-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 574,
      "raw": {
        "INR": "25INR0247",
        "Project Name": "Bluebonnet Prairie Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bluebonnet Prairie Wind, LLC",
        "POI Location": "Tap 138kV 200 CHATFIELD - 3454 MONTFTSS__8",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-06T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2027-08-01T00:00:00",
        "Construction End": "2028-05-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0247",
        "Project Name": "Bluebonnet Prairie Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bluebonnet Prairie Wind, LLC",
        "POI Location": "Tap 138kV 200 CHATFIELD - 3454 MONTFTSS__8",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-06T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2022-11-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2027-08-01T00:00:00",
        "Construction End": "2028-05-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 575,
      "raw": {
        "INR": "25INR0248",
        "Project Name": "Strawberry Acres Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Strawberry Acres Energy Center, LLC",
        "POI Location": "5132 Eagle Creek Substation 138kV ",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-11T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": "2025-10-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0248",
        "Project Name": "Strawberry Acres Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Strawberry Acres Energy Center, LLC",
        "POI Location": "5132 Eagle Creek Substation 138kV ",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-11T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-15T00:00:00",
        "FIS Approved": "2025-10-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 576,
      "raw": {
        "INR": "25INR0253",
        "Project Name": "Whiskey BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Whiskey BESS LLC",
        "POI Location": "6828 Canton Tap 138 kV ",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-04T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2023-05-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0253",
        "Project Name": "Whiskey BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Whiskey BESS LLC",
        "POI Location": "6828 Canton Tap 138 kV ",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-04T00:00:00",
        "Screening Study Started": "2022-12-07T00:00:00",
        "Screening Study Complete": "2023-03-06T00:00:00",
        "FIS Requested": "2023-05-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 577,
      "raw": {
        "INR": "25INR0262",
        "Project Name": "Shepard Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Shepard Energy Storage LLC",
        "POI Location": "# 38900 Hidden Lakes - # 42015 PHR 138 KV ",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-02T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-11T00:00:00",
        "FIS Requested": "2022-12-09T00:00:00",
        "FIS Approved": "2026-03-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-01-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0262",
        "Project Name": "Shepard Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Shepard Energy Storage LLC",
        "POI Location": "# 38900 Hidden Lakes - # 42015 PHR 138 KV ",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-02T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-11T00:00:00",
        "FIS Requested": "2022-12-09T00:00:00",
        "FIS Approved": "2026-03-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-01-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 578,
      "raw": {
        "INR": "25INR0266",
        "Project Name": "East Blackland Battery Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DERIVA ENERGY STORAGE, LLC",
        "POI Location": "7337 Kimbro 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0266",
        "Project Name": "East Blackland Battery Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DERIVA ENERGY STORAGE, LLC",
        "POI Location": "7337 Kimbro 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-11-17T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2022-11-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 579,
      "raw": {
        "INR": "25INR0270",
        "Project Name": "Harryoung Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Four LLC",
        "POI Location": "Tap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 190.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2023-08-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0270",
        "Project Name": "Harryoung Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Four LLC",
        "POI Location": "Tap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 190.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2022-11-23T00:00:00",
        "Screening Study Complete": "2023-02-17T00:00:00",
        "FIS Requested": "2023-08-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 580,
      "raw": {
        "INR": "25INR0271",
        "Project Name": "City Breeze BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "City Breeze BESS LLC",
        "POI Location": "8111 MAGILL4A 138KV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-03-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 143.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-11T00:00:00",
        "FIS Requested": "2022-12-06T00:00:00",
        "FIS Approved": "2026-06-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-25T00:00:00",
        "Meets All Planning": "2026-07-30T00:00:00",
        "Unnamed: 25": "2026-07-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0271",
        "Project Name": "City Breeze BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "City Breeze BESS LLC",
        "POI Location": "8111 MAGILL4A 138KV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-03-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 143.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-14T00:00:00",
        "Screening Study Started": "2022-12-15T00:00:00",
        "Screening Study Complete": "2023-03-11T00:00:00",
        "FIS Requested": "2022-12-06T00:00:00",
        "FIS Approved": "2026-06-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-05-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-25T00:00:00",
        "Meets All Planning": "2026-07-30T00:00:00",
        "Unnamed: 25": "2026-07-30T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 581,
      "raw": {
        "INR": "25INR0280",
        "Project Name": "Nockenut Springs Solar 5",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap 345 kV 5133 Elm Creek - 5915 South Texas Project",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-08T00:00:00",
        "FIS Requested": "2023-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0280",
        "Project Name": "Nockenut Springs Solar 5",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap 345 kV 5133 Elm Creek - 5915 South Texas Project",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-24T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-08T00:00:00",
        "FIS Requested": "2023-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 582,
      "raw": {
        "INR": "25INR0281",
        "Project Name": "Cosper Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Gransolar Texas Twenty LLC",
        "POI Location": "Tap 138kV 115 Ding Dong - 3630 Copperas Cove Tu\n",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 148.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2023-05-26T00:00:00",
        "FIS Approved": "2024-11-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0281",
        "Project Name": "Cosper Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Gransolar Texas Twenty LLC",
        "POI Location": "Tap 138kV 115 Ding Dong - 3630 Copperas Cove Tu\n",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 148.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2023-05-26T00:00:00",
        "FIS Approved": "2024-11-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 583,
      "raw": {
        "INR": "25INR0282",
        "Project Name": "Hornet Solar II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hornet Solar II LLC",
        "POI Location": "Ozark Trail Switch 345kV substation (Bus #23901)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-20T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-29T00:00:00",
        "FIS Requested": "2022-12-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0282",
        "Project Name": "Hornet Solar II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hornet Solar II LLC",
        "POI Location": "Ozark Trail Switch 345kV substation (Bus #23901)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-20T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-29T00:00:00",
        "FIS Requested": "2022-12-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 584,
      "raw": {
        "INR": "25INR0283",
        "Project Name": "Hornet Storage II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hornet Storage II LLC",
        "POI Location": "Ozark Trail Switch 345kV substation (Bus # 23901)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-29T00:00:00",
        "FIS Requested": "2022-12-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0283",
        "Project Name": "Hornet Storage II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hornet Storage II LLC",
        "POI Location": "Ozark Trail Switch 345kV substation (Bus # 23901)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-29T00:00:00",
        "FIS Requested": "2022-12-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 585,
      "raw": {
        "INR": "25INR0286",
        "Project Name": "Savannah Oaks Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Savannah Oaks Solar Project LLC",
        "POI Location": "Tap 345kV 46020 Limestone Plant - 967 Gibbons Creek",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.19,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-19T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0286",
        "Project Name": "Savannah Oaks Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Savannah Oaks Solar Project LLC",
        "POI Location": "Tap 345kV 46020 Limestone Plant - 967 Gibbons Creek",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.19,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-19T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 586,
      "raw": {
        "INR": "25INR0287",
        "Project Name": "Hide Town Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hide Town Energy Storage LLC",
        "POI Location": "18555 Union Switch 138 kV\n",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-24T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2024-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0287",
        "Project Name": "Hide Town Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hide Town Energy Storage LLC",
        "POI Location": "18555 Union Switch 138 kV\n",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-24T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2024-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 587,
      "raw": {
        "INR": "25INR0288",
        "Project Name": "Buffalo Prairie Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buffalo Meadow Energy Center, LLC",
        "POI Location": "Tap 345kV 975 Jack Creek - 3400 Twin Oak",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 308.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-30T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-29T00:00:00",
        "FIS Requested": "2022-12-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0288",
        "Project Name": "Buffalo Prairie Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buffalo Meadow Energy Center, LLC",
        "POI Location": "Tap 345kV 975 Jack Creek - 3400 Twin Oak",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 308.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-30T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-29T00:00:00",
        "FIS Requested": "2022-12-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 588,
      "raw": {
        "INR": "25INR0293",
        "Project Name": "TOCE BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TOCE BESS 1, LLC",
        "POI Location": "138 kV Danevang Switching Station (Bus# 5546)",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-10-02T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-09-22T00:00:00",
        "FIS Approved": "2024-11-07T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0293",
        "Project Name": "TOCE BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "TOCE BESS 1, LLC",
        "POI Location": "138 kV Danevang Switching Station (Bus# 5546)",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-10-02T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-09-22T00:00:00",
        "FIS Approved": "2024-11-07T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 589,
      "raw": {
        "INR": "25INR0297",
        "Project Name": "RIVERBEND SOLAR SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Riverbend Renewables, LLC",
        "POI Location": "TAP 345 KV  LINE  FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS\n",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-13T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0297",
        "Project Name": "RIVERBEND SOLAR SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Riverbend Renewables, LLC",
        "POI Location": "TAP 345 KV  LINE  FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS\n",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-13T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 590,
      "raw": {
        "INR": "25INR0301",
        "Project Name": "Van Zandt Energy Storage ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rocky Mountain Energy Holdings, LLC",
        "POI Location": "1027 Odessa EHV Switch 138 kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-21T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-04-05T00:00:00",
        "FIS Approved": "2024-11-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-03T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0301",
        "Project Name": "Van Zandt Energy Storage ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rocky Mountain Energy Holdings, LLC",
        "POI Location": "1027 Odessa EHV Switch 138 kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-21T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-04-05T00:00:00",
        "FIS Approved": "2024-11-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-03T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 591,
      "raw": {
        "INR": "25INR0304",
        "Project Name": "Flying Kite Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "FLYING KITE SOLAR LLC",
        "POI Location": "Tap the 138 kV La Pryor (#8008) - Poblano (#8009)",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 80.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-31T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-03-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-10-02T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0304",
        "Project Name": "Flying Kite Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "FLYING KITE SOLAR LLC",
        "POI Location": "Tap the 138 kV La Pryor (#8008) - Poblano (#8009)",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 80.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-31T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-03-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-10-02T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 592,
      "raw": {
        "INR": "25INR0306",
        "Project Name": "Red Top Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cat Red Top Solar, LLC",
        "POI Location": "Tap 138kV 1431 Graham SES - Short Grass 11525",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-24T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2026-01-07T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0306",
        "Project Name": "Red Top Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cat Red Top Solar, LLC",
        "POI Location": "Tap 138kV 1431 Graham SES - Short Grass 11525",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-24T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2026-01-07T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 593,
      "raw": {
        "INR": "25INR0310",
        "Project Name": "IEP Blackhawk",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IEP Texas Verde II, llc",
        "POI Location": "38740 Heights Substation 138kV ",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-04T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-03-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0310",
        "Project Name": "IEP Blackhawk",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IEP Texas Verde II, llc",
        "POI Location": "38740 Heights Substation 138kV ",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-04T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-03-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 594,
      "raw": {
        "INR": "25INR0311",
        "Project Name": "RIVERBEND STORAGE SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Riverbend Renewables, LLC",
        "POI Location": "TAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-13T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-03T00:00:00",
        "FIS Approved": "2024-07-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0311",
        "Project Name": "RIVERBEND STORAGE SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Riverbend Renewables, LLC",
        "POI Location": "TAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-13T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-03T00:00:00",
        "FIS Approved": "2024-07-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 595,
      "raw": {
        "INR": "25INR0319",
        "Project Name": "Northington Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Northington Solar, LLC",
        "POI Location": "The 138 kV El Campo (#8102) - Pulsar (#8192) Line; AEP. ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-19T00:00:00",
        "FIS Requested": "2023-02-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-10-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0319",
        "Project Name": "Northington Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Northington Solar, LLC",
        "POI Location": "The 138 kV El Campo (#8102) - Pulsar (#8192) Line; AEP. ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-19T00:00:00",
        "FIS Requested": "2023-02-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-10-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 596,
      "raw": {
        "INR": "25INR0321",
        "Project Name": "El Molino Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "El Molino Solar, LLC",
        "POI Location": "Tap 138kV 80439 LaQuinta - 8297 Bruni 8297",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-16T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0321",
        "Project Name": "El Molino Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "El Molino Solar, LLC",
        "POI Location": "Tap 138kV 80439 LaQuinta - 8297 Bruni 8297",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-16T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 597,
      "raw": {
        "INR": "25INR0322",
        "Project Name": "El Molino Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "El Molino Solar, LLC",
        "POI Location": "Tap 138kV 80439 LaQuinta - 8297 Bruni 8297",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-16T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0322",
        "Project Name": "El Molino Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "El Molino Solar, LLC",
        "POI Location": "Tap 138kV 80439 LaQuinta - 8297 Bruni 8297",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-16T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 598,
      "raw": {
        "INR": "25INR0329",
        "Project Name": "Lynx Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Corpus Battery Storage, LLC",
        "POI Location": "138KV Tap 8921 Terra Verde - 8518 Kingsville",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-03-01T00:00:00",
        "FIS Approved": "2025-08-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-23T00:00:00",
        "Unnamed: 25": "2025-10-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-19T00:00:00",
        "Approved for Synchronization": "2026-04-07T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0329",
        "Project Name": "Lynx Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Corpus Battery Storage, LLC",
        "POI Location": "138KV Tap 8921 Terra Verde - 8518 Kingsville",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-02T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-03-01T00:00:00",
        "FIS Approved": "2025-08-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-23T00:00:00",
        "Unnamed: 25": "2025-10-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-19T00:00:00",
        "Approved for Synchronization": "2026-04-07T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 599,
      "raw": {
        "INR": "25INR0330",
        "Project Name": "Clutch City Solar Phase II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HZ SOLAR I, LLC",
        "POI Location": "tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT#04",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-20T00:00:00",
        "FIS Requested": "2023-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-11T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0330",
        "Project Name": "Clutch City Solar Phase II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HZ SOLAR I, LLC",
        "POI Location": "tap 138kV 42960 Mustang Bayou – 42100 Hudson CKT#04",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-20T00:00:00",
        "FIS Requested": "2023-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-11T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 600,
      "raw": {
        "INR": "25INR0331",
        "Project Name": "Buffalo Meadow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buffalo Meadow Energy Center, LLC",
        "POI Location": "Tap Jack Creek (975) - Twin Oak (3400) 345kV line",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-15T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-05-26T00:00:00",
        "FIS Requested": "2023-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0331",
        "Project Name": "Buffalo Meadow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buffalo Meadow Energy Center, LLC",
        "POI Location": "Tap Jack Creek (975) - Twin Oak (3400) 345kV line",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-15T00:00:00",
        "Screening Study Started": "2023-02-27T00:00:00",
        "Screening Study Complete": "2023-05-26T00:00:00",
        "FIS Requested": "2023-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 601,
      "raw": {
        "INR": "25INR0334",
        "Project Name": "Star Dairy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Star Dairy Storage",
        "POI Location": "Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-17T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-11T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0334",
        "Project Name": "Star Dairy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Star Dairy Storage",
        "POI Location": "Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-17T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-11T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 602,
      "raw": {
        "INR": "25INR0337",
        "Project Name": "Butcherbird Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Butcherbird Solar, LLC",
        "POI Location": "Tap 138 kV - Bell County #133 to Bartlett Switch #114",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 116,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-12-06T00:00:00",
        "FIS Approved": "2025-12-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0337",
        "Project Name": "Butcherbird Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Butcherbird Solar, LLC",
        "POI Location": "Tap 138 kV - Bell County #133 to Bartlett Switch #114",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 116,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-12-06T00:00:00",
        "FIS Approved": "2025-12-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 603,
      "raw": {
        "INR": "25INR0338",
        "Project Name": "Les Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rocky Mountain Energy Development, LLC",
        "POI Location": "Tap 138 kV 1326 Stanton East – 11324 Leatherwood Pod",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-23T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-05T00:00:00",
        "FIS Requested": "2023-02-17T00:00:00",
        "FIS Approved": "2025-06-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0338",
        "Project Name": "Les Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rocky Mountain Energy Development, LLC",
        "POI Location": "Tap 138 kV 1326 Stanton East – 11324 Leatherwood Pod",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-23T00:00:00",
        "Screening Study Started": "2023-02-09T00:00:00",
        "Screening Study Complete": "2023-05-05T00:00:00",
        "FIS Requested": "2023-02-17T00:00:00",
        "FIS Approved": "2025-06-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 604,
      "raw": {
        "INR": "25INR0339",
        "Project Name": "Fort Concho Energy storage  ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rocky Mountain Energy Development, LLC",
        "POI Location": "Tap 138 kV #76320 Schkade -  #76011 Twin Buttes Line; LCRA",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0339",
        "Project Name": "Fort Concho Energy storage  ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rocky Mountain Energy Development, LLC",
        "POI Location": "Tap 138 kV #76320 Schkade -  #76011 Twin Buttes Line; LCRA",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 605,
      "raw": {
        "INR": "25INR0341",
        "Project Name": "Rosebud Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rosebud Storage, LLC",
        "POI Location": "Tap 69 kV 67 BAGGINS - 69 BARCLAY",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2023-03-09T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-12-04T00:00:00",
        "FIS Approved": "2025-10-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0341",
        "Project Name": "Rosebud Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rosebud Storage, LLC",
        "POI Location": "Tap 69 kV 67 BAGGINS - 69 BARCLAY",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2023-03-09T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-12-04T00:00:00",
        "FIS Approved": "2025-10-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 606,
      "raw": {
        "INR": "25INR0342",
        "Project Name": "Nickel Spruce Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nickel Spruce Solar LLC",
        "POI Location": "Tap 138kV 6735 Pleasant Springs Switching Station - 6736 Middl",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-10T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-10-31T17:42:30.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0342",
        "Project Name": "Nickel Spruce Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nickel Spruce Solar LLC",
        "POI Location": "Tap 138kV 6735 Pleasant Springs Switching Station - 6736 Middl",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-10T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-10-31T17:42:30.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 607,
      "raw": {
        "INR": "25INR0346",
        "Project Name": "Cado Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cado Storage, LLC",
        "POI Location": "Tap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-06-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-10T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2026-08-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0346",
        "Project Name": "Cado Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cado Storage, LLC",
        "POI Location": "Tap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-06-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-10T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2026-08-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 608,
      "raw": {
        "INR": "25INR0347",
        "Project Name": "Cadet Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS 5, LLC",
        "POI Location": "Tap 69kV 32864 BRYN_ATK69 to 32873 BRYN SHADY",
        "County": "Brazos",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.42,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2023-05-22T00:00:00",
        "Screening Study Complete": "2023-08-18T00:00:00",
        "FIS Requested": "2023-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0347",
        "Project Name": "Cadet Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS 5, LLC",
        "POI Location": "Tap 69kV 32864 BRYN_ATK69 to 32873 BRYN SHADY",
        "County": "Brazos",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.42,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2023-05-22T00:00:00",
        "Screening Study Complete": "2023-08-18T00:00:00",
        "FIS Requested": "2023-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 609,
      "raw": {
        "INR": "25INR0353",
        "Project Name": "Marshall Spring Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Marshall Springs Solar, LLC",
        "POI Location": "New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.",
        "County": "Gillespie",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-18T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0353",
        "Project Name": "Marshall Spring Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Marshall Springs Solar, LLC",
        "POI Location": "New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.",
        "County": "Gillespie",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-18T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 610,
      "raw": {
        "INR": "25INR0354",
        "Project Name": "Marshall Spring Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Marshall Springs Storage, LLC",
        "POI Location": "New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.",
        "County": "Gillespie",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-18T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0354",
        "Project Name": "Marshall Spring Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Marshall Springs Storage, LLC",
        "POI Location": "New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.",
        "County": "Gillespie",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-18T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 611,
      "raw": {
        "INR": "25INR0368",
        "Project Name": "Echols Grove Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Echols Grove, LLC",
        "POI Location": "Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770)",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.56,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-03-22T00:00:00",
        "FIS Approved": "2026-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0368",
        "Project Name": "Echols Grove Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Echols Grove, LLC",
        "POI Location": "Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770)",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.56,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-03-17T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-03-22T00:00:00",
        "FIS Approved": "2026-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-07-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 612,
      "raw": {
        "INR": "25INR0370",
        "Project Name": "Willis Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Majewski Storage LLC",
        "POI Location": "tap 138kV Emory North 3171 to Liberty POD 1723",
        "County": "Rains",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 176.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-03T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-24T00:00:00",
        "FIS Requested": "2023-03-13T00:00:00",
        "FIS Approved": "2024-11-08T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-07-07T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0370",
        "Project Name": "Willis Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Majewski Storage LLC",
        "POI Location": "tap 138kV Emory North 3171 to Liberty POD 1723",
        "County": "Rains",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 176.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-03T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-24T00:00:00",
        "FIS Requested": "2023-03-13T00:00:00",
        "FIS Approved": "2024-11-08T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-07-07T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 613,
      "raw": {
        "INR": "25INR0371",
        "Project Name": "McMurtre Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BT McMurtre Storage, LLC",
        "POI Location": "tap 138kV 1819 Commerce South - 1815 Cumby Tap",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 176.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-10T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-06T00:00:00",
        "FIS Approved": "2024-07-08T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-09-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0371",
        "Project Name": "McMurtre Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BT McMurtre Storage, LLC",
        "POI Location": "tap 138kV 1819 Commerce South - 1815 Cumby Tap",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 176.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-10T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-06T00:00:00",
        "FIS Approved": "2024-07-08T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-09-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 614,
      "raw": {
        "INR": "25INR0372",
        "Project Name": "Elan BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Elan BESS, LLC",
        "POI Location": "42380 Needville 138kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-01T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": "2024-03-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0372",
        "Project Name": "Elan BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Elan BESS, LLC",
        "POI Location": "42380 Needville 138kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-01T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": "2024-03-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 615,
      "raw": {
        "INR": "25INR0375",
        "Project Name": "NavBoot BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Navboot BESS LLC",
        "POI Location": "8858 MCKENZIE4A 138kV",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-11-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 303.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-10T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-10-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0375",
        "Project Name": "NavBoot BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Navboot BESS LLC",
        "POI Location": "8858 MCKENZIE4A 138kV",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-11-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 303.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-10T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-10-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 616,
      "raw": {
        "INR": "25INR0376",
        "Project Name": "Hawkins BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP BLUE TOPAZ 7, LLC",
        "POI Location": "85005 ELGATO4A 138 kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-19T00:00:00",
        "Screening Study Started": "2023-05-03T00:00:00",
        "Screening Study Complete": "2023-07-28T00:00:00",
        "FIS Requested": "2023-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0376",
        "Project Name": "Hawkins BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP BLUE TOPAZ 7, LLC",
        "POI Location": "85005 ELGATO4A 138 kV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-19T00:00:00",
        "Screening Study Started": "2023-05-03T00:00:00",
        "Screening Study Complete": "2023-07-28T00:00:00",
        "FIS Requested": "2023-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 617,
      "raw": {
        "INR": "25INR0377",
        "Project Name": "Proteus Vernon Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vernon Solar and Storage LLC (a Delaware LLC)",
        "POI Location": "6060 Vernon 138kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0377",
        "Project Name": "Proteus Vernon Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vernon Solar and Storage LLC (a Delaware LLC)",
        "POI Location": "6060 Vernon 138kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 618,
      "raw": {
        "INR": "25INR0378",
        "Project Name": "Second Division Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mound Creek Storage, LLC",
        "POI Location": "Tap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-13T00:00:00",
        "FIS Requested": "2023-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0378",
        "Project Name": "Second Division Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mound Creek Storage, LLC",
        "POI Location": "Tap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380) Ckt 60 Line",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2025-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-13T00:00:00",
        "FIS Requested": "2023-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 619,
      "raw": {
        "INR": "25INR0379",
        "Project Name": "Starr Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Lake Storage, LLC",
        "POI Location": "8795 Roma 138kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-03-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0379",
        "Project Name": "Starr Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Lake Storage, LLC",
        "POI Location": "8795 Roma 138kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-03T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-03-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 620,
      "raw": {
        "INR": "25INR0382",
        "Project Name": "HappyDogSolar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rosula Solar LLC",
        "POI Location": "Tap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-04T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 85.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-30T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-25T00:00:00",
        "FIS Approved": "2025-01-07T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0382",
        "Project Name": "HappyDogSolar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rosula Solar LLC",
        "POI Location": "Tap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-04T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 85.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-30T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-25T00:00:00",
        "FIS Approved": "2025-01-07T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 621,
      "raw": {
        "INR": "25INR0384",
        "Project Name": "Zorro BESS ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ZORRO BESS LLC",
        "POI Location": "138 kV Ben Wheeler (Bus# 6852)",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-06-02T00:00:00",
        "FIS Approved": "2024-05-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0384",
        "Project Name": "Zorro BESS ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ZORRO BESS LLC",
        "POI Location": "138 kV Ben Wheeler (Bus# 6852)",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-06-02T00:00:00",
        "FIS Approved": "2024-05-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 622,
      "raw": {
        "INR": "25INR0385",
        "Project Name": "Bobcat Cameron BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bobcat BESS, LLC",
        "POI Location": "5764 East Rio Hondo Substation 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-06T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0385",
        "Project Name": "Bobcat Cameron BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bobcat BESS, LLC",
        "POI Location": "5764 East Rio Hondo Substation 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-06T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 623,
      "raw": {
        "INR": "25INR0389",
        "Project Name": "Stoneridge BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Stoneridge Solar, LLC",
        "POI Location": "Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-09T00:00:00",
        "FIS Approved": "2024-09-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-01-28T00:00:00",
        "Meets All Planning": "2025-01-28T00:00:00",
        "Unnamed: 25": "2025-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-26T00:00:00",
        "Approved for Synchronization": "2025-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0389",
        "Project Name": "Stoneridge BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Stoneridge Solar, LLC",
        "POI Location": "Tap 345 kV 13429 SANDOW SWITCH - 7040 AUSTROP CKT 2",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-09T00:00:00",
        "FIS Approved": "2024-09-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-19T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-01-28T00:00:00",
        "Meets All Planning": "2025-01-28T00:00:00",
        "Unnamed: 25": "2025-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-26T00:00:00",
        "Approved for Synchronization": "2025-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 624,
      "raw": {
        "INR": "25INR0391",
        "Project Name": "Purple Sage BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Purple Sage, LLC",
        "POI Location": "Anna 345 kV Bus# 2373.",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-07T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2024-03-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0391",
        "Project Name": "Purple Sage BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Purple Sage, LLC",
        "POI Location": "Anna 345 kV Bus# 2373.",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-07T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2024-03-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 625,
      "raw": {
        "INR": "25INR0392",
        "Project Name": "Purple Sage BESS 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Purple Sage, LLC",
        "POI Location": "Anna 345 kV Bus# 2373",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-07T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2024-03-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0392",
        "Project Name": "Purple Sage BESS 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Purple Sage, LLC",
        "POI Location": "Anna 345 kV Bus# 2373",
        "County": "Collin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-07T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-05T00:00:00",
        "FIS Requested": "2023-03-07T00:00:00",
        "FIS Approved": "2024-03-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 626,
      "raw": {
        "INR": "25INR0394",
        "Project Name": "Orchard Ray BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pettus BESS",
        "POI Location": "8590 Tuleta 138kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0394",
        "Project Name": "Orchard Ray BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pettus BESS",
        "POI Location": "8590 Tuleta 138kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 627,
      "raw": {
        "INR": "25INR0395",
        "Project Name": "Hinkell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Reveille BESS",
        "POI Location": "8612 Reveille 138kV",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 78.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0395",
        "Project Name": "Hinkell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Reveille BESS",
        "POI Location": "8612 Reveille 138kV",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 78.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 628,
      "raw": {
        "INR": "25INR0396",
        "Project Name": "Stewart Grady BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grady BESS",
        "POI Location": "Tap 138kV 11368 Expanse Switch – 23841 Sale Ranch",
        "County": "Martin",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-05-26T00:00:00",
        "Screening Study Complete": "2023-08-22T00:00:00",
        "FIS Requested": "2023-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0396",
        "Project Name": "Stewart Grady BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grady BESS",
        "POI Location": "Tap 138kV 11368 Expanse Switch – 23841 Sale Ranch",
        "County": "Martin",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-05-26T00:00:00",
        "Screening Study Complete": "2023-08-22T00:00:00",
        "FIS Requested": "2023-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 629,
      "raw": {
        "INR": "25INR0400",
        "Project Name": "Maldives Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Maldives Solar LLC",
        "POI Location": "Galvani 345 kV station (Bus #59912)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181.3,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2023-07-08T00:00:00",
        "Screening Study Started": "2023-07-18T00:00:00",
        "Screening Study Complete": "2023-10-15T00:00:00",
        "FIS Requested": "2023-07-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-12-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2024-07-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0400",
        "Project Name": "Maldives Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Maldives Solar LLC",
        "POI Location": "Galvani 345 kV station (Bus #59912)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181.3,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2023-07-08T00:00:00",
        "Screening Study Started": "2023-07-18T00:00:00",
        "Screening Study Complete": "2023-10-15T00:00:00",
        "FIS Requested": "2023-07-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2023-12-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2024-07-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 630,
      "raw": {
        "INR": "25INR0401",
        "Project Name": "WOE Gyp King Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KSK Wind Farm 1, LLC",
        "POI Location": "Tap 138kV 33798 GYP_18 – 6088 BENJ4A",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 304.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-18T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-04-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0401",
        "Project Name": "WOE Gyp King Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "KSK Wind Farm 1, LLC",
        "POI Location": "Tap 138kV 33798 GYP_18 – 6088 BENJ4A",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 304.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-18T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-04-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 631,
      "raw": {
        "INR": "25INR0402",
        "Project Name": "Driet BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Driet BESS LLC",
        "POI Location": "7254 WEIMAR8 138kV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0402",
        "Project Name": "Driet BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Driet BESS LLC",
        "POI Location": "7254 WEIMAR8 138kV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 632,
      "raw": {
        "INR": "25INR0405",
        "Project Name": "Pledgor BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Pledgor BESS",
        "POI Location": "Tap Gulftie (43340) – Pledger (43120) circuit 60",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2023-05-03T00:00:00",
        "Screening Study Complete": "2023-07-31T00:00:00",
        "FIS Requested": "2023-04-25T00:00:00",
        "FIS Approved": "2024-08-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0405",
        "Project Name": "Pledgor BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Pledgor BESS",
        "POI Location": "Tap Gulftie (43340) – Pledger (43120) circuit 60",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2023-05-03T00:00:00",
        "Screening Study Complete": "2023-07-31T00:00:00",
        "FIS Requested": "2023-04-25T00:00:00",
        "FIS Approved": "2024-08-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 633,
      "raw": {
        "INR": "25INR0414",
        "Project Name": "Rogers Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dialville BESS",
        "POI Location": "Tap 138 KV DailVille (3160) - Neches Pump (3296)",
        "County": "Cherokee",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-03T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0414",
        "Project Name": "Rogers Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dialville BESS",
        "POI Location": "Tap 138 KV DailVille (3160) - Neches Pump (3296)",
        "County": "Cherokee",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-03T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 634,
      "raw": {
        "INR": "25INR0416",
        "Project Name": "Proteus Vernon Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vernon Solar and Storage LLC (a Delaware LLC)",
        "POI Location": "6060 Vernon 138kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0416",
        "Project Name": "Proteus Vernon Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vernon Solar and Storage LLC (a Delaware LLC)",
        "POI Location": "6060 Vernon 138kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-03-27T00:00:00",
        "Screening Study Complete": "2023-06-19T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 635,
      "raw": {
        "INR": "25INR0417",
        "Project Name": "Mesa View Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mesa View Storage, LLC",
        "POI Location": "Tap 345 kV KINGMTSW (#842) to NORTMC (#76000)",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 254.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-11T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": "2026-06-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-09-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-07-29T00:00:00",
        "Meets All Planning": "2026-07-29T00:00:00",
        "Unnamed: 25": "2026-07-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0417",
        "Project Name": "Mesa View Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mesa View Storage, LLC",
        "POI Location": "Tap 345 kV KINGMTSW (#842) to NORTMC (#76000)",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 254.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-11T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": "2026-06-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-09-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-07-29T00:00:00",
        "Meets All Planning": "2026-07-29T00:00:00",
        "Unnamed: 25": "2026-07-29T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 636,
      "raw": {
        "INR": "25INR0420",
        "Project Name": "Houston BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "SMT Houston",
        "POI Location": "Tap 138 kV LAUDER (#46002) - RITTENHOUSE (#46282) ckt 95",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 227.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-31T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-03T00:00:00",
        "FIS Requested": "2023-03-28T00:00:00",
        "FIS Approved": "2024-04-04T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0420",
        "Project Name": "Houston BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "SMT Houston",
        "POI Location": "Tap 138 kV LAUDER (#46002) - RITTENHOUSE (#46282) ckt 95",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 227.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-31T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-03T00:00:00",
        "FIS Requested": "2023-03-28T00:00:00",
        "FIS Approved": "2024-04-04T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 637,
      "raw": {
        "INR": "25INR0421",
        "Project Name": "Aldrin 138 BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Aldrin Energy Storage LLC",
        "POI Location": "(Bus: 39015) North Alvin TNMP 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-02T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-04T00:00:00",
        "FIS Approved": "2025-08-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-06T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0421",
        "Project Name": "Aldrin 138 BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Aldrin Energy Storage LLC",
        "POI Location": "(Bus: 39015) North Alvin TNMP 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-02T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-04T00:00:00",
        "FIS Approved": "2025-08-22T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-04-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2024-05-06T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 638,
      "raw": {
        "INR": "25INR0422",
        "Project Name": "Waterloo Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Waterloo Solar 1, LLC",
        "POI Location": "Tap 345-kV 7040 Austrop to 7042 Zorn ",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-18T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-03-30T00:00:00",
        "FIS Approved": "2026-09-18T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-09-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0422",
        "Project Name": "Waterloo Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Waterloo Solar 1, LLC",
        "POI Location": "Tap 345-kV 7040 Austrop to 7042 Zorn ",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-18T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-03-30T00:00:00",
        "FIS Approved": "2026-09-18T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-09-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 639,
      "raw": {
        "INR": "25INR0425",
        "Project Name": "Aldrin 345 BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Aldrin Energy Storage LLC",
        "POI Location": "(Bus: 43030) Meadow 345kV substation",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 362,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-05T00:00:00",
        "FIS Approved": "2025-04-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0425",
        "Project Name": "Aldrin 345 BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Aldrin Energy Storage LLC",
        "POI Location": "(Bus: 43030) Meadow 345kV substation",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 362,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-05T00:00:00",
        "FIS Approved": "2025-04-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 640,
      "raw": {
        "INR": "25INR0430",
        "Project Name": "Hackberry Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hackberry Creek Solar LLC",
        "POI Location": "tap 345kV 10053 Cattleman Switch  - 1058 Longshore Switch ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 175.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-19T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-19T00:00:00",
        "FIS Approved": "2025-10-22T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0430",
        "Project Name": "Hackberry Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hackberry Creek Solar LLC",
        "POI Location": "tap 345kV 10053 Cattleman Switch  - 1058 Longshore Switch ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 175.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-19T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-19T00:00:00",
        "FIS Approved": "2025-10-22T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 641,
      "raw": {
        "INR": "25INR0432",
        "Project Name": "Brotherton Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BT Brotherton Storage, LLC",
        "POI Location": "6937 Tucker Sub 138kV ",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 176.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-12T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-13T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0432",
        "Project Name": "Brotherton Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BT Brotherton Storage, LLC",
        "POI Location": "6937 Tucker Sub 138kV ",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 176.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-12T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-13T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2024-08-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 642,
      "raw": {
        "INR": "25INR0434",
        "Project Name": "Bluegill BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bluegill BESS, LLC",
        "POI Location": "Tap 138 kV 40130 Atascocita - 40690 East Gate",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-06-07T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-05-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0434",
        "Project Name": "Bluegill BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bluegill BESS, LLC",
        "POI Location": "Tap 138 kV 40130 Atascocita - 40690 East Gate",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-06-07T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-05-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 643,
      "raw": {
        "INR": "25INR0439",
        "Project Name": "Stephens Ranch Wind Repower ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Stephens Ranch Wind Energy, LLC",
        "POI Location": "59900 Long Draw 345 kV ",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 12.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-07T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0439",
        "Project Name": "Stephens Ranch Wind Repower ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Stephens Ranch Wind Energy, LLC",
        "POI Location": "59900 Long Draw 345 kV ",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 12.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-07T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 644,
      "raw": {
        "INR": "25INR0440",
        "Project Name": "Bronc Rodeo Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energiekontor US Texas SP 16 LLC",
        "POI Location": "Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-19T00:00:00",
        "Screening Study Started": "2023-05-03T00:00:00",
        "Screening Study Complete": "2023-07-28T00:00:00",
        "FIS Requested": "2023-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0440",
        "Project Name": "Bronc Rodeo Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energiekontor US Texas SP 16 LLC",
        "POI Location": "Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-19T00:00:00",
        "Screening Study Started": "2023-05-03T00:00:00",
        "Screening Study Complete": "2023-07-28T00:00:00",
        "FIS Requested": "2023-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 645,
      "raw": {
        "INR": "25INR0441",
        "Project Name": "Dios BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Dios BESS, LLC",
        "POI Location": "8117 GANADO138kV",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-08T00:00:00",
        "FIS Approved": "2025-12-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0441",
        "Project Name": "Dios BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Dios BESS, LLC",
        "POI Location": "8117 GANADO138kV",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-08T00:00:00",
        "FIS Approved": "2025-12-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 646,
      "raw": {
        "INR": "25INR0442",
        "Project Name": "Happy Dog Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rosula Storage LLC",
        "POI Location": "Tap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-23T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-06-02T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0442",
        "Project Name": "Happy Dog Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rosula Storage LLC",
        "POI Location": "Tap 345kV 3704 Hog Creek Switch – 3687 Bell County East Switch",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-23T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-06-02T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-12-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 647,
      "raw": {
        "INR": "25INR0446",
        "Project Name": "Guitar BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guitar BESS LLC",
        "POI Location": "Tap 138kV 6275 ABEAST4A - 6670 PUTN4C",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-15T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2024-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0446",
        "Project Name": "Guitar BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guitar BESS LLC",
        "POI Location": "Tap 138kV 6275 ABEAST4A - 6670 PUTN4C",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-15T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2024-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 648,
      "raw": {
        "INR": "25INR0447",
        "Project Name": "Waterloo BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Waterloo BESS, LLC",
        "POI Location": "Tap 345-kV 7040 Austrop to 7042 Zorn ",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-03T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-09-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0447",
        "Project Name": "Waterloo BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Waterloo BESS, LLC",
        "POI Location": "Tap 345-kV 7040 Austrop to 7042 Zorn ",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-03T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-09-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 649,
      "raw": {
        "INR": "25INR0451",
        "Project Name": "Tres Rios Ranch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LectricWind LLC",
        "POI Location": "76008 Twelvemile 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 290,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-05-26T00:00:00",
        "Screening Study Complete": "2023-08-22T00:00:00",
        "FIS Requested": "2023-05-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0451",
        "Project Name": "Tres Rios Ranch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LectricWind LLC",
        "POI Location": "76008 Twelvemile 345kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 290,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-22T00:00:00",
        "Screening Study Started": "2023-05-26T00:00:00",
        "Screening Study Complete": "2023-08-22T00:00:00",
        "FIS Requested": "2023-05-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 650,
      "raw": {
        "INR": "25INR0458",
        "Project Name": "Surfside Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rocky Mountain Energy Holdings, LLC",
        "POI Location": "Tap 138kV 42110 Angleton – 43150 Riwood ckt 82",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2023-07-19T00:00:00",
        "Screening Study Complete": "2023-10-10T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0458",
        "Project Name": "Surfside Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rocky Mountain Energy Holdings, LLC",
        "POI Location": "Tap 138kV 42110 Angleton – 43150 Riwood ckt 82",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2023-07-19T00:00:00",
        "Screening Study Complete": "2023-10-10T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 651,
      "raw": {
        "INR": "25INR0460",
        "Project Name": "Acker BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Ogallala BESS LLC",
        "POI Location": "23912 Ogallala 345 kV",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-26T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0460",
        "Project Name": "Acker BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Ogallala BESS LLC",
        "POI Location": "23912 Ogallala 345 kV",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-26T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 652,
      "raw": {
        "INR": "25INR0466",
        "Project Name": "Yooperlite Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BT Yooperlite Storage, LLC",
        "POI Location": "Tap 138 kV 580 Westbrook Switch - 588 Willow",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 175.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-06T00:00:00",
        "FIS Approved": "2025-05-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0466",
        "Project Name": "Yooperlite Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BT Yooperlite Storage, LLC",
        "POI Location": "Tap 138 kV 580 Westbrook Switch - 588 Willow",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 175.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-06T00:00:00",
        "FIS Approved": "2025-05-19T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 653,
      "raw": {
        "INR": "25INR0473",
        "Project Name": "Crowded Star I BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jones City Solar II, LLC",
        "POI Location": "68014 Open Sky ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-25T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-09T00:00:00",
        "FIS Approved": "2025-11-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0473",
        "Project Name": "Crowded Star I BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Jones City Solar II, LLC",
        "POI Location": "68014 Open Sky ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-25T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-09T00:00:00",
        "FIS Approved": "2025-11-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 654,
      "raw": {
        "INR": "25INR0474",
        "Project Name": "Solheim Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Solheim Solar, LLC",
        "POI Location": "Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV",
        "County": "Bosque",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 108.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-04T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2024-03-21T00:00:00",
        "FIS Approved": "2026-03-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0474",
        "Project Name": "Solheim Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Solheim Solar, LLC",
        "POI Location": "Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV",
        "County": "Bosque",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 108.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-04T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2024-03-21T00:00:00",
        "FIS Approved": "2026-03-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 655,
      "raw": {
        "INR": "25INR0480",
        "Project Name": "Bell Creek BESS ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BELL CREEK BESS, LLC",
        "POI Location": "Tap 138kV 39500 West Colombia - 39703 FM524",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-29T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-11-17T00:00:00",
        "FIS Approved": "2024-05-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-11-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0480",
        "Project Name": "Bell Creek BESS ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "BELL CREEK BESS, LLC",
        "POI Location": "Tap 138kV 39500 West Colombia - 39703 FM524",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-29T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-21T00:00:00",
        "FIS Requested": "2023-11-17T00:00:00",
        "FIS Approved": "2024-05-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-11-14T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 656,
      "raw": {
        "INR": "25INR0482",
        "Project Name": "Vault Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "PPM THR Solar",
        "POI Location": "Tap #331 Rwmiller - #320 Jaybird 138kV ",
        "County": "Palo Pinto",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 108.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-20T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-16T00:00:00",
        "FIS Approved": "2024-12-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-06-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0482",
        "Project Name": "Vault Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "PPM THR Solar",
        "POI Location": "Tap #331 Rwmiller - #320 Jaybird 138kV ",
        "County": "Palo Pinto",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 108.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-20T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-16T00:00:00",
        "FIS Approved": "2024-12-02T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-06-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 657,
      "raw": {
        "INR": "25INR0489",
        "Project Name": "Ranchero BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ranchero Battery Facility, LLC",
        "POI Location": "7053 Noelke 345 kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-25T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2024-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0489",
        "Project Name": "Ranchero BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ranchero Battery Facility, LLC",
        "POI Location": "7053 Noelke 345 kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-25T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2024-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 658,
      "raw": {
        "INR": "25INR0491",
        "Project Name": "Tarim BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Tarim BESS LLC",
        "POI Location": "5727 Pawnee Switching Substation 138kV",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0491",
        "Project Name": "Tarim BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BRP Tarim BESS LLC",
        "POI Location": "5727 Pawnee Switching Substation 138kV",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 659,
      "raw": {
        "INR": "25INR0492",
        "Project Name": "Blue Summit Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "61001 JIM TREECE 345kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-28T00:00:00",
        "Screening Study Started": "2023-10-20T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2023-10-18T00:00:00",
        "FIS Approved": "2025-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2012-02-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2023-10-26T00:00:00",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2025-07-28T00:00:00",
        "Unnamed: 25": "2025-07-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-17T00:00:00",
        "Approved for Synchronization": "2026-02-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0492",
        "Project Name": "Blue Summit Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "61001 JIM TREECE 345kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-28T00:00:00",
        "Screening Study Started": "2023-10-20T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2023-10-18T00:00:00",
        "FIS Approved": "2025-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2012-02-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2023-10-26T00:00:00",
        "Meets Planning": "2025-02-13T00:00:00",
        "Meets All Planning": "2025-07-28T00:00:00",
        "Unnamed: 25": "2025-07-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-12-17T00:00:00",
        "Approved for Synchronization": "2026-02-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 660,
      "raw": {
        "INR": "25INR0493",
        "Project Name": "PHOTON SOLAR 1 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 235.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-28T00:00:00",
        "Screening Study Started": "2024-09-02T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2024-08-28T00:00:00",
        "FIS Approved": "2022-11-28T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-05T00:00:00",
        "Meets All Planning": "2021-11-05T00:00:00",
        "Unnamed: 25": "2023-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-15T00:00:00",
        "Approved for Synchronization": "2024-10-31T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0493",
        "Project Name": "PHOTON SOLAR 1 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 235.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-28T00:00:00",
        "Screening Study Started": "2024-09-02T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2024-08-28T00:00:00",
        "FIS Approved": "2022-11-28T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-05T00:00:00",
        "Meets All Planning": "2021-11-05T00:00:00",
        "Unnamed: 25": "2023-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-10-15T00:00:00",
        "Approved for Synchronization": "2024-10-31T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 661,
      "raw": {
        "INR": "25INR0494",
        "Project Name": "Willow Beach Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Capital Wind, LLC",
        "POI Location": "Tap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 202.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-28T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-09-20T00:00:00",
        "FIS Approved": "2024-11-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-06-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0494",
        "Project Name": "Willow Beach Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Capital Wind, LLC",
        "POI Location": "Tap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 202.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-28T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-09-20T00:00:00",
        "FIS Approved": "2024-11-18T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-06-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 662,
      "raw": {
        "INR": "25INR0495",
        "Project Name": "Dolomite Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Wilson Storage, LLC",
        "POI Location": "218 Rockett 69kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2023-08-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0495",
        "Project Name": "Dolomite Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Wilson Storage, LLC",
        "POI Location": "218 Rockett 69kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2023-08-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 663,
      "raw": {
        "INR": "25INR0497",
        "Project Name": "Stegall Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BT Martin Solar, LLC",
        "POI Location": "Elliott (Bus #53) to Franklin (Bus #57) 69kV Transmission Line",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-08-02T00:00:00",
        "FIS Approved": "2025-08-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0497",
        "Project Name": "Stegall Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BT Martin Solar, LLC",
        "POI Location": "Elliott (Bus #53) to Franklin (Bus #57) 69kV Transmission Line",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 81.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-08-02T00:00:00",
        "FIS Approved": "2025-08-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 664,
      "raw": {
        "INR": "25INR0498",
        "Project Name": "Stegall Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BT Martin Solar, LLC",
        "POI Location": "Tap connection to a new switching station on the Elliott (Bus #53) - Franklin (Bus #57) 69 kV Transmission Line ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.47,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-07T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": "2025-08-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0498",
        "Project Name": "Stegall Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BT Martin Solar, LLC",
        "POI Location": "Tap connection to a new switching station on the Elliott (Bus #53) - Franklin (Bus #57) 69 kV Transmission Line ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.47,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-07T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": "2025-08-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 665,
      "raw": {
        "INR": "25INR0501",
        "Project Name": "Longday Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longday Solar",
        "POI Location": "Tap138 kV 8252 Brackettville - 8260 Escondido",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-22T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0501",
        "Project Name": "Longday Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longday Solar",
        "POI Location": "Tap138 kV 8252 Brackettville - 8260 Escondido",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-22T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 666,
      "raw": {
        "INR": "25INR0502",
        "Project Name": "Longday BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longday Solar",
        "POI Location": "Tap 138 kV 8252 Brackettville - 8260 Escondido",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-22T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0502",
        "Project Name": "Longday BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longday Solar",
        "POI Location": "Tap 138 kV 8252 Brackettville - 8260 Escondido",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-22T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 667,
      "raw": {
        "INR": "25INR0504",
        "Project Name": "Lazy Frog Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lazy Frog Solar, LLC",
        "POI Location": "11688 Thorn Tree Switch 345kV",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2024-05-10T00:00:00",
        "FIS Approved": "2025-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0504",
        "Project Name": "Lazy Frog Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lazy Frog Solar, LLC",
        "POI Location": "11688 Thorn Tree Switch 345kV",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2024-05-10T00:00:00",
        "FIS Approved": "2025-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 668,
      "raw": {
        "INR": "25INR0505",
        "Project Name": "Mud Cat Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mud Cat Solar, LLC",
        "POI Location": "Tap 138KV 11768 Hawk Hollow – 1768 Deport",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-13T00:00:00",
        "Screening Study Started": "2023-10-20T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2024-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0505",
        "Project Name": "Mud Cat Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mud Cat Solar, LLC",
        "POI Location": "Tap 138KV 11768 Hawk Hollow – 1768 Deport",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-13T00:00:00",
        "Screening Study Started": "2023-10-20T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2024-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 669,
      "raw": {
        "INR": "25INR0506",
        "Project Name": "Lazy Frog Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lazy Frog Solar, LLC",
        "POI Location": "11688 Thorn Tree Switch 345kV",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2024-05-10T00:00:00",
        "FIS Approved": "2025-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0506",
        "Project Name": "Lazy Frog Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lazy Frog Solar, LLC",
        "POI Location": "11688 Thorn Tree Switch 345kV",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2024-05-10T00:00:00",
        "FIS Approved": "2025-10-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 670,
      "raw": {
        "INR": "25INR0507",
        "Project Name": "Mud Cat Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mud Cat Solar, LLC",
        "POI Location": "11768 Hawk Hollow – 1768 Deport 138kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-13T00:00:00",
        "Screening Study Started": "2023-10-20T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2024-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0507",
        "Project Name": "Mud Cat Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mud Cat Solar, LLC",
        "POI Location": "11768 Hawk Hollow – 1768 Deport 138kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-13T00:00:00",
        "Screening Study Started": "2023-10-20T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2024-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 671,
      "raw": {
        "INR": "25INR0512",
        "Project Name": "Monument Hill Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "RWE Solar Development, LLC",
        "POI Location": "Tap 345kV 7055 Fayette - 9074 Lytton Springs ",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-31T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-08-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0512",
        "Project Name": "Monument Hill Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "RWE Solar Development, LLC",
        "POI Location": "Tap 345kV 7055 Fayette - 9074 Lytton Springs ",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-31T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-08-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 672,
      "raw": {
        "INR": "25INR0513",
        "Project Name": "Kahla Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Kahla Storage, LLC",
        "POI Location": "Tap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-16T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0513",
        "Project Name": "Kahla Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Kahla Storage, LLC",
        "POI Location": "Tap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-16T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 673,
      "raw": {
        "INR": "25INR0515",
        "Project Name": "Fagus Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Energy Storage MISAE II LLC",
        "POI Location": "60501 Tesla 345kV",
        "County": "Childress",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-19T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0515",
        "Project Name": "Fagus Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Energy Storage MISAE II LLC",
        "POI Location": "60501 Tesla 345kV",
        "County": "Childress",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-19T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 674,
      "raw": {
        "INR": "25INR0528",
        "Project Name": "Indigo Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-12T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0528",
        "Project Name": "Indigo Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-12T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 675,
      "raw": {
        "INR": "25INR0529",
        "Project Name": "Indigo Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-23T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0529",
        "Project Name": "Indigo Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-23T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 676,
      "raw": {
        "INR": "25INR0530",
        "Project Name": "Indigo Storage 4",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0530",
        "Project Name": "Indigo Storage 4",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Innovative Solar 245, LLC",
        "POI Location": "tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-03-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 677,
      "raw": {
        "INR": "25INR0531",
        "Project Name": "CPS Energy AvR1CT2 Rotor Replacement",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5475 Braunig 345kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 23.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-02-09T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2024-01-26T00:00:00",
        "FIS Approved": "2024-04-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2028-03-20T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2024-04-01T00:00:00",
        "Meets Planning": "2024-04-01T00:00:00",
        "Meets All Planning": "2024-04-25T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-11-22T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0531",
        "Project Name": "CPS Energy AvR1CT2 Rotor Replacement",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5475 Braunig 345kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 23.2,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-02-09T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2024-01-26T00:00:00",
        "FIS Approved": "2024-04-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2028-03-20T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2024-04-01T00:00:00",
        "Meets Planning": "2024-04-01T00:00:00",
        "Meets All Planning": "2024-04-25T00:00:00",
        "Unnamed: 25": "2024-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-11-22T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 678,
      "raw": {
        "INR": "25INR0542",
        "Project Name": "Hynes Bay Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hynes Bay Energy Storage, LLC",
        "POI Location": "Tap 138kV 5546 DANEVANG SW - 8121 BLESSING",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-16T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0542",
        "Project Name": "Hynes Bay Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hynes Bay Energy Storage, LLC",
        "POI Location": "Tap 138kV 5546 DANEVANG SW - 8121 BLESSING",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-16T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 679,
      "raw": {
        "INR": "25INR0545",
        "Project Name": "Blue Creek Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Blue Creek Energy Storage, LLC",
        "POI Location": "Tap 138kV 42985 DYANN_POI8 - 43190 S_LANE_B138 Ckt 60",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-11T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-10-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0545",
        "Project Name": "Blue Creek Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Blue Creek Energy Storage, LLC",
        "POI Location": "Tap 138kV 42985 DYANN_POI8 - 43190 S_LANE_B138 Ckt 60",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-11T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-10-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 680,
      "raw": {
        "INR": "25INR0546",
        "Project Name": "VISOL 1 SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VISOL 1 SOLAR, LLC",
        "POI Location": "Tap 138kV 8683 Comstock - 60389 Corral",
        "County": "Val Verde",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 94.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-04T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2024-01-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0546",
        "Project Name": "VISOL 1 SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VISOL 1 SOLAR, LLC",
        "POI Location": "Tap 138kV 8683 Comstock - 60389 Corral",
        "County": "Val Verde",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 94.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-04T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2024-01-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 681,
      "raw": {
        "INR": "25INR0547",
        "Project Name": "Indigo solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo Solar 2",
        "POI Location": "Tap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-23T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-22T00:00:00",
        "FIS Requested": "2024-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0547",
        "Project Name": "Indigo solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo Solar 2",
        "POI Location": "Tap 345KV 68001 Clayton 345KV -68000 WShack Ckt 2",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-23T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-22T00:00:00",
        "FIS Requested": "2024-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 682,
      "raw": {
        "INR": "25INR0550",
        "Project Name": "Friendswood Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Friendswood Energy Storage LLC",
        "POI Location": "TAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 105.08,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-01-04T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-17T00:00:00",
        "FIS Approved": "2025-12-11T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0550",
        "Project Name": "Friendswood Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Friendswood Energy Storage LLC",
        "POI Location": "TAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 105.08,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-01-04T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-17T00:00:00",
        "FIS Approved": "2025-12-11T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 683,
      "raw": {
        "INR": "25INR0552",
        "Project Name": "HarryoungBESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Four LLC",
        "POI Location": "8319 Rio Hondo sub 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 190.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-26T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-19T00:00:00",
        "FIS Requested": "2023-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0552",
        "Project Name": "HarryoungBESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Four LLC",
        "POI Location": "8319 Rio Hondo sub 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 190.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-26T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-19T00:00:00",
        "FIS Requested": "2023-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 684,
      "raw": {
        "INR": "25INR0554",
        "Project Name": "Dan Kearney BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Dan Kearney BESS LLC",
        "POI Location": "39703 TNFM524 138kV\n",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.38,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-10-19T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-01-03T00:00:00",
        "FIS Approved": "2026-09-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0554",
        "Project Name": "Dan Kearney BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Dan Kearney BESS LLC",
        "POI Location": "39703 TNFM524 138kV\n",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.38,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-10-19T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-01-03T00:00:00",
        "FIS Approved": "2026-09-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-10-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 685,
      "raw": {
        "INR": "25INR0557",
        "Project Name": "McCamey's Castle Battery",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Castle Storage, LLC",
        "POI Location": "76597 Robbins Switch 138 kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-29T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-10-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-03-20T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-05-28T00:00:00",
        "Construction End": "2027-03-31T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0557",
        "Project Name": "McCamey's Castle Battery",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Castle Storage, LLC",
        "POI Location": "76597 Robbins Switch 138 kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-29T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-10-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-03-20T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-05-28T00:00:00",
        "Construction End": "2027-03-31T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 686,
      "raw": {
        "INR": "25INR0558",
        "Project Name": "Ayass BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Harvick BESS, LLC",
        "POI Location": "6206 Bush Knob 69kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-27T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0558",
        "Project Name": "Ayass BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Harvick BESS, LLC",
        "POI Location": "6206 Bush Knob 69kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-27T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 687,
      "raw": {
        "INR": "25INR0566",
        "Project Name": "Copano Bay Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Copano Bay Energy Storage, LLC",
        "POI Location": "Tap 138kV 42980 Nash - 44010 WA Parish Ckt 2",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-22T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0566",
        "Project Name": "Copano Bay Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Copano Bay Energy Storage, LLC",
        "POI Location": "Tap 138kV 42980 Nash - 44010 WA Parish Ckt 2",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-22T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 688,
      "raw": {
        "INR": "25INR0578",
        "Project Name": "Forest Creek Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Forest Creek Wind Farm, LLC",
        "POI Location": "Mcdonald 138 kV (Bus #: 1333)",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 125.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-15T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2023-12-08T00:00:00",
        "FIS Approved": "2024-12-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2005-11-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-01-24T00:00:00",
        "Meets All Planning": "2025-01-24T00:00:00",
        "Unnamed: 25": "2025-01-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-07-28T00:00:00",
        "Approved for Synchronization": "2025-08-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0578",
        "Project Name": "Forest Creek Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Forest Creek Wind Farm, LLC",
        "POI Location": "Mcdonald 138 kV (Bus #: 1333)",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 125.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-15T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2023-12-08T00:00:00",
        "FIS Approved": "2024-12-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2005-11-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-01-24T00:00:00",
        "Meets All Planning": "2025-01-24T00:00:00",
        "Unnamed: 25": "2025-01-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-07-28T00:00:00",
        "Approved for Synchronization": "2025-08-27T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 689,
      "raw": {
        "INR": "25INR0579",
        "Project Name": "Albatross BESS 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Albatross Solar, LLC",
        "POI Location": "Tap 138kV 165 Windsor Switch - 161 McGregor",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 159.6,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-02-01T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-01-03T00:00:00",
        "FIS Approved": "2025-10-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-09-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0579",
        "Project Name": "Albatross BESS 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Albatross Solar, LLC",
        "POI Location": "Tap 138kV 165 Windsor Switch - 161 McGregor",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 159.6,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-02-01T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-01-03T00:00:00",
        "FIS Approved": "2025-10-30T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-09-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 690,
      "raw": {
        "INR": "25INR0582",
        "Project Name": "Maleza Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brush Storage, LLC",
        "POI Location": "44220 Julia 345kV\n",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-10T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0582",
        "Project Name": "Maleza Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brush Storage, LLC",
        "POI Location": "44220 Julia 345kV\n",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-10T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 691,
      "raw": {
        "INR": "25INR0583",
        "Project Name": "Shannon Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shannon Wind, LLC",
        "POI Location": "1458 Cobb Switching Station 345 kV",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 18.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-26T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-31T00:00:00",
        "FIS Requested": "2024-01-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0583",
        "Project Name": "Shannon Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shannon Wind, LLC",
        "POI Location": "1458 Cobb Switching Station 345 kV",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 18.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-26T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-31T00:00:00",
        "FIS Requested": "2024-01-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 692,
      "raw": {
        "INR": "25INR0586",
        "Project Name": "Zeus Armstrong Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Armstrong Solar, LLC",
        "POI Location": "Tap 345KV  23900 AlLIBATES -23914 TULECNYN ",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-01T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-01-01T00:00:00",
        "Construction End": "2027-03-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0586",
        "Project Name": "Zeus Armstrong Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Armstrong Solar, LLC",
        "POI Location": "Tap 345KV  23900 AlLIBATES -23914 TULECNYN ",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-01T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-01-01T00:00:00",
        "Construction End": "2027-03-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 693,
      "raw": {
        "INR": "25INR0587",
        "Project Name": "Zeus Armstrong BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Armstrong BESS, LLC",
        "POI Location": "Tap 345KV 23900 ALIBATES - 23914 TULECNYN CKT1 & CKT2",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1043.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-01-01T00:00:00",
        "Construction End": "2027-03-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0587",
        "Project Name": "Zeus Armstrong BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Armstrong BESS, LLC",
        "POI Location": "Tap 345KV 23900 ALIBATES - 23914 TULECNYN CKT1 & CKT2",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1043.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-01-01T00:00:00",
        "Construction End": "2027-03-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 694,
      "raw": {
        "INR": "25INR0588",
        "Project Name": "Zeus Mitchell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mitchell Solar, LLC",
        "POI Location": "Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 804.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-14T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-03-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-02-18T00:00:00",
        "Construction End": "2026-03-15T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0588",
        "Project Name": "Zeus Mitchell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mitchell Solar, LLC",
        "POI Location": "Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 804.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-14T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-03-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-02-18T00:00:00",
        "Construction End": "2026-03-15T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 695,
      "raw": {
        "INR": "25INR0589",
        "Project Name": "Zeus Mitchell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mitchell BESS",
        "POI Location": "Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1042.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-03-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-02-18T00:00:00",
        "Construction End": "2026-03-15T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0589",
        "Project Name": "Zeus Mitchell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mitchell BESS",
        "POI Location": "Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1042.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-03-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-02-18T00:00:00",
        "Construction End": "2026-03-15T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 696,
      "raw": {
        "INR": "25INR0590",
        "Project Name": "Zeus Rusk Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rusk Solar, LLC",
        "POI Location": " Tap 345kV 3109 Stryker to 3100 Martin Lake",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 26.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-07-01T00:00:00",
        "Construction End": "2027-04-29T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0590",
        "Project Name": "Zeus Rusk Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rusk Solar, LLC",
        "POI Location": " Tap 345kV 3109 Stryker to 3100 Martin Lake",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 26.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-07-01T00:00:00",
        "Construction End": "2027-04-29T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 697,
      "raw": {
        "INR": "25INR0591",
        "Project Name": "Zeus Rusk BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rusk BESS, LLC",
        "POI Location": " Tap 345kV 3109 Stryker to 3100 Martin Lake",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-30T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-07-01T00:00:00",
        "Construction End": "2027-04-29T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0591",
        "Project Name": "Zeus Rusk BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rusk BESS, LLC",
        "POI Location": " Tap 345kV 3109 Stryker to 3100 Martin Lake",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-30T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-07-01T00:00:00",
        "Construction End": "2027-04-29T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 698,
      "raw": {
        "INR": "25INR0606",
        "Project Name": "Proteus Thornton Ranch Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Thornton Ranch Solar, LLC",
        "POI Location": "37990 TNSTAGHORN1 138kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-12T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0606",
        "Project Name": "Proteus Thornton Ranch Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Thornton Ranch Solar, LLC",
        "POI Location": "37990 TNSTAGHORN1 138kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-12T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 699,
      "raw": {
        "INR": "25INR0607",
        "Project Name": "Proteus Thornton Ranch Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Thornton Ranch Solar, LLC",
        "POI Location": "37990 TNSTAGHORN1 138kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0607",
        "Project Name": "Proteus Thornton Ranch Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Thornton Ranch Solar, LLC",
        "POI Location": "37990 TNSTAGHORN1 138kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 700,
      "raw": {
        "INR": "25INR0608",
        "Project Name": "Proteus London-Leigh Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "London Leigh Solar, LLC",
        "POI Location": "345kV Bernoulli (bus # 59907) ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0608",
        "Project Name": "Proteus London-Leigh Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "London Leigh Solar, LLC",
        "POI Location": "345kV Bernoulli (bus # 59907) ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 701,
      "raw": {
        "INR": "25INR0609",
        "Project Name": "Proteus London-Leigh Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "London Leigh Solar, LLC",
        "POI Location": "Bernoulli (bus # 59907) ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-04-19T00:00:00",
        "FIS Requested": "2023-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0609",
        "Project Name": "Proteus London-Leigh Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "London Leigh Solar, LLC",
        "POI Location": "Bernoulli (bus # 59907) ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-04-19T00:00:00",
        "FIS Requested": "2023-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 702,
      "raw": {
        "INR": "25INR0610",
        "Project Name": "Adam Bryant BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adam Bryant BESS LLC",
        "POI Location": "Tap 138kV 5225 HONDO – 5819 HONDO CREEK",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 99.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-15T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-04-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0610",
        "Project Name": "Adam Bryant BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adam Bryant BESS LLC",
        "POI Location": "Tap 138kV 5225 HONDO – 5819 HONDO CREEK",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 99.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-15T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-04-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 703,
      "raw": {
        "INR": "25INR0611",
        "Project Name": "Odessa Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Odessa Energy Storage LLC,",
        "POI Location": "1058 LONGSHORE 345kV\n",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-03T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0611",
        "Project Name": "Odessa Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Odessa Energy Storage LLC,",
        "POI Location": "1058 LONGSHORE 345kV\n",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-03T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 704,
      "raw": {
        "INR": "25INR0616",
        "Project Name": "Bobcat Bluff Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cub Storage LLC",
        "POI Location": "1475 Windthorst 138 kV",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-18T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-25T00:00:00",
        "FIS Requested": "2024-06-12T00:00:00",
        "FIS Approved": "2026-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-01-12T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-07-31T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0616",
        "Project Name": "Bobcat Bluff Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cub Storage LLC",
        "POI Location": "1475 Windthorst 138 kV",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-18T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-25T00:00:00",
        "FIS Requested": "2024-06-12T00:00:00",
        "FIS Approved": "2026-06-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-01-12T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-07-31T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 705,
      "raw": {
        "INR": "25INR0621",
        "Project Name": "Anagram Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anagram Solar",
        "POI Location": "8156 Charter 138 kV ",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 130.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2025-01-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0621",
        "Project Name": "Anagram Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anagram Solar",
        "POI Location": "8156 Charter 138 kV ",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 130.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2025-01-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 706,
      "raw": {
        "INR": "25INR0622",
        "Project Name": "Turkey Creek Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenray Solar Corporation",
        "POI Location": "7425 ODLASW 138kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180.9,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-10-04T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-08-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-04-01T00:00:00",
        "Construction End": "2027-07-30T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0622",
        "Project Name": "Turkey Creek Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenray Solar Corporation",
        "POI Location": "7425 ODLASW 138kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180.9,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-10-04T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-08-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-04-01T00:00:00",
        "Construction End": "2027-07-30T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 707,
      "raw": {
        "INR": "25INR0623",
        "Project Name": "Turkey Creek Battery Energy Storage System SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenray Solar Corporation",
        "POI Location": "7425 ODLASW 138 kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-09-26T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-09-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-04-01T00:00:00",
        "Construction End": "2027-07-30T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0623",
        "Project Name": "Turkey Creek Battery Energy Storage System SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenray Solar Corporation",
        "POI Location": "7425 ODLASW 138 kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-09-26T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-09-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-04-01T00:00:00",
        "Construction End": "2027-07-30T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 708,
      "raw": {
        "INR": "25INR0628",
        "Project Name": "Wichita Falls Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Falls Energy Storage LLC",
        "POI Location": "Tap 345kV 1422 Bowman - 1458 Cobb Switch",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-25T00:00:00",
        "FIS Requested": "2024-02-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0628",
        "Project Name": "Wichita Falls Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Falls Energy Storage LLC",
        "POI Location": "Tap 345kV 1422 Bowman - 1458 Cobb Switch",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-25T00:00:00",
        "FIS Requested": "2024-02-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 709,
      "raw": {
        "INR": "25INR0629",
        "Project Name": "Midland Energy Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Midland Energy Storage LLC",
        "POI Location": "Tap 345kV 10057 Prong Moss Switch - 10062 Rockhound Switch CKT 1",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-17T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-26T00:00:00",
        "FIS Requested": "2024-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0629",
        "Project Name": "Midland Energy Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Midland Energy Storage LLC",
        "POI Location": "Tap 345kV 10057 Prong Moss Switch - 10062 Rockhound Switch CKT 1",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-17T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-26T00:00:00",
        "FIS Requested": "2024-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 710,
      "raw": {
        "INR": "25INR0632",
        "Project Name": "Jenna Eco-Electric Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Clean Energy Holdings, LLC",
        "POI Location": "Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES ",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 576.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-17T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-13T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": "2026-04-02T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0632",
        "Project Name": "Jenna Eco-Electric Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Clean Energy Holdings, LLC",
        "POI Location": "Tap 345 kV 1048 Tonkawa Switch - 1430 Graham SES ",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 576.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-17T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-13T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": "2026-04-02T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 711,
      "raw": {
        "INR": "25INR0653",
        "Project Name": "Southfork Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Southfork Energy Storage, LLC",
        "POI Location": "tap 345kV 60709 Oersted - 60616 Edison\nCKT 1",
        "County": "Kimble",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-19T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0653",
        "Project Name": "Southfork Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Southfork Energy Storage, LLC",
        "POI Location": "tap 345kV 60709 Oersted - 60616 Edison\nCKT 1",
        "County": "Kimble",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-19T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 712,
      "raw": {
        "INR": "25INR0656",
        "Project Name": "Gilleys Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Gilleys Energy Storage, LLC",
        "POI Location": "Tap 345 kV 1730 West Krum - 6111 Riley CKT 2",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-03T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-27T00:00:00",
        "FIS Requested": "2024-05-06T00:00:00",
        "FIS Approved": "2026-01-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0656",
        "Project Name": "Gilleys Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Gilleys Energy Storage, LLC",
        "POI Location": "Tap 345 kV 1730 West Krum - 6111 Riley CKT 2",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-03T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-27T00:00:00",
        "FIS Requested": "2024-05-06T00:00:00",
        "FIS Approved": "2026-01-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 713,
      "raw": {
        "INR": "25INR0657",
        "Project Name": "O'Bannion Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "O'Bannion Energy Storage, LLC",
        "POI Location": "1506 Long Hollow Switch 345 kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-06T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-01T00:00:00",
        "FIS Approved": "2025-05-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2026-01-12T00:00:00",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0657",
        "Project Name": "O'Bannion Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "O'Bannion Energy Storage, LLC",
        "POI Location": "1506 Long Hollow Switch 345 kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-06T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-01T00:00:00",
        "FIS Approved": "2025-05-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2026-01-12T00:00:00",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 714,
      "raw": {
        "INR": "25INR0660",
        "Project Name": "Wooderson Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wooderson Energy Storage, LLC",
        "POI Location": "Tap 345 kV 11418 TECUMSEH- 1421 Willow Creek",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-15T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": "2027-09-21T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0660",
        "Project Name": "Wooderson Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wooderson Energy Storage, LLC",
        "POI Location": "Tap 345 kV 11418 TECUMSEH- 1421 Willow Creek",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-15T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": "2027-09-21T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 715,
      "raw": {
        "INR": "25INR0661",
        "Project Name": "McCrae Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "McCrae Energy Storage, LLC",
        "POI Location": "Tap 345 kV 1900 COMCHPKW_5 - 1440 COMCHESS1_5  ",
        "County": "Erath",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-29T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-13T00:00:00",
        "FIS Requested": "2024-05-01T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0661",
        "Project Name": "McCrae Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "McCrae Energy Storage, LLC",
        "POI Location": "Tap 345 kV 1900 COMCHPKW_5 - 1440 COMCHESS1_5  ",
        "County": "Erath",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-29T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-13T00:00:00",
        "FIS Requested": "2024-05-01T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 716,
      "raw": {
        "INR": "25INR0666",
        "Project Name": "GIBSON BRANCH BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gibson Branch BESS LLC",
        "POI Location": "7064 Lampasas Substation 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 142.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-09T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-14T00:00:00",
        "FIS Requested": "2024-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0666",
        "Project Name": "GIBSON BRANCH BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gibson Branch BESS LLC",
        "POI Location": "7064 Lampasas Substation 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 142.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-09T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-14T00:00:00",
        "FIS Requested": "2024-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 717,
      "raw": {
        "INR": "25INR0673",
        "Project Name": "PHOTON SOLAR 4 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-28T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2024-08-21T00:00:00",
        "FIS Approved": "2022-11-28T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-05T00:00:00",
        "Meets All Planning": "2023-01-27T00:00:00",
        "Unnamed: 25": "2023-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-06-25T00:00:00",
        "Approved for Synchronization": "2024-11-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0673",
        "Project Name": "PHOTON SOLAR 4 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-28T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2021-02-02T00:00:00",
        "FIS Requested": "2024-08-21T00:00:00",
        "FIS Approved": "2022-11-28T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2021-11-05T00:00:00",
        "Meets All Planning": "2023-01-27T00:00:00",
        "Unnamed: 25": "2023-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-06-25T00:00:00",
        "Approved for Synchronization": "2024-11-04T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 718,
      "raw": {
        "INR": "25INR0688",
        "Project Name": "Giga Texas Data Center ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Giga Texas Energy, LLC",
        "POI Location": "HORNSBY Substation POIB# 7047 \n\nSite will be connected behind the meter at Medium Voltage  24.9 kV with non export controls\n\nGSU TRANSFORMER\n80/106/133MVA\n345kV DELTA PRIMARY\n24.9kV WYE-G SECONDARY\nZ=XX%, 65DEG C RISE",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 133,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-15T00:00:00",
        "Screening Study Started": "2024-08-27T00:00:00",
        "Screening Study Complete": "2024-11-25T00:00:00",
        "FIS Requested": "2024-07-30T00:00:00",
        "FIS Approved": "2025-03-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0688",
        "Project Name": "Giga Texas Data Center ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Giga Texas Energy, LLC",
        "POI Location": "HORNSBY Substation POIB# 7047 \n\nSite will be connected behind the meter at Medium Voltage  24.9 kV with non export controls\n\nGSU TRANSFORMER\n80/106/133MVA\n345kV DELTA PRIMARY\n24.9kV WYE-G SECONDARY\nZ=XX%, 65DEG C RISE",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2025-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 133,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-15T00:00:00",
        "Screening Study Started": "2024-08-27T00:00:00",
        "Screening Study Complete": "2024-11-25T00:00:00",
        "FIS Requested": "2024-07-30T00:00:00",
        "FIS Approved": "2025-03-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-04-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 719,
      "raw": {
        "INR": "25INR0693",
        "Project Name": "Leon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Leon BESS",
        "POI Location": "Tab 138kv 3355  Grapeland_Magnolia - 3357 Pleasant_Springs.",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-13T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0693",
        "Project Name": "Leon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Leon BESS",
        "POI Location": "Tab 138kv 3355  Grapeland_Magnolia - 3357 Pleasant_Springs.",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-13T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 720,
      "raw": {
        "INR": "25INR0694",
        "Project Name": "Hays Energy Unit 1 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Hays Energy 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2024-10-18T00:00:00",
        "Screening Study Complete": "2025-01-15T00:00:00",
        "FIS Requested": "2026-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0694",
        "Project Name": "Hays Energy Unit 1 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Hays Energy 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2024-10-18T00:00:00",
        "Screening Study Complete": "2025-01-15T00:00:00",
        "FIS Requested": "2026-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 721,
      "raw": {
        "INR": "25INR0695",
        "Project Name": "Hays Energy Unit 4 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Hays Energy 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-15T00:00:00",
        "FIS Requested": "2026-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0695",
        "Project Name": "Hays Energy Unit 4 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HAYS ENERGY, LLC",
        "POI Location": "7043 Hays Energy 345kV",
        "County": "Hays",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 18,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-15T00:00:00",
        "FIS Requested": "2026-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 722,
      "raw": {
        "INR": "25INR0853",
        "Project Name": "Tango Lily BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "25INR0853",
        "Project Name": "Tango Lily BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 723,
      "raw": {
        "INR": "26INR0001",
        "Project Name": "Turin TxHSR TPSS HN-6",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "8 Crutchfield 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-22T00:00:00",
        "Screening Study Started": "2019-09-27T00:00:00",
        "Screening Study Complete": "2021-04-28T00:00:00",
        "FIS Requested": "2019-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0001",
        "Project Name": "Turin TxHSR TPSS HN-6",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Texas Central Rail Holdings, LLC",
        "POI Location": "8 Crutchfield 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "OT",
        "Capacity (MW)": 50,
        "Unnamed: 11": null,
        "Unnamed: 12": "2019-10-22T00:00:00",
        "Screening Study Started": "2019-09-27T00:00:00",
        "Screening Study Complete": "2021-04-28T00:00:00",
        "FIS Requested": "2019-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 724,
      "raw": {
        "INR": "26INR0004",
        "Project Name": "GRIMES SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CG Grimes County LLC",
        "POI Location": "40600 Roans Prairie 345kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-02-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 153.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-09T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-03T00:00:00",
        "FIS Requested": "2022-03-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0004",
        "Project Name": "GRIMES SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CG Grimes County LLC",
        "POI Location": "40600 Roans Prairie 345kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2026-02-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 153.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-03-09T00:00:00",
        "Screening Study Started": "2022-03-14T00:00:00",
        "Screening Study Complete": "2022-06-03T00:00:00",
        "FIS Requested": "2022-03-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 725,
      "raw": {
        "INR": "26INR0008",
        "Project Name": "Puerto Del Sol 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PUERTO DEL SOL, LLC",
        "POI Location": "Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-20T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2023-01-13T16:05:18.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0008",
        "Project Name": "Puerto Del Sol 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PUERTO DEL SOL, LLC",
        "POI Location": "Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-20T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2023-01-13T16:05:18.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 726,
      "raw": {
        "INR": "26INR0019",
        "Project Name": "HyFuels Green Lake Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HyFuels Green Lake Solar LLC",
        "POI Location": "Dokmai 138kV Substation (bus #80090)",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 347,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-09T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-22T00:00:00",
        "FIS Requested": "2023-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0019",
        "Project Name": "HyFuels Green Lake Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HyFuels Green Lake Solar LLC",
        "POI Location": "Dokmai 138kV Substation (bus #80090)",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 347,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-09T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-22T00:00:00",
        "FIS Requested": "2023-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 727,
      "raw": {
        "INR": "26INR0021",
        "Project Name": "Crossroads Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "HyFuels Green Lake Wind LLC",
        "POI Location": "80090 Dokmai 138 KV",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-28T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 277.38,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2023-07-01T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-22T00:00:00",
        "FIS Requested": "2023-06-16T00:00:00",
        "FIS Approved": "2026-05-28T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-07-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0021",
        "Project Name": "Crossroads Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "HyFuels Green Lake Wind LLC",
        "POI Location": "80090 Dokmai 138 KV",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-28T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 277.38,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2023-07-01T00:00:00",
        "Screening Study Started": "2022-09-27T00:00:00",
        "Screening Study Complete": "2022-12-22T00:00:00",
        "FIS Requested": "2023-06-16T00:00:00",
        "FIS Approved": "2026-05-28T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-07-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 728,
      "raw": {
        "INR": "26INR0024",
        "Project Name": "Becerra Creek Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bordas Renewable Energy, LLC",
        "POI Location": "345 kV Cenizo Substation (#80220)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-19T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-09-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0024",
        "Project Name": "Becerra Creek Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bordas Renewable Energy, LLC",
        "POI Location": "345 kV Cenizo Substation (#80220)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-19T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-09-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 729,
      "raw": {
        "INR": "26INR0028",
        "Project Name": "HyFuels Calhoun Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HyFuels Green Lake Solar LLC",
        "POI Location": "Tap 345kV 8715 RADIANT7A - 8728 COBRA7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-15T00:00:00",
        "FIS Requested": "2023-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0028",
        "Project Name": "HyFuels Calhoun Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HyFuels Green Lake Solar LLC",
        "POI Location": "Tap 345kV 8715 RADIANT7A - 8728 COBRA7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2022-10-18T00:00:00",
        "Screening Study Complete": "2023-01-15T00:00:00",
        "FIS Requested": "2023-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 730,
      "raw": {
        "INR": "26INR0033",
        "Project Name": "Fairway Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Fairway Storage LLC",
        "POI Location": "Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-04T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-08-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0033",
        "Project Name": "Fairway Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Fairway Storage LLC",
        "POI Location": "Tap 138kV 3503 FAIRWPOD_8 - 196 FAIRFIELD",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-17T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-04T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-08-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 731,
      "raw": {
        "INR": "26INR0034",
        "Project Name": "Bracero Pecan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bracero Pecan Storage LLC",
        "POI Location": "60716 SARAGOSA 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 238.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-04T00:00:00",
        "FIS Requested": "2023-07-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-06-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0034",
        "Project Name": "Bracero Pecan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bracero Pecan Storage LLC",
        "POI Location": "60716 SARAGOSA 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 238.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2022-11-07T00:00:00",
        "Screening Study Complete": "2023-02-04T00:00:00",
        "FIS Requested": "2023-07-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-06-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 732,
      "raw": {
        "INR": "26INR0045",
        "Project Name": "LUND STORAGE CENTER 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lund Storage Center 1, LLC",
        "POI Location": "TAP 138 KV LINE AND CREATE NEW BUS BETWEEN\nKIMBRO (7337) AND ELGIN SWITCH (3650)",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 407.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-26T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0045",
        "Project Name": "LUND STORAGE CENTER 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lund Storage Center 1, LLC",
        "POI Location": "TAP 138 KV LINE AND CREATE NEW BUS BETWEEN\nKIMBRO (7337) AND ELGIN SWITCH (3650)",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 407.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-26T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 733,
      "raw": {
        "INR": "26INR0068",
        "Project Name": "Charro Creek Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0068",
        "Project Name": "Charro Creek Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 734,
      "raw": {
        "INR": "26INR0069",
        "Project Name": "Charro Creek Storage 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0069",
        "Project Name": "Charro Creek Storage 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 735,
      "raw": {
        "INR": "26INR0070",
        "Project Name": "Charro Creek Solar 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0070",
        "Project Name": "Charro Creek Solar 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 736,
      "raw": {
        "INR": "26INR0071",
        "Project Name": "Charro Creek Storage 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0071",
        "Project Name": "Charro Creek Storage 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 737,
      "raw": {
        "INR": "26INR0072",
        "Project Name": "Charro Creek Solar 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap on PAWNEESW5 (#5725) - COLETO7A (#8164) Line",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0072",
        "Project Name": "Charro Creek Solar 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap on PAWNEESW5 (#5725) - COLETO7A (#8164) Line",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-02-27T00:00:00",
        "Screening Study Started": "2023-03-08T00:00:00",
        "Screening Study Complete": "2023-06-01T00:00:00",
        "FIS Requested": "2023-02-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 738,
      "raw": {
        "INR": "26INR0073",
        "Project Name": "Charro Creek Storage 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0073",
        "Project Name": "Charro Creek Storage 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Charro Creek Solar LLC",
        "POI Location": "Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 739,
      "raw": {
        "INR": "26INR0074",
        "Project Name": "Anila Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Alina Energy LLC",
        "POI Location": "Tap 345kV 5133 Elm Creek - 5901 San Miguel Gen Ckt 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-20T00:00:00",
        "FIS Approved": "2024-07-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0074",
        "Project Name": "Anila Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Alina Energy LLC",
        "POI Location": "Tap 345kV 5133 Elm Creek - 5901 San Miguel Gen Ckt 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-23T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-01-20T00:00:00",
        "FIS Approved": "2024-07-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 740,
      "raw": {
        "INR": "26INR0077",
        "Project Name": "Anila BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Alina Energy LLC",
        "POI Location": "Tap of 345 kV Elm Creek (Bus# 5133) - San Miguel Gen (Bus# 5901) Transmission Line Ckt 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-01T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-20T00:00:00",
        "FIS Requested": "2023-05-25T00:00:00",
        "FIS Approved": "2024-07-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0077",
        "Project Name": "Anila BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Alina Energy LLC",
        "POI Location": "Tap of 345 kV Elm Creek (Bus# 5133) - San Miguel Gen (Bus# 5901) Transmission Line Ckt 1",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-01T00:00:00",
        "Screening Study Started": "2023-02-20T00:00:00",
        "Screening Study Complete": "2023-05-20T00:00:00",
        "FIS Requested": "2023-05-25T00:00:00",
        "FIS Approved": "2024-07-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 741,
      "raw": {
        "INR": "26INR0082",
        "Project Name": "Amerada Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amerada Solar, LLC",
        "POI Location": "Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-12T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0082",
        "Project Name": "Amerada Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amerada Solar, LLC",
        "POI Location": "Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-12T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 742,
      "raw": {
        "INR": "26INR0083",
        "Project Name": "Zeppelin Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ZEPPELIN ENERGY STORAGE LLC",
        "POI Location": "6464 San Angelo North",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 163.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-17T19:02:06",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0083",
        "Project Name": "Zeppelin Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ZEPPELIN ENERGY STORAGE LLC",
        "POI Location": "6464 San Angelo North",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 163.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-01-30T00:00:00",
        "Screening Study Complete": "2023-04-28T00:00:00",
        "FIS Requested": "2023-02-17T19:02:06",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 743,
      "raw": {
        "INR": "26INR0084",
        "Project Name": "Amerada Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amerada Solar, LLC",
        "POI Location": "Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0084",
        "Project Name": "Amerada Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amerada Solar, LLC",
        "POI Location": "Tap 345kV 3133 RICHLND2_5 - 3381 BIGBRNW_5",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-10T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 744,
      "raw": {
        "INR": "26INR0086",
        "Project Name": "Solarville Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ville Solar, LLC",
        "POI Location": "Tap 345kV  #3123 Trinidad Switch – #2432 Tri Corner.\n",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-12T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-15T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0086",
        "Project Name": "Solarville Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ville Solar, LLC",
        "POI Location": "Tap 345kV  #3123 Trinidad Switch – #2432 Tri Corner.\n",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-12T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-15T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 745,
      "raw": {
        "INR": "26INR0088",
        "Project Name": "La Salle Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "La Salle Solar LLC",
        "POI Location": "Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709)\n(Cuernos 345 kV New Station)\n",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 512.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-31T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0088",
        "Project Name": "La Salle Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "La Salle Solar LLC",
        "POI Location": "Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709)\n(Cuernos 345 kV New Station)\n",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 512.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-31T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 746,
      "raw": {
        "INR": "26INR0089",
        "Project Name": "Crescent C BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "OCI La Salle ESS LLC",
        "POI Location": "Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) CKT#2",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 508.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-15T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-03T00:00:00",
        "FIS Requested": "2023-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0089",
        "Project Name": "Crescent C BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "OCI La Salle ESS LLC",
        "POI Location": "Tap 345kV LOBO7A (#80219) - FOWLERTONSW5 (#5709) CKT#2",
        "County": "La Salle",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 508.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-15T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-03T00:00:00",
        "FIS Requested": "2023-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 747,
      "raw": {
        "INR": "26INR0098",
        "Project Name": "Douie Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Spring Solar LLC",
        "POI Location": "Tap 138 kV 3501 Sea way Teague - 3394 Jewett",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-09T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-12T00:00:00",
        "FIS Approved": "2025-07-07T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-03-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0098",
        "Project Name": "Douie Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Spring Solar LLC",
        "POI Location": "Tap 138 kV 3501 Sea way Teague - 3394 Jewett",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-09T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-12T00:00:00",
        "FIS Approved": "2025-07-07T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-03-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 748,
      "raw": {
        "INR": "26INR0107",
        "Project Name": "Freedom Falcon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon BESS, LLC",
        "POI Location": "Tap 345kV #80224 Tiempo - #80227 Rapido",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 501.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0107",
        "Project Name": "Freedom Falcon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon BESS, LLC",
        "POI Location": "Tap 345kV #80224 Tiempo - #80227 Rapido",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 501.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-26T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 749,
      "raw": {
        "INR": "26INR0110",
        "Project Name": "Western Flats Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Point Mountain Solar Facility 1 LLC",
        "POI Location": "Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 410.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-17T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0110",
        "Project Name": "Western Flats Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Point Mountain Solar Facility 1 LLC",
        "POI Location": "Tap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from Crane.",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 410.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-17T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 750,
      "raw": {
        "INR": "26INR0111",
        "Project Name": "Graphic Packaging Gas",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Graphic Packaging International",
        "POI Location": "Tap 138kV 3446 Peppervine Switch - 3544 Castleman Substation",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-02-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 43.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-03-19T00:00:00",
        "FIS Requested": "2024-01-05T00:00:00",
        "FIS Approved": "2024-12-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-07-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2023-07-27T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-06-23T00:00:00",
        "Meets Planning": "2026-08-17T00:00:00",
        "Meets All Planning": "2026-08-17T00:00:00",
        "Unnamed: 25": "2026-08-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0111",
        "Project Name": "Graphic Packaging Gas",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Graphic Packaging International",
        "POI Location": "Tap 138kV 3446 Peppervine Switch - 3544 Castleman Substation",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-02-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 43.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-03-19T00:00:00",
        "FIS Requested": "2024-01-05T00:00:00",
        "FIS Approved": "2024-12-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-07-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2023-07-27T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-06-23T00:00:00",
        "Meets Planning": "2026-08-17T00:00:00",
        "Meets All Planning": "2026-08-17T00:00:00",
        "Unnamed: 25": "2026-08-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 751,
      "raw": {
        "INR": "26INR0112",
        "Project Name": "Lemma Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greening USA Corp.",
        "POI Location": "6088 Benjamin AEP 138kV ",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-23T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0112",
        "Project Name": "Lemma Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greening USA Corp.",
        "POI Location": "6088 Benjamin AEP 138kV ",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-23T00:00:00",
        "Screening Study Started": "2023-04-07T00:00:00",
        "Screening Study Complete": "2023-07-05T00:00:00",
        "FIS Requested": "2023-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 752,
      "raw": {
        "INR": "26INR0113",
        "Project Name": "Meitner Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Meitner, LLC",
        "POI Location": "79000 Gray Substation 345kV",
        "County": "Gray",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-05-24T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 709,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-07-18T00:00:00",
        "Screening Study Complete": "2023-10-15T00:00:00",
        "FIS Requested": "2023-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0113",
        "Project Name": "Meitner Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Meitner, LLC",
        "POI Location": "79000 Gray Substation 345kV",
        "County": "Gray",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-05-24T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 709,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-07-18T00:00:00",
        "Screening Study Complete": "2023-10-15T00:00:00",
        "FIS Requested": "2023-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 753,
      "raw": {
        "INR": "26INR0116",
        "Project Name": "Falcon Zapata Storage 138",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Falcon BESS, LLC",
        "POI Location": "Tap 138kV 8299 Zapata - 8957 Lopeno",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-28T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-02-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0116",
        "Project Name": "Falcon Zapata Storage 138",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Falcon BESS, LLC",
        "POI Location": "Tap 138kV 8299 Zapata - 8957 Lopeno",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-03-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-28T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-02-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-03-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 754,
      "raw": {
        "INR": "26INR0117",
        "Project Name": "Oyster Creek Solar I SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oyster Creek Solar 1, LLC",
        "POI Location": "Tap 138kV 42110 Angleton - 42050 Clute",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0117",
        "Project Name": "Oyster Creek Solar I SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oyster Creek Solar 1, LLC",
        "POI Location": "Tap 138kV 42110 Angleton - 42050 Clute",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 755,
      "raw": {
        "INR": "26INR0118",
        "Project Name": "Oyster Creek Storage I SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oyster Creek Solar 1, LLC",
        "POI Location": "Tap 138kV 42110 Angleton - 42050 Clute",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-02T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0118",
        "Project Name": "Oyster Creek Storage I SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oyster Creek Solar 1, LLC",
        "POI Location": "Tap 138kV 42110 Angleton - 42050 Clute",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-02T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 756,
      "raw": {
        "INR": "26INR0120",
        "Project Name": "Bramble Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bramble Energy Center, LLC",
        "POI Location": "8236 West Batesville 138kV",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 225.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-23T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0120",
        "Project Name": "Bramble Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bramble Energy Center, LLC",
        "POI Location": "8236 West Batesville 138kV",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 225.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-23T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 757,
      "raw": {
        "INR": "26INR0121",
        "Project Name": "Pioneer Hutt Solar (Alternative POI)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings LLC   ",
        "POI Location": "TAP 345kV 11028 Odessa Ehv - 59901 Grelton (West C)\n",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 116,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0121",
        "Project Name": "Pioneer Hutt Solar (Alternative POI)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings LLC   ",
        "POI Location": "TAP 345kV 11028 Odessa Ehv - 59901 Grelton (West C)\n",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 116,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 758,
      "raw": {
        "INR": "26INR0130",
        "Project Name": "Elm Flats Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Orca Falls Solar, LLC",
        "POI Location": "Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.84,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-12T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0130",
        "Project Name": "Elm Flats Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Orca Falls Solar, LLC",
        "POI Location": "Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.84,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-12T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 759,
      "raw": {
        "INR": "26INR0131",
        "Project Name": "Elm Flats Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Orca Falls Solar, LLC",
        "POI Location": "Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-17T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0131",
        "Project Name": "Elm Flats Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Orca Falls Solar, LLC",
        "POI Location": "Tap 138kV 3472 BRIAR_CRK_8 – 3467 POWELL1_8",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-05-17T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 760,
      "raw": {
        "INR": "26INR0134",
        "Project Name": "Myers Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Myers Solar, LLC",
        "POI Location": "8629 Baez 69 kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0134",
        "Project Name": "Myers Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Myers Solar, LLC",
        "POI Location": "8629 Baez 69 kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-13T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 761,
      "raw": {
        "INR": "26INR0135",
        "Project Name": "Myers Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Myers Solar, LLC",
        "POI Location": "8629 Baez 69 kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-07T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0135",
        "Project Name": "Myers Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Myers Solar, LLC",
        "POI Location": "8629 Baez 69 kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 75.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-07T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 762,
      "raw": {
        "INR": "26INR0143",
        "Project Name": "Santa Garcias Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Oxy Renewable Energy LLC",
        "POI Location": "Tap 138kV 8515 Alazan - 8458 Barney Davis",
        "County": "Kleberg",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 265,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-06T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0143",
        "Project Name": "Santa Garcias Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Oxy Renewable Energy LLC",
        "POI Location": "Tap 138kV 8515 Alazan - 8458 Barney Davis",
        "County": "Kleberg",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 265,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-06T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 763,
      "raw": {
        "INR": "26INR0144",
        "Project Name": "Wittig Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Wittig LLC",
        "POI Location": "138 kV Gulftie (#43340) – San Bernard (#43110)",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 106.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-05T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-01-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0144",
        "Project Name": "Wittig Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Wittig LLC",
        "POI Location": "138 kV Gulftie (#43340) – San Bernard (#43110)",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 106.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-05T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-01-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 764,
      "raw": {
        "INR": "26INR0146",
        "Project Name": "DMF Sagerton Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double Mountain Fork LLC",
        "POI Location": "Tap 138kV 6158 Aspermont – 6161 Paint Creek",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-23T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0146",
        "Project Name": "DMF Sagerton Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double Mountain Fork LLC",
        "POI Location": "Tap 138kV 6158 Aspermont – 6161 Paint Creek",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-23T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 765,
      "raw": {
        "INR": "26INR0147",
        "Project Name": "Seven Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hancock Springs, LLC",
        "POI Location": "Tap 7061 COPPERAS COVE 7260 Kempner 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 145,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-18T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0147",
        "Project Name": "Seven Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Hancock Springs, LLC",
        "POI Location": "Tap 7061 COPPERAS COVE 7260 Kempner 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 145,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-18T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 766,
      "raw": {
        "INR": "26INR0148",
        "Project Name": "DMF Sagerton Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double Mountain Fork LLC",
        "POI Location": "Tap 138kV 6158 Aspermont – 6161 Paint Creek",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-23T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0148",
        "Project Name": "DMF Sagerton Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double Mountain Fork LLC",
        "POI Location": "Tap 138kV 6158 Aspermont – 6161 Paint Creek",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-23T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 767,
      "raw": {
        "INR": "26INR0150",
        "Project Name": "Proving Ground Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lantana Solar LLC",
        "POI Location": "Tap 138 kV Live Oak (6500) - Santiago (6490)",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 82.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2024-01-26T16:36:16",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0150",
        "Project Name": "Proving Ground Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lantana Solar LLC",
        "POI Location": "Tap 138 kV Live Oak (6500) - Santiago (6490)",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 82.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2024-01-26T16:36:16",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 768,
      "raw": {
        "INR": "26INR0155",
        "Project Name": "Ross Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "tap 345kV 8249 Angstrom – 8676 Static",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1025.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-06-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0155",
        "Project Name": "Ross Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "tap 345kV 8249 Angstrom – 8676 Static",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1025.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-06-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 769,
      "raw": {
        "INR": "26INR0156",
        "Project Name": "Ross Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "tap the 345 kV Angstrom (#8249) – Static (#8676) line; AEP",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 510.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-21T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-03T00:00:00",
        "FIS Requested": "2023-07-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-06-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0156",
        "Project Name": "Ross Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "tap the 345 kV Angstrom (#8249) – Static (#8676) line; AEP",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 510.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-21T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-03T00:00:00",
        "FIS Requested": "2023-07-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-06-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 770,
      "raw": {
        "INR": "26INR0159",
        "Project Name": "Proving Ground BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lantana Solar LLC",
        "POI Location": "Tap 138kV 6500 Live Oak - 6490 Santiago\n",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2024-01-26T16:41:11",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0159",
        "Project Name": "Proving Ground BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lantana Solar LLC",
        "POI Location": "Tap 138kV 6500 Live Oak - 6490 Santiago\n",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2024-01-26T16:41:11",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 771,
      "raw": {
        "INR": "26INR0161",
        "Project Name": "Timberline Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Timberline Renewables, LLC",
        "POI Location": "Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise",
        "County": "Nacogdoches",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-24T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2023-08-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0161",
        "Project Name": "Timberline Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Timberline Renewables, LLC",
        "POI Location": "Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise",
        "County": "Nacogdoches",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-24T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2023-08-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 772,
      "raw": {
        "INR": "26INR0162",
        "Project Name": "Timberline Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Timberline Renewables, LLC",
        "POI Location": "Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise",
        "County": "Nacogdoches",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2023-08-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0162",
        "Project Name": "Timberline Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Timberline Renewables, LLC",
        "POI Location": "Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise",
        "County": "Nacogdoches",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-15T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2023-08-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 773,
      "raw": {
        "INR": "26INR0171",
        "Project Name": "Lazy U Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U Solar 1",
        "POI Location": "Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-07T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0171",
        "Project Name": "Lazy U Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U Solar 1",
        "POI Location": "Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-07T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 774,
      "raw": {
        "INR": "26INR0172",
        "Project Name": "Lazy U Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U Solar 2",
        "POI Location": "Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-14T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0172",
        "Project Name": "Lazy U Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U Solar 2",
        "POI Location": "Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-14T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 775,
      "raw": {
        "INR": "26INR0173",
        "Project Name": "Juniper Ridge BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U ESS 1",
        "POI Location": "Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-03T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2023-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0173",
        "Project Name": "Juniper Ridge BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U ESS 1",
        "POI Location": "Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-03T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2023-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 776,
      "raw": {
        "INR": "26INR0174",
        "Project Name": "Juniper Ridge BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U ESS 2",
        "POI Location": "Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-16T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0174",
        "Project Name": "Juniper Ridge BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lazy U ESS 2",
        "POI Location": "Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-16T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 777,
      "raw": {
        "INR": "26INR0176",
        "Project Name": "Dionysus Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Dionysus Solar, LLC",
        "POI Location": "Tap 138kV 6733 Mustang Prairie - 6732 Latexo",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 153.26,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-06-14T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0176",
        "Project Name": "Dionysus Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Dionysus Solar, LLC",
        "POI Location": "Tap 138kV 6733 Mustang Prairie - 6732 Latexo",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 153.26,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-06-14T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 778,
      "raw": {
        "INR": "26INR0177",
        "Project Name": "Dionysus Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Dionysus Solar, LLC",
        "POI Location": "Tap 138kV 6733 Mustang Prairie - 6732 Latexo",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 77.28,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-06-14T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0177",
        "Project Name": "Dionysus Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Dionysus Solar, LLC",
        "POI Location": "Tap 138kV 6733 Mustang Prairie - 6732 Latexo",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 77.28,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-06-14T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 779,
      "raw": {
        "INR": "26INR0179",
        "Project Name": "SunShiner ESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SunShiner ESS LLC",
        "POI Location": "8008 La Pryor4A",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-20T00:00:00",
        "Screening Study Started": "2023-09-25T00:00:00",
        "Screening Study Complete": "2023-12-21T00:00:00",
        "FIS Requested": "2023-09-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0179",
        "Project Name": "SunShiner ESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SunShiner ESS LLC",
        "POI Location": "8008 La Pryor4A",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-20T00:00:00",
        "Screening Study Started": "2023-09-25T00:00:00",
        "Screening Study Complete": "2023-12-21T00:00:00",
        "FIS Requested": "2023-09-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 780,
      "raw": {
        "INR": "26INR0180",
        "Project Name": "Cape Rich BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cape Rich BESS",
        "POI Location": "3387 Revolution Switch 138kV",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-03T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-06T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": "2024-06-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-02-03T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0180",
        "Project Name": "Cape Rich BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cape Rich BESS",
        "POI Location": "3387 Revolution Switch 138kV",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-03T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-06T00:00:00",
        "FIS Requested": "2023-07-03T00:00:00",
        "FIS Approved": "2024-06-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-02-03T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 781,
      "raw": {
        "INR": "26INR0181",
        "Project Name": "Solar Star Frontier BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Solar Star Frontier BESS, LLC",
        "POI Location": "8656 Luna 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-23T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0181",
        "Project Name": "Solar Star Frontier BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Solar Star Frontier BESS, LLC",
        "POI Location": "8656 Luna 138kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-23T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 782,
      "raw": {
        "INR": "26INR0184",
        "Project Name": "Arc Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Paris Energy Storage, LLC",
        "POI Location": "Tap 138kV 1693 Paris Switch - 11806 ENLOE T8 ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-19T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-25T00:00:00",
        "FIS Approved": "2025-05-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0184",
        "Project Name": "Arc Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Paris Energy Storage, LLC",
        "POI Location": "Tap 138kV 1693 Paris Switch - 11806 ENLOE T8 ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-19T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-25T00:00:00",
        "FIS Approved": "2025-05-02T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 783,
      "raw": {
        "INR": "26INR0185",
        "Project Name": "Beitel Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brazos Energy Storage, LLC",
        "POI Location": "579 Jack County 138kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2023-08-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0185",
        "Project Name": "Beitel Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brazos Energy Storage, LLC",
        "POI Location": "579 Jack County 138kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-10T00:00:00",
        "FIS Requested": "2023-08-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 784,
      "raw": {
        "INR": "26INR0188",
        "Project Name": "Western Flats Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Point Mountain Solar Facility 1 LLC",
        "POI Location": "Tap 138 kV 76615 Crane -76635 King Mountain",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 410.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-17T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2025-01-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0188",
        "Project Name": "Western Flats Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Point Mountain Solar Facility 1 LLC",
        "POI Location": "Tap 138 kV 76615 Crane -76635 King Mountain",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 410.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-17T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2025-01-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 785,
      "raw": {
        "INR": "26INR0189",
        "Project Name": "Skipjack Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Skipper Energy Storage LLC",
        "POI Location": "Tap 138 42980 Nash - 44010 W A Parish ckt #2",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0189",
        "Project Name": "Skipjack Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Skipper Energy Storage LLC",
        "POI Location": "Tap 138 42980 Nash - 44010 W A Parish ckt #2",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-17T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2023-07-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 786,
      "raw": {
        "INR": "26INR0194",
        "Project Name": "Motif BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Motif Storage, LLC ",
        "POI Location": "7440 Tarpley 138kV",
        "County": "Bandera",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0194",
        "Project Name": "Motif BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Motif Storage, LLC ",
        "POI Location": "7440 Tarpley 138kV",
        "County": "Bandera",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 787,
      "raw": {
        "INR": "26INR0200",
        "Project Name": "Vaughn Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Vaughn Battery Storage, LLC",
        "POI Location": "13 Keith 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-20T00:00:00",
        "FIS Approved": "2025-12-19T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0200",
        "Project Name": "Vaughn Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Vaughn Battery Storage, LLC",
        "POI Location": "13 Keith 138kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-20T00:00:00",
        "FIS Approved": "2025-12-19T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 788,
      "raw": {
        "INR": "26INR0201",
        "Project Name": "Rock Rose BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rock Rose Energy Storage LLC",
        "POI Location": "44070 Whaley 345 kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-03-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-21T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-08T00:00:00",
        "FIS Approved": "2026-03-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-11-12T00:00:00",
        "Meets Planning": "2025-11-13T00:00:00",
        "Meets All Planning": "2026-05-26T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0201",
        "Project Name": "Rock Rose BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Rock Rose Energy Storage LLC",
        "POI Location": "44070 Whaley 345 kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-03-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-21T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-08T00:00:00",
        "FIS Approved": "2026-03-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-06-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-11-12T00:00:00",
        "Meets Planning": "2025-11-13T00:00:00",
        "Meets All Planning": "2026-05-26T00:00:00",
        "Unnamed: 25": "2026-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 789,
      "raw": {
        "INR": "26INR0211",
        "Project Name": "Titus Low Carbon Ventures Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Solar, LLC",
        "POI Location": "Tap 345kV 8249 Angstrom - 8624 Grissom ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 338.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-09-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2026-05-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0211",
        "Project Name": "Titus Low Carbon Ventures Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero Solar, LLC",
        "POI Location": "Tap 345kV 8249 Angstrom - 8624 Grissom ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 338.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-09-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2026-05-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 790,
      "raw": {
        "INR": "26INR0215",
        "Project Name": "JackGard BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Jackgard BESS",
        "POI Location": "1429 Jacksboro 345kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-12T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-07-31T00:00:00",
        "FIS Approved": "2024-11-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0215",
        "Project Name": "JackGard BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Jackgard BESS",
        "POI Location": "1429 Jacksboro 345kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-12T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-02T00:00:00",
        "FIS Requested": "2023-07-31T00:00:00",
        "FIS Approved": "2024-11-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 791,
      "raw": {
        "INR": "26INR0218",
        "Project Name": "Fort Chadbourne Cattle BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Chadbourne BESS",
        "POI Location": "6324 Fort Chadbourne 138 kv ",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-14T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0218",
        "Project Name": "Fort Chadbourne Cattle BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Chadbourne BESS",
        "POI Location": "6324 Fort Chadbourne 138 kv ",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 50.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-14T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 792,
      "raw": {
        "INR": "26INR0219",
        "Project Name": "Mountain Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Mountain Springs BESS",
        "POI Location": "704 Mountain Springs 138 kV",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-30T00:00:00",
        "FIS Requested": "2023-09-21T00:00:00",
        "FIS Approved": "2025-06-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0219",
        "Project Name": "Mountain Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Mountain Springs BESS",
        "POI Location": "704 Mountain Springs 138 kV",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-30T00:00:00",
        "FIS Requested": "2023-09-21T00:00:00",
        "FIS Approved": "2025-06-05T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 793,
      "raw": {
        "INR": "26INR0222",
        "Project Name": "GOTHAM BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AEU BATTERY PROJECT IV LLC ",
        "POI Location": "5640 DRISCOLLSUB9 69kV",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-03-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 151.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-01T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2024-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0222",
        "Project Name": "GOTHAM BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AEU BATTERY PROJECT IV LLC ",
        "POI Location": "5640 DRISCOLLSUB9 69kV",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-03-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 151.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-01T00:00:00",
        "Screening Study Started": "2023-07-31T00:00:00",
        "Screening Study Complete": "2023-10-27T00:00:00",
        "FIS Requested": "2024-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 794,
      "raw": {
        "INR": "26INR0226",
        "Project Name": "First Capitol BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "First Capitol BESS, LLC",
        "POI Location": "Tap 138kV West Columbia Main (39500) - Sweeny Cogen (110505)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-05-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0226",
        "Project Name": "First Capitol BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "First Capitol BESS, LLC",
        "POI Location": "Tap 138kV West Columbia Main (39500) - Sweeny Cogen (110505)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-25T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-05-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 795,
      "raw": {
        "INR": "26INR0228",
        "Project Name": "Santa Monica Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Karol Solar IV",
        "POI Location": "Tap 345 KV 68091 NAVARRO - 3381 BIGBRNW_5 Ckt 2",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-03T00:00:00",
        "Screening Study Started": "2023-09-07T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2024-09-24T00:00:00",
        "FIS Approved": "2026-08-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0228",
        "Project Name": "Santa Monica Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Karol Solar IV",
        "POI Location": "Tap 345 KV 68091 NAVARRO - 3381 BIGBRNW_5 Ckt 2",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 105.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-03T00:00:00",
        "Screening Study Started": "2023-09-07T00:00:00",
        "Screening Study Complete": "2023-12-04T00:00:00",
        "FIS Requested": "2024-09-24T00:00:00",
        "FIS Approved": "2026-08-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 796,
      "raw": {
        "INR": "26INR0229",
        "Project Name": "Pamplona Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Karol Solar III",
        "POI Location": "Tap 138 kV 44740 WALLIS_S65_8  - 44700 GEBHRT_X65B8 Ckt#65\n\n",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 42.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-08T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-03T00:00:00",
        "FIS Requested": "2024-06-18T00:00:00",
        "FIS Approved": "2025-07-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0229",
        "Project Name": "Pamplona Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Karol Solar III",
        "POI Location": "Tap 138 kV 44740 WALLIS_S65_8  - 44700 GEBHRT_X65B8 Ckt#65\n\n",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 42.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-08T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-03T00:00:00",
        "FIS Requested": "2024-06-18T00:00:00",
        "FIS Approved": "2025-07-25T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 797,
      "raw": {
        "INR": "26INR0230",
        "Project Name": "Titus Sienta Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sol Sienta Solar, LLC",
        "POI Location": "Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 501.93,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-09T00:00:00",
        "FIS Requested": "2023-10-09T00:00:00",
        "FIS Approved": "2026-02-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-10-01T00:00:00",
        "Construction End": "2026-04-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0230",
        "Project Name": "Titus Sienta Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sol Sienta Solar, LLC",
        "POI Location": "Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 501.93,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-09T00:00:00",
        "FIS Requested": "2023-10-09T00:00:00",
        "FIS Approved": "2026-02-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2025-10-01T00:00:00",
        "Construction End": "2026-04-01T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 798,
      "raw": {
        "INR": "26INR0231",
        "Project Name": "Energy City BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy City BESS LLC",
        "POI Location": "Tap 138kV AQUEDUCT SUB(#1172) - Mockingbird North Tap(#11299) ",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-13T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-30T00:00:00",
        "FIS Requested": "2023-09-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0231",
        "Project Name": "Energy City BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy City BESS LLC",
        "POI Location": "Tap 138kV AQUEDUCT SUB(#1172) - Mockingbird North Tap(#11299) ",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-13T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-30T00:00:00",
        "FIS Requested": "2023-09-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 799,
      "raw": {
        "INR": "26INR0238",
        "Project Name": "Clapton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clapton Solar",
        "POI Location": "Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0238",
        "Project Name": "Clapton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clapton Solar",
        "POI Location": "Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 800,
      "raw": {
        "INR": "26INR0241",
        "Project Name": "Sol Marina SLF Energy Center ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sol Marina Energy Center, LLC",
        "POI Location": "Tap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466)",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171.09,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-17T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-09-07T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-07-29T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0241",
        "Project Name": "Sol Marina SLF Energy Center ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sol Marina Energy Center, LLC",
        "POI Location": "Tap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466)",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 171.09,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-17T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-09-07T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-04-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-07-29T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 801,
      "raw": {
        "INR": "26INR0243",
        "Project Name": "Caladium BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Caladium Storage, LLC",
        "POI Location": "57664 Sunnyside 69kV",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-09T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0243",
        "Project Name": "Caladium BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Caladium Storage, LLC",
        "POI Location": "57664 Sunnyside 69kV",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-09T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 802,
      "raw": {
        "INR": "26INR0247",
        "Project Name": "Jane Storage Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NMRE Holdings, LLC",
        "POI Location": "59901 Grelton 345 kV ",
        "County": "Martin",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 240.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-13T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-01T00:00:00",
        "FIS Requested": "2023-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0247",
        "Project Name": "Jane Storage Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NMRE Holdings, LLC",
        "POI Location": "59901 Grelton 345 kV ",
        "County": "Martin",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 240.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-13T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-01T00:00:00",
        "FIS Requested": "2023-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 803,
      "raw": {
        "INR": "26INR0250",
        "Project Name": "Duffy BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Duffy Energy Storage LLC",
        "POI Location": "Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 241.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-14T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-08T00:00:00",
        "FIS Approved": "2026-03-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2026-04-27T00:00:00",
        "Unnamed: 25": "2026-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0250",
        "Project Name": "Duffy BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Duffy Energy Storage LLC",
        "POI Location": "Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 241.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-14T00:00:00",
        "Screening Study Started": "2023-08-21T00:00:00",
        "Screening Study Complete": "2023-11-17T00:00:00",
        "FIS Requested": "2023-08-08T00:00:00",
        "FIS Approved": "2026-03-03T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2026-04-27T00:00:00",
        "Unnamed: 25": "2026-04-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 804,
      "raw": {
        "INR": "26INR0252",
        "Project Name": "Neutron Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Elawan Neutron Storage, LLC",
        "POI Location": "Tap 345kV 13405 Trading House - 68090 Sam Switch",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-01T00:00:00",
        "FIS Requested": "2023-08-21T00:00:00",
        "FIS Approved": "2025-05-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0252",
        "Project Name": "Neutron Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Elawan Neutron Storage, LLC",
        "POI Location": "Tap 345kV 13405 Trading House - 68090 Sam Switch",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-21T00:00:00",
        "Screening Study Started": "2023-09-08T00:00:00",
        "Screening Study Complete": "2023-12-01T00:00:00",
        "FIS Requested": "2023-08-21T00:00:00",
        "FIS Approved": "2025-05-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 805,
      "raw": {
        "INR": "26INR0253",
        "Project Name": "Goldfinch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT DJ4M Solar, LLC",
        "POI Location": "Tap Connection Bus 2485 Poetry Switch to 3103 Shamburger Switch",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-15T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0253",
        "Project Name": "Goldfinch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT DJ4M Solar, LLC",
        "POI Location": "Tap Connection Bus 2485 Poetry Switch to 3103 Shamburger Switch",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-15T00:00:00",
        "Screening Study Started": "2023-09-22T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 806,
      "raw": {
        "INR": "26INR0254",
        "Project Name": "Goldfinch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT DJ4M Solar, LLC",
        "POI Location": "Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch ",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-26T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0254",
        "Project Name": "Goldfinch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT DJ4M Solar, LLC",
        "POI Location": "Tap Connection Bus 2485 Poetry Switch – 3223 Shamburger Switch ",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-26T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2023-12-14T00:00:00",
        "FIS Requested": "2023-09-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 807,
      "raw": {
        "INR": "26INR0255",
        "Project Name": "Operation Sunshine",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Duck Creek Solar, LLC",
        "POI Location": " 7077 Amos Creek 345kV",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 603.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-29T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0255",
        "Project Name": "Operation Sunshine",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Duck Creek Solar, LLC",
        "POI Location": " 7077 Amos Creek 345kV",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 603.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-29T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 808,
      "raw": {
        "INR": "26INR0256",
        "Project Name": "Camino Ranch Solar 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Ranch Solar Project LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 237.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-05T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-01-10T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0256",
        "Project Name": "Camino Ranch Solar 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Ranch Solar Project LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 237.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-05T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-01-10T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 809,
      "raw": {
        "INR": "26INR0257",
        "Project Name": "Camino Ranch Storage 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Ranch Solar LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 238.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-23T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0257",
        "Project Name": "Camino Ranch Storage 2 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Camino Ranch Solar LLC",
        "POI Location": "Tap to Jim English (#3351) – Flat Branch (#3345) 138kV",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 238.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-23T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2026-05-08T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 810,
      "raw": {
        "INR": "26INR0258",
        "Project Name": "Running Iron Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Running Iron Solar, LLC",
        "POI Location": "Tap 138kV Conoco 8138 - Black Cat 80124",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 204.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0258",
        "Project Name": "Running Iron Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Running Iron Solar, LLC",
        "POI Location": "Tap 138kV Conoco 8138 - Black Cat 80124",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 204.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 811,
      "raw": {
        "INR": "26INR0259",
        "Project Name": "Cottontail Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cottontail Energy Center, LLC",
        "POI Location": "7258 Glidden Substation 138kV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-05T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0259",
        "Project Name": "Cottontail Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cottontail Energy Center, LLC",
        "POI Location": "7258 Glidden Substation 138kV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-05T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 812,
      "raw": {
        "INR": "26INR0260",
        "Project Name": "Evans Creek Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Evans Creek Energy Storage LLC",
        "POI Location": "Comstock 138kV Substation (PSSE Bus #8683)",
        "County": "Val Verde",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-13T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0260",
        "Project Name": "Evans Creek Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Evans Creek Energy Storage LLC",
        "POI Location": "Comstock 138kV Substation (PSSE Bus #8683)",
        "County": "Val Verde",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-13T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 813,
      "raw": {
        "INR": "26INR0261",
        "Project Name": "Bastrop Peaking Generators (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "MPH Bastrop Peakers, LLC",
        "POI Location": "7048 L_GARFIE5_1Y 345kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-09T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0261",
        "Project Name": "Bastrop Peaking Generators (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "MPH Bastrop Peakers, LLC",
        "POI Location": "7048 L_GARFIE5_1Y 345kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-09T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-03-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 814,
      "raw": {
        "INR": "26INR0269",
        "Project Name": "Moccasin Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Swenson Solar LLC",
        "POI Location": "Tapping the 345 kV Line from Kirchhoff (Bus# 60707) to Clear Crossing (Bus# 60515)",
        "County": "Stonewall",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 603.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-30T00:00:00",
        "Screening Study Started": "2023-09-07T00:00:00",
        "Screening Study Complete": "2023-12-06T00:00:00",
        "FIS Requested": "2023-09-01T00:00:00",
        "FIS Approved": "2026-01-08T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-09-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-04-21T00:00:00",
        "Unnamed: 25": "2026-04-21T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0269",
        "Project Name": "Moccasin Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Swenson Solar LLC",
        "POI Location": "Tapping the 345 kV Line from Kirchhoff (Bus# 60707) to Clear Crossing (Bus# 60515)",
        "County": "Stonewall",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 603.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-30T00:00:00",
        "Screening Study Started": "2023-09-07T00:00:00",
        "Screening Study Complete": "2023-12-06T00:00:00",
        "FIS Requested": "2023-09-01T00:00:00",
        "FIS Approved": "2026-01-08T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-09-04T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2026-04-21T00:00:00",
        "Unnamed: 25": "2026-04-21T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 815,
      "raw": {
        "INR": "26INR0273",
        "Project Name": "Momentum Hazy Jane BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MOMENTUM HAZY JANE, LLC",
        "POI Location": "Tap 138kV 1102 Judkins - 1110 Edward",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-02-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-21T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0273",
        "Project Name": "Momentum Hazy Jane BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "MOMENTUM HAZY JANE, LLC",
        "POI Location": "Tap 138kV 1102 Judkins - 1110 Edward",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-02-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-21T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 816,
      "raw": {
        "INR": "26INR0280",
        "Project Name": "Pethrus BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Pethrus BESS, LLC",
        "POI Location": "Tap Wichita Falls Switch (#1464) – North Star (#1467) 138 kV Line",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 174.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-15T00:00:00",
        "Screening Study Started": "2023-09-23T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2023-08-30T00:00:00",
        "FIS Approved": "2025-03-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0280",
        "Project Name": "Pethrus BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Pethrus BESS, LLC",
        "POI Location": "Tap Wichita Falls Switch (#1464) – North Star (#1467) 138 kV Line",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 174.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-15T00:00:00",
        "Screening Study Started": "2023-09-23T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2023-08-30T00:00:00",
        "FIS Approved": "2025-03-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 817,
      "raw": {
        "INR": "26INR0285",
        "Project Name": "Hill Valley BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hill Valley BESS, LLC",
        "POI Location": "345 kV Singleton (#44645)",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 245.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-10T00:00:00",
        "FIS Approved": "2024-12-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-04-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0285",
        "Project Name": "Hill Valley BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Hill Valley BESS, LLC",
        "POI Location": "345 kV Singleton (#44645)",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 245.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-10T00:00:00",
        "FIS Approved": "2024-12-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-04-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 818,
      "raw": {
        "INR": "26INR0287",
        "Project Name": "Firebird BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS 6, LLC",
        "POI Location": "Tap 138kV #1099 Southwestern Portland Tap - #1052 Rexall",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-31T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2023-10-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0287",
        "Project Name": "Firebird BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TX BESS 6, LLC",
        "POI Location": "Tap 138kV #1099 Southwestern Portland Tap - #1052 Rexall",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-31T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2023-10-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 819,
      "raw": {
        "INR": "26INR0290",
        "Project Name": "Cold Creek Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cold Creek Solar and Storage LLC",
        "POI Location": "Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 431.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0290",
        "Project Name": "Cold Creek Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cold Creek Solar and Storage LLC",
        "POI Location": "Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 431.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 820,
      "raw": {
        "INR": "26INR0291",
        "Project Name": "Cold Creek Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cold Creek Solar and Storage LLC",
        "POI Location": "Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 171.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0291",
        "Project Name": "Cold Creek Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cold Creek Solar and Storage LLC",
        "POI Location": "Tap 345kV line Big Hill (#76003) - Twin Buttes (#76009)",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 171.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 821,
      "raw": {
        "INR": "26INR0294",
        "Project Name": "Longleaf Power Station ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "WattBridge Texas Holdings, LLC",
        "POI Location": "Redland Substation (# 3321)",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-09T00:00:00",
        "FIS Requested": "2023-10-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0294",
        "Project Name": "Longleaf Power Station ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "WattBridge Texas Holdings, LLC",
        "POI Location": "Redland Substation (# 3321)",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-04T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-09T00:00:00",
        "FIS Requested": "2023-10-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 822,
      "raw": {
        "INR": "26INR0295",
        "Project Name": "Trinity Hills BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Phoenix Battery Storage, LLC ",
        "POI Location": "To the 345 kV Garvey Road Switch (#17002)",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-26T00:00:00",
        "FIS Requested": "2023-11-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0295",
        "Project Name": "Trinity Hills BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Phoenix Battery Storage, LLC ",
        "POI Location": "To the 345 kV Garvey Road Switch (#17002)",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-26T00:00:00",
        "FIS Requested": "2023-11-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 823,
      "raw": {
        "INR": "26INR0296",
        "Project Name": "Sherbino II BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Phoenix Battery Storage, LLC",
        "POI Location": "38430 TNMP White baker Switching Station 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 77.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-19T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-27T00:00:00",
        "FIS Requested": "2023-11-16T00:00:00",
        "FIS Approved": "2025-04-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-05-14T00:00:00",
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0296",
        "Project Name": "Sherbino II BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Phoenix Battery Storage, LLC",
        "POI Location": "38430 TNMP White baker Switching Station 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 77.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-19T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-27T00:00:00",
        "FIS Requested": "2023-11-16T00:00:00",
        "FIS Approved": "2025-04-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2024-08-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-05-14T00:00:00",
        "Unnamed: 25": "2025-05-01T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 824,
      "raw": {
        "INR": "26INR0297",
        "Project Name": "Buzzi Maryneal Wind Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buzzi Unicem USA",
        "POI Location": "1413 SWEETCRK-9 ",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-01-02T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-02T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0297",
        "Project Name": "Buzzi Maryneal Wind Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buzzi Unicem USA",
        "POI Location": "1413 SWEETCRK-9 ",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-01-02T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-02T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 825,
      "raw": {
        "INR": "26INR0300",
        "Project Name": "Whitewright Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SunWR, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – Anna Switch 2373",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0300",
        "Project Name": "Whitewright Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SunWR, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – Anna Switch 2373",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 826,
      "raw": {
        "INR": "26INR0301",
        "Project Name": "Bhalu Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bhalu Storage, LLC",
        "POI Location": "Tap 138kV Bulldog (#23833) – Elbow (#23834) ",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-23T00:00:00",
        "Screening Study Started": "2023-10-30T00:00:00",
        "Screening Study Complete": "2024-01-26T00:00:00",
        "FIS Requested": "2023-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0301",
        "Project Name": "Bhalu Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bhalu Storage, LLC",
        "POI Location": "Tap 138kV Bulldog (#23833) – Elbow (#23834) ",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-23T00:00:00",
        "Screening Study Started": "2023-10-30T00:00:00",
        "Screening Study Complete": "2024-01-26T00:00:00",
        "FIS Requested": "2023-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 827,
      "raw": {
        "INR": "26INR0302",
        "Project Name": "Young County Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Young County Energy Storage LLC",
        "POI Location": "TAP 138 KV BUS AND CREAT NEW BUS BETWEEN MURRAY (792) AND GRAHAM SES (1431)\nCOUNTY : YOUNG\n",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-02T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": "2026-07-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0302",
        "Project Name": "Young County Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Young County Energy Storage LLC",
        "POI Location": "TAP 138 KV BUS AND CREAT NEW BUS BETWEEN MURRAY (792) AND GRAHAM SES (1431)\nCOUNTY : YOUNG\n",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-02T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": "2026-07-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 828,
      "raw": {
        "INR": "26INR0304",
        "Project Name": "JUNIPERUSSS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BLUE STONE RENEWABLE XXI LLC",
        "POI Location": "Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 80.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-01-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0304",
        "Project Name": "JUNIPERUSSS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BLUE STONE RENEWABLE XXI LLC",
        "POI Location": "Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 80.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-01-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 829,
      "raw": {
        "INR": "26INR0306",
        "Project Name": "Nautilus Heavy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nautilus Heavy Storage, LLC",
        "POI Location": "8422 Dupont 138kV ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-01-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-11T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0306",
        "Project Name": "Nautilus Heavy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nautilus Heavy Storage, LLC",
        "POI Location": "8422 Dupont 138kV ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-01-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-11T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 830,
      "raw": {
        "INR": "26INR0309",
        "Project Name": "Solace Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Quantum BESS, LLC",
        "POI Location": "tap 345kV 1430 Graham - 1048 Tonkawas",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 321.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-27T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-22T00:00:00",
        "FIS Approved": "2025-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-07-24T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-01-30T00:00:00",
        "Approved for Synchronization": "2026-03-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0309",
        "Project Name": "Solace Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Quantum BESS, LLC",
        "POI Location": "tap 345kV 1430 Graham - 1048 Tonkawas",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 321.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-27T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-22T00:00:00",
        "FIS Approved": "2025-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-07-24T00:00:00",
        "Meets All Planning": "2025-07-24T00:00:00",
        "Unnamed: 25": "2025-07-24T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-01-30T00:00:00",
        "Approved for Synchronization": "2026-03-03T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 831,
      "raw": {
        "INR": "26INR0310",
        "Project Name": "Quantum Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Quantum II BESS, LLC",
        "POI Location": "60089 Kilby Switching Station 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 321.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-28T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-22T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2025-08-04T00:00:00",
        "Unnamed: 25": "2025-08-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-26T00:00:00",
        "Approved for Synchronization": "2026-04-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0310",
        "Project Name": "Quantum Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Quantum II BESS, LLC",
        "POI Location": "60089 Kilby Switching Station 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 321.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-28T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-22T00:00:00",
        "FIS Approved": "2025-06-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2023-10-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2025-08-04T00:00:00",
        "Unnamed: 25": "2025-08-04T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-03-26T00:00:00",
        "Approved for Synchronization": "2026-04-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 832,
      "raw": {
        "INR": "26INR0311",
        "Project Name": "Senator Aggreko Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Senator Aggreko Solar LLC",
        "POI Location": "138 kV Sunglow Substation (#78016)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 258.91,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-10-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0311",
        "Project Name": "Senator Aggreko Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Senator Aggreko Solar LLC",
        "POI Location": "138 kV Sunglow Substation (#78016)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 258.91,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-10-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 833,
      "raw": {
        "INR": "26INR0312",
        "Project Name": "Senator Aggreko Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Senator Aggreko Storage LLC",
        "POI Location": "138 kV Sunglow Substation (#78016)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 147.63,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-10-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0312",
        "Project Name": "Senator Aggreko Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Senator Aggreko Storage LLC",
        "POI Location": "138 kV Sunglow Substation (#78016)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 147.63,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-10-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 834,
      "raw": {
        "INR": "26INR0313",
        "Project Name": "Edens Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hill PV, LLC",
        "POI Location": "Tap 69kV 3532 Itasca - 3523 Hillsboro",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 70.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-18T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0313",
        "Project Name": "Edens Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hill PV, LLC",
        "POI Location": "Tap 69kV 3532 Itasca - 3523 Hillsboro",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-04-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 70.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-18T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 835,
      "raw": {
        "INR": "26INR0314",
        "Project Name": "Brazos River BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Brazos River BESS LLC",
        "POI Location": "Tap 138kV 39530 West Colombia LOCAL TNP - 39560 ANGLETON TNP",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-31T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2024-01-01T00:00:00",
        "FIS Requested": "2024-05-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0314",
        "Project Name": "Brazos River BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Brazos River BESS LLC",
        "POI Location": "Tap 138kV 39530 West Colombia LOCAL TNP - 39560 ANGLETON TNP",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-31T00:00:00",
        "Screening Study Started": "2023-10-04T00:00:00",
        "Screening Study Complete": "2024-01-01T00:00:00",
        "FIS Requested": "2024-05-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 836,
      "raw": {
        "INR": "26INR0317",
        "Project Name": "Pinnacle Point Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GCI Pinnacle Point, LLC",
        "POI Location": "Tap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-11-08T00:00:00",
        "FIS Approved": "2025-11-10T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0317",
        "Project Name": "Pinnacle Point Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GCI Pinnacle Point, LLC",
        "POI Location": "Tap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-07T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-11-08T00:00:00",
        "FIS Approved": "2025-11-10T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 837,
      "raw": {
        "INR": "26INR0318",
        "Project Name": "Sandford Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Sandford Solar, LLC",
        "POI Location": "Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) ",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 126.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-20T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2023-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0318",
        "Project Name": "Sandford Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Sandford Solar, LLC",
        "POI Location": "Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) ",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 126.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-20T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2023-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 838,
      "raw": {
        "INR": "26INR0319",
        "Project Name": "Sandford Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Sandford Solar, LLC",
        "POI Location": "Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) ",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-18T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2023-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0319",
        "Project Name": "Sandford Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Sandford Solar, LLC",
        "POI Location": "Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) ",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-01-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-18T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2023-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 839,
      "raw": {
        "INR": "26INR0324",
        "Project Name": "Misty Hollow BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Clear Fork BESS, LLC",
        "POI Location": "345 kV Singleton (#44645)",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 245.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-06T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-12-06T00:00:00",
        "FIS Approved": "2025-03-04T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0324",
        "Project Name": "Misty Hollow BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Clear Fork BESS, LLC",
        "POI Location": "345 kV Singleton (#44645)",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 245.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-06T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-12-06T00:00:00",
        "FIS Approved": "2025-03-04T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 840,
      "raw": {
        "INR": "26INR0327",
        "Project Name": "Sleepy Hollow BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sleepy Hollow BESS, LLC",
        "POI Location": "Tap 138 kV 792 Murray - 6169 Paint Creek ",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 123.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-30T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-27T00:00:00",
        "FIS Requested": "2023-11-15T00:00:00",
        "FIS Approved": "2025-07-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0327",
        "Project Name": "Sleepy Hollow BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sleepy Hollow BESS, LLC",
        "POI Location": "Tap 138 kV 792 Murray - 6169 Paint Creek ",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 123.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-30T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-27T00:00:00",
        "FIS Requested": "2023-11-15T00:00:00",
        "FIS Approved": "2025-07-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 841,
      "raw": {
        "INR": "26INR0328",
        "Project Name": "Yorktown BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Navitas Energy LLC",
        "POI Location": "(#78575) LCRA Yorktown 138 kV",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-18T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0328",
        "Project Name": "Yorktown BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Navitas Energy LLC",
        "POI Location": "(#78575) LCRA Yorktown 138 kV",
        "County": "DeWitt",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-18T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 842,
      "raw": {
        "INR": "26INR0329",
        "Project Name": "Pianissimo BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pianissimo Storage, LLC",
        "POI Location": "Tap 138kV 685 LEO - 587 GREENWOOD",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0329",
        "Project Name": "Pianissimo BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pianissimo Storage, LLC",
        "POI Location": "Tap 138kV 685 LEO - 587 GREENWOOD",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 843,
      "raw": {
        "INR": "26INR0330",
        "Project Name": "Alamo City BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ALAMO CITY ESS LLC ",
        "POI Location": "Tap 138kV 5294 Martinez - 5110 JT Deely",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 128.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-21T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": "2026-08-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-08-21T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0330",
        "Project Name": "Alamo City BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ALAMO CITY ESS LLC ",
        "POI Location": "Tap 138kV 5294 Martinez - 5110 JT Deely",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 128.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-21T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": "2026-08-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-22T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-08-21T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 844,
      "raw": {
        "INR": "26INR0331",
        "Project Name": "RUSH ESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "OCI Solar Power LLC",
        "POI Location": "Tap 345 kV 5231 HOWARD_5 – 5400 SPRUCE",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-02-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-20T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0331",
        "Project Name": "RUSH ESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "OCI Solar Power LLC",
        "POI Location": "Tap 345 kV 5231 HOWARD_5 – 5400 SPRUCE",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-02-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-20T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-01-16T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 845,
      "raw": {
        "INR": "26INR0340",
        "Project Name": "SOUTHERN SELECT ENERGY STORAGE",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "SOUTHERN SELECT ENERGY STORAGE LLC",
        "POI Location": "Bus Name: TNHEIGHTS_1\nBus Number: 38740\n",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-05-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-16T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2026-04-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-05-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-07-31T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0340",
        "Project Name": "SOUTHERN SELECT ENERGY STORAGE",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "SOUTHERN SELECT ENERGY STORAGE LLC",
        "POI Location": "Bus Name: TNHEIGHTS_1\nBus Number: 38740\n",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-05-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-16T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2026-04-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-05-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-07-31T00:00:00",
        "Meets All Planning": "2026-07-31T00:00:00",
        "Unnamed: 25": "2026-07-31T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 846,
      "raw": {
        "INR": "26INR0341",
        "Project Name": "Megamouth Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GCI Megamouth, LLC",
        "POI Location": "42750 Mykawa 138 kV ",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2024-03-11T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": "2024-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0341",
        "Project Name": "Megamouth Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GCI Megamouth, LLC",
        "POI Location": "42750 Mykawa 138 kV ",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2024-03-11T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": "2024-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 847,
      "raw": {
        "INR": "26INR0343",
        "Project Name": "Stinger Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Stinger Energy Storage LLC",
        "POI Location": "Tap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #40820)",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0343",
        "Project Name": "Stinger Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Stinger Energy Storage LLC",
        "POI Location": "Tap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #40820)",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-02T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 848,
      "raw": {
        "INR": "26INR0345",
        "Project Name": "NET Power Demonstration plant",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "NET Power LLC",
        "POI Location": "42360 Mirage POI 8 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-08-21T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 25.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-03T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-08T00:00:00",
        "FIS Requested": "2024-09-03T00:00:00",
        "FIS Approved": "2025-07-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0345",
        "Project Name": "NET Power Demonstration plant",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "NET Power LLC",
        "POI Location": "42360 Mirage POI 8 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-08-21T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 25.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-03T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-08T00:00:00",
        "FIS Requested": "2024-09-03T00:00:00",
        "FIS Approved": "2025-07-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 849,
      "raw": {
        "INR": "26INR0347",
        "Project Name": "Midfield PV Project SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " HQC Solar Holdings 1, LLC",
        "POI Location": "Tap 138kV 8121 Blessing - 8125 Lolita",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-02-27T00:00:00",
        "FIS Requested": "2023-11-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0347",
        "Project Name": "Midfield PV Project SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " HQC Solar Holdings 1, LLC",
        "POI Location": "Tap 138kV 8121 Blessing - 8125 Lolita",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-02-27T00:00:00",
        "FIS Requested": "2023-11-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 850,
      "raw": {
        "INR": "26INR0355",
        "Project Name": "Pleiades Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Pleiades Storage, LLC",
        "POI Location": "Tap 138kV Einstein 23852 - 10043 St. Lawrence",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-23T00:00:00",
        "FIS Approved": "2025-01-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2028-05-22T00:00:00",
        "Construction End": "2029-09-22T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0355",
        "Project Name": "Pleiades Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Pleiades Storage, LLC",
        "POI Location": "Tap 138kV Einstein 23852 - 10043 St. Lawrence",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-23T00:00:00",
        "FIS Approved": "2025-01-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2028-05-22T00:00:00",
        "Construction End": "2029-09-22T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 851,
      "raw": {
        "INR": "26INR0356",
        "Project Name": "Saluga Ranch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Saluga Ranch Energy, LLC",
        "POI Location": "Asherton 8283 - Big wells 8613 -138 kV ",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0356",
        "Project Name": "Saluga Ranch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Saluga Ranch Energy, LLC",
        "POI Location": "Asherton 8283 - Big wells 8613 -138 kV ",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 852,
      "raw": {
        "INR": "26INR0357",
        "Project Name": "Operation Sunshine Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Duck Creek Storage, LLC",
        "POI Location": " 7077 Amos Creek 345kV",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2024-01-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-09-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0357",
        "Project Name": "Operation Sunshine Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Duck Creek Storage, LLC",
        "POI Location": " 7077 Amos Creek 345kV",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-02-09T00:00:00",
        "FIS Requested": "2024-01-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-27T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-09-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 853,
      "raw": {
        "INR": "26INR0359",
        "Project Name": "Uva Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Grape Creek Solar, LLC",
        "POI Location": "Muleshoe #59922 345 KV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-18T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-10-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-07T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0359",
        "Project Name": "Uva Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Grape Creek Solar, LLC",
        "POI Location": "Muleshoe #59922 345 KV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-18T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-10-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-07T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 854,
      "raw": {
        "INR": "26INR0362",
        "Project Name": "Midfield BESS Project SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HQC Solar Holdings 1, LLC",
        "POI Location": "Tap 138kV 8121 Blessing - 8125 Lolita",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-09T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-07-22T00:00:00",
        "FIS Requested": "2024-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0362",
        "Project Name": "Midfield BESS Project SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HQC Solar Holdings 1, LLC",
        "POI Location": "Tap 138kV 8121 Blessing - 8125 Lolita",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-09T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-07-22T00:00:00",
        "FIS Requested": "2024-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 855,
      "raw": {
        "INR": "26INR0363",
        "Project Name": "Saint Charles Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RSN STORAGE 001, LLC",
        "POI Location": "TAP 138kV 3345 FLATBRA_8 - 3351 JIM_ENG_8 \n",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-09T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0363",
        "Project Name": "Saint Charles Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RSN STORAGE 001, LLC",
        "POI Location": "TAP 138kV 3345 FLATBRA_8 - 3351 JIM_ENG_8 \n",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-09T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 856,
      "raw": {
        "INR": "26INR0364",
        "Project Name": "Pollo Pinto Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "TX Palo Pinto SB 6, LLC",
        "POI Location": "Tap 138kV 331 RWMILLER - 320 JAYBIRD",
        "County": "Palo Pinto",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-02-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-11T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-26T00:00:00",
        "FIS Approved": "2026-04-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0364",
        "Project Name": "Pollo Pinto Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "TX Palo Pinto SB 6, LLC",
        "POI Location": "Tap 138kV 331 RWMILLER - 320 JAYBIRD",
        "County": "Palo Pinto",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-02-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-11T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-26T00:00:00",
        "FIS Approved": "2026-04-01T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 857,
      "raw": {
        "INR": "26INR0365",
        "Project Name": "BLACK BEAR SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ESCONDIDO DRAW RESOURCES, LLC",
        "POI Location": "#6564 ILLN4A 138 KV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 102.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-19T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-04T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0365",
        "Project Name": "BLACK BEAR SOLAR",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ESCONDIDO DRAW RESOURCES, LLC",
        "POI Location": "#6564 ILLN4A 138 KV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 102.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-19T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-04T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 858,
      "raw": {
        "INR": "26INR0366",
        "Project Name": "BLACK BEAR BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ESCONDIDO DRAW RESOURCES, LLC",
        "POI Location": "#6564 ILLN4A 138kV\n",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-19T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-04T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0366",
        "Project Name": "BLACK BEAR BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ESCONDIDO DRAW RESOURCES, LLC",
        "POI Location": "#6564 ILLN4A 138kV\n",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-19T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-04T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 859,
      "raw": {
        "INR": "26INR0370",
        "Project Name": "Central Power Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hydra-Gen Energy Unlimited ",
        "POI Location": "967 Gibbons Creek 345kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 750,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0370",
        "Project Name": "Central Power Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hydra-Gen Energy Unlimited ",
        "POI Location": "967 Gibbons Creek 345kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 750,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 860,
      "raw": {
        "INR": "26INR0374",
        "Project Name": "Cobra Clean Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cobra Clean Energy Center LLC",
        "POI Location": "looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-09T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-07-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0374",
        "Project Name": "Cobra Clean Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cobra Clean Energy Center LLC",
        "POI Location": "looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-10-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-09T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-07-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 861,
      "raw": {
        "INR": "26INR0375",
        "Project Name": "Avalon BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Avalon BESS, LLC",
        "POI Location": "Tapping the 345 kV Line from Smithers (Bus# 44650) to Bellaire (Bus# 47000).",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 522.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-06T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-08T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": "2024-05-20T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-12-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0375",
        "Project Name": "Avalon BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Avalon BESS, LLC",
        "POI Location": "Tapping the 345 kV Line from Smithers (Bus# 44650) to Bellaire (Bus# 47000).",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 522.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-06T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-08T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": "2024-05-20T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-12-17T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 862,
      "raw": {
        "INR": "26INR0376",
        "Project Name": "Blackcat Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Matagorda ESS, LLC",
        "POI Location": "138kV Blackcat Substation (#80124)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-02T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0376",
        "Project Name": "Blackcat Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Matagorda ESS, LLC",
        "POI Location": "138kV Blackcat Substation (#80124)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-02T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 863,
      "raw": {
        "INR": "26INR0380",
        "Project Name": "Pepper Solar Farm",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pepper Solar Farm LLC",
        "POI Location": "Tap 345kV 3405 THOUSE__5  - 3406 ELM_MOTT_5",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-21T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-22T00:00:00",
        "FIS Approved": "2026-08-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-06-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0380",
        "Project Name": "Pepper Solar Farm",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pepper Solar Farm LLC",
        "POI Location": "Tap 345kV 3405 THOUSE__5  - 3406 ELM_MOTT_5",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-21T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-22T00:00:00",
        "FIS Approved": "2026-08-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-06-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 864,
      "raw": {
        "INR": "26INR0385",
        "Project Name": "Nanulak BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nanulak BESS, L.L.C. ",
        "POI Location": "38113 TNCOYOTSPG1 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 181.54,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": "2026-06-06T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0385",
        "Project Name": "Nanulak BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Nanulak BESS, L.L.C. ",
        "POI Location": "38113 TNCOYOTSPG1 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 181.54,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": "2026-06-06T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 865,
      "raw": {
        "INR": "26INR0386",
        "Project Name": "Zeus Spade Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spade Wind, LLC",
        "POI Location": "Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-20T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 987.3,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2025-01-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-10-01T00:00:00",
        "Construction End": "2027-10-10T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0386",
        "Project Name": "Zeus Spade Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spade Wind, LLC",
        "POI Location": "Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-20T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 987.3,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2025-01-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-10-01T00:00:00",
        "Construction End": "2027-10-10T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 866,
      "raw": {
        "INR": "26INR0387",
        "Project Name": "Zeus Spade BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spade BESS",
        "POI Location": "Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 446.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-04T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2025-01-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-10-01T00:00:00",
        "Construction End": "2026-10-15T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0387",
        "Project Name": "Zeus Spade BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spade BESS",
        "POI Location": "Tap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 446.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-04T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2025-01-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": "2026-10-01T00:00:00",
        "Construction End": "2026-10-15T00:00:00",
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 867,
      "raw": {
        "INR": "26INR0388",
        "Project Name": "Aggie Solar Project SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "reNRG TX 8 LLC",
        "POI Location": "POI: COYOTE SPRINGS SUBSTATION - 138KV\nBUS NUMBER : 38113\nCOUNTY : REEVES\nPOI LOCATION: 31.396675, -103.6252777\n",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 103.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-12-08T00:00:00",
        "FIS Approved": "2025-07-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0388",
        "Project Name": "Aggie Solar Project SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "reNRG TX 8 LLC",
        "POI Location": "POI: COYOTE SPRINGS SUBSTATION - 138KV\nBUS NUMBER : 38113\nCOUNTY : REEVES\nPOI LOCATION: 31.396675, -103.6252777\n",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 103.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-12-08T00:00:00",
        "FIS Approved": "2025-07-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 868,
      "raw": {
        "INR": "26INR0389",
        "Project Name": "AGGIE STORAGE PROJECT SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "reNRG TX 8 LLC",
        "POI Location": "POI: COYOTE SPRINGS SUBSTATION - 138KV\nBUS NUMBER: 38113\nPOI LOCATION: 31.396675, -103.6252777\nCOUNTY: REEVES",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-12-08T00:00:00",
        "FIS Approved": "2025-07-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0389",
        "Project Name": "AGGIE STORAGE PROJECT SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "reNRG TX 8 LLC",
        "POI Location": "POI: COYOTE SPRINGS SUBSTATION - 138KV\nBUS NUMBER: 38113\nPOI LOCATION: 31.396675, -103.6252777\nCOUNTY: REEVES",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-02T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-12-08T00:00:00",
        "FIS Approved": "2025-07-03T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 869,
      "raw": {
        "INR": "26INR0391",
        "Project Name": "Jumping Cactus Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Wing Energy Center, LLC",
        "POI Location": "138 kV Zenaida Bus# 80043 ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-03T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-03-19T00:00:00",
        "FIS Requested": "2023-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0391",
        "Project Name": "Jumping Cactus Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Wing Energy Center, LLC",
        "POI Location": "138 kV Zenaida Bus# 80043 ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-03T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-03-19T00:00:00",
        "FIS Requested": "2023-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 870,
      "raw": {
        "INR": "26INR0393",
        "Project Name": "Dove Wing Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Wing Energy Center, LLC",
        "POI Location": "138 kV Zenaida Bus# 80043",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-13T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0393",
        "Project Name": "Dove Wing Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Wing Energy Center, LLC",
        "POI Location": "138 kV Zenaida Bus# 80043",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-13T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 871,
      "raw": {
        "INR": "26INR0394",
        "Project Name": "Timber Cove Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Freestone Solar, LLC",
        "POI Location": "Tap 138 kV 212 Winkler - 3510 Pin Oak",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-04T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2023-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0394",
        "Project Name": "Timber Cove Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Freestone Solar, LLC",
        "POI Location": "Tap 138 kV 212 Winkler - 3510 Pin Oak",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-04T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2023-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 872,
      "raw": {
        "INR": "26INR0396",
        "Project Name": "Kodiak AGR1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hunt Energy Network, LLC",
        "POI Location": "38113 TNCOYOTSPG1",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-08T00:00:00",
        "Fuel": "OIL",
        "Technology": "OT",
        "Capacity (MW)": 132,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-10-03T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-28T00:00:00",
        "FIS Requested": "2024-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0396",
        "Project Name": "Kodiak AGR1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hunt Energy Network, LLC",
        "POI Location": "38113 TNCOYOTSPG1",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-08T00:00:00",
        "Fuel": "OIL",
        "Technology": "OT",
        "Capacity (MW)": 132,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-10-03T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-28T00:00:00",
        "FIS Requested": "2024-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 873,
      "raw": {
        "INR": "26INR0402",
        "Project Name": "HILLBORO BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green XI LLC ",
        "POI Location": "Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 130.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0402",
        "Project Name": "HILLBORO BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green XI LLC ",
        "POI Location": "Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 130.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 874,
      "raw": {
        "INR": "26INR0408",
        "Project Name": "Liatris Flexible Gas",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Stone Creek Peaker LLC",
        "POI Location": "Tap 138 kV (42980) Nash - (44010) WA Parish CKT02",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 204.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-11-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-05-22T00:00:00",
        "GHG Permit": "2024-05-22T00:00:00",
        "Water Availability": "2026-02-18T00:00:00",
        "Meets Planning": "2026-02-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0408",
        "Project Name": "Liatris Flexible Gas",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Stone Creek Peaker LLC",
        "POI Location": "Tap 138 kV (42980) Nash - (44010) WA Parish CKT02",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 204.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-11-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-05-22T00:00:00",
        "GHG Permit": "2024-05-22T00:00:00",
        "Water Availability": "2026-02-18T00:00:00",
        "Meets Planning": "2026-02-18T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 875,
      "raw": {
        "INR": "26INR0409",
        "Project Name": "Lucky 7 Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lucky 7 Solar Farm LLC",
        "POI Location": "Tap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH ",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-29T00:00:00",
        "FIS Approved": "2026-08-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0409",
        "Project Name": "Lucky 7 Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Lucky 7 Solar Farm LLC",
        "POI Location": "Tap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH ",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-29T00:00:00",
        "FIS Approved": "2026-08-28T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 876,
      "raw": {
        "INR": "26INR0410",
        "Project Name": "Prost ESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prost ESS LLC",
        "POI Location": "Tap 138kV L_PISEK_8_1Y (#7296) - L_WELCOM8_1Y(#7577)",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-12T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0410",
        "Project Name": "Prost ESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prost ESS LLC",
        "POI Location": "Tap 138kV L_PISEK_8_1Y (#7296) - L_WELCOM8_1Y(#7577)",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-12T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 877,
      "raw": {
        "INR": "26INR0411",
        "Project Name": "Tex-Bar ESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tex-Bar ESS LLC",
        "POI Location": "Tap 345kV JEWETT_S5 (#3390) -- SINGLETON (#44645)",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-14T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-26T00:00:00",
        "FIS Approved": "2024-09-26T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0411",
        "Project Name": "Tex-Bar ESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Tex-Bar ESS LLC",
        "POI Location": "Tap 345kV JEWETT_S5 (#3390) -- SINGLETON (#44645)",
        "County": "Madison",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-14T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-26T00:00:00",
        "FIS Approved": "2024-09-26T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 878,
      "raw": {
        "INR": "26INR0412",
        "Project Name": "BumbleBee Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BumbleBee Solar Farm LLC",
        "POI Location": "Tap 345kV 5725 PawneeSW5 - 8689 Tango",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.86,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-02-22T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0412",
        "Project Name": "BumbleBee Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BumbleBee Solar Farm LLC",
        "POI Location": "Tap 345kV 5725 PawneeSW5 - 8689 Tango",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.86,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-02-22T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 879,
      "raw": {
        "INR": "26INR0417",
        "Project Name": "GAMAY ENERGY STORAGE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GAMAY ENERGY STORAGE LLC",
        "POI Location": "Tap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500), in Brazoria County.",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 418.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0417",
        "Project Name": "GAMAY ENERGY STORAGE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "GAMAY ENERGY STORAGE LLC",
        "POI Location": "Tap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500), in Brazoria County.",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 418.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-30T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-27T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 880,
      "raw": {
        "INR": "26INR0418",
        "Project Name": "TE Smith Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Smith II Battery Storage, LLC",
        "POI Location": "2478 Royse 345kV",
        "County": "Rockwall",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-02-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.32,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-12-09T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-12T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0418",
        "Project Name": "TE Smith Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Smith II Battery Storage, LLC",
        "POI Location": "2478 Royse 345kV",
        "County": "Rockwall",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-02-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.32,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-12-09T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-12T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 881,
      "raw": {
        "INR": "26INR0419",
        "Project Name": "Lone Bow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Lone Bow LLC",
        "POI Location": "Tap 138 kV 8683 Comstock - 60389 Corral",
        "County": "Val Verde",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 277.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-22T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-02-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0419",
        "Project Name": "Lone Bow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greenalia Solar Power Lone Bow LLC",
        "POI Location": "Tap 138 kV 8683 Comstock - 60389 Corral",
        "County": "Val Verde",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 277.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-22T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-02-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 882,
      "raw": {
        "INR": "26INR0420",
        "Project Name": "Whitetail BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hunt Energy Network, LLC",
        "POI Location": "tap Salt Mine (#23846) to Bulldog (#23833) 138kV",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0420",
        "Project Name": "Whitetail BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hunt Energy Network, LLC",
        "POI Location": "tap Salt Mine (#23846) to Bulldog (#23833) 138kV",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 883,
      "raw": {
        "INR": "26INR0422",
        "Project Name": "PowerVault BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Elm Mott BESS",
        "POI Location": "Tap 345kV 3406 Elm Mott - 3405 Tradinghouse Ses",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 254.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-07T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-04-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0422",
        "Project Name": "PowerVault BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Elm Mott BESS",
        "POI Location": "Tap 345kV 3406 Elm Mott - 3405 Tradinghouse Ses",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 254.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-07T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-04-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 884,
      "raw": {
        "INR": "26INR0425",
        "Project Name": "Twinwood Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Twinwood PV1, LLC",
        "POI Location": "Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 358.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-05-26T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0425",
        "Project Name": "Twinwood Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Twinwood PV1, LLC",
        "POI Location": "Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 358.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-05-26T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 885,
      "raw": {
        "INR": "26INR0426",
        "Project Name": "Maderagemela BESS1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Twinwood ES1, LLC",
        "POI Location": "Tap 138kV 44750 FULSHR_S25_8 to 44860 TWINWD_S25_8",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-31T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-05-26T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0426",
        "Project Name": "Maderagemela BESS1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Twinwood ES1, LLC",
        "POI Location": "Tap 138kV 44750 FULSHR_S25_8 to 44860 TWINWD_S25_8",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-31T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-07-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-11-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-05-26T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 886,
      "raw": {
        "INR": "26INR0427",
        "Project Name": "BremRaek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BremRaek BESS",
        "POI Location": "7271 LCRA New Bremen 138 kV ",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0427",
        "Project Name": "BremRaek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BremRaek BESS",
        "POI Location": "7271 LCRA New Bremen 138 kV ",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 887,
      "raw": {
        "INR": "26INR0428",
        "Project Name": "Diamond Cowboy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Diamond B Storage, LLC",
        "POI Location": "Tap 345kV 8249 Angstrom - 8624 Grissom",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-03T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-12T00:00:00",
        "FIS Requested": "2024-04-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2026-05-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0428",
        "Project Name": "Diamond Cowboy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Diamond B Storage, LLC",
        "POI Location": "Tap 345kV 8249 Angstrom - 8624 Grissom",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-03T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-12T00:00:00",
        "FIS Requested": "2024-04-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2026-05-26T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 888,
      "raw": {
        "INR": "26INR0429",
        "Project Name": "Post Trail Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Post Trail Energy, LLC",
        "POI Location": "Tap 138kV Conoco 8138 - Black Cat 80124",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-26T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-08T00:00:00",
        "FIS Requested": "2024-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0429",
        "Project Name": "Post Trail Energy",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Post Trail Energy, LLC",
        "POI Location": "Tap 138kV Conoco 8138 - Black Cat 80124",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-26T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-08T00:00:00",
        "FIS Requested": "2024-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 889,
      "raw": {
        "INR": "26INR0430",
        "Project Name": "Clapton Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clapton BESS",
        "POI Location": "Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0430",
        "Project Name": "Clapton Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clapton BESS",
        "POI Location": "Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 890,
      "raw": {
        "INR": "26INR0431",
        "Project Name": "Big Rooter West Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Big Rooter West, LLC",
        "POI Location": "39950# TNTNP_ONE_3  345 KV ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 403.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0431",
        "Project Name": "Big Rooter West Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Big Rooter West, LLC",
        "POI Location": "39950# TNTNP_ONE_3  345 KV ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 403.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 891,
      "raw": {
        "INR": "26INR0432",
        "Project Name": "Big Rooter West Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Rooter West, LLC",
        "POI Location": "39950# TNTNP_ONE_3  345 KV ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0432",
        "Project Name": "Big Rooter West Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Rooter West, LLC",
        "POI Location": "39950# TNTNP_ONE_3  345 KV ",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-05T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 892,
      "raw": {
        "INR": "26INR0440",
        "Project Name": "Hamby Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Abilene GCE LLC",
        "POI Location": " 6245 ABILENE ROBERTSON PRISON 138 KV ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-01T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0440",
        "Project Name": "Hamby Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Abilene GCE LLC",
        "POI Location": " 6245 ABILENE ROBERTSON PRISON 138 KV ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-01T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 893,
      "raw": {
        "INR": "26INR0442",
        "Project Name": "Donna BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donna Solar LLC",
        "POI Location": "Tap 345 kV 80137 Stewart Road - 8383 North Edinburg",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 53.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0442",
        "Project Name": "Donna BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donna Solar LLC",
        "POI Location": "Tap 345 kV 80137 Stewart Road - 8383 North Edinburg",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 53.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 894,
      "raw": {
        "INR": "26INR0443",
        "Project Name": "Sullivan Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sullivan Solar LLC",
        "POI Location": "Tap 138kV 8798 La Grulla - 8355 Goodwin ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 170.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0443",
        "Project Name": "Sullivan Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sullivan Solar LLC",
        "POI Location": "Tap 138kV 8798 La Grulla - 8355 Goodwin ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 170.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 895,
      "raw": {
        "INR": "26INR0444",
        "Project Name": "Sullivan BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sullivan Solar LLC",
        "POI Location": "Tap 138kV 8798 La Grulla - 8355 Goodwin ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 72.19,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0444",
        "Project Name": "Sullivan BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sullivan Solar LLC",
        "POI Location": "Tap 138kV 8798 La Grulla - 8355 Goodwin ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 72.19,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 896,
      "raw": {
        "INR": "26INR0445",
        "Project Name": "Sword Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hidalgo Solar LLC",
        "POI Location": "Tap 138 kV 8394 Liston - 8392 Bates ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 137.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0445",
        "Project Name": "Sword Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hidalgo Solar LLC",
        "POI Location": "Tap 138 kV 8394 Liston - 8392 Bates ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 137.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 897,
      "raw": {
        "INR": "26INR0446",
        "Project Name": "Sword BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hidalgo Solar LLC",
        "POI Location": "Tap 138 kV 8394 Liston - 8392 Bates ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 40.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0446",
        "Project Name": "Sword BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hidalgo Solar LLC",
        "POI Location": "Tap 138 kV 8394 Liston - 8392 Bates ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 40.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 898,
      "raw": {
        "INR": "26INR0447",
        "Project Name": "Honey Mesquite Wind Farm",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Honey Mesquite Wind Farm , LLC",
        "POI Location": "59902 Sand Bluff 345kV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 173.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-09-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-20T00:00:00",
        "Unnamed: 25": "2025-10-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-03T00:00:00",
        "Approved for Synchronization": "2026-08-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0447",
        "Project Name": "Honey Mesquite Wind Farm",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Honey Mesquite Wind Farm , LLC",
        "POI Location": "59902 Sand Bluff 345kV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 173.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-06T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2024-09-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": "2025-10-20T00:00:00",
        "Unnamed: 25": "2025-10-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-03T00:00:00",
        "Approved for Synchronization": "2026-08-20T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 899,
      "raw": {
        "INR": "26INR0452",
        "Project Name": "Cannibal Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cannibal Draw Solar, LLC",
        "POI Location": "Sand_Bluff 345 kV (59902)",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 149.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-27T00:00:00",
        "FIS Requested": "2024-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-01-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0452",
        "Project Name": "Cannibal Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cannibal Draw Solar, LLC",
        "POI Location": "Sand_Bluff 345 kV (59902)",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 149.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-27T00:00:00",
        "FIS Requested": "2024-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-01-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 900,
      "raw": {
        "INR": "26INR0453",
        "Project Name": "Cannibal Draw Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cannibal Draw Solar, LLC",
        "POI Location": "Sand_Bluff 345 kV (59902)",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 98.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-27T00:00:00",
        "FIS Requested": "2024-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-01-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0453",
        "Project Name": "Cannibal Draw Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cannibal Draw Solar, LLC",
        "POI Location": "Sand_Bluff 345 kV (59902)",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 98.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-27T00:00:00",
        "FIS Requested": "2024-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-01-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": "2025-02-12T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 901,
      "raw": {
        "INR": "26INR0454",
        "Project Name": "Dove Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Creek Solar, LLC",
        "POI Location": "Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 163.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-10T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0454",
        "Project Name": "Dove Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Creek Solar, LLC",
        "POI Location": "Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 163.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-10T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 902,
      "raw": {
        "INR": "26INR0455",
        "Project Name": "Dove Creek Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Creek Solar, LLC",
        "POI Location": "Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 162.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-10T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0455",
        "Project Name": "Dove Creek Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dove Creek Solar, LLC",
        "POI Location": "Tap at Big Hill - Twin Buttes 345 kV line (76003 / 76009)",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 162.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-10T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 903,
      "raw": {
        "INR": "26INR0460",
        "Project Name": "Lightning Ridge Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lightning Ridge Storage LLC",
        "POI Location": "Tap #1429 Jacksboro Substation 345kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-18T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2024-03-27T00:00:00",
        "FIS Approved": "2025-11-24T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0460",
        "Project Name": "Lightning Ridge Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Lightning Ridge Storage LLC",
        "POI Location": "Tap #1429 Jacksboro Substation 345kV",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-18T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2024-03-27T00:00:00",
        "FIS Approved": "2025-11-24T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 904,
      "raw": {
        "INR": "26INR0461",
        "Project Name": "Rio Hondo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SBESS TX25 LLC",
        "POI Location": "Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-18T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0461",
        "Project Name": "Rio Hondo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SBESS TX25 LLC",
        "POI Location": "Tap 138kV #80309 Las Pulgas - #8319 Rio Hondo",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-18T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 905,
      "raw": {
        "INR": "26INR0464",
        "Project Name": "Ceres BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ceres BESS, LLC",
        "POI Location": "Tap 138 kV 6883 QUINLAN NORTH SS - 6860 UNION VALLEY SS",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0464",
        "Project Name": "Ceres BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ceres BESS, LLC",
        "POI Location": "Tap 138 kV 6883 QUINLAN NORTH SS - 6860 UNION VALLEY SS",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 906,
      "raw": {
        "INR": "26INR0465",
        "Project Name": "Lavita BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lavita BESS, LLC",
        "POI Location": "Tap 345kV Temple Pecan Creek (3412) - Temple Switch (3414) 345kV ckt 2",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 606,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-03T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0465",
        "Project Name": "Lavita BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lavita BESS, LLC",
        "POI Location": "Tap 345kV Temple Pecan Creek (3412) - Temple Switch (3414) 345kV ckt 2",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 606,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-03T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 907,
      "raw": {
        "INR": "26INR0466",
        "Project Name": "Symphony BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Symphony BESS, LLC",
        "POI Location": "46220 PETERS",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 612,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-28T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2025-01-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0466",
        "Project Name": "Symphony BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Symphony BESS, LLC",
        "POI Location": "46220 PETERS",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 612,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-28T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2025-01-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 908,
      "raw": {
        "INR": "26INR0467",
        "Project Name": "Basketflower Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Basketflower Solar, LLC",
        "POI Location": "Tap 138kV Risingstar (285) - Nimrod (289)",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-25T00:00:00",
        "FIS Approved": "2026-03-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0467",
        "Project Name": "Basketflower Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Basketflower Solar, LLC",
        "POI Location": "Tap 138kV Risingstar (285) - Nimrod (289)",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-25T00:00:00",
        "FIS Approved": "2026-03-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 909,
      "raw": {
        "INR": "26INR0468",
        "Project Name": "Basketflower Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Basketflower Solar, LLC",
        "POI Location": "Tap 138kV Risingstar (285) - Nimrod (289)",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 183,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-24T00:00:00",
        "FIS Approved": "2026-03-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0468",
        "Project Name": "Basketflower Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Basketflower Solar, LLC",
        "POI Location": "Tap 138kV Risingstar (285) - Nimrod (289)",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 183,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-24T00:00:00",
        "FIS Approved": "2026-03-26T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 910,
      "raw": {
        "INR": "26INR0469",
        "Project Name": "Roxton Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roxton Solar, LLC",
        "POI Location": "Tap 138 KV Bois Pump (1835) - Brookston (1833)",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-05-22T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-03-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-09-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0469",
        "Project Name": "Roxton Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roxton Solar, LLC",
        "POI Location": "Tap 138 KV Bois Pump (1835) - Brookston (1833)",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-05-22T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-03-10T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2026-09-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2026-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 911,
      "raw": {
        "INR": "26INR0470",
        "Project Name": "Roxton Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roxton Solar, LLC",
        "POI Location": "Tap 138 KV Bois Pump (1835) - Brookston (1833)",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 116.8,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-03-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-09-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0470",
        "Project Name": "Roxton Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Roxton Solar, LLC",
        "POI Location": "Tap 138 KV Bois Pump (1835) - Brookston (1833)",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 116.8,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-03-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-09-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 912,
      "raw": {
        "INR": "26INR0472",
        "Project Name": "Bologna BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "MALONEY BESS LLC",
        "POI Location": "Tap 138kV #1450 Pleasant Valley Switch - #1492 Wichita Falls Riverbend",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-26T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2024-03-20T00:00:00",
        "FIS Approved": "2025-03-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0472",
        "Project Name": "Bologna BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "MALONEY BESS LLC",
        "POI Location": "Tap 138kV #1450 Pleasant Valley Switch - #1492 Wichita Falls Riverbend",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-26T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2024-03-20T00:00:00",
        "FIS Approved": "2025-03-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 913,
      "raw": {
        "INR": "26INR0474",
        "Project Name": "Sorghum BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blue Creek BESS, LLC",
        "POI Location": "#44060 Blue Substation 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-18T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-18T00:00:00",
        "FIS Approved": "2024-11-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0474",
        "Project Name": "Sorghum BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Blue Creek BESS, LLC",
        "POI Location": "#44060 Blue Substation 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-18T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-18T00:00:00",
        "FIS Approved": "2024-11-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-01-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 914,
      "raw": {
        "INR": "26INR0485",
        "Project Name": "Prospector Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prospector Storage LLC",
        "POI Location": "Natural Dam 138kV Substation (23836)",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-28T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-01T00:00:00",
        "FIS Requested": "2024-06-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0485",
        "Project Name": "Prospector Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prospector Storage LLC",
        "POI Location": "Natural Dam 138kV Substation (23836)",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-28T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-01T00:00:00",
        "FIS Requested": "2024-06-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 915,
      "raw": {
        "INR": "26INR0487",
        "Project Name": "Anglin BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth BESS LLC",
        "POI Location": "1883 EVRSW 138kV\n",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-11T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-06T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0487",
        "Project Name": "Anglin BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth BESS LLC",
        "POI Location": "1883 EVRSW 138kV\n",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-11T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-06T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 916,
      "raw": {
        "INR": "26INR0496",
        "Project Name": "Hardeman BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quanah BESS LLC",
        "POI Location": "6050 PAUL 138kV",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0496",
        "Project Name": "Hardeman BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quanah BESS LLC",
        "POI Location": "6050 PAUL 138kV",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 917,
      "raw": {
        "INR": "26INR0497",
        "Project Name": "Rosharon BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rosharon BESS LLC",
        "POI Location": "138 kV 42570 Archer (ACH) ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-12-27T00:00:00",
        "FIS Approved": "2026-01-14T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0497",
        "Project Name": "Rosharon BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Rosharon BESS LLC",
        "POI Location": "138 kV 42570 Archer (ACH) ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-12-27T00:00:00",
        "FIS Approved": "2026-01-14T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 918,
      "raw": {
        "INR": "26INR0498",
        "Project Name": "Buckaroo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Weatherford BESS LLC",
        "POI Location": "Tap 138kV BROCK(487) – STHBROCKSW(489)",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-25T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0498",
        "Project Name": "Buckaroo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Weatherford BESS LLC",
        "POI Location": "Tap 138kV BROCK(487) – STHBROCKSW(489)",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-25T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 919,
      "raw": {
        "INR": "26INR0499",
        "Project Name": "Mineral Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Burnet County LLC",
        "POI Location": "7065 DOBVI 138kV",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-30T00:00:00",
        "FIS Requested": "2024-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0499",
        "Project Name": "Mineral Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Burnet County LLC",
        "POI Location": "7065 DOBVI 138kV",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-11-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-30T00:00:00",
        "FIS Requested": "2024-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 920,
      "raw": {
        "INR": "26INR0500",
        "Project Name": "Shackleford BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shackelford County BESS LLC",
        "POI Location": "1442 CFRSW 345kV",
        "County": "Shackelford",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-03T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2025-01-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0500",
        "Project Name": "Shackleford BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Shackelford County BESS LLC",
        "POI Location": "1442 CFRSW 345kV",
        "County": "Shackelford",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-03T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2025-01-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 921,
      "raw": {
        "INR": "26INR0501",
        "Project Name": "Rolling Plains BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Haskell County BESS LLC",
        "POI Location": "6104 SMOKY HILL 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-15T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-09-13T00:00:00",
        "FIS Requested": "2024-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0501",
        "Project Name": "Rolling Plains BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Haskell County BESS LLC",
        "POI Location": "6104 SMOKY HILL 345kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-15T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-09-13T00:00:00",
        "FIS Requested": "2024-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 922,
      "raw": {
        "INR": "26INR0502",
        "Project Name": "Fudge Ranch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Crandall BESS LLC",
        "POI Location": "<6902><TALTY_RC><138kV>",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-02T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-11T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0502",
        "Project Name": "Fudge Ranch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Crandall BESS LLC",
        "POI Location": "<6902><TALTY_RC><138kV>",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-02T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-11T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 923,
      "raw": {
        "INR": "26INR0503",
        "Project Name": "Rex Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rex BESS, LLC",
        "POI Location": "Tap 138 kV 48096 El Dorado - 43610 Scarsdale CKT 92",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-06-05T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0503",
        "Project Name": "Rex Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rex BESS, LLC",
        "POI Location": "Tap 138 kV 48096 El Dorado - 43610 Scarsdale CKT 92",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-06-05T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 924,
      "raw": {
        "INR": "26INR0505",
        "Project Name": "Goldhill Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Goldhill Energy Storage LLC",
        "POI Location": "Tap 138kV 8154 VISTRON4B – 8189 TUNGSTEN4A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-12T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0505",
        "Project Name": "Goldhill Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Goldhill Energy Storage LLC",
        "POI Location": "Tap 138kV 8154 VISTRON4B – 8189 TUNGSTEN4A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-12T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 925,
      "raw": {
        "INR": "26INR0507",
        "Project Name": "Los Vientos IB Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Los Vientos Windpower IB, LLC",
        "POI Location": "#8319 RIOHONDO 138 kV",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 184.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-17T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0507",
        "Project Name": "Los Vientos IB Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Los Vientos Windpower IB, LLC",
        "POI Location": "#8319 RIOHONDO 138 kV",
        "County": "Willacy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 184.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-17T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 926,
      "raw": {
        "INR": "26INR0511",
        "Project Name": "Little Star Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "#9043 CISTERN 345kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 61.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-20T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-23T00:00:00",
        "FIS Requested": "2024-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0511",
        "Project Name": "Little Star Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "#9043 CISTERN 345kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 61.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-20T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-23T00:00:00",
        "FIS Requested": "2024-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 927,
      "raw": {
        "INR": "26INR0514",
        "Project Name": "Techne BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Techne BESS, LLC",
        "POI Location": "7560 RED ROCK 138kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-05T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-08T00:00:00",
        "FIS Requested": "2024-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0514",
        "Project Name": "Techne BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Techne BESS, LLC",
        "POI Location": "7560 RED ROCK 138kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-05T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-08T00:00:00",
        "FIS Requested": "2024-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 928,
      "raw": {
        "INR": "26INR0515",
        "Project Name": "Rio Grand Valley Element Fuels Power",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Element H2Gen, LLC",
        "POI Location": "Tap 138kV 59450 Waterport Substation - 5789 Southmost Sub",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-05T00:00:00",
        "Fuel": "HYD",
        "Technology": "OT",
        "Capacity (MW)": 79.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-14T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2025-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0515",
        "Project Name": "Rio Grand Valley Element Fuels Power",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Element H2Gen, LLC",
        "POI Location": "Tap 138kV 59450 Waterport Substation - 5789 Southmost Sub",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-05T00:00:00",
        "Fuel": "HYD",
        "Technology": "OT",
        "Capacity (MW)": 79.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-14T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2025-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 929,
      "raw": {
        "INR": "26INR0519",
        "Project Name": "Sky Global West Houston",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sky Global Power Two, LLC",
        "POI Location": "tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 324.58,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-29T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-10-04T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": "2025-03-12T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-03-25T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0519",
        "Project Name": "Sky Global West Houston",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Sky Global Power Two, LLC",
        "POI Location": "tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 324.58,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-29T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-10-04T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": "2025-03-12T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-03-25T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 930,
      "raw": {
        "INR": "26INR0521",
        "Project Name": "Millers Branch Solar III",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Miller's Branch Solar LLC",
        "POI Location": "Tap 345kV 60703 Gauss - 60514 Clear Crossing (60712 QUASAR)",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 133,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-30T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-04T00:00:00",
        "FIS Requested": "2025-01-30T00:00:00",
        "FIS Approved": "2024-12-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-06-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-14T00:00:00",
        "Meets All Planning": "2026-01-27T00:00:00",
        "Unnamed: 25": "2026-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-26T00:00:00",
        "Approved for Synchronization": "2026-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0521",
        "Project Name": "Millers Branch Solar III",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Miller's Branch Solar LLC",
        "POI Location": "Tap 345kV 60703 Gauss - 60514 Clear Crossing (60712 QUASAR)",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 133,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-30T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-04T00:00:00",
        "FIS Requested": "2025-01-30T00:00:00",
        "FIS Approved": "2024-12-09T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2021-06-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-05-14T00:00:00",
        "Meets All Planning": "2026-01-27T00:00:00",
        "Unnamed: 25": "2026-01-27T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-26T00:00:00",
        "Approved for Synchronization": "2026-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 931,
      "raw": {
        "INR": "26INR0523",
        "Project Name": "Demeter Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " Demeter Solar, LLC",
        "POI Location": "Tap 138kV 7224 LULING - 7216 Lockhart",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 138,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-17T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-30T00:00:00",
        "FIS Requested": "2024-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0523",
        "Project Name": "Demeter Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " Demeter Solar, LLC",
        "POI Location": "Tap 138kV 7224 LULING - 7216 Lockhart",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 138,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-17T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-30T00:00:00",
        "FIS Requested": "2024-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 932,
      "raw": {
        "INR": "26INR0524",
        "Project Name": "Fagus Solar Park 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Greenalia Solar Power Misae III, LLC",
        "POI Location": "60501 Tesla 345 kV ",
        "County": "Childress",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-06-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 169.59,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2018-07-06T00:00:00",
        "FIS Requested": "2024-05-30T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-12-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0524",
        "Project Name": "Fagus Solar Park 3 SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Greenalia Solar Power Misae III, LLC",
        "POI Location": "60501 Tesla 345 kV ",
        "County": "Childress",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-06-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 169.59,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2018-07-06T00:00:00",
        "FIS Requested": "2024-05-30T00:00:00",
        "FIS Approved": "2026-06-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2019-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2024-12-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 933,
      "raw": {
        "INR": "26INR0525",
        "Project Name": "Bypass BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bypass BESS II LLC",
        "POI Location": "44000 Wa Parish 345 kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0525",
        "Project Name": "Bypass BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bypass BESS II LLC",
        "POI Location": "44000 Wa Parish 345 kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 934,
      "raw": {
        "INR": "26INR0527",
        "Project Name": "Mandolin Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center I, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-09T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0527",
        "Project Name": "Mandolin Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center I, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-09T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 935,
      "raw": {
        "INR": "26INR0528",
        "Project Name": "Mandolin Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center I, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-09T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0528",
        "Project Name": "Mandolin Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center I, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido ",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-09T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 936,
      "raw": {
        "INR": "26INR0529",
        "Project Name": "Electric E - West Texas Generation",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Electric E Power Marketing",
        "POI Location": "#11166 ENPOD 138kV",
        "County": "Loving",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-09T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 43.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-19T00:00:00",
        "Screening Study Started": "2024-10-18T00:00:00",
        "Screening Study Complete": "2025-01-10T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0529",
        "Project Name": "Electric E - West Texas Generation",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Electric E Power Marketing",
        "POI Location": "#11166 ENPOD 138kV",
        "County": "Loving",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-09T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 43.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-19T00:00:00",
        "Screening Study Started": "2024-10-18T00:00:00",
        "Screening Study Complete": "2025-01-10T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 937,
      "raw": {
        "INR": "26INR0530",
        "Project Name": "Longview Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Longview Wind, LLC",
        "POI Location": "Venturi (Bus #59923)",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 352.6,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2025-09-17T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0530",
        "Project Name": "Longview Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Longview Wind, LLC",
        "POI Location": "Venturi (Bus #59923)",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 352.6,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2025-09-17T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-09T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 938,
      "raw": {
        "INR": "26INR0531",
        "Project Name": "West Munday Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Lake Creek Wind, LLC",
        "POI Location": "Tap 345kV 60703 Gauss7D – 60712 Quasar",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 351.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-05T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0531",
        "Project Name": "West Munday Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Lake Creek Wind, LLC",
        "POI Location": "Tap 345kV 60703 Gauss7D – 60712 Quasar",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 351.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-05T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 939,
      "raw": {
        "INR": "26INR0537",
        "Project Name": "Comanche Creek generating station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longfellow Power LLC",
        "POI Location": "TNCENTRY1_1 [138 kV] ( 38431)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 107,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-23T00:00:00",
        "FIS Requested": "2024-06-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0537",
        "Project Name": "Comanche Creek generating station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longfellow Power LLC",
        "POI Location": "TNCENTRY1_1 [138 kV] ( 38431)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 107,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-23T00:00:00",
        "FIS Requested": "2024-06-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 940,
      "raw": {
        "INR": "26INR0545",
        "Project Name": "Knight Airport BESS I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Airport Storage I LLC",
        "POI Location": "Tap 138kV 48126 Gulfgate - 48199 Knight 06 and 42680 Garden Villas - 42770 Ashville 06",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 522.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0545",
        "Project Name": "Knight Airport BESS I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Airport Storage I LLC",
        "POI Location": "Tap 138kV 48126 Gulfgate - 48199 Knight 06 and 42680 Garden Villas - 42770 Ashville 06",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 522.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 941,
      "raw": {
        "INR": "26INR0546",
        "Project Name": "Hobby BESS I",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Airport Storage II LLC",
        "POI Location": "Double Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Villas – 48013 Chocolate Bayou",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 602.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-03T00:00:00",
        "FIS Requested": "2024-08-15T00:00:00",
        "FIS Approved": "2026-01-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0546",
        "Project Name": "Hobby BESS I",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Airport Storage II LLC",
        "POI Location": "Double Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Villas – 48013 Chocolate Bayou",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 602.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-03T00:00:00",
        "FIS Requested": "2024-08-15T00:00:00",
        "FIS Approved": "2026-01-20T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 942,
      "raw": {
        "INR": "26INR0548",
        "Project Name": "Burnet Bay Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "TOCE TX BESS 4, LLC",
        "POI Location": "tap 138kV 40390 Crosby - 40790 Haney",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-27T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-08T00:00:00",
        "FIS Requested": "2024-08-29T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0548",
        "Project Name": "Burnet Bay Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "TOCE TX BESS 4, LLC",
        "POI Location": "tap 138kV 40390 Crosby - 40790 Haney",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.83,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-27T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-08T00:00:00",
        "FIS Requested": "2024-08-29T00:00:00",
        "FIS Approved": "2026-02-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 943,
      "raw": {
        "INR": "26INR0550",
        "Project Name": "Grand Mesa BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PERRY GREEN POWER LLC",
        "POI Location": "76582 MESA VIEW SWITCH 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 253.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-02T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0550",
        "Project Name": "Grand Mesa BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PERRY GREEN POWER LLC",
        "POI Location": "76582 MESA VIEW SWITCH 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 253.28,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-02T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 944,
      "raw": {
        "INR": "26INR0551",
        "Project Name": "Hastings Park BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Brazos Roots BESS, LLC",
        "POI Location": "39010 138kV HASTINGS",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.34,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-08-02T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-01T00:00:00",
        "FIS Requested": "2024-08-09T00:00:00",
        "FIS Approved": "2025-03-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0551",
        "Project Name": "Hastings Park BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Brazos Roots BESS, LLC",
        "POI Location": "39010 138kV HASTINGS",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-02-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.34,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-08-02T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-01T00:00:00",
        "FIS Requested": "2024-08-09T00:00:00",
        "FIS Approved": "2025-03-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 945,
      "raw": {
        "INR": "26INR0555",
        "Project Name": "Desert Palm BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Desert Palm BESS, LLC",
        "POI Location": "78280 Bevo Substation 138 kV",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0555",
        "Project Name": "Desert Palm BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Desert Palm BESS, LLC",
        "POI Location": "78280 Bevo Substation 138 kV",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 946,
      "raw": {
        "INR": "26INR0556",
        "Project Name": "Wintergarden BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wintergarden BESS LLC",
        "POI Location": "8970 Catarina 138 kV \n\n",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-13T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-08-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0556",
        "Project Name": "Wintergarden BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wintergarden BESS LLC",
        "POI Location": "8970 Catarina 138 kV \n\n",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-13T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-08-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 947,
      "raw": {
        "INR": "26INR0559",
        "Project Name": "Georgia-Lynn BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Georgia Lynn BESS LLC",
        "POI Location": "80064 CHOCBAYU4A 138 kV",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 108.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-25T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-28T00:00:00",
        "FIS Requested": "2024-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0559",
        "Project Name": "Georgia-Lynn BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Georgia Lynn BESS LLC",
        "POI Location": "80064 CHOCBAYU4A 138 kV",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-02-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 108.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-25T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-28T00:00:00",
        "FIS Requested": "2024-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 948,
      "raw": {
        "INR": "26INR0560",
        "Project Name": "Fort Worth Power Core Bastrop Gas Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth Power Core LLC",
        "POI Location": "Tap 345kV 7042 ZORN - 7040 AUSTROP",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 506.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-05T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-22T00:00:00",
        "FIS Requested": "2025-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2024-12-20T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2025-11-19T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0560",
        "Project Name": "Fort Worth Power Core Bastrop Gas Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth Power Core LLC",
        "POI Location": "Tap 345kV 7042 ZORN - 7040 AUSTROP",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 506.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-05T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-22T00:00:00",
        "FIS Requested": "2025-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2024-12-20T00:00:00",
        "GHG Permit": null,
        "Water Availability": "2025-11-19T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 949,
      "raw": {
        "INR": "26INR0573",
        "Project Name": "Cummins BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Solar Development, LLC",
        "POI Location": "1333 MCDONALD 138kV\n",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-10T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-11-12T00:00:00",
        "FIS Requested": "2024-09-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0573",
        "Project Name": "Cummins BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Solar Development, LLC",
        "POI Location": "1333 MCDONALD 138kV\n",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.89,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-10T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-11-12T00:00:00",
        "FIS Requested": "2024-09-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 950,
      "raw": {
        "INR": "26INR0589",
        "Project Name": "Goat Mountain BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clearway Energy Group LLC",
        "POI Location": "76030-Gasconades Creek 345 kV\n",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0589",
        "Project Name": "Goat Mountain BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clearway Energy Group LLC",
        "POI Location": "76030-Gasconades Creek 345 kV\n",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 951,
      "raw": {
        "INR": "26INR0590",
        "Project Name": "Callisto ID Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "47170 (H_O_C__B138) 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-10T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0590",
        "Project Name": "Callisto ID Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "47170 (H_O_C__B138) 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-10T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 952,
      "raw": {
        "INR": "26INR0597",
        "Project Name": "Electric E - West Texas Generation 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Electric E Power Marketing",
        "POI Location": "#18664 SHAWPD 138kV",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0597",
        "Project Name": "Electric E - West Texas Generation 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Electric E Power Marketing",
        "POI Location": "#18664 SHAWPD 138kV",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 953,
      "raw": {
        "INR": "26INR0599",
        "Project Name": "Coda BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coda BESS, LLC",
        "POI Location": "(#80258) Mayo 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0599",
        "Project Name": "Coda BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coda BESS, LLC",
        "POI Location": "(#80258) Mayo 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 954,
      "raw": {
        "INR": "26INR0600",
        "Project Name": "Crocus Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Crocus Solar, LLC",
        "POI Location": "Tap 138 kV Gunsolas Creek Sub (1660) – Breckenridge Tap (1613)",
        "County": "Stephens",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 102,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-27T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0600",
        "Project Name": "Crocus Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Crocus Solar, LLC",
        "POI Location": "Tap 138 kV Gunsolas Creek Sub (1660) – Breckenridge Tap (1613)",
        "County": "Stephens",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 102,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-27T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 955,
      "raw": {
        "INR": "26INR0601",
        "Project Name": "Crocus Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Crocus Solar, LLC",
        "POI Location": "Tap 138 kV Gunsolas Creek Sub (1660) – Breckenridge Tap (1613)",
        "County": "Stephens",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-27T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0601",
        "Project Name": "Crocus Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Crocus Solar, LLC",
        "POI Location": "Tap 138 kV Gunsolas Creek Sub (1660) – Breckenridge Tap (1613)",
        "County": "Stephens",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-27T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 956,
      "raw": {
        "INR": "26INR0602",
        "Project Name": "Damia Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Damia Solar, LLC",
        "POI Location": "Tap 138kV 6317 Cisco - 3545 MTNBRANCH_8 ",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0602",
        "Project Name": "Damia Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Damia Solar, LLC",
        "POI Location": "Tap 138kV 6317 Cisco - 3545 MTNBRANCH_8 ",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 957,
      "raw": {
        "INR": "26INR0603",
        "Project Name": "Damia Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Damia Solar, LLC",
        "POI Location": "Tap 138kV 6317 Cisco - 3545 MTNBRANCH_8 ",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 306,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0603",
        "Project Name": "Damia Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Damia Solar, LLC",
        "POI Location": "Tap 138kV 6317 Cisco - 3545 MTNBRANCH_8 ",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 306,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 958,
      "raw": {
        "INR": "26INR0605",
        "Project Name": "White Bright BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VLN, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – Anna Switch 2373",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 313.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-12T00:00:00",
        "Screening Study Started": "2025-03-21T00:00:00",
        "Screening Study Complete": "2025-06-17T00:00:00",
        "FIS Requested": "2024-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0605",
        "Project Name": "White Bright BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "VLN, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – Anna Switch 2373",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 313.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-12T00:00:00",
        "Screening Study Started": "2025-03-21T00:00:00",
        "Screening Study Complete": "2025-06-17T00:00:00",
        "FIS Requested": "2024-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 959,
      "raw": {
        "INR": "26INR0609",
        "Project Name": "Scorpius Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ben Milam Solar 4",
        "POI Location": "3377 LTPSW 345KV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-19T00:00:00",
        "Screening Study Started": "2024-12-16T00:00:00",
        "Screening Study Complete": "2025-03-03T00:00:00",
        "FIS Requested": "2024-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0609",
        "Project Name": "Scorpius Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ben Milam Solar 4",
        "POI Location": "3377 LTPSW 345KV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-19T00:00:00",
        "Screening Study Started": "2024-12-16T00:00:00",
        "Screening Study Complete": "2025-03-03T00:00:00",
        "FIS Requested": "2024-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 960,
      "raw": {
        "INR": "26INR0611",
        "Project Name": "Goat Mountain BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clearway Energy Group LLC",
        "POI Location": "76030-Gasconades Creek 345 kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0611",
        "Project Name": "Goat Mountain BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Clearway Energy Group LLC",
        "POI Location": "76030-Gasconades Creek 345 kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 961,
      "raw": {
        "INR": "26INR0612",
        "Project Name": "Clay County Yang Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-CCY, LLC",
        "POI Location": " 1458 Cobb Switching Station 345 kV",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 307.51,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-12-20T00:00:00",
        "Screening Study Started": "2024-12-26T00:00:00",
        "Screening Study Complete": "2025-03-19T00:00:00",
        "FIS Requested": "2024-12-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0612",
        "Project Name": "Clay County Yang Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-CCY, LLC",
        "POI Location": " 1458 Cobb Switching Station 345 kV",
        "County": "Clay",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 307.51,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-12-20T00:00:00",
        "Screening Study Started": "2024-12-26T00:00:00",
        "Screening Study Complete": "2025-03-19T00:00:00",
        "FIS Requested": "2024-12-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 962,
      "raw": {
        "INR": "26INR0613",
        "Project Name": "Wichita County Mawson Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-WCM, LLC",
        "POI Location": "Tap 345kV Fisher Road Switch (#1425) – Riley (#6101) Line",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0613",
        "Project Name": "Wichita County Mawson Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-WCM, LLC",
        "POI Location": "Tap 345kV Fisher Road Switch (#1425) – Riley (#6101) Line",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 963,
      "raw": {
        "INR": "26INR0614",
        "Project Name": "Bell County Leifester Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-BCRCML, LLC",
        "POI Location": "Tap 138kV 3428 Killeen South – 13628 Founders Trail Sub",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0614",
        "Project Name": "Bell County Leifester Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-BCRCML, LLC",
        "POI Location": "Tap 138kV 3428 Killeen South – 13628 Founders Trail Sub",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 964,
      "raw": {
        "INR": "26INR0615",
        "Project Name": "Bell County Morgan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-BCTRM, LLC",
        "POI Location": "To Tap 138 kV Trimmier Substation (Bus# 136)",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0615",
        "Project Name": "Bell County Morgan Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-BCTRM, LLC",
        "POI Location": "To Tap 138 kV Trimmier Substation (Bus# 136)",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 965,
      "raw": {
        "INR": "26INR0616",
        "Project Name": "Blanco County Behrends Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-BCB, LLC",
        "POI Location": "#70482 Blanco Substation 138 kV - currently being upgraded",
        "County": "Blanco",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0616",
        "Project Name": "Blanco County Behrends Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-BCB, LLC",
        "POI Location": "#70482 Blanco Substation 138 kV - currently being upgraded",
        "County": "Blanco",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 966,
      "raw": {
        "INR": "26INR0617",
        "Project Name": "Knox County Moore Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-KCM, LLC",
        "POI Location": "6110 Munday East Substation 138kV",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0617",
        "Project Name": "Knox County Moore Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DM-KCM, LLC",
        "POI Location": "6110 Munday East Substation 138kV",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 967,
      "raw": {
        "INR": "26INR0618",
        "Project Name": "Taylor County Paul Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "DM-TCP, LLC",
        "POI Location": "6260 Abilene South Substation 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-05T00:00:00",
        "FIS Approved": "2026-04-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0618",
        "Project Name": "Taylor County Paul Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "DM-TCP, LLC",
        "POI Location": "6260 Abilene South Substation 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-05T00:00:00",
        "FIS Approved": "2026-04-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 968,
      "raw": {
        "INR": "26INR0619",
        "Project Name": "Bonham Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "J&J Solar Ranch LLC",
        "POI Location": "Tap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-16T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0619",
        "Project Name": "Bonham Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "J&J Solar Ranch LLC",
        "POI Location": "Tap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-16T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 969,
      "raw": {
        "INR": "26INR0621",
        "Project Name": "Juno 3 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Juno Solar 3",
        "POI Location": "#59916 Buck Canyon 345kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-18T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0621",
        "Project Name": "Juno 3 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Juno Solar 3",
        "POI Location": "#59916 Buck Canyon 345kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-18T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 970,
      "raw": {
        "INR": "26INR0622",
        "Project Name": "Buffalo Gap 1 Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Gap Wind Farm, LLC",
        "POI Location": "6216 Bluff Creek Substation 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 120.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-10T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2005-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-05-05T00:00:00",
        "Unnamed: 25": "2026-05-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0622",
        "Project Name": "Buffalo Gap 1 Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Gap Wind Farm, LLC",
        "POI Location": "6216 Bluff Creek Substation 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 120.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-10T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2005-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-05-05T00:00:00",
        "Unnamed: 25": "2026-05-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 971,
      "raw": {
        "INR": "26INR0625",
        "Project Name": "Buffalo Gap 2 Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Gap Wind Farm 2, LLC",
        "POI Location": "6216 Bluff Creek 138 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 231.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-03T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-11-26T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2005-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-05-05T00:00:00",
        "Unnamed: 25": "2026-05-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0625",
        "Project Name": "Buffalo Gap 2 Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Gap Wind Farm 2, LLC",
        "POI Location": "6216 Bluff Creek 138 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 231.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-03T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-11-26T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2005-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-05-05T00:00:00",
        "Unnamed: 25": "2026-05-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 972,
      "raw": {
        "INR": "26INR0626",
        "Project Name": "Buffalo Gap 3 Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Gap Wind Farm 3, LLC",
        "POI Location": "6216 Bluff_Creek 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 168.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-12-03T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-20T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2005-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-05-05T00:00:00",
        "Unnamed: 25": "2026-05-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0626",
        "Project Name": "Buffalo Gap 3 Wind Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Buffalo Gap Wind Farm 3, LLC",
        "POI Location": "6216 Bluff_Creek 138kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 168.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-12-03T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-20T00:00:00",
        "FIS Approved": "2026-03-17T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2005-02-28T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": "2026-05-05T00:00:00",
        "Unnamed: 25": "2026-05-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 973,
      "raw": {
        "INR": "26INR0630",
        "Project Name": "Betel Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BETEL STORAGE I",
        "POI Location": "3377 Little Pond Switch ( LTPSW) 345",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0630",
        "Project Name": "Betel Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BETEL STORAGE I",
        "POI Location": "3377 Little Pond Switch ( LTPSW) 345",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 974,
      "raw": {
        "INR": "26INR0632",
        "Project Name": "Dempsey Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dempsey Solar LLC",
        "POI Location": "Tap 138 KV Ridge (#37)-Robertson (#32) line; BEPC",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 245.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0632",
        "Project Name": "Dempsey Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dempsey Solar LLC",
        "POI Location": "Tap 138 KV Ridge (#37)-Robertson (#32) line; BEPC",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 245.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 975,
      "raw": {
        "INR": "26INR0633",
        "Project Name": "Betel Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BETEL STORAGE II",
        "POI Location": "3377 Little Pond 345",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0633",
        "Project Name": "Betel Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BETEL STORAGE II",
        "POI Location": "3377 Little Pond 345",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 976,
      "raw": {
        "INR": "26INR0635",
        "Project Name": "Aquila Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ben Milam Solar 5",
        "POI Location": "3706 Gibson Switch 345kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-05T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0635",
        "Project Name": "Aquila Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ben Milam Solar 5",
        "POI Location": "3706 Gibson Switch 345kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-05T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 977,
      "raw": {
        "INR": "26INR0636",
        "Project Name": "Lyra Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "JUNO BESS I",
        "POI Location": "345kV MULESHOE (#59922)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0636",
        "Project Name": "Lyra Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "JUNO BESS I",
        "POI Location": "345kV MULESHOE (#59922)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 978,
      "raw": {
        "INR": "26INR0640",
        "Project Name": "Amberjack2 BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hunt Energy Network, LLC",
        "POI Location": "79501 KINGFISHER 345KV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-26T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-05-03T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0640",
        "Project Name": "Amberjack2 BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hunt Energy Network, LLC",
        "POI Location": "79501 KINGFISHER 345KV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-04-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-26T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-05-03T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 979,
      "raw": {
        "INR": "26INR0647",
        "Project Name": "Wake Wind Energy Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "WAKE WIND ENERGY",
        "POI Location": "59904 Cottonwood 345",
        "County": "Crosby",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-06-04T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 252.5,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-15T00:00:00",
        "FIS Requested": "2025-04-17T00:00:00",
        "FIS Approved": "2026-06-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2014-02-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-08-03T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0647",
        "Project Name": "Wake Wind Energy Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "WAKE WIND ENERGY",
        "POI Location": "59904 Cottonwood 345",
        "County": "Crosby",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-06-04T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 252.5,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-15T00:00:00",
        "FIS Requested": "2025-04-17T00:00:00",
        "FIS Approved": "2026-06-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2014-02-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-08-03T00:00:00",
        "Meets All Planning": "2026-08-03T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 980,
      "raw": {
        "INR": "26INR0654",
        "Project Name": "Great Hambino BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Atascosa BESS, LLC",
        "POI Location": "#5700 Miracle Lake Substation 138kV ",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-09-11T00:00:00",
        "Screening Study Complete": "2025-11-12T00:00:00",
        "FIS Requested": "2025-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0654",
        "Project Name": "Great Hambino BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Atascosa BESS, LLC",
        "POI Location": "#5700 Miracle Lake Substation 138kV ",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-09-11T00:00:00",
        "Screening Study Complete": "2025-11-12T00:00:00",
        "FIS Requested": "2025-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 981,
      "raw": {
        "INR": "26INR0664",
        "Project Name": "Coleto Creek - Fuel Change Only",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "COLETO CREEK POWER LLC",
        "POI Location": "8162 Coleto Creek 138kV",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "ST",
        "Capacity (MW)": 655,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0664",
        "Project Name": "Coleto Creek - Fuel Change Only",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "COLETO CREEK POWER LLC",
        "POI Location": "8162 Coleto Creek 138kV",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "ST",
        "Capacity (MW)": 655,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 982,
      "raw": {
        "INR": "26INR0685",
        "Project Name": "Exergy Energy West Texas Natural Gas Reciprocating Power I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "August Partners LLC",
        "POI Location": "38095 TNJACKRBT1 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-10T00:00:00",
        "Screening Study Started": "2025-07-22T00:00:00",
        "Screening Study Complete": "2025-10-09T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0685",
        "Project Name": "Exergy Energy West Texas Natural Gas Reciprocating Power I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "August Partners LLC",
        "POI Location": "38095 TNJACKRBT1 138kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-10T00:00:00",
        "Screening Study Started": "2025-07-22T00:00:00",
        "Screening Study Complete": "2025-10-09T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 983,
      "raw": {
        "INR": "26INR0686",
        "Project Name": "Zeus Mitchell BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zeus Mitchell BESS II, LLC",
        "POI Location": "Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1042.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-20T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-05-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0686",
        "Project Name": "Zeus Mitchell BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zeus Mitchell BESS II, LLC",
        "POI Location": "Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1042.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-20T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-05-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 984,
      "raw": {
        "INR": "26INR0700",
        "Project Name": "Key City Battery Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Key City Battery Storage LLC",
        "POI Location": "6235 Abilene Mulberry Creek 345",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-13T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2026-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0700",
        "Project Name": "Key City Battery Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Key City Battery Storage LLC",
        "POI Location": "6235 Abilene Mulberry Creek 345",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-13T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2026-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 985,
      "raw": {
        "INR": "26INR0701",
        "Project Name": "Key City Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Key City Solar LLC",
        "POI Location": "6235 Abilene Mulberry Creek 345",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 989.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-10T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2026-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0701",
        "Project Name": "Key City Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Key City Solar LLC",
        "POI Location": "6235 Abilene Mulberry Creek 345",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 989.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-10T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2026-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 986,
      "raw": {
        "INR": "26INR0715",
        "Project Name": "Tierra Bonita BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood II BESS LLC",
        "POI Location": "860 GIRVINSW 345kV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-30T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0715",
        "Project Name": "Tierra Bonita BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood II BESS LLC",
        "POI Location": "860 GIRVINSW 345kV ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-30T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 987,
      "raw": {
        "INR": "26INR0718",
        "Project Name": "PHOTON SOLAR REPOWERING",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-30T00:00:00",
        "Screening Study Started": "2025-10-13T00:00:00",
        "Screening Study Complete": "2025-12-23T00:00:00",
        "FIS Requested": "2025-10-02T00:00:00",
        "FIS Approved": "2026-09-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-25T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0718",
        "Project Name": "PHOTON SOLAR REPOWERING",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-30T00:00:00",
        "Screening Study Started": "2025-10-13T00:00:00",
        "Screening Study Complete": "2025-12-23T00:00:00",
        "FIS Requested": "2025-10-02T00:00:00",
        "FIS Approved": "2026-09-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2021-02-25T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 988,
      "raw": {
        "INR": "26INR0724",
        "Project Name": "Monahans Power Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Liberty Power Innovations LLC",
        "POI Location": "Tap #1107 Monahans Tap 2 to #11117 Pecos Trail 138kV\n\n",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 18.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-29T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2026-05-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0724",
        "Project Name": "Monahans Power Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Liberty Power Innovations LLC",
        "POI Location": "Tap #1107 Monahans Tap 2 to #11117 Pecos Trail 138kV\n\n",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 18.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-29T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2026-05-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 989,
      "raw": {
        "INR": "26INR0725",
        "Project Name": "PHOTON BESS REPOWERING",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 305.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-21T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2025-12-23T00:00:00",
        "FIS Requested": "2025-10-07T00:00:00",
        "FIS Approved": "2026-09-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0725",
        "Project Name": "PHOTON BESS REPOWERING",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GulfStar Power, LLC",
        "POI Location": "44880 Waterh_POI_5 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 305.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-21T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2025-12-23T00:00:00",
        "FIS Requested": "2025-10-07T00:00:00",
        "FIS Approved": "2026-09-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 990,
      "raw": {
        "INR": "26INR0726",
        "Project Name": "Roadrunner Crossing Wind (Uprate)",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Roadrunner Wind, LLC",
        "POI Location": "68051 Reata 345kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 7.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-04T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-10T00:00:00",
        "FIS Approved": "2026-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-30T00:00:00",
        "Meets All Planning": "2026-07-30T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "26INR0726",
        "Project Name": "Roadrunner Crossing Wind (Uprate)",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Roadrunner Wind, LLC",
        "POI Location": "68051 Reata 345kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 7.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-04T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-10T00:00:00",
        "FIS Approved": "2026-06-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-30T00:00:00",
        "Meets All Planning": "2026-07-30T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 991,
      "raw": {
        "INR": "27INR0002",
        "Project Name": "Puerto Del Sol 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PUERTO DEL SOL, LLC",
        "POI Location": "Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-28T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2023-01-30T17:14:19",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0002",
        "Project Name": "Puerto Del Sol 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PUERTO DEL SOL, LLC",
        "POI Location": "Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-28T00:00:00",
        "Screening Study Started": "2022-05-16T00:00:00",
        "Screening Study Complete": "2022-08-13T00:00:00",
        "FIS Requested": "2023-01-30T17:14:19",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 992,
      "raw": {
        "INR": "27INR0003",
        "Project Name": "Becerra Creek Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bordas Renewable Energy, LLC",
        "POI Location": "345 kV Cenizo Substation (#80220)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-19T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-09-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0003",
        "Project Name": "Becerra Creek Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bordas Renewable Energy, LLC",
        "POI Location": "345 kV Cenizo Substation (#80220)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-09-19T00:00:00",
        "Screening Study Started": "2022-09-21T00:00:00",
        "Screening Study Complete": "2022-12-19T00:00:00",
        "FIS Requested": "2022-09-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 993,
      "raw": {
        "INR": "27INR0004",
        "Project Name": "Dundee West Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 2, LLC",
        "POI Location": "345 kV Riley Substation (#6101); AEP",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 146.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0004",
        "Project Name": "Dundee West Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 2, LLC",
        "POI Location": "345 kV Riley Substation (#6101); AEP",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 146.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 994,
      "raw": {
        "INR": "27INR0005",
        "Project Name": "Dundee East A Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 2, LLC",
        "POI Location": "345 kV Riley Substation  (#6101); AEP",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 524,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0005",
        "Project Name": "Dundee East A Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 2, LLC",
        "POI Location": "345 kV Riley Substation  (#6101); AEP",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 524,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 995,
      "raw": {
        "INR": "27INR0007",
        "Project Name": "Felix East Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 1, LLC",
        "POI Location": "The 345 kV Riley Substation (#6101); AEP",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0007",
        "Project Name": "Felix East Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 1, LLC",
        "POI Location": "The 345 kV Riley Substation (#6101); AEP",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 996,
      "raw": {
        "INR": "27INR0009",
        "Project Name": "Felix Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Felix 1, LLC",
        "POI Location": "The 345 kV Riley Substation (#6101); AEP",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0009",
        "Project Name": "Felix Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Felix 1, LLC",
        "POI Location": "The 345 kV Riley Substation (#6101); AEP",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2022-12-28T00:00:00",
        "Screening Study Started": "2023-01-03T00:00:00",
        "Screening Study Complete": "2023-03-30T00:00:00",
        "FIS Requested": "2022-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 997,
      "raw": {
        "INR": "27INR0011",
        "Project Name": "Dundee East B Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 2, LLC",
        "POI Location": "345 kV Riley Substation (#6101); AEP",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 261.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0011",
        "Project Name": "Dundee East B Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 2, LLC",
        "POI Location": "345 kV Riley Substation (#6101); AEP",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 261.45,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 998,
      "raw": {
        "INR": "27INR0012",
        "Project Name": "Felix West Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 1, LLC",
        "POI Location": "6101 Riley 345 kV ",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0012",
        "Project Name": "Felix West Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Felix 1, LLC",
        "POI Location": "6101 Riley 345 kV ",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-01-06T00:00:00",
        "Screening Study Started": "2023-01-17T00:00:00",
        "Screening Study Complete": "2023-04-14T00:00:00",
        "FIS Requested": "2023-01-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-02-21T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-04-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 999,
      "raw": {
        "INR": "27INR0014",
        "Project Name": "Kit Fox Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kit Fox Storage, LLC",
        "POI Location": "Walton Switch (6899) 138KV",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0014",
        "Project Name": "Kit Fox Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kit Fox Storage, LLC",
        "POI Location": "Walton Switch (6899) 138KV",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-08T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1000,
      "raw": {
        "INR": "27INR0022",
        "Project Name": "Panhandle Flagship Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005)",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 439.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0022",
        "Project Name": "Panhandle Flagship Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005)",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 439.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1001,
      "raw": {
        "INR": "27INR0023",
        "Project Name": "Panhandle Flagship Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005).\nStation 2 (27INR0023) connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 (27INR0022 & 27INR0025) connects to POIB via 22.5 mile tie-line",
        "County": "Hutchinson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 304.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0023",
        "Project Name": "Panhandle Flagship Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005).\nStation 2 (27INR0023) connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 (27INR0022 & 27INR0025) connects to POIB via 22.5 mile tie-line",
        "County": "Hutchinson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 304.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1002,
      "raw": {
        "INR": "27INR0024",
        "Project Name": "Panhandle Flagship Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024) connects to Station 2 (27INR0023) via a 4.4 mile internal tie line. Station 2 connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 connects to POI",
        "County": "Hutchinson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 260.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0024",
        "Project Name": "Panhandle Flagship Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005).Station 3 (27INR0024) connects to Station 2 (27INR0023) via a 4.4 mile internal tie line. Station 2 connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 connects to POI",
        "County": "Hutchinson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 260.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1003,
      "raw": {
        "INR": "27INR0025",
        "Project Name": "Panhandle Flagship Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005)",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 371.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2026-01-30T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0025",
        "Project Name": "Panhandle Flagship Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Panhandle Solar Group Operating Company LLC",
        "POI Location": "345 kV Railhead Substation (RAILHEAD #79005)",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2031-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 371.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-09T00:00:00",
        "Screening Study Started": "2023-03-13T00:00:00",
        "Screening Study Complete": "2023-06-09T00:00:00",
        "FIS Requested": "2023-02-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2026-01-30T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1004,
      "raw": {
        "INR": "27INR0029",
        "Project Name": "Short Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Solar I, LLC",
        "POI Location": "Tap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-12T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-05-07T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0029",
        "Project Name": "Short Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Solar I, LLC",
        "POI Location": "Tap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-12T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-14T00:00:00",
        "FIS Requested": "2023-04-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-05-07T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1005,
      "raw": {
        "INR": "27INR0040",
        "Project Name": "Solar Star Rhome Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Solar Star Rhome Storage",
        "POI Location": "576 RHOME 138kV",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 226.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-17T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-08-04T00:00:00",
        "FIS Approved": "2025-07-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0040",
        "Project Name": "Solar Star Rhome Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Solar Star Rhome Storage",
        "POI Location": "576 RHOME 138kV",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 226.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-17T00:00:00",
        "Screening Study Started": "2023-04-19T00:00:00",
        "Screening Study Complete": "2023-07-12T00:00:00",
        "FIS Requested": "2023-08-04T00:00:00",
        "FIS Approved": "2025-07-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1006,
      "raw": {
        "INR": "27INR0047",
        "Project Name": "Sunscape Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunscape Renewable Energy LLC",
        "POI Location": "Bus# 8455 Lon C Hill to Bus# 80078 Reforzar 345 kV Line",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 522.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-14T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-07-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0047",
        "Project Name": "Sunscape Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunscape Renewable Energy LLC",
        "POI Location": "Bus# 8455 Lon C Hill to Bus# 80078 Reforzar 345 kV Line",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 522.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-14T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-07-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1007,
      "raw": {
        "INR": "27INR0048",
        "Project Name": "Sunscape Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunscape Renewable Energy LLC",
        "POI Location": "Tap 345kV 8455 Lon C Hill -- 80078 Reforzar",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-06T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-07-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0048",
        "Project Name": "Sunscape Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sunscape Renewable Energy LLC",
        "POI Location": "Tap 345kV 8455 Lon C Hill -- 80078 Reforzar",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-06T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-20T00:00:00",
        "FIS Requested": "2023-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-07-18T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": "2025-08-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1008,
      "raw": {
        "INR": "27INR0049",
        "Project Name": "Darkwood Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mustang Creek Solar, LLC",
        "POI Location": "Tap 345KV 1900 Comanche Peak to 1440 Comanche SS ",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-11-09T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0049",
        "Project Name": "Darkwood Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mustang Creek Solar, LLC",
        "POI Location": "Tap 345KV 1900 Comanche Peak to 1440 Comanche SS ",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-11-09T00:00:00",
        "FIS Approved": "2026-09-17T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1009,
      "raw": {
        "INR": "27INR0050",
        "Project Name": "Darkwood BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mustang Creek Solar, LLC",
        "POI Location": "Tap 345KV 1900 Comanche Peak - 1440 Comanche Switch",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-10-31T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0050",
        "Project Name": "Darkwood BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Mustang Creek Solar, LLC",
        "POI Location": "Tap 345KV 1900 Comanche Peak - 1440 Comanche Switch",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-09T00:00:00",
        "Screening Study Started": "2023-06-07T00:00:00",
        "Screening Study Complete": "2023-09-01T00:00:00",
        "FIS Requested": "2023-10-31T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-11-05T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1010,
      "raw": {
        "INR": "27INR0056",
        "Project Name": "Laurel Wind Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LAUREL ENERGY CENTER, LLC",
        "POI Location": "Tap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 and\nTap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 1",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 306.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0056",
        "Project Name": "Laurel Wind Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LAUREL ENERGY CENTER, LLC",
        "POI Location": "Tap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 and\nTap Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 1",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 306.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2023-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-25T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1011,
      "raw": {
        "INR": "27INR0061",
        "Project Name": "Hecate Energy Orem Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy LLC",
        "POI Location": "42530 Jones Creek 345kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1542,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2024-06-14T21:30:56",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0061",
        "Project Name": "Hecate Energy Orem Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy LLC",
        "POI Location": "42530 Jones Creek 345kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1542,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-27T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2024-06-14T21:30:56",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1012,
      "raw": {
        "INR": "27INR0063",
        "Project Name": "Supra Wind  ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "Tap #6101 Riley 7A to #60505 Edithcla 7B 345kV\n",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 205.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-05T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2023-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0063",
        "Project Name": "Supra Wind  ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "Tap #6101 Riley 7A to #60505 Edithcla 7B 345kV\n",
        "County": "Hardeman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 205.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-05T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-05T00:00:00",
        "FIS Requested": "2023-06-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1013,
      "raw": {
        "INR": "27INR0071",
        "Project Name": "Sandow Lakes Energy Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SL Energy Power Plant I, LLC",
        "POI Location": "#13430 Sandow Switch 138kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1291.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0071",
        "Project Name": "Sandow Lakes Energy Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SL Energy Power Plant I, LLC",
        "POI Location": "#13430 Sandow Switch 138kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1291.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-20T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1014,
      "raw": {
        "INR": "27INR0074",
        "Project Name": "Desert Hill Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings",
        "POI Location": "Tap 138kV El Capitan (#10179) - Black River (#1096).",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-07T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2026-04-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0074",
        "Project Name": "Desert Hill Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings",
        "POI Location": "Tap 138kV El Capitan (#10179) - Black River (#1096).",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-07T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2026-04-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1015,
      "raw": {
        "INR": "27INR0076",
        "Project Name": "Bob Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "59902 Sand Bluff 345kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 239.47,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-06-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0076",
        "Project Name": "Bob Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "59902 Sand Bluff 345kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 239.47,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-06-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1016,
      "raw": {
        "INR": "27INR0077",
        "Project Name": "Cuchillas BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Two",
        "POI Location": "80219 Lobo 345kV",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-17T00:00:00",
        "Screening Study Started": "2023-09-26T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2023-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0077",
        "Project Name": "Cuchillas BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gransolar Texas Two",
        "POI Location": "80219 Lobo 345kV",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-17T00:00:00",
        "Screening Study Started": "2023-09-26T00:00:00",
        "Screening Study Complete": "2023-12-20T00:00:00",
        "FIS Requested": "2023-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1017,
      "raw": {
        "INR": "27INR0082",
        "Project Name": "Orbit Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GCI Orbit Energy Storage, LLC",
        "POI Location": "Tap 345 kV Calaveras Power Station (BUS #5400) to VON_ROSE (BUS #5475)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 501.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-29T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0082",
        "Project Name": "Orbit Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GCI Orbit Energy Storage, LLC",
        "POI Location": "Tap 345 kV Calaveras Power Station (BUS #5400) to VON_ROSE (BUS #5475)",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 501.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-11-30T00:00:00",
        "Screening Study Complete": "2024-02-29T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1018,
      "raw": {
        "INR": "27INR0083",
        "Project Name": "Spinner Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GCI Wolf Energy Storage, LLC",
        "POI Location": "8196 Poesta Substation 138kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-05T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-09T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": "2026-01-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0083",
        "Project Name": "Spinner Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "GCI Wolf Energy Storage, LLC",
        "POI Location": "8196 Poesta Substation 138kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-05T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-09T00:00:00",
        "FIS Requested": "2023-09-27T00:00:00",
        "FIS Approved": "2026-01-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1019,
      "raw": {
        "INR": "27INR0084",
        "Project Name": "Aegle Power",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aegle Power LLC ",
        "POI Location": "(#79501) Kingfisher 345 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1536.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-03T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0084",
        "Project Name": "Aegle Power",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aegle Power LLC ",
        "POI Location": "(#79501) Kingfisher 345 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-07-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1536.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-03T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1020,
      "raw": {
        "INR": "27INR0085",
        "Project Name": "Eagle Claw Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Eagle Claw Energy Center, LLC",
        "POI Location": "Singleton (Bus #44645) - Zenith (Bus #44900) Circuit #99 345 kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-28T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-10-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0085",
        "Project Name": "Eagle Claw Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Eagle Claw Energy Center, LLC",
        "POI Location": "Singleton (Bus #44645) - Zenith (Bus #44900) Circuit #99 345 kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-09-28T00:00:00",
        "Screening Study Started": "2023-10-13T00:00:00",
        "Screening Study Complete": "2024-01-10T00:00:00",
        "FIS Requested": "2023-10-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1021,
      "raw": {
        "INR": "27INR0091",
        "Project Name": "Oak Tree Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Live Oak Energy Storage, LLC",
        "POI Location": "Tap Shaula (#5380) – South Texas (#5915) ",
        "County": "Lavaca",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-09-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-14T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-02-21T00:00:00",
        "FIS Requested": "2023-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-05-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0091",
        "Project Name": "Oak Tree Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Live Oak Energy Storage, LLC",
        "POI Location": "Tap Shaula (#5380) – South Texas (#5915) ",
        "County": "Lavaca",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-09-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-14T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-02-21T00:00:00",
        "FIS Requested": "2023-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-05-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1022,
      "raw": {
        "INR": "27INR0092",
        "Project Name": "Pecan BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Gransolar Texas Three LLC",
        "POI Location": "(PSSE BUS# 47) HILTOPLKS8 138kV ",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-11T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0092",
        "Project Name": "Pecan BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Gransolar Texas Three LLC",
        "POI Location": "(PSSE BUS# 47) HILTOPLKS8 138kV ",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-11T00:00:00",
        "Screening Study Started": "2023-10-25T00:00:00",
        "Screening Study Complete": "2024-01-22T00:00:00",
        "FIS Requested": "2023-10-12T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1023,
      "raw": {
        "INR": "27INR0093",
        "Project Name": "Guadalupe Battery Storage Project ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guadalupe Power Partners, LP  ",
        "POI Location": "# 7044 Marion 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-02T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-08T00:00:00",
        "FIS Requested": "2024-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0093",
        "Project Name": "Guadalupe Battery Storage Project ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guadalupe Power Partners, LP  ",
        "POI Location": "# 7044 Marion 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-02T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-08T00:00:00",
        "FIS Requested": "2024-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1024,
      "raw": {
        "INR": "27INR0095",
        "Project Name": "Bulldog Power (TEF - Due Diligence) ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Bulldog Power LLC",
        "POI Location": "39703 TNMP FM524 Substation 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-18T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 311,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-08T00:00:00",
        "FIS Requested": "2023-11-08T00:00:00",
        "FIS Approved": "2026-03-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0095",
        "Project Name": "Bulldog Power (TEF - Due Diligence) ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Bulldog Power LLC",
        "POI Location": "39703 TNMP FM524 Substation 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-18T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 311,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-08T00:00:00",
        "FIS Requested": "2023-11-08T00:00:00",
        "FIS Approved": "2026-03-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1025,
      "raw": {
        "INR": "27INR0096",
        "Project Name": "Rubicon Power BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rubicon Power LLC",
        "POI Location": "39703 TNMP FM524 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-08T00:00:00",
        "FIS Requested": "2023-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0096",
        "Project Name": "Rubicon Power BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rubicon Power LLC",
        "POI Location": "39703 TNMP FM524 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-13T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-02-08T00:00:00",
        "FIS Requested": "2023-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1026,
      "raw": {
        "INR": "27INR0097",
        "Project Name": "JUNIPERUS BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BLUE STONE RENEWABLE XXI LLC",
        "POI Location": "Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 169.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-05T00:00:00",
        "Screening Study Started": "2023-10-30T00:00:00",
        "Screening Study Complete": "2024-01-26T00:00:00",
        "FIS Requested": "2024-07-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0097",
        "Project Name": "JUNIPERUS BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BLUE STONE RENEWABLE XXI LLC",
        "POI Location": "Tap 345kV Cash Switch (bus# 2464) - Sandy Ranch Switch (bus# 2621)",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 169.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-05T00:00:00",
        "Screening Study Started": "2023-10-30T00:00:00",
        "Screening Study Complete": "2024-01-26T00:00:00",
        "FIS Requested": "2024-07-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1027,
      "raw": {
        "INR": "27INR0102",
        "Project Name": "Cottonseed Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cottonseed Energy Storage LLC",
        "POI Location": "South Lane City and PSEE # is 43190",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-01T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": "2024-08-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0102",
        "Project Name": "Cottonseed Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cottonseed Energy Storage LLC",
        "POI Location": "South Lane City and PSEE # is 43190",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-01T00:00:00",
        "Screening Study Started": "2023-11-14T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2023-11-02T00:00:00",
        "FIS Approved": "2024-08-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1028,
      "raw": {
        "INR": "27INR0105",
        "Project Name": "Starlight Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mills Tx Solar LLC",
        "POI Location": "tap the 138 kV Goldthwaite (#7070) – San Saba Switch (#77074) ",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-05-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 130.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-06T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0105",
        "Project Name": "Starlight Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mills Tx Solar LLC",
        "POI Location": "tap the 138 kV Goldthwaite (#7070) – San Saba Switch (#77074) ",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-05-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 130.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-06T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1029,
      "raw": {
        "INR": "27INR0107",
        "Project Name": "Starlight Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mills Tx Solar LLC",
        "POI Location": "Tap 138kV 7070 Goldthwaite – 77074 San Saba Switch",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-05-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.96,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-02-16T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0107",
        "Project Name": "Starlight Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Mills Tx Solar LLC",
        "POI Location": "Tap 138kV 7070 Goldthwaite – 77074 San Saba Switch",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-05-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.96,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-02-16T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-02-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1030,
      "raw": {
        "INR": "27INR0108",
        "Project Name": "Paint Rock Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Paint Rock Wind, LLC",
        "POI Location": "Amos Creek (7077) – Bow Wood (76006)",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 379.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-06T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2023-12-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0108",
        "Project Name": "Paint Rock Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Paint Rock Wind, LLC",
        "POI Location": "Amos Creek (7077) – Bow Wood (76006)",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 379.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-06T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2023-12-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-24T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1031,
      "raw": {
        "INR": "27INR0109",
        "Project Name": "Two Barbaras BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Two Barbaras BESS",
        "POI Location": "Tap 138 kV Pinehurst (#46240) – Mill Creek (#44850) Line",
        "County": "Montgomery",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-01-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 217.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-15T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0109",
        "Project Name": "Two Barbaras BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Two Barbaras BESS",
        "POI Location": "Tap 138 kV Pinehurst (#46240) – Mill Creek (#44850) Line",
        "County": "Montgomery",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-01-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 217.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-15T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-10-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1032,
      "raw": {
        "INR": "27INR0111",
        "Project Name": "Malachite Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Malachite Solar LLC",
        "POI Location": "The 345 kV Hillje (#44200) – Holman (#9073) Line; AEN. ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 184.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-31T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-01-25T00:00:00",
        "FIS Approved": "2025-11-04T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0111",
        "Project Name": "Malachite Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Malachite Solar LLC",
        "POI Location": "The 345 kV Hillje (#44200) – Holman (#9073) Line; AEN. ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 184.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-31T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-22T00:00:00",
        "FIS Requested": "2024-01-25T00:00:00",
        "FIS Approved": "2025-11-04T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1033,
      "raw": {
        "INR": "27INR0112",
        "Project Name": "Malachite BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Malachite Storage LLC",
        "POI Location": "Tap 345 kV 44200 Hillje – 9073 Holman ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 191.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-07-22T00:00:00",
        "FIS Requested": "2024-05-15T00:00:00",
        "FIS Approved": "2025-11-04T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0112",
        "Project Name": "Malachite BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Malachite Storage LLC",
        "POI Location": "Tap 345 kV 44200 Hillje – 9073 Holman ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 191.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-07-22T00:00:00",
        "FIS Requested": "2024-05-15T00:00:00",
        "FIS Approved": "2025-11-04T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1034,
      "raw": {
        "INR": "27INR0115",
        "Project Name": "Diamante BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BESS DIAMANTE LLC",
        "POI Location": "40600 ROANS__POI_5 345kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 513.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-17T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0115",
        "Project Name": "Diamante BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "BESS DIAMANTE LLC",
        "POI Location": "40600 ROANS__POI_5 345kV",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 513.68,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-17T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1035,
      "raw": {
        "INR": "27INR0117",
        "Project Name": "Roble BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flexen USA LLC",
        "POI Location": "7180 L_ZORN__8_1Y 138kV\n",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-17T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-14T00:00:00",
        "FIS Requested": "2025-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0117",
        "Project Name": "Roble BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flexen USA LLC",
        "POI Location": "7180 L_ZORN__8_1Y 138kV\n",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-17T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-14T00:00:00",
        "FIS Requested": "2025-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1036,
      "raw": {
        "INR": "27INR0120",
        "Project Name": "Solar Star Bay City Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Solar Star Bay City Storage",
        "POI Location": "Tap 138kV Conoco (#8138) – Black Cat (#80124)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-11T00:00:00",
        "FIS Requested": "2024-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0120",
        "Project Name": "Solar Star Bay City Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Solar Star Bay City Storage",
        "POI Location": "Tap 138kV Conoco (#8138) – Black Cat (#80124)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-02-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-11T00:00:00",
        "FIS Requested": "2024-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1037,
      "raw": {
        "INR": "27INR0124",
        "Project Name": "RedSun Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Redsun Solar Project LLC",
        "POI Location": "Tap 138kV 7100 Burnet - 7529 Bertram",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 82.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-28T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-09-25T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0124",
        "Project Name": "RedSun Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Redsun Solar Project LLC",
        "POI Location": "Tap 138kV 7100 Burnet - 7529 Bertram",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 82.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-28T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-09-25T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1038,
      "raw": {
        "INR": "27INR0125",
        "Project Name": "RedSun BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Redsun Solar Project LLC",
        "POI Location": "Existing Line from Substation Name: Burnet (PSSE#7100) to Substation Name: Bertram (PSSE#7520)",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 84.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-27T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-21T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0125",
        "Project Name": "RedSun BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Redsun Solar Project LLC",
        "POI Location": "Existing Line from Substation Name: Burnet (PSSE#7100) to Substation Name: Bertram (PSSE#7520)",
        "County": "Burnet",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 84.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-27T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-21T00:00:00",
        "FIS Approved": "2025-07-29T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1039,
      "raw": {
        "INR": "27INR0126",
        "Project Name": "Corvus Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Corvus Solar, LLC",
        "POI Location": "Tap 345kV Cenzio (#80219) - Lobo (#80220)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-16T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-16T00:00:00",
        "FIS Approved": "2026-08-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0126",
        "Project Name": "Corvus Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Corvus Solar, LLC",
        "POI Location": "Tap 345kV Cenzio (#80219) - Lobo (#80220)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-16T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-16T00:00:00",
        "FIS Approved": "2026-08-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1040,
      "raw": {
        "INR": "27INR0127",
        "Project Name": "Bigway Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "Tap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0127",
        "Project Name": "Bigway Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "Tap 345kV 59904 Cottonwood - 60500 Edith Clarke Ckt #2",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1041,
      "raw": {
        "INR": "27INR0128",
        "Project Name": "Bigway Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "Tap 345KV #59904 Cottonwood - #60500 Edith Clarke Ckt #2",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-02-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0128",
        "Project Name": "Bigway Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "Tap 345KV #59904 Cottonwood - #60500 Edith Clarke Ckt #2",
        "County": "King",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2023-12-20T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2024-02-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-02-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-03-19T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1042,
      "raw": {
        "INR": "27INR0132",
        "Project Name": "Palo Verde Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "Tap 345kV 8624 Grissom – 8455 Lon C Hill",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-22T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-01T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0132",
        "Project Name": "Palo Verde Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "Tap 345kV 8624 Grissom – 8455 Lon C Hill",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-22T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-01T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1043,
      "raw": {
        "INR": "27INR0139",
        "Project Name": "Gatsby Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gatsby Energy Storage LLC",
        "POI Location": "Fort Lancaster 138 kV Substation (PSSE Bus #76579)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-07T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-12-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0139",
        "Project Name": "Gatsby Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gatsby Energy Storage LLC",
        "POI Location": "Fort Lancaster 138 kV Substation (PSSE Bus #76579)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-07T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2023-12-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1044,
      "raw": {
        "INR": "27INR0140",
        "Project Name": "Kingsmill Wind SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Kingsmill Wind, LLC",
        "POI Location": "79005 Railhead 345kV",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 606.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-18T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-10-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0140",
        "Project Name": "Kingsmill Wind SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Kingsmill Wind, LLC",
        "POI Location": "79005 Railhead 345kV",
        "County": "Carson",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 606.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-18T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-10-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1045,
      "raw": {
        "INR": "27INR0141",
        "Project Name": "Bluefox Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Industrial November Project LLC",
        "POI Location": "#8754 Zoisite 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0141",
        "Project Name": "Bluefox Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Industrial November Project LLC",
        "POI Location": "#8754 Zoisite 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1046,
      "raw": {
        "INR": "27INR0142",
        "Project Name": "UNICORN BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Unicorn Energies",
        "POI Location": "Tap 138 kV Wa Parish (#44015) - Crabb River Road Line (#44170) Line; CNP",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 278.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2024-01-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0142",
        "Project Name": "UNICORN BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Unicorn Energies",
        "POI Location": "Tap 138 kV Wa Parish (#44015) - Crabb River Road Line (#44170) Line; CNP",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 278.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-05T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2024-01-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1047,
      "raw": {
        "INR": "27INR0143",
        "Project Name": "Ogalalla Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Ogalalla Solar LLC",
        "POI Location": "23912 OGALLALA_5 345kV",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-24T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-25T00:00:00",
        "FIS Requested": "2024-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0143",
        "Project Name": "Ogalalla Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Ogalalla Solar LLC",
        "POI Location": "23912 OGALLALA_5 345kV",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-24T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-25T00:00:00",
        "FIS Requested": "2024-04-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1048,
      "raw": {
        "INR": "27INR0144",
        "Project Name": "Angel City Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Angel City Energy Center, LLC",
        "POI Location": "Coleto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Coleto Creek, 28.2 miles from Pawnee Sub. POI co-ordinates: 28.755, -97.583",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-22T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0144",
        "Project Name": "Angel City Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Angel City Energy Center, LLC",
        "POI Location": "Coleto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Coleto Creek, 28.2 miles from Pawnee Sub. POI co-ordinates: 28.755, -97.583",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-22T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1049,
      "raw": {
        "INR": "27INR0145",
        "Project Name": "Steelhead Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS TEXAS SEVEN, LLC",
        "POI Location": "Tap 1593 BONHAM_P8 to Allens Creek 1835 138kV",
        "County": "Fannin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 192.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-17T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0145",
        "Project Name": "Steelhead Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS TEXAS SEVEN, LLC",
        "POI Location": "Tap 1593 BONHAM_P8 to Allens Creek 1835 138kV",
        "County": "Fannin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 192.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-17T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1050,
      "raw": {
        "INR": "27INR0146",
        "Project Name": "Larrea Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood IV LLC",
        "POI Location": "Tap 345kV 76002 Bakerfield - 60404 Solstice CKT#1",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 231.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2024-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0146",
        "Project Name": "Larrea Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood IV LLC",
        "POI Location": "Tap 345kV 76002 Bakerfield - 60404 Solstice CKT#1",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 231.6,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-01-03T00:00:00",
        "Screening Study Complete": "2024-03-29T00:00:00",
        "FIS Requested": "2024-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1051,
      "raw": {
        "INR": "27INR0147",
        "Project Name": "Paloma Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Harrison Street Development, LLC",
        "POI Location": "Tap 138 kV 57640 Rock Island - 57639 Sheridan",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 193.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0147",
        "Project Name": "Paloma Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Harrison Street Development, LLC",
        "POI Location": "Tap 138 kV 57640 Rock Island - 57639 Sheridan",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 193.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-08T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1052,
      "raw": {
        "INR": "27INR0148",
        "Project Name": "Paloma Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Harrison Street Development, LLC",
        "POI Location": "Tap 138kV 57640 Rock Island - 57639 Sheridan",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 53.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-22T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0148",
        "Project Name": "Paloma Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Harrison Street Development, LLC",
        "POI Location": "Tap 138kV 57640 Rock Island - 57639 Sheridan",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 53.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-22T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-05-01T00:00:00",
        "FIS Requested": "2024-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1053,
      "raw": {
        "INR": "27INR0149",
        "Project Name": "Diablo Campo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Diablo Campo Energy Center, LLC",
        "POI Location": "The Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 313.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-23T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0149",
        "Project Name": "Diablo Campo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Diablo Campo Energy Center, LLC",
        "POI Location": "The Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 313.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-23T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1054,
      "raw": {
        "INR": "27INR0150",
        "Project Name": "Cielo Vista Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Solar, LLC",
        "POI Location": "Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-18T00:00:00",
        "FIS Requested": "2025-04-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0150",
        "Project Name": "Cielo Vista Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Solar, LLC",
        "POI Location": "Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-18T00:00:00",
        "FIS Requested": "2025-04-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1055,
      "raw": {
        "INR": "27INR0151",
        "Project Name": "Coyote Den Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coyote Den Energy Center, LLC",
        "POI Location": "The Kenedy Switching Station #2 (#8186) to Rosata POD  (#8153) Line ; AEP",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-31T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0151",
        "Project Name": "Coyote Den Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coyote Den Energy Center, LLC",
        "POI Location": "The Kenedy Switching Station #2 (#8186) to Rosata POD  (#8153) Line ; AEP",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-31T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-29T00:00:00",
        "FIS Requested": "2024-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1056,
      "raw": {
        "INR": "27INR0152",
        "Project Name": "New Shepherd Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "New Shepherd Energy Center, LLC",
        "POI Location": "the Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line, AEP.",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-03T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2023-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0152",
        "Project Name": "New Shepherd Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "New Shepherd Energy Center, LLC",
        "POI Location": "the Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line, AEP.",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-03T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-05T00:00:00",
        "FIS Requested": "2023-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1057,
      "raw": {
        "INR": "27INR0169",
        "Project Name": "Marcos Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS Texas Eight",
        "POI Location": "To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 216.11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-06T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2023-12-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0169",
        "Project Name": "Marcos Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS Texas Eight",
        "POI Location": "To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 216.11,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-06T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2023-12-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1058,
      "raw": {
        "INR": "27INR0170",
        "Project Name": "Marcos BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS Texas Eight LLC",
        "POI Location": "To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 115.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0170",
        "Project Name": "Marcos BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS Texas Eight LLC",
        "POI Location": "To the 138 kV line from EDNA (#8118) to VICTORIA4A (#8172)",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 115.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-17T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1059,
      "raw": {
        "INR": "27INR0173",
        "Project Name": "Trenno BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "JSB1, LLC",
        "POI Location": "Tap 138kV 2281 Godley - 2888 Carmichael",
        "County": "Johnson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-25T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-08-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-08-11T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0173",
        "Project Name": "Trenno BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "JSB1, LLC",
        "POI Location": "Tap 138kV 2281 Godley - 2888 Carmichael",
        "County": "Johnson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-09-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-25T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-08-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-08-11T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1060,
      "raw": {
        "INR": "27INR0180",
        "Project Name": "Otter BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS TEXAS TEN, LLC",
        "POI Location": "5378 SHEPHERD RD 138kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-01T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0180",
        "Project Name": "Otter BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GRS BESS TEXAS TEN, LLC",
        "POI Location": "5378 SHEPHERD RD 138kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-01T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1061,
      "raw": {
        "INR": "27INR0181",
        "Project Name": "Elk Unit 4 ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Golden Spread Electric Cooperative, Inc.",
        "POI Location": "141607 AEEC_5",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 210,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-03-19T00:00:00",
        "FIS Approved": "2025-07-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2025-08-14T00:00:00",
        "GHG Permit": "2025-08-14T00:00:00",
        "Water Availability": "2026-07-29T00:00:00",
        "Meets Planning": "2026-07-29T00:00:00",
        "Meets All Planning": "2026-07-29T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0181",
        "Project Name": "Elk Unit 4 ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Golden Spread Electric Cooperative, Inc.",
        "POI Location": "141607 AEEC_5",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 210,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-03-19T00:00:00",
        "FIS Approved": "2025-07-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2025-08-14T00:00:00",
        "GHG Permit": "2025-08-14T00:00:00",
        "Water Availability": "2026-07-29T00:00:00",
        "Meets Planning": "2026-07-29T00:00:00",
        "Meets All Planning": "2026-07-29T00:00:00",
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1062,
      "raw": {
        "INR": "27INR0186",
        "Project Name": "Silver Dollar Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silver Dollar Solar Project, LLC",
        "POI Location": "Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.9,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-21T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-29T00:00:00",
        "FIS Requested": "2024-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0186",
        "Project Name": "Silver Dollar Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silver Dollar Solar Project, LLC",
        "POI Location": "Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.9,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-21T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-29T00:00:00",
        "FIS Requested": "2024-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1063,
      "raw": {
        "INR": "27INR0187",
        "Project Name": "Silver Dollar Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silver Dollar Solar Project, LLC",
        "POI Location": "Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-21T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-29T00:00:00",
        "FIS Requested": "2024-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0187",
        "Project Name": "Silver Dollar Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silver Dollar Solar Project, LLC",
        "POI Location": "Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-21T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-29T00:00:00",
        "FIS Requested": "2024-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1064,
      "raw": {
        "INR": "27INR0190",
        "Project Name": "Millsing BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Millsing BESS",
        "POI Location": "44645 CNP Singleton 345kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 501.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-02T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-05T00:00:00",
        "FIS Approved": "2024-10-08T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0190",
        "Project Name": "Millsing BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Millsing BESS",
        "POI Location": "44645 CNP Singleton 345kV ",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 501.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-02T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-05T00:00:00",
        "FIS Approved": "2024-10-08T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1065,
      "raw": {
        "INR": "27INR0192",
        "Project Name": "Cedar Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cedar Draw Solar LLC",
        "POI Location": "60011 Nebula7A 345kV ",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 451.4,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-01T00:00:00",
        "FIS Approved": "2026-09-24T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0192",
        "Project Name": "Cedar Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cedar Draw Solar LLC",
        "POI Location": "60011 Nebula7A 345kV ",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 451.4,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-01T00:00:00",
        "FIS Approved": "2026-09-24T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1066,
      "raw": {
        "INR": "27INR0193",
        "Project Name": "Cedar Draw BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cedar Draw Solar LLC",
        "POI Location": "60011 Nebula7A 345kV ",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 225.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-20T00:00:00",
        "FIS Approved": "2026-09-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0193",
        "Project Name": "Cedar Draw BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Cedar Draw Solar LLC",
        "POI Location": "60011 Nebula7A 345kV ",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 225.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-20T00:00:00",
        "FIS Approved": "2026-09-23T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1067,
      "raw": {
        "INR": "27INR0195",
        "Project Name": "CORUSCANT BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AEU Battery Project III LLC",
        "POI Location": "Tap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-04-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 417.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-12T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0195",
        "Project Name": "CORUSCANT BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AEU Battery Project III LLC",
        "POI Location": "Tap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2027-04-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 417.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-12T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1068,
      "raw": {
        "INR": "27INR0196",
        "Project Name": "Houston County BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Houston ESS, LLC",
        "POI Location": "Tap ETEC 138kV #6733 Mustang Prairie to #6732 Latexo Sub",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-02T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-01-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0196",
        "Project Name": "Houston County BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Houston ESS, LLC",
        "POI Location": "Tap ETEC 138kV #6733 Mustang Prairie to #6732 Latexo Sub",
        "County": "Houston",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 125.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-02T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-20T00:00:00",
        "FIS Requested": "2024-01-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1069,
      "raw": {
        "INR": "27INR0198",
        "Project Name": "Musgravite Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Solex Ridge, LLC",
        "POI Location": "Tap 138 kV (6855) Coffee - (6849) New York.",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-01T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-06T00:00:00",
        "FIS Approved": "2025-10-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0198",
        "Project Name": "Musgravite Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Solex Ridge, LLC",
        "POI Location": "Tap 138 kV (6855) Coffee - (6849) New York.",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-01T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-06T00:00:00",
        "FIS Approved": "2025-10-06T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1070,
      "raw": {
        "INR": "27INR0202",
        "Project Name": "Shallow Valley Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Shallow Valley Storage, LLC",
        "POI Location": "Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub\n\n",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.39,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2024-07-19T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-19T00:00:00",
        "FIS Approved": "2026-02-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0202",
        "Project Name": "Shallow Valley Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Shallow Valley Storage, LLC",
        "POI Location": "Tap 138kV 1239 Coyanosa - 11238 Blair Lake Sub\n\n",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.39,
        "Unnamed: 11": "Status Change INA-to-PLN   ",
        "Unnamed: 12": "2024-07-19T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-19T00:00:00",
        "FIS Approved": "2026-02-27T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1071,
      "raw": {
        "INR": "27INR0203",
        "Project Name": "Dunlay Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Medina PV, LLC",
        "POI Location": "Tap 138kV 5813 PearsonSW - 5225 Hondo",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0203",
        "Project Name": "Dunlay Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Medina PV, LLC",
        "POI Location": "Tap 138kV 5813 PearsonSW - 5225 Hondo",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1072,
      "raw": {
        "INR": "27INR0205",
        "Project Name": "Donna Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donna Solar LLC",
        "POI Location": "Tap 345 kV (80137) Stewart Road - (8383) North Edinburg CKT ID#01",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 168.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0205",
        "Project Name": "Donna Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donna Solar LLC",
        "POI Location": "Tap 345 kV (80137) Stewart Road - (8383) North Edinburg CKT ID#01",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 168.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1073,
      "raw": {
        "INR": "27INR0206",
        "Project Name": "Chacon Creek",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cattlemen BESS LLC",
        "POI Location": "(#8962)  LYTLE4A 138KV",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 188.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-07T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0206",
        "Project Name": "Chacon Creek",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cattlemen BESS LLC",
        "POI Location": "(#8962)  LYTLE4A 138KV",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 188.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-07T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1074,
      "raw": {
        "INR": "27INR0207",
        "Project Name": "Wander Waters BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Wander Waters BESS LLC",
        "POI Location": "61001 JIMTREEC7A 345kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 303.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-11T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-12T00:00:00",
        "FIS Approved": "2025-11-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0207",
        "Project Name": "Wander Waters BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Wander Waters BESS LLC",
        "POI Location": "61001 JIMTREEC7A 345kV",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 303.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-11T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-12T00:00:00",
        "FIS Approved": "2025-11-14T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1075,
      "raw": {
        "INR": "27INR0208",
        "Project Name": "Sugarloaf BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sugarloaf Clean Energy LLC",
        "POI Location": "(#80481) PILONCIL4 138KV",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0208",
        "Project Name": "Sugarloaf BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sugarloaf Clean Energy LLC",
        "POI Location": "(#80481) PILONCIL4 138KV",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1076,
      "raw": {
        "INR": "27INR0209",
        "Project Name": "Goby Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Goby Energy Center",
        "POI Location": "Tap 138kV line 44390 Karsten -  44721 Thompsons ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-09-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.65,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-01T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-15T00:00:00",
        "FIS Requested": "2024-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0209",
        "Project Name": "Goby Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Goby Energy Center",
        "POI Location": "Tap 138kV line 44390 Karsten -  44721 Thompsons ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-09-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.65,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-01T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-15T00:00:00",
        "FIS Requested": "2024-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1077,
      "raw": {
        "INR": "27INR0216",
        "Project Name": "Champs Elysees BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Champs Elysees Renewables, LLC",
        "POI Location": "Tap 345 kV 3377 Little Pond Switch - 3704 Hog Creek Switch",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-25T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0216",
        "Project Name": "Champs Elysees BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Champs Elysees Renewables, LLC",
        "POI Location": "Tap 345 kV 3377 Little Pond Switch - 3704 Hog Creek Switch",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-25T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1078,
      "raw": {
        "INR": "27INR0217",
        "Project Name": "Journey Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Journey Solar, LLC",
        "POI Location": "Tap 138kV Paint Creek 6161 - Aspermont 6158 ",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 124.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-13T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0217",
        "Project Name": "Journey Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Journey Solar, LLC",
        "POI Location": "Tap 138kV Paint Creek 6161 - Aspermont 6158 ",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 124.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-13T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1079,
      "raw": {
        "INR": "27INR0218",
        "Project Name": "Themisto Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Themisto Solar, LLC",
        "POI Location": "Tap 345kV Champion Creek #1414 – Sweetwater East #11420",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-23T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0218",
        "Project Name": "Themisto Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Themisto Solar, LLC",
        "POI Location": "Tap 345kV Champion Creek #1414 – Sweetwater East #11420",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-08-23T00:00:00",
        "Screening Study Started": "2024-02-26T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1080,
      "raw": {
        "INR": "27INR0219",
        "Project Name": "Galaxy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar, LLC",
        "POI Location": "Stainback Switch (bus #2217) - Elrod Switch (bus #3159)",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 177.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-22T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0219",
        "Project Name": "Galaxy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar, LLC",
        "POI Location": "Stainback Switch (bus #2217) - Elrod Switch (bus #3159)",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 177.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-22T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1081,
      "raw": {
        "INR": "27INR0220",
        "Project Name": "Galaxy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar, LLC",
        "POI Location": "Stainback Switch (bus #2217) - Elrod Switch (bus #3159)\n",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-22T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0220",
        "Project Name": "Galaxy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar, LLC",
        "POI Location": "Stainback Switch (bus #2217) - Elrod Switch (bus #3159)\n",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-22T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-08-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1082,
      "raw": {
        "INR": "27INR0222",
        "Project Name": "Fierce River BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Grande Solar LLC",
        "POI Location": "Tapping the 345 kV Line from Del Sol (Bus# 80355) to Frontera (Bus# 80119) ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 284.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-21T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0222",
        "Project Name": "Fierce River BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Grande Solar LLC",
        "POI Location": "Tapping the 345 kV Line from Del Sol (Bus# 80355) to Frontera (Bus# 80119) ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 284.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-21T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1083,
      "raw": {
        "INR": "27INR0224",
        "Project Name": "Leopard BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bobcat Energy Center, LLC",
        "POI Location": "8721 Beecher 138 kV  ",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 264.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-22T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-06-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-08-08T00:00:00",
        "Meets Planning": "2025-08-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0224",
        "Project Name": "Leopard BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bobcat Energy Center, LLC",
        "POI Location": "8721 Beecher 138 kV  ",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 264.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-22T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-06-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-08-08T00:00:00",
        "Meets Planning": "2025-08-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1084,
      "raw": {
        "INR": "27INR0227",
        "Project Name": "PALO VERDE BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "Tap 345kV 8624 Grissom – 8455 Lon C Hill",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-01T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0227",
        "Project Name": "PALO VERDE BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "Tap 345kV 8624 Grissom – 8455 Lon C Hill",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-01T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1085,
      "raw": {
        "INR": "27INR0231",
        "Project Name": "Easy Battery Energy Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Easy Wind Energy Center, LLC ",
        "POI Location": "Tap 345 kV 76003 Big Hill to 76005 Schneeman Draw",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-18T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0231",
        "Project Name": "Easy Battery Energy Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Easy Wind Energy Center, LLC ",
        "POI Location": "Tap 345 kV 76003 Big Hill to 76005 Schneeman Draw",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-18T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1086,
      "raw": {
        "INR": "27INR0232",
        "Project Name": "Anawa La Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anawa La Solar LLC",
        "POI Location": "TAP 138 KV 8394 LISTON - 8392 BATES ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 93.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-29T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0232",
        "Project Name": "Anawa La Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anawa La Solar LLC",
        "POI Location": "TAP 138 KV 8394 LISTON - 8392 BATES ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 93.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-29T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1087,
      "raw": {
        "INR": "27INR0233",
        "Project Name": "Anawa La BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anawa La Solar LLC",
        "POI Location": "Tap 138KV 8394 Liston- 8392 Bates ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0233",
        "Project Name": "Anawa La BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anawa La Solar LLC",
        "POI Location": "Tap 138KV 8394 Liston- 8392 Bates ",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-08-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1088,
      "raw": {
        "INR": "27INR0234",
        "Project Name": "Lima Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Industrial Lima Project, LLC   ",
        "POI Location": "Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-16T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-02T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0234",
        "Project Name": "Lima Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Industrial Lima Project, LLC   ",
        "POI Location": "Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-16T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-02T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1089,
      "raw": {
        "INR": "27INR0236",
        "Project Name": "Atticus Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Atticus Energy Storage",
        "POI Location": "Tap 69 KV 6570 Bond Road - 6513 Sonora ",
        "County": "Sutton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-01-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-26T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2024-03-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0236",
        "Project Name": "Atticus Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Atticus Energy Storage",
        "POI Location": "Tap 69 KV 6570 Bond Road - 6513 Sonora ",
        "County": "Sutton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-01-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-26T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-25T00:00:00",
        "FIS Requested": "2024-03-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1090,
      "raw": {
        "INR": "27INR0241",
        "Project Name": "Callan Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Menard PV, LLC",
        "POI Location": "Tap 69kV 60386 Heartland to 6363 Yellow Jacket",
        "County": "Menard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 90.97,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-22T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0241",
        "Project Name": "Callan Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Menard PV, LLC",
        "POI Location": "Tap 69kV 60386 Heartland to 6363 Yellow Jacket",
        "County": "Menard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 90.97,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-22T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1091,
      "raw": {
        "INR": "27INR0242",
        "Project Name": "Stonewall Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Stonewall PV, LLC",
        "POI Location": "Tap 69kV #755 BEPC Aspermont - #6156 AEP Aspermont",
        "County": "Stonewall",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-06T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-01T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0242",
        "Project Name": "Stonewall Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Stonewall PV, LLC",
        "POI Location": "Tap 69kV #755 BEPC Aspermont - #6156 AEP Aspermont",
        "County": "Stonewall",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-06T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-01T00:00:00",
        "FIS Approved": "2026-03-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1092,
      "raw": {
        "INR": "27INR0245",
        "Project Name": "Pez Rojo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Pez Rojo BESS, LLC",
        "POI Location": "Tap 138 kV #40260 Chamon  - #40912 King",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 217.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-23T00:00:00",
        "FIS Requested": "2024-06-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-05-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0245",
        "Project Name": "Pez Rojo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Pez Rojo BESS, LLC",
        "POI Location": "Tap 138 kV #40260 Chamon  - #40912 King",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 217.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-23T00:00:00",
        "FIS Requested": "2024-06-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-05-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1093,
      "raw": {
        "INR": "27INR0246",
        "Project Name": "Easy Wind Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Easy Wind Energy Center, LLC",
        "POI Location": "Tap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 241.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-01T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-16T00:00:00",
        "FIS Requested": "2024-05-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0246",
        "Project Name": "Easy Wind Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Easy Wind Energy Center, LLC",
        "POI Location": "Tap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 241.13,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-01T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-16T00:00:00",
        "FIS Requested": "2024-05-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1094,
      "raw": {
        "INR": "27INR0247",
        "Project Name": "Sun Angel ESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sun Angel ESS LLC",
        "POI Location": "Tap 138kV LUFKINE East (#3326) - HERTY TAP (#3318)",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-03T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-11T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0247",
        "Project Name": "Sun Angel ESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sun Angel ESS LLC",
        "POI Location": "Tap 138kV LUFKINE East (#3326) - HERTY TAP (#3318)",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-03T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-06-11T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1095,
      "raw": {
        "INR": "27INR0248",
        "Project Name": "Double A Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double A Solar, LLC",
        "POI Location": "Tap 69kV 5678 Schroeder - 5675 Big Oak",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 132.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-14T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0248",
        "Project Name": "Double A Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double A Solar, LLC",
        "POI Location": "Tap 69kV 5678 Schroeder - 5675 Big Oak",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 132.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-14T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1096,
      "raw": {
        "INR": "27INR0249",
        "Project Name": "Raghorn Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Raghorn Solar LLC",
        "POI Location": "Tap 69kV #5654 San Diego - #5658 Orange Grove",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 91.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-14T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-16T00:00:00",
        "FIS Requested": "2024-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0249",
        "Project Name": "Raghorn Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Raghorn Solar LLC",
        "POI Location": "Tap 69kV #5654 San Diego - #5658 Orange Grove",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 91.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-14T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-16T00:00:00",
        "FIS Requested": "2024-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1097,
      "raw": {
        "INR": "27INR0251",
        "Project Name": "Sayle Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sayle Solar LLC",
        "POI Location": "Tap 69kV #5522 Edna - #5518 El Toro SW",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 122.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-09T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-30T00:00:00",
        "FIS Requested": "2024-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0251",
        "Project Name": "Sayle Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sayle Solar LLC",
        "POI Location": "Tap 69kV #5522 Edna - #5518 El Toro SW",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 122.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-09T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-30T00:00:00",
        "FIS Requested": "2024-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1098,
      "raw": {
        "INR": "27INR0252",
        "Project Name": "Parula Energy Center ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Parula Energy Center",
        "POI Location": "7287 Bellville North 138kV",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250.95,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-10T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-15T00:00:00",
        "FIS Requested": "2024-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0252",
        "Project Name": "Parula Energy Center ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Parula Energy Center",
        "POI Location": "7287 Bellville North 138kV",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250.95,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-05-10T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-15T00:00:00",
        "FIS Requested": "2024-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1099,
      "raw": {
        "INR": "27INR0253",
        "Project Name": "Old Victory Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "8692 MAVERICK4A 138kV",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-17T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0253",
        "Project Name": "Old Victory Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "8692 MAVERICK4A 138kV",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-17T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1100,
      "raw": {
        "INR": "27INR0255",
        "Project Name": "New Minglewood Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "#11098 Sand Lake Switch Station (SANDLAKE_5) 345kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-24T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0255",
        "Project Name": "New Minglewood Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "#11098 Sand Lake Switch Station (SANDLAKE_5) 345kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-24T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1101,
      "raw": {
        "INR": "27INR0257",
        "Project Name": "Double A Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double A Storage, LLC",
        "POI Location": "Tap 69kV 5678 Schroeder - 5675 Big Oak",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0257",
        "Project Name": "Double A Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Double A Storage, LLC",
        "POI Location": "Tap 69kV 5678 Schroeder - 5675 Big Oak",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-08-07T00:00:00",
        "FIS Requested": "2024-05-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1102,
      "raw": {
        "INR": "27INR0259",
        "Project Name": "Raghorn Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Raghorn Storage LLC",
        "POI Location": "Tap 69kV #5654 San Diego - #5658 Orange Grove",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-16T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-16T00:00:00",
        "FIS Requested": "2024-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0259",
        "Project Name": "Raghorn Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Raghorn Storage LLC",
        "POI Location": "Tap 69kV #5654 San Diego - #5658 Orange Grove",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-16T00:00:00",
        "Screening Study Started": "2024-05-20T00:00:00",
        "Screening Study Complete": "2024-08-16T00:00:00",
        "FIS Requested": "2024-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1103,
      "raw": {
        "INR": "27INR0260",
        "Project Name": "Sayle Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sayle Storage LLC",
        "POI Location": "Tap 69kV #5522 Edna - #5518 El Toro SW",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-09T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-30T00:00:00",
        "FIS Requested": "2024-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0260",
        "Project Name": "Sayle Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sayle Storage LLC",
        "POI Location": "Tap 69kV #5522 Edna - #5518 El Toro SW",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-09T00:00:00",
        "Screening Study Started": "2024-06-03T00:00:00",
        "Screening Study Complete": "2024-08-30T00:00:00",
        "FIS Requested": "2024-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1104,
      "raw": {
        "INR": "27INR0261",
        "Project Name": "Tipperary Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tippsol ",
        "POI Location": "6498 Live Oak AEP 69kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-10T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0261",
        "Project Name": "Tipperary Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tippsol ",
        "POI Location": "6498 Live Oak AEP 69kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-10T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-05-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1105,
      "raw": {
        "INR": "27INR0274",
        "Project Name": "Flying Kite Bess",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flying Kite BESS, LLC",
        "POI Location": "Tap the 138 kV La Pryor (#8008) - Poblano (#8009)",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-10T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-28T00:00:00",
        "FIS Requested": "2024-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0274",
        "Project Name": "Flying Kite Bess",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flying Kite BESS, LLC",
        "POI Location": "Tap the 138 kV La Pryor (#8008) - Poblano (#8009)",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-10T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-28T00:00:00",
        "FIS Requested": "2024-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1106,
      "raw": {
        "INR": "27INR0279",
        "Project Name": "Red Hollow Renewable Energy BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Red Hollow Renewable Energy LLC",
        "POI Location": "Tap 345kV 1422 Bowman - 17002 Garvey Road ",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2025-08-04T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0279",
        "Project Name": "Red Hollow Renewable Energy BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Red Hollow Renewable Energy LLC",
        "POI Location": "Tap 345kV 1422 Bowman - 17002 Garvey Road ",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2025-08-04T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1107,
      "raw": {
        "INR": "27INR0285",
        "Project Name": "Rain Lily Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rain Lily Storage One, LLC",
        "POI Location": "Tap 138kV #350 ABBYBEND - #363 HOOD",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 105.6,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0285",
        "Project Name": "Rain Lily Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rain Lily Storage One, LLC",
        "POI Location": "Tap 138kV #350 ABBYBEND - #363 HOOD",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 105.6,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1108,
      "raw": {
        "INR": "27INR0288",
        "Project Name": "Rain Lily Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rain Lily Solar 1 LLC",
        "POI Location": "Tap 138kV #350 ABBYBEND - #363 HOOD",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 147.76,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0288",
        "Project Name": "Rain Lily Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rain Lily Solar 1 LLC",
        "POI Location": "Tap 138kV #350 ABBYBEND - #363 HOOD",
        "County": "Hood",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 147.76,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-01-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-16T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1109,
      "raw": {
        "INR": "27INR0290",
        "Project Name": "Drill Baby Drill BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SBESS TX8 LLC",
        "POI Location": "23859 SALTFLAT 138KV",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-12T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-20T00:00:00",
        "FIS Requested": "2025-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0290",
        "Project Name": "Drill Baby Drill BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SBESS TX8 LLC",
        "POI Location": "23859 SALTFLAT 138KV",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-12T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-20T00:00:00",
        "FIS Requested": "2025-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1110,
      "raw": {
        "INR": "27INR0291",
        "Project Name": "Nouveau BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RamZ BESS, LLC",
        "POI Location": "1444 Brown Switch - 3348 Russell Gap 345 kV Line",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-31T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2024-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0291",
        "Project Name": "Nouveau BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RamZ BESS, LLC",
        "POI Location": "1444 Brown Switch - 3348 Russell Gap 345 kV Line",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-31T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-01-08T00:00:00",
        "FIS Requested": "2024-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1111,
      "raw": {
        "INR": "27INR0292",
        "Project Name": "Donelson Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donelson Solar ",
        "POI Location": "Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 75.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-13T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0292",
        "Project Name": "Donelson Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donelson Solar ",
        "POI Location": "Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 75.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-13T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1112,
      "raw": {
        "INR": "27INR0293",
        "Project Name": "Donelson Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donelson Storage",
        "POI Location": "Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-13T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0293",
        "Project Name": "Donelson Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Donelson Storage",
        "POI Location": "Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-13T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1113,
      "raw": {
        "INR": "27INR0294",
        "Project Name": "Bernice Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bernice Energy Storage LLC",
        "POI Location": "5135 ELMENDORF 138kV ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 402.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-09T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0294",
        "Project Name": "Bernice Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bernice Energy Storage LLC",
        "POI Location": "5135 ELMENDORF 138kV ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-02-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 402.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-09T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1114,
      "raw": {
        "INR": "27INR0297",
        "Project Name": "Tolivar Power Plant (TEF- Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pecos Power Plant, LLC",
        "POI Location": "Tap 138 KV 38045 IH20-38043 COWPEN ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-11T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 224.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2025-11-19T00:00:00",
        "FIS Requested": "2024-06-14T00:00:00",
        "FIS Approved": "2025-06-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-12-12T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-03-25T00:00:00",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2026-06-16T00:00:00",
        "Unnamed: 25": "2026-08-06T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0297",
        "Project Name": "Tolivar Power Plant (TEF- Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pecos Power Plant, LLC",
        "POI Location": "Tap 138 KV 38045 IH20-38043 COWPEN ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-06-11T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 224.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-10T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2025-11-19T00:00:00",
        "FIS Requested": "2024-06-14T00:00:00",
        "FIS Approved": "2025-06-23T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-12-12T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-03-25T00:00:00",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": "2026-06-16T00:00:00",
        "Unnamed: 25": "2026-08-06T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1115,
      "raw": {
        "INR": "27INR0298",
        "Project Name": "Symank Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Symank Solar, LLC",
        "POI Location": "Tap 69 kV 37470 TNOLSEN - 37520 TNSYCAMORE",
        "County": "Bosque",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 66.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-29T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0298",
        "Project Name": "Symank Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BT Symank Solar, LLC",
        "POI Location": "Tap 69 kV 37470 TNOLSEN - 37520 TNSYCAMORE",
        "County": "Bosque",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 66.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-29T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1116,
      "raw": {
        "INR": "27INR0301",
        "Project Name": "Hondo Arroyo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hondo Creek Solar, LLC",
        "POI Location": "Tap 138 kV 5225 Hondo - 5813 Pearson ",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-11T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0301",
        "Project Name": "Hondo Arroyo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hondo Creek Solar, LLC",
        "POI Location": "Tap 138 kV 5225 Hondo - 5813 Pearson ",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-11T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1117,
      "raw": {
        "INR": "27INR0305",
        "Project Name": "Kurtz Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kurtz Solar, LLC",
        "POI Location": "Tap 69kV #8206 Charlotte - #8607 Jourdanton",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-29T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0305",
        "Project Name": "Kurtz Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kurtz Solar, LLC",
        "POI Location": "Tap 69kV #8206 Charlotte - #8607 Jourdanton",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-29T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1118,
      "raw": {
        "INR": "27INR0306",
        "Project Name": "Kurtz Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kurtz Storage, LLC",
        "POI Location": "Tap 69kV #8206 Charlotte - #8607 Jourdanton",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-29T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0306",
        "Project Name": "Kurtz Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kurtz Storage, LLC",
        "POI Location": "Tap 69kV #8206 Charlotte - #8607 Jourdanton",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-29T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1119,
      "raw": {
        "INR": "27INR0307",
        "Project Name": "Beaverhead Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Beaverhead Solar, LLC",
        "POI Location": "Direct to Sub 69kv #5653 Ben Bolt.",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 61.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0307",
        "Project Name": "Beaverhead Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Beaverhead Solar, LLC",
        "POI Location": "Direct to Sub 69kv #5653 Ben Bolt.",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-11T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 61.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1120,
      "raw": {
        "INR": "27INR0308",
        "Project Name": "Beaverhead Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Beaverhead Solar, LLC",
        "POI Location": "Direct to Sub 69kv #5653 Ben Bolt.\n",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 61.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0308",
        "Project Name": "Beaverhead Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Beaverhead Solar, LLC",
        "POI Location": "Direct to Sub 69kv #5653 Ben Bolt.\n",
        "County": "Jim Wells",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 61.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1121,
      "raw": {
        "INR": "27INR0309",
        "Project Name": "Tall Saddle Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tall Saddle Solar, LLC",
        "POI Location": "80076 AJO SUBSTATION 345kV",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-01T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-26T00:00:00",
        "FIS Requested": "2025-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0309",
        "Project Name": "Tall Saddle Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tall Saddle Solar, LLC",
        "POI Location": "80076 AJO SUBSTATION 345kV",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 252.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-01T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-26T00:00:00",
        "FIS Requested": "2025-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1122,
      "raw": {
        "INR": "27INR0310",
        "Project Name": "Tall Saddle Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tall Saddle Wind, LLC",
        "POI Location": "80076 AJO SUBSTATION 345kV",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 522.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-02T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-26T00:00:00",
        "FIS Requested": "2025-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0310",
        "Project Name": "Tall Saddle Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tall Saddle Wind, LLC",
        "POI Location": "80076 AJO SUBSTATION 345kV",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 522.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-02T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-26T00:00:00",
        "FIS Requested": "2025-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1123,
      "raw": {
        "INR": "27INR0312",
        "Project Name": "HILLBORO WIND",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green XI LLC",
        "POI Location": "Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 33.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-24T00:00:00",
        "FIS Requested": "2024-11-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0312",
        "Project Name": "HILLBORO WIND",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Abei Energy Green XI LLC",
        "POI Location": "Tap 138kV Ash Creek Switch (Bus #3473) – Revolution Switch (Bus #3387)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 33.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-09-24T00:00:00",
        "FIS Requested": "2024-11-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1124,
      "raw": {
        "INR": "27INR0313",
        "Project Name": "Spindletop Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Banita Creek Solar LLC ",
        "POI Location": "Tap Stryker [3109] - Lufkin [3117] 345 kV line",
        "County": "Nacogdoches",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 286.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-16T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-25T00:00:00",
        "FIS Requested": "2024-07-26T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0313",
        "Project Name": "Spindletop Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Banita Creek Solar LLC ",
        "POI Location": "Tap Stryker [3109] - Lufkin [3117] 345 kV line",
        "County": "Nacogdoches",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 286.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-16T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-25T00:00:00",
        "FIS Requested": "2024-07-26T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1125,
      "raw": {
        "INR": "27INR0315",
        "Project Name": "Old Roman Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "23868 STILES 138 KV",
        "County": "Reagan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-11T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0315",
        "Project Name": "Old Roman Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "23868 STILES 138 KV",
        "County": "Reagan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-11T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1126,
      "raw": {
        "INR": "27INR0316",
        "Project Name": "Avant Prairie BESS ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Avant Prairie ESS LLC",
        "POI Location": "Tap 345kV BIGBRNE (#3380) - JEWETT (#3390) CKT 1",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-03T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-09-02T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0316",
        "Project Name": "Avant Prairie BESS ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Avant Prairie ESS LLC",
        "POI Location": "Tap 345kV BIGBRNE (#3380) - JEWETT (#3390) CKT 1",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-03T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-09-02T00:00:00",
        "FIS Approved": "2026-09-01T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1127,
      "raw": {
        "INR": "27INR0317",
        "Project Name": "Edgewood BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap Edgewood 138kV bus(3181) to CANTNSW_8 (3174)",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-16T00:00:00",
        "Screening Study Started": "2024-11-21T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0317",
        "Project Name": "Edgewood BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap Edgewood 138kV bus(3181) to CANTNSW_8 (3174)",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-16T00:00:00",
        "Screening Study Started": "2024-11-21T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1128,
      "raw": {
        "INR": "27INR0321",
        "Project Name": "Rock Island Generating (TEF -Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Kerrville Public Utility Board Public Facility Corporation",
        "POI Location": "57640 Rock Island 138 kV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 121.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-15T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-11T00:00:00",
        "FIS Approved": "2025-03-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-08-01T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-05-05T00:00:00",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0321",
        "Project Name": "Rock Island Generating (TEF -Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Kerrville Public Utility Board Public Facility Corporation",
        "POI Location": "57640 Rock Island 138 kV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 121.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-15T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-11T00:00:00",
        "FIS Approved": "2025-03-21T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-03-17T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2024-08-01T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-05-05T00:00:00",
        "Meets Planning": "2025-08-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": "2026-08-03T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1129,
      "raw": {
        "INR": "27INR0323",
        "Project Name": "Prairie Blossom Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Blossom Storage, LLC",
        "POI Location": "Tap 138kV #1322 Big Spring Switch – #1366 Big Spring CRMWD",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-10-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0323",
        "Project Name": "Prairie Blossom Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Blossom Storage, LLC",
        "POI Location": "Tap 138kV #1322 Big Spring Switch – #1366 Big Spring CRMWD",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-10-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1130,
      "raw": {
        "INR": "27INR0324",
        "Project Name": "LONE STAR INDUSTRIAL PARK GAS POWER PROJECT  ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "LONE STAR INDUSTRIAL PARK, LLC",
        "POI Location": "1795 Monticello SES 138kV",
        "County": "Morris",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-11T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 166,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-29T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0324",
        "Project Name": "LONE STAR INDUSTRIAL PARK GAS POWER PROJECT  ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "LONE STAR INDUSTRIAL PARK, LLC",
        "POI Location": "1795 Monticello SES 138kV",
        "County": "Morris",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-11T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 166,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-29T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-12-02T00:00:00",
        "FIS Requested": "2024-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1131,
      "raw": {
        "INR": "27INR0325",
        "Project Name": "Calf Creek Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coyote Ridge Storage, LLC",
        "POI Location": "Buffalo 138 kV Substation #23837",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2026-01-14T00:00:00",
        "FIS Requested": "2025-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0325",
        "Project Name": "Calf Creek Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coyote Ridge Storage, LLC",
        "POI Location": "Buffalo 138 kV Substation #23837",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2026-01-14T00:00:00",
        "FIS Requested": "2025-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1132,
      "raw": {
        "INR": "27INR0327",
        "Project Name": "Sunflower Valley Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sunflower Valley Storage, LLC",
        "POI Location": " 1414 Champion Creek Substation 345 kV",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-07T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-04-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0327",
        "Project Name": "Sunflower Valley Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sunflower Valley Storage, LLC",
        "POI Location": " 1414 Champion Creek Substation 345 kV",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-07T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-04-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1133,
      "raw": {
        "INR": "27INR0330",
        "Project Name": "Wild Horse Desert Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Wild Horse Desert Solar, LLC",
        "POI Location": "Tap 138kV 8613 Big Well - 8212 Dilley Switch",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-10T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": "2026-09-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0330",
        "Project Name": "Wild Horse Desert Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Wild Horse Desert Solar, LLC",
        "POI Location": "Tap 138kV 8613 Big Well - 8212 Dilley Switch",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-10T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": "2026-09-14T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1134,
      "raw": {
        "INR": "27INR0331",
        "Project Name": "Wild Horse Desert Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wild Horse Desert Solar, LLC",
        "POI Location": "Tap 138kV 8613 Big Well - 8212 Dilley Switch",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 90.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0331",
        "Project Name": "Wild Horse Desert Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wild Horse Desert Solar, LLC",
        "POI Location": "Tap 138kV 8613 Big Well - 8212 Dilley Switch",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 90.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1135,
      "raw": {
        "INR": "27INR0332",
        "Project Name": "White Wing Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "White Wing Solar, LLC",
        "POI Location": "Tap 345 kV (#60504) Tesla - (#6111) Riley\n",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 127.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-24T00:00:00",
        "Screening Study Started": "2025-08-13T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0332",
        "Project Name": "White Wing Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "White Wing Solar, LLC",
        "POI Location": "Tap 345 kV (#60504) Tesla - (#6111) Riley\n",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 127.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-24T00:00:00",
        "Screening Study Started": "2025-08-13T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1136,
      "raw": {
        "INR": "27INR0333",
        "Project Name": "White Wing Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "White Wing Solar, LLC",
        "POI Location": "Tap 345 kV (#60504) Tesla - (#6111) Riley\n",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 130.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-24T00:00:00",
        "Screening Study Started": "2025-08-13T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-01-12T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0333",
        "Project Name": "White Wing Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "White Wing Solar, LLC",
        "POI Location": "Tap 345 kV (#60504) Tesla - (#6111) Riley\n",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 130.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-24T00:00:00",
        "Screening Study Started": "2025-08-13T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-08-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-01-12T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1137,
      "raw": {
        "INR": "27INR0334",
        "Project Name": "Buffalo Jump Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BOULEVARD ASSOCIATES, LLC",
        "POI Location": "1097 Culberson 345 KV",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 740,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-28T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2025-12-07T00:00:00",
        "FIS Requested": "2025-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0334",
        "Project Name": "Buffalo Jump Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BOULEVARD ASSOCIATES, LLC",
        "POI Location": "1097 Culberson 345 KV",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 740,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-28T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2025-12-07T00:00:00",
        "FIS Requested": "2025-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1138,
      "raw": {
        "INR": "27INR0337",
        "Project Name": "Jalisco Cogen ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HEP Power Generation, LLC",
        "POI Location": "8475  JAVELINA4A 138 KV",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 167.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-05T00:00:00",
        "FIS Requested": "2025-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0337",
        "Project Name": "Jalisco Cogen ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HEP Power Generation, LLC",
        "POI Location": "8475  JAVELINA4A 138 KV",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 167.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-05T00:00:00",
        "FIS Requested": "2025-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1139,
      "raw": {
        "INR": "27INR0338",
        "Project Name": "Billie Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Weslaco Storage LLC",
        "POI Location": "Tap 138kV 8357 North Weslaco – 8358 North Mercedes",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 83.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-02T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-27T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0338",
        "Project Name": "Billie Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Weslaco Storage LLC",
        "POI Location": "Tap 138kV 8357 North Weslaco – 8358 North Mercedes",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 83.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-02T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-27T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1140,
      "raw": {
        "INR": "27INR0342",
        "Project Name": "Dorsey Road BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Horizon Energy Storage Greenfield Project Holdings LLC",
        "POI Location": "Tap 138 kV Chavanea (5085) - Palo Alto (5330). ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-08-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-04T00:00:00",
        "Screening Study Started": "2025-03-06T00:00:00",
        "Screening Study Complete": "2025-06-03T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0342",
        "Project Name": "Dorsey Road BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Horizon Energy Storage Greenfield Project Holdings LLC",
        "POI Location": "Tap 138 kV Chavanea (5085) - Palo Alto (5330). ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-08-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-04T00:00:00",
        "Screening Study Started": "2025-03-06T00:00:00",
        "Screening Study Complete": "2025-06-03T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1141,
      "raw": {
        "INR": "27INR0348",
        "Project Name": "Johnson Grass Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Johnson Grass Solar ,LLC",
        "POI Location": "Tap 138kV (#11395) Navigation - (#10054) Cattlemen ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-30T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-09-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0348",
        "Project Name": "Johnson Grass Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Johnson Grass Solar ,LLC",
        "POI Location": "Tap 138kV (#11395) Navigation - (#10054) Cattlemen ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 195.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-30T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-09-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1142,
      "raw": {
        "INR": "27INR0354",
        "Project Name": "Cebocell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cebocell, LLC",
        "POI Location": "3137 BlackFork 138 KV",
        "County": "Smith",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-20T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0354",
        "Project Name": "Cebocell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cebocell, LLC",
        "POI Location": "3137 BlackFork 138 KV",
        "County": "Smith",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-20T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-13T00:00:00",
        "FIS Requested": "2024-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1143,
      "raw": {
        "INR": "27INR0355",
        "Project Name": "Gardner Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "59902 Sand Bluff 345kV ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 309.5,
        "Unnamed: 11": "COD  SFS/NtP",
        "Unnamed: 12": "2024-09-26T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-30T00:00:00",
        "FIS Requested": "2024-09-25T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0355",
        "Project Name": "Gardner Draw Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "59902 Sand Bluff 345kV ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 309.5,
        "Unnamed: 11": "COD  SFS/NtP",
        "Unnamed: 12": "2024-09-26T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-30T00:00:00",
        "FIS Requested": "2024-09-25T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1144,
      "raw": {
        "INR": "27INR0362",
        "Project Name": "Hamlet Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hamlet Solar, LLC",
        "POI Location": "Tap 138kV #5895 PEARSALL - #5827 MOORE",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-04T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0362",
        "Project Name": "Hamlet Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hamlet Solar, LLC",
        "POI Location": "Tap 138kV #5895 PEARSALL - #5827 MOORE",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-04T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1145,
      "raw": {
        "INR": "27INR0363",
        "Project Name": "Hamlet Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hamlet Solar, LLC",
        "POI Location": "Tap 138kV #5895 PEARSALL -#5827 MOORE",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0363",
        "Project Name": "Hamlet Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hamlet Solar, LLC",
        "POI Location": "Tap 138kV #5895 PEARSALL -#5827 MOORE",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1146,
      "raw": {
        "INR": "27INR0364",
        "Project Name": "Cashel BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TIPPSOL LLC",
        "POI Location": "6500 Live Oak AEP 138kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-22T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-26T00:00:00",
        "FIS Requested": "2024-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0364",
        "Project Name": "Cashel BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TIPPSOL LLC",
        "POI Location": "6500 Live Oak AEP 138kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-22T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-26T00:00:00",
        "FIS Requested": "2024-10-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1147,
      "raw": {
        "INR": "27INR0365",
        "Project Name": "Comanche BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ENERGOS BESS",
        "POI Location": "#1440 Comanche Switching Station 345kV",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 614.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2024-12-06T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-02-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0365",
        "Project Name": "Comanche BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "ENERGOS BESS",
        "POI Location": "#1440 Comanche Switching Station 345kV",
        "County": "Comanche",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 614.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2024-12-06T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-02-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-20T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1148,
      "raw": {
        "INR": "27INR0367",
        "Project Name": "Goat Mountain Wind-Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Goat Wind LLC",
        "POI Location": "76030 Gasconades Creek 345kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 303.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-10T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-07T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-02-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-06-15T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-18T00:00:00",
        "Meets All Planning": "2026-07-15T00:00:00",
        "Unnamed: 25": "2026-08-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0367",
        "Project Name": "Goat Mountain Wind-Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Goat Wind LLC",
        "POI Location": "76030 Gasconades Creek 345kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 303.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-10T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-07T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": "2026-01-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-02-20T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-06-15T00:00:00",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-06-18T00:00:00",
        "Meets All Planning": "2026-07-15T00:00:00",
        "Unnamed: 25": "2026-08-05T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1149,
      "raw": {
        "INR": "27INR0371",
        "Project Name": "Feather Dalea BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "59902 Sand_Bluff 345kV\n",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-16T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-09-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0371",
        "Project Name": "Feather Dalea BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "59902 Sand_Bluff 345kV\n",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-16T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-09-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1150,
      "raw": {
        "INR": "27INR0372",
        "Project Name": "Abeja Solar Farm",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Abeja Solar Farm LLC",
        "POI Location": "Tap 345kV 8012 PALADIO7A - 8689 TANGO7A",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.84,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-12-09T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0372",
        "Project Name": "Abeja Solar Farm",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Abeja Solar Farm LLC",
        "POI Location": "Tap 345kV 8012 PALADIO7A - 8689 TANGO7A",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.84,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-12-09T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2024-12-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-16T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1151,
      "raw": {
        "INR": "27INR0373",
        "Project Name": "Velado Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velado Solar, LLC",
        "POI Location": "Tap 138kV 78281 Dimmit - 8274 Conoco Chittam ",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 115.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0373",
        "Project Name": "Velado Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velado Solar, LLC",
        "POI Location": "Tap 138kV 78281 Dimmit - 8274 Conoco Chittam ",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 115.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1152,
      "raw": {
        "INR": "27INR0374",
        "Project Name": "Velado Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velado Solar, LLC",
        "POI Location": "Tap 138kv 78281 Dimmit - 8274 Conoco Chittam.",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 115.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-05T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0374",
        "Project Name": "Velado Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velado Solar, LLC",
        "POI Location": "Tap 138kv 78281 Dimmit - 8274 Conoco Chittam.",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 115.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-05T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1153,
      "raw": {
        "INR": "27INR0375",
        "Project Name": "Buck Ranch Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buck Ranch Solar, LLC",
        "POI Location": "5690 WEST GEORGE WEST SUB 69kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0375",
        "Project Name": "Buck Ranch Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buck Ranch Solar, LLC",
        "POI Location": "5690 WEST GEORGE WEST SUB 69kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1154,
      "raw": {
        "INR": "27INR0376",
        "Project Name": "Buck Ranch Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buck Ranch Solar, LLC",
        "POI Location": "5690 WEST GEORGE WEST SUB 69kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 40.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-13T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0376",
        "Project Name": "Buck Ranch Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buck Ranch Solar, LLC",
        "POI Location": "5690 WEST GEORGE WEST SUB 69kV",
        "County": "Live Oak",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 40.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-13T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1155,
      "raw": {
        "INR": "27INR0379",
        "Project Name": "Scrap Iron Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energiekontor US Texas SP 15 LLC",
        "POI Location": "Tap 138kV (#9) Bedias - (#25) North Zulch",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 110.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-02T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-06T00:00:00",
        "FIS Requested": "2025-04-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0379",
        "Project Name": "Scrap Iron Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energiekontor US Texas SP 15 LLC",
        "POI Location": "Tap 138kV (#9) Bedias - (#25) North Zulch",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 110.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-02T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-06T00:00:00",
        "FIS Requested": "2025-04-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1156,
      "raw": {
        "INR": "27INR0380",
        "Project Name": "La Mancha Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "La Mancha Solar, LLC",
        "POI Location": "Tap 69kV 5836 NBatesville  - 5822 Leona ",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0380",
        "Project Name": "La Mancha Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "La Mancha Solar, LLC",
        "POI Location": "Tap 69kV 5836 NBatesville  - 5822 Leona ",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1157,
      "raw": {
        "INR": "27INR0381",
        "Project Name": "La Mancha Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "La Mancha Storage, LLC",
        "POI Location": "Tap 69kV 5836 NBatesville - 5822 Leona ",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 40.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0381",
        "Project Name": "La Mancha Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "La Mancha Storage, LLC",
        "POI Location": "Tap 69kV 5836 NBatesville - 5822 Leona ",
        "County": "Zavala",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 40.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-07T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-14T00:00:00",
        "FIS Requested": "2024-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1158,
      "raw": {
        "INR": "27INR0382",
        "Project Name": "Calico BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "Tap 138 kV 8723 CANGREJO4A - 8721 BEECHER4A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-28T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-26T00:00:00",
        "FIS Requested": "2025-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0382",
        "Project Name": "Calico BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "Tap 138 kV 8723 CANGREJO4A - 8721 BEECHER4A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-28T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-26T00:00:00",
        "FIS Requested": "2025-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1159,
      "raw": {
        "INR": "27INR0383",
        "Project Name": "Windjammer Windpower",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Windjammer Windpower, LLC",
        "POI Location": "tap 345kV 59902 Sand Bluff Wind Farm  - 59907 Bernoulli ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 244.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-20T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-06T00:00:00",
        "FIS Requested": "2024-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-06T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0383",
        "Project Name": "Windjammer Windpower",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Windjammer Windpower, LLC",
        "POI Location": "tap 345kV 59902 Sand Bluff Wind Farm  - 59907 Bernoulli ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 244.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-20T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-06T00:00:00",
        "FIS Requested": "2024-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-06T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1160,
      "raw": {
        "INR": "27INR0384",
        "Project Name": "Straight Spur Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345 kV 23876 Clear Fork -11157 Gardenale Switch ",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 247.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0384",
        "Project Name": "Straight Spur Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345 kV 23876 Clear Fork -11157 Gardenale Switch ",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 247.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-06T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-03T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1161,
      "raw": {
        "INR": "27INR0385",
        "Project Name": "Straight Spur Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157)",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-17T00:00:00",
        "Screening Study Started": "2024-11-21T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0385",
        "Project Name": "Straight Spur Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157)",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-17T00:00:00",
        "Screening Study Started": "2024-11-21T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1162,
      "raw": {
        "INR": "27INR0386",
        "Project Name": "Straight Spur Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345kV ClearFork( Bus # 23876) to Gardenale Switch (Bus # 11157)\n",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0386",
        "Project Name": "Straight Spur Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345kV ClearFork( Bus # 23876) to Gardenale Switch (Bus # 11157)\n",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1163,
      "raw": {
        "INR": "27INR0389",
        "Project Name": "Sugaree Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sugaree Solar LLC",
        "POI Location": "138kV Escondido (8260) to Brackettville (8252)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-08T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-10-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-09-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0389",
        "Project Name": "Sugaree Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sugaree Solar LLC",
        "POI Location": "138kV Escondido (8260) to Brackettville (8252)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-08T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-10-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-09-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1164,
      "raw": {
        "INR": "27INR0390",
        "Project Name": "Diamond Sage Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "tap 345kV 80219 LOBO7A - 5709 FOWLER\nTONSW5 CKT2",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-28T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0390",
        "Project Name": "Diamond Sage Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "tap 345kV 80219 LOBO7A - 5709 FOWLER\nTONSW5 CKT2",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-28T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1165,
      "raw": {
        "INR": "27INR0392",
        "Project Name": "Cernan BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cernan BESS LLC",
        "POI Location": "Hillje 345kV (#44200)",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 10.04,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-12-23T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2025-01-30T00:00:00",
        "FIS Approved": "2025-10-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0392",
        "Project Name": "Cernan BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Cernan BESS LLC",
        "POI Location": "Hillje 345kV (#44200)",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 10.04,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-12-23T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2025-01-30T00:00:00",
        "FIS Approved": "2025-10-31T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1166,
      "raw": {
        "INR": "27INR0393",
        "Project Name": "Ferdinand Grid BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coval Infrastructure DevCo LLC",
        "POI Location": "5260 Leon Creek 138kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-14T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-04T00:00:00",
        "FIS Requested": "2024-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0393",
        "Project Name": "Ferdinand Grid BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coval Infrastructure DevCo LLC",
        "POI Location": "5260 Leon Creek 138kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-14T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-04T00:00:00",
        "FIS Requested": "2024-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1167,
      "raw": {
        "INR": "27INR0395",
        "Project Name": "Diamond Sage Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-21T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0395",
        "Project Name": "Diamond Sage Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 213.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-21T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1168,
      "raw": {
        "INR": "27INR0396",
        "Project Name": "Bluewind BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bluewind Energy Center, LLC",
        "POI Location": "5713 Oaks Substation 138kV",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 246.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-22T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0396",
        "Project Name": "Bluewind BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bluewind Energy Center, LLC",
        "POI Location": "5713 Oaks Substation 138kV",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 246.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-22T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1169,
      "raw": {
        "INR": "27INR0398",
        "Project Name": "Bravo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bravo BESS LLC",
        "POI Location": "Tap 345kV 80220 CENIZO7A - 80224 TIEMPO7A",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0398",
        "Project Name": "Bravo BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bravo BESS LLC",
        "POI Location": "Tap 345kV 80220 CENIZO7A - 80224 TIEMPO7A",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-20T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1170,
      "raw": {
        "INR": "27INR0399",
        "Project Name": "Resaca Oasis Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Resaca Oasis Storage, LLC",
        "POI Location": "# 79601 Stillman Substation 138 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-03T00:00:00",
        "Screening Study Started": "2024-12-12T00:00:00",
        "Screening Study Complete": "2025-03-03T00:00:00",
        "FIS Requested": "2024-11-22T00:00:00",
        "FIS Approved": "2025-10-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": "2025-06-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0399",
        "Project Name": "Resaca Oasis Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Resaca Oasis Storage, LLC",
        "POI Location": "# 79601 Stillman Substation 138 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-03T00:00:00",
        "Screening Study Started": "2024-12-12T00:00:00",
        "Screening Study Complete": "2025-03-03T00:00:00",
        "FIS Requested": "2024-11-22T00:00:00",
        "FIS Approved": "2025-10-10T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-05-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": "2025-06-03T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1171,
      "raw": {
        "INR": "27INR0400",
        "Project Name": "Reforzar BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "345 kV 80078 Reforzar",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-30T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0400",
        "Project Name": "Reforzar BESS 1",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "345 kV 80078 Reforzar",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-30T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-11-05T00:00:00",
        "FIS Approved": "2026-06-18T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1172,
      "raw": {
        "INR": "27INR0401",
        "Project Name": "Reforzar Bess 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "345 kV 80078 Reforzar",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0401",
        "Project Name": "Reforzar Bess 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "345 kV 80078 Reforzar",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-14T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1173,
      "raw": {
        "INR": "27INR0409",
        "Project Name": "Baker Branch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mockingbird Storage Center, LLC",
        "POI Location": "Pacific Switch  (PACSW)  345 kV Bus 11683",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 287.22,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-13T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-11T00:00:00",
        "FIS Requested": "2025-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0409",
        "Project Name": "Baker Branch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mockingbird Storage Center, LLC",
        "POI Location": "Pacific Switch  (PACSW)  345 kV Bus 11683",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 287.22,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-13T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-11T00:00:00",
        "FIS Requested": "2025-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1174,
      "raw": {
        "INR": "27INR0412",
        "Project Name": "Spinosa BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spinosa Energy Center, LLC",
        "POI Location": "Tap 138 kV Wichita Falls Cogen (#1498) – Pleasant Valley Switch (#1450)",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0412",
        "Project Name": "Spinosa BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spinosa Energy Center, LLC",
        "POI Location": "Tap 138 kV Wichita Falls Cogen (#1498) – Pleasant Valley Switch (#1450)",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1175,
      "raw": {
        "INR": "27INR0413",
        "Project Name": "Edgewood BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap Edgewood 138kV bus(3181) to 3174",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-21T00:00:00",
        "FIS Requested": "2025-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0413",
        "Project Name": "Edgewood BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap Edgewood 138kV bus(3181) to 3174",
        "County": "Van Zandt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-24T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-21T00:00:00",
        "FIS Requested": "2025-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1176,
      "raw": {
        "INR": "27INR0414",
        "Project Name": "Diamond Sage BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "tap 345kV 80219 LOBO7A - 5709 FOWLERTONSW5 CKT2\n",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-28T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0414",
        "Project Name": "Diamond Sage BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "tap 345kV 80219 LOBO7A - 5709 FOWLERTONSW5 CKT2\n",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-01-28T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-15T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1177,
      "raw": {
        "INR": "27INR0417",
        "Project Name": "Bluebonnet Trail Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Bluebonnet trail solar LLC",
        "POI Location": "Tap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5 ",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-18T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": "2026-07-30T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0417",
        "Project Name": "Bluebonnet Trail Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Bluebonnet trail solar LLC",
        "POI Location": "Tap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5 ",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-18T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": "2026-07-30T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1178,
      "raw": {
        "INR": "27INR0418",
        "Project Name": "Pioneer Path Energy Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0418",
        "Project Name": "Pioneer Path Energy Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1179,
      "raw": {
        "INR": "27INR0421",
        "Project Name": "M-Bar Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "M-Bar Energy I, LLC",
        "POI Location": "1141 Holt Switch Substation 138kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 30.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": "2026-08-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0421",
        "Project Name": "M-Bar Solar I",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "M-Bar Energy I, LLC",
        "POI Location": "1141 Holt Switch Substation 138kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 30.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": "2026-08-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1180,
      "raw": {
        "INR": "27INR0422",
        "Project Name": "M-Bar BESS I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "M-Bar Energy I, LLC",
        "POI Location": "1141 Holt Switch Substation 138 kV ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 82.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0422",
        "Project Name": "M-Bar BESS I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "M-Bar Energy I, LLC",
        "POI Location": "1141 Holt Switch Substation 138 kV ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 82.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1181,
      "raw": {
        "INR": "27INR0423",
        "Project Name": "Pioneer Path Energy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0423",
        "Project Name": "Pioneer Path Energy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1182,
      "raw": {
        "INR": "27INR0424",
        "Project Name": "Pioneer Path Energy Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0424",
        "Project Name": "Pioneer Path Energy Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1183,
      "raw": {
        "INR": "27INR0425",
        "Project Name": "Pioneer Path Energy Storage 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0425",
        "Project Name": "Pioneer Path Energy Storage 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1184,
      "raw": {
        "INR": "27INR0426",
        "Project Name": "Prairie Horizon Energy Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0426",
        "Project Name": "Prairie Horizon Energy Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1185,
      "raw": {
        "INR": "27INR0427",
        "Project Name": "Prairie Horizon Energy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0427",
        "Project Name": "Prairie Horizon Energy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1186,
      "raw": {
        "INR": "27INR0428",
        "Project Name": "Prairie Horizon Energy Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0428",
        "Project Name": "Prairie Horizon Energy Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1187,
      "raw": {
        "INR": "27INR0429",
        "Project Name": "Prairie Horizon Energy Storage 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0429",
        "Project Name": "Prairie Horizon Energy Storage 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power management LLC",
        "POI Location": "Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-03-21T00:00:00",
        "FIS Requested": "2025-01-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1188,
      "raw": {
        "INR": "27INR0432",
        "Project Name": "Coyote Ridge BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grenergy USA",
        "POI Location": "292 Holder 138 kV",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 111.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0432",
        "Project Name": "Coyote Ridge BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grenergy USA",
        "POI Location": "292 Holder 138 kV",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-10-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 111.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-16T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1189,
      "raw": {
        "INR": "27INR0434",
        "Project Name": "Lyra Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Juno Solar 4",
        "POI Location": "345kV MULESHOE (#59922)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-20T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0434",
        "Project Name": "Lyra Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Juno Solar 4",
        "POI Location": "345kV MULESHOE (#59922)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-20T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-07-01T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1190,
      "raw": {
        "INR": "27INR0435",
        "Project Name": "Clairemont Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Clairemont Solar LLC",
        "POI Location": "59908 Novaprime 345kV",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": "2026-08-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-11-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0435",
        "Project Name": "Clairemont Solar 1",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Clairemont Solar LLC",
        "POI Location": "59908 Novaprime 345kV",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": "2026-08-13T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-11-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1191,
      "raw": {
        "INR": "27INR0436",
        "Project Name": "Coati Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Bus # 40830, Humble, 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0436",
        "Project Name": "Coati Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Bus # 40830, Humble, 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 202.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1192,
      "raw": {
        "INR": "27INR0437",
        "Project Name": "Hondo Arroyo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hondo Creek Solar, LLC",
        "POI Location": "Tap 138 kV 5225 Hondo - 5813 Pearson",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-27T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0437",
        "Project Name": "Hondo Arroyo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hondo Creek Solar, LLC",
        "POI Location": "Tap 138 kV 5225 Hondo - 5813 Pearson",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-27T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-17T00:00:00",
        "FIS Requested": "2024-12-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1193,
      "raw": {
        "INR": "27INR0438",
        "Project Name": "Wisdom Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wisdom Green Energy LLC",
        "POI Location": "Tap 138 kV #38455 HOLIDAY SUB TNP -  #38450 SOAPTREE TNP",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 299.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-17T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0438",
        "Project Name": "Wisdom Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wisdom Green Energy LLC",
        "POI Location": "Tap 138 kV #38455 HOLIDAY SUB TNP -  #38450 SOAPTREE TNP",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 299.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-17T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1194,
      "raw": {
        "INR": "27INR0440",
        "Project Name": "Wisdom BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wisdom Green Energy LLC",
        "POI Location": "Tap 138 kV #38455 HOLIDAY SUB TNP - 138 kV #38450 SOAPTREE TNP",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-27T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-02-21T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0440",
        "Project Name": "Wisdom BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Wisdom Green Energy LLC",
        "POI Location": "Tap 138 kV #38455 HOLIDAY SUB TNP - 138 kV #38450 SOAPTREE TNP",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-06T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-27T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-02-21T00:00:00",
        "FIS Approved": "2025-10-09T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-03-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1195,
      "raw": {
        "INR": "27INR0441",
        "Project Name": "Pavo Creek Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pavo Creek Storage, LLC",
        "POI Location": "Tap #3659 Thorndale North - #3701 Rookie Switch 138 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-20T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0441",
        "Project Name": "Pavo Creek Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pavo Creek Storage, LLC",
        "POI Location": "Tap #3659 Thorndale North - #3701 Rookie Switch 138 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-20T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-09-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1196,
      "raw": {
        "INR": "27INR0443",
        "Project Name": "Serenity Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Serenity Wind, LLC",
        "POI Location": "23931 MIDPOINT SWITCH 345 kV ",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 473,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0443",
        "Project Name": "Serenity Wind ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Serenity Wind, LLC",
        "POI Location": "23931 MIDPOINT SWITCH 345 kV ",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 473,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1197,
      "raw": {
        "INR": "27INR0444",
        "Project Name": "Diamond Sage BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-21T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0444",
        "Project Name": "Diamond Sage BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "DGC Renewables, LLC",
        "POI Location": "Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-21T00:00:00",
        "FIS Requested": "2025-01-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1198,
      "raw": {
        "INR": "27INR0445",
        "Project Name": "Moon Chapel Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Orsted Onshore Development North America, LLC",
        "POI Location": "Tap 345kV 76090  Divide  - 76009 Twin Buttes Ckt 1",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 379.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-07T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0445",
        "Project Name": "Moon Chapel Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Orsted Onshore Development North America, LLC",
        "POI Location": "Tap 345kV 76090  Divide  - 76009 Twin Buttes Ckt 1",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 379.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-07T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1199,
      "raw": {
        "INR": "27INR0447",
        "Project Name": "Jay Flat BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Jay Flat BESS LLC",
        "POI Location": "59908 Novaprime 345kV",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 259.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0447",
        "Project Name": "Jay Flat BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Jay Flat BESS LLC",
        "POI Location": "59908 Novaprime 345kV",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 259.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-21T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1200,
      "raw": {
        "INR": "27INR0449",
        "Project Name": "Gulf Prairie Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Prairie Energy LLC",
        "POI Location": "(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 202.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-29T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0449",
        "Project Name": "Gulf Prairie Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Prairie Energy LLC",
        "POI Location": "(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 202.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-29T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1201,
      "raw": {
        "INR": "27INR0451",
        "Project Name": "Dairyland Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "To 345 kV Birthright Station (#11684)",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-07T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-18T00:00:00",
        "FIS Requested": "2025-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0451",
        "Project Name": "Dairyland Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "To 345 kV Birthright Station (#11684)",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-07T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-18T00:00:00",
        "FIS Requested": "2025-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1202,
      "raw": {
        "INR": "27INR0452",
        "Project Name": "Moccasin Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345kV #60707 Kirchhoff -  #60515 Clear Crossing CKT-1",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 603.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0452",
        "Project Name": "Moccasin Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "Tap 345kV #60707 Kirchhoff -  #60515 Clear Crossing CKT-1",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 603.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1203,
      "raw": {
        "INR": "27INR0453",
        "Project Name": "Roboman Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Roboman Solar, LLC",
        "POI Location": "Tap 345 kV (#76009) Twin Buttes  – (#76090) Divide  Ckt 1",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 272.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-26T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0453",
        "Project Name": "Roboman Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Roboman Solar, LLC",
        "POI Location": "Tap 345 kV (#76009) Twin Buttes  – (#76090) Divide  Ckt 1",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 272.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-26T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1204,
      "raw": {
        "INR": "27INR0455",
        "Project Name": "Yellow Leaf Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724) ",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 103.19,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-24T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0455",
        "Project Name": "Yellow Leaf Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724) ",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 103.19,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-24T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1205,
      "raw": {
        "INR": "27INR0456",
        "Project Name": "Yellow Leaf BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-24T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0456",
        "Project Name": "Yellow Leaf BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV Crandall (#2727) – Kaufman Northwest (#2724)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-24T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1206,
      "raw": {
        "INR": "27INR0457",
        "Project Name": "watermelon 1 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5   345.00 - 2432 TRICRN1_5   345.00 345kV line ckt 1. ",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0457",
        "Project Name": "watermelon 1 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5   345.00 - 2432 TRICRN1_5   345.00 345kV line ckt 1. ",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-13T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1207,
      "raw": {
        "INR": "27INR0458",
        "Project Name": "watermelon 2 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. ",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0458",
        "Project Name": "watermelon 2 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. ",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1208,
      "raw": {
        "INR": "27INR0459",
        "Project Name": "watermelon 3 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. 1.6 miles from 2427 WATMLL_W5",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0459",
        "Project Name": "watermelon 3 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. 1.6 miles from 2427 WATMLL_W5",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1209,
      "raw": {
        "INR": "27INR0460",
        "Project Name": "watermelon 4 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. ",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0460",
        "Project Name": "watermelon 4 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. ",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-16T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1210,
      "raw": {
        "INR": "27INR0461",
        "Project Name": "Fermata BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fermata BESS, LLC",
        "POI Location": "Tap 345kV 2464# CASHSW_T5 – 2461# ROYSE_N5",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-20T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0461",
        "Project Name": "Fermata BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fermata BESS, LLC",
        "POI Location": "Tap 345kV 2464# CASHSW_T5 – 2461# ROYSE_N5",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-20T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1211,
      "raw": {
        "INR": "27INR0465",
        "Project Name": "Althea Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sugaree Solar LLC",
        "POI Location": "Tap Escondido (8260) - Brackettville (8252)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2024-12-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-09-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-01-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0465",
        "Project Name": "Althea Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sugaree Solar LLC",
        "POI Location": "Tap Escondido (8260) - Brackettville (8252)",
        "County": "Maverick",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2024-12-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-09-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2026-01-08T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1212,
      "raw": {
        "INR": "27INR0466",
        "Project Name": "Wolfram Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy, LLC",
        "POI Location": "Dokmai 138kV Substation (bus #80090)",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2025-05-19T00:00:00",
        "Screening Study Complete": "2025-08-15T00:00:00",
        "FIS Requested": "2025-05-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0466",
        "Project Name": "Wolfram Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy, LLC",
        "POI Location": "Dokmai 138kV Substation (bus #80090)",
        "County": "Calhoun",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2025-05-19T00:00:00",
        "Screening Study Complete": "2025-08-15T00:00:00",
        "FIS Requested": "2025-05-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1213,
      "raw": {
        "INR": "27INR0469",
        "Project Name": "Kickstart Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0469",
        "Project Name": "Kickstart Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1214,
      "raw": {
        "INR": "27INR0470",
        "Project Name": "Kickstart Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0470",
        "Project Name": "Kickstart Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1215,
      "raw": {
        "INR": "27INR0471",
        "Project Name": "Kickstart Energy Storage III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV #1906 VENUS_S5  to #68091 NAVARRO ",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0471",
        "Project Name": "Kickstart Energy Storage III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV #1906 VENUS_S5  to #68091 NAVARRO ",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1216,
      "raw": {
        "INR": "27INR0472",
        "Project Name": "Kickstart Energy Storage IV",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV #1906 VENUS_S5  to #68091 NAVARRO ",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0472",
        "Project Name": "Kickstart Energy Storage IV",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "Tap 345 kV #1906 VENUS_S5  to #68091 NAVARRO ",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.44,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1217,
      "raw": {
        "INR": "27INR0474",
        "Project Name": "Fivemile Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "180 Wind LLC",
        "POI Location": "Tap 138kV Lamesa 138kv (10008) to Jim Payne 138kV (18880) ",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 282.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-25T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0474",
        "Project Name": "Fivemile Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "180 Wind LLC",
        "POI Location": "Tap 138kV Lamesa 138kv (10008) to Jim Payne 138kV (18880) ",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 282.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-25T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-04-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1218,
      "raw": {
        "INR": "27INR0478",
        "Project Name": "Metro BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Metro BESS LLC",
        "POI Location": "138 kV LYTTON8 (9075)",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-22T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0478",
        "Project Name": "Metro BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Metro BESS LLC",
        "POI Location": "138 kV LYTTON8 (9075)",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-22T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1219,
      "raw": {
        "INR": "27INR0480",
        "Project Name": "Borden Dino Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Borden Dino Solar, LLC",
        "POI Location": "59905 FARADAY 345KV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120.47,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0480",
        "Project Name": "Borden Dino Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Borden Dino Solar, LLC",
        "POI Location": "59905 FARADAY 345KV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 120.47,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1220,
      "raw": {
        "INR": "27INR0481",
        "Project Name": "Borden Dino BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Borden Dino Solar, LLC",
        "POI Location": "59905 FARADAY 345KV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0481",
        "Project Name": "Borden Dino BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Borden Dino Solar, LLC",
        "POI Location": "59905 FARADAY 345KV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-06T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1221,
      "raw": {
        "INR": "27INR0485",
        "Project Name": "Blackland Prairie 1 Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Balcones Ridge Resiliency LLC",
        "POI Location": "9328 Austrop 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-04-10T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0485",
        "Project Name": "Blackland Prairie 1 Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Balcones Ridge Resiliency LLC",
        "POI Location": "9328 Austrop 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-04-10T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1222,
      "raw": {
        "INR": "27INR0486",
        "Project Name": "Blackland Prairie 2 Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Balcones Ridge Resiliency II LLC",
        "POI Location": "9328 Austrop 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0486",
        "Project Name": "Blackland Prairie 2 Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Balcones Ridge Resiliency II LLC",
        "POI Location": "9328 Austrop 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1223,
      "raw": {
        "INR": "27INR0487",
        "Project Name": "Blackland Prairie 3 Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Balcones Ridge Resiliency II LLC",
        "POI Location": "9328 Austrop 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0487",
        "Project Name": "Blackland Prairie 3 Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Balcones Ridge Resiliency II LLC",
        "POI Location": "9328 Austrop 138kV",
        "County": "Travis",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1224,
      "raw": {
        "INR": "27INR0488",
        "Project Name": "Dry Creek Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Oak Hill Solar II LLC",
        "POI Location": "Dorsett 345 kV Switching Station(tap 345 kV 3100 Martin Lake - 3105 Elkton)",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.28,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-06-02T00:00:00",
        "FIS Approved": "2026-09-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0488",
        "Project Name": "Dry Creek Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Oak Hill Solar II LLC",
        "POI Location": "Dorsett 345 kV Switching Station(tap 345 kV 3100 Martin Lake - 3105 Elkton)",
        "County": "Rusk",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.28,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-06-02T00:00:00",
        "FIS Approved": "2026-09-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1225,
      "raw": {
        "INR": "27INR0489",
        "Project Name": "Power Lane II Gas - Alternate",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GEUS",
        "POI Location": "Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 104.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-07T00:00:00",
        "Screening Study Started": "2025-06-03T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-05-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0489",
        "Project Name": "Power Lane II Gas - Alternate",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "GEUS",
        "POI Location": "Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 104.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-07T00:00:00",
        "Screening Study Started": "2025-06-03T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-05-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1226,
      "raw": {
        "INR": "27INR0492",
        "Project Name": "Gulf Gateway Solar One",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Gateway Solar, LLC",
        "POI Location": "Tap 345 kV 8249 Angstrom - 8624 Grissom ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-03T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0492",
        "Project Name": "Gulf Gateway Solar One",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Gateway Solar, LLC",
        "POI Location": "Tap 345 kV 8249 Angstrom - 8624 Grissom ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-03T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1227,
      "raw": {
        "INR": "27INR0493",
        "Project Name": "Velociraptor BESS I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor BESS I, LLC",
        "POI Location": "10012 METEOR_5 Substation 345kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 246,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-15T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0493",
        "Project Name": "Velociraptor BESS I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor BESS I, LLC",
        "POI Location": "10012 METEOR_5 Substation 345kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 246,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-15T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1228,
      "raw": {
        "INR": "27INR0494",
        "Project Name": "Obbligato BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Obbligato BESS, LLC",
        "POI Location": "Tap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-06-06T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-10T00:00:00",
        "FIS Requested": "2025-06-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0494",
        "Project Name": "Obbligato BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Obbligato BESS, LLC",
        "POI Location": "Tap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-02-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-06-06T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-10T00:00:00",
        "FIS Requested": "2025-06-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1229,
      "raw": {
        "INR": "27INR0497",
        "Project Name": "Black Mountain Somervell Gas Combined",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth Power Core LLC",
        "POI Location": "Dinosaur Switch (#15208)",
        "County": "Somervell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 495.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-11T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0497",
        "Project Name": "Black Mountain Somervell Gas Combined",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth Power Core LLC",
        "POI Location": "Dinosaur Switch (#15208)",
        "County": "Somervell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 495.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-11T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1230,
      "raw": {
        "INR": "27INR0498",
        "Project Name": "Infrakey Waco Data Park Gas 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Infrakey Capital LLC",
        "POI Location": "252 BOSQUESW8 138kV\n(Brazos Connection)",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-30T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2026-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0498",
        "Project Name": "Infrakey Waco Data Park Gas 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Infrakey Capital LLC",
        "POI Location": "252 BOSQUESW8 138kV\n(Brazos Connection)",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-30T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2026-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1231,
      "raw": {
        "INR": "27INR0499",
        "Project Name": "Draco Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Draco Solar LLC",
        "POI Location": "Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-08-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-31T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0499",
        "Project Name": "Draco Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Draco Solar LLC",
        "POI Location": "Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-08-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-31T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1232,
      "raw": {
        "INR": "27INR0500",
        "Project Name": "Antila Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Antila Solar LLC",
        "POI Location": "#59916 Buck Canyon 345kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-01T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0500",
        "Project Name": "Antila Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Antila Solar LLC",
        "POI Location": "#59916 Buck Canyon 345kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-01T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-08-13T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1233,
      "raw": {
        "INR": "27INR0501",
        "Project Name": "Mesquite Creek Windpower Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mesquite Creek Wind LLC",
        "POI Location": "<59900><Long Draw><345>",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 214.2,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-26T00:00:00",
        "FIS Requested": "2025-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0501",
        "Project Name": "Mesquite Creek Windpower Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mesquite Creek Wind LLC",
        "POI Location": "<59900><Long Draw><345>",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 214.2,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-26T00:00:00",
        "FIS Requested": "2025-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1234,
      "raw": {
        "INR": "27INR0503",
        "Project Name": "Dog Star Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dog Star Solar LLC",
        "POI Location": "Bluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 499.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-25T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0503",
        "Project Name": "Dog Star Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dog Star Solar LLC",
        "POI Location": "Bluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 499.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-25T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-16T00:00:00",
        "FIS Requested": "2025-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1235,
      "raw": {
        "INR": "27INR0504",
        "Project Name": "Dog Star Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dog Star Solar LLC",
        "POI Location": "Bluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 499.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-25T00:00:00",
        "Screening Study Started": "2025-07-02T00:00:00",
        "Screening Study Complete": "2025-09-19T00:00:00",
        "FIS Requested": "2025-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0504",
        "Project Name": "Dog Star Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dog Star Solar LLC",
        "POI Location": "Bluff Creek (Bus #60040) to Mulberry Creek (Bus #6235) 345 kV",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 499.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-25T00:00:00",
        "Screening Study Started": "2025-07-02T00:00:00",
        "Screening Study Complete": "2025-09-19T00:00:00",
        "FIS Requested": "2025-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1236,
      "raw": {
        "INR": "27INR0510",
        "Project Name": "Pecos Wind",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Midnight Energy Center, LLC",
        "POI Location": "Tap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 193.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-23T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-03-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0510",
        "Project Name": "Pecos Wind",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Midnight Energy Center, LLC",
        "POI Location": "Tap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 193.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-23T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-03-18T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1237,
      "raw": {
        "INR": "27INR0512",
        "Project Name": "Silver Hills Windpower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silver Hills Windpower, LLC",
        "POI Location": "10066 Prong Moss Switch 138kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 54.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0512",
        "Project Name": "Silver Hills Windpower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silver Hills Windpower, LLC",
        "POI Location": "10066 Prong Moss Switch 138kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 54.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1238,
      "raw": {
        "INR": "27INR0524",
        "Project Name": "Portland Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Convergent Energy Solutions LLC",
        "POI Location": "8566 HOT IRON 4A 138 kV\n8569 HOT IRON 4B 138 kV\n\n(2) POIs will be used for this project because there are (2) 138 kV lines supplying the ArcelorMittal plant. Project physical connection will be 13.8 kV bus at ArcelorMittal.\n",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-01-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-30T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0524",
        "Project Name": "Portland Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Convergent Energy Solutions LLC",
        "POI Location": "8566 HOT IRON 4A 138 kV\n8569 HOT IRON 4B 138 kV\n\n(2) POIs will be used for this project because there are (2) 138 kV lines supplying the ArcelorMittal plant. Project physical connection will be 13.8 kV bus at ArcelorMittal.\n",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-01-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-30T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1239,
      "raw": {
        "INR": "27INR0529",
        "Project Name": "Zeus Scurry Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Scurry Solar, LLC",
        "POI Location": "MHOS 345 kV Substation (#59911)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2025-06-03T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0529",
        "Project Name": "Zeus Scurry Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Scurry Solar, LLC",
        "POI Location": "MHOS 345 kV Substation (#59911)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2025-06-03T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1240,
      "raw": {
        "INR": "27INR0531",
        "Project Name": "Erika BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Erika Solar, LLC",
        "POI Location": "Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0531",
        "Project Name": "Erika BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Erika Solar, LLC",
        "POI Location": "Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1241,
      "raw": {
        "INR": "27INR0535",
        "Project Name": "Zeus Scurry BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zeus Scurry BESS",
        "POI Location": "MHOS 345 kV Substation (#59911)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1043.07,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0535",
        "Project Name": "Zeus Scurry BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zeus Scurry BESS",
        "POI Location": "MHOS 345 kV Substation (#59911)",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1043.07,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-02T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1242,
      "raw": {
        "INR": "27INR0536",
        "Project Name": "Siete Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Siete Wind, LLC",
        "POI Location": "345kV 8718 Triada",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-03T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 492.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-25T00:00:00",
        "FIS Requested": "2025-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0536",
        "Project Name": "Siete Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Siete Wind, LLC",
        "POI Location": "345kV 8718 Triada",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-03T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 492.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-25T00:00:00",
        "FIS Requested": "2025-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1243,
      "raw": {
        "INR": "27INR0554",
        "Project Name": "Texas Sun Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pigg Grounds LLC",
        "POI Location": "Cordele Substation ; Bus no. 5524",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 71.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-11-19T00:00:00",
        "FIS Requested": "2025-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0554",
        "Project Name": "Texas Sun Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pigg Grounds LLC",
        "POI Location": "Cordele Substation ; Bus no. 5524",
        "County": "Jackson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-12-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 71.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-11-19T00:00:00",
        "FIS Requested": "2025-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1244,
      "raw": {
        "INR": "27INR0555",
        "Project Name": "Montezuma Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Montezuma Storage LLC",
        "POI Location": "L_GLIDDE8_1Y; Bus number - 7258 138KV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-10-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 183.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-09-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0555",
        "Project Name": "Montezuma Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Montezuma Storage LLC",
        "POI Location": "L_GLIDDE8_1Y; Bus number - 7258 138KV",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-10-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 183.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-09-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1245,
      "raw": {
        "INR": "27INR0556",
        "Project Name": "Gulf Gateway Storage One ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Gateway Storage, LLC",
        "POI Location": "Tap 345 kV 8249 Angstrom - 8624 Grissom ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0556",
        "Project Name": "Gulf Gateway Storage One ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Gateway Storage, LLC",
        "POI Location": "Tap 345 kV 8249 Angstrom - 8624 Grissom ",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1246,
      "raw": {
        "INR": "27INR0557",
        "Project Name": "STP Unit2 High Pressure Turbine Upgrade",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Constellation South Texas, LLC",
        "POI Location": "5915 SO_TEX__345A 345 kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-04-23T00:00:00",
        "Fuel": "NUC",
        "Technology": "ST",
        "Capacity (MW)": 1336.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-28T00:00:00",
        "Screening Study Started": "2026-04-30T00:00:00",
        "Screening Study Complete": "2026-07-24T00:00:00",
        "FIS Requested": "2026-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2026-09-10T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0557",
        "Project Name": "STP Unit2 High Pressure Turbine Upgrade",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Constellation South Texas, LLC",
        "POI Location": "5915 SO_TEX__345A 345 kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-04-23T00:00:00",
        "Fuel": "NUC",
        "Technology": "ST",
        "Capacity (MW)": 1336.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-28T00:00:00",
        "Screening Study Started": "2026-04-30T00:00:00",
        "Screening Study Complete": "2026-07-24T00:00:00",
        "FIS Requested": "2026-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "2026-09-10T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1247,
      "raw": {
        "INR": "27INR0562",
        "Project Name": "Frizzle BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Frizzle BESS, L.L.C. ",
        "POI Location": "#38143, TNSLVRLEAF1, 138kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-09-11T00:00:00",
        "Screening Study Complete": "2025-11-11T00:00:00",
        "FIS Requested": "2025-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0562",
        "Project Name": "Frizzle BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Frizzle BESS, L.L.C. ",
        "POI Location": "#38143, TNSLVRLEAF1, 138kV",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 180.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-09-11T00:00:00",
        "Screening Study Complete": "2025-11-11T00:00:00",
        "FIS Requested": "2025-09-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1248,
      "raw": {
        "INR": "27INR0570",
        "Project Name": "Sisters Solar - Phase 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Oberon Solar IV, LLC",
        "POI Location": "10009 McGee 345 kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-23T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-14T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0570",
        "Project Name": "Sisters Solar - Phase 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Oberon Solar IV, LLC",
        "POI Location": "10009 McGee 345 kV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-23T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-14T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1249,
      "raw": {
        "INR": "27INR0571",
        "Project Name": "Nabla Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nabla Park LLC",
        "POI Location": "Double Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 750,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0571",
        "Project Name": "Nabla Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nabla Park LLC",
        "POI Location": "Double Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 750,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1250,
      "raw": {
        "INR": "27INR0572",
        "Project Name": "Kilby1 Part 1 Small Block Simple Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-04T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 371,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-16T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2026-01-06T00:00:00",
        "FIS Requested": "2025-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0572",
        "Project Name": "Kilby1 Part 1 Small Block Simple Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-04T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 371,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-16T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2026-01-06T00:00:00",
        "FIS Requested": "2025-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1251,
      "raw": {
        "INR": "27INR0575",
        "Project Name": "Trailblazer Natural Gas Generation Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trailblazer Infrastructure LLC",
        "POI Location": "11420 Sweetwater East Switch 345 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1026,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-29T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0575",
        "Project Name": "Trailblazer Natural Gas Generation Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trailblazer Infrastructure LLC",
        "POI Location": "11420 Sweetwater East Switch 345 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1026,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-29T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1252,
      "raw": {
        "INR": "27INR0576",
        "Project Name": "Trailblazer BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trailblazer Infrastructure LLC",
        "POI Location": "11420 Sweetwater East Switch 345 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 261.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-24T00:00:00",
        "Screening Study Started": "2026-03-18T00:00:00",
        "Screening Study Complete": "2026-06-15T00:00:00",
        "FIS Requested": "2026-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0576",
        "Project Name": "Trailblazer BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trailblazer Infrastructure LLC",
        "POI Location": "11420 Sweetwater East Switch 345 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 261.97,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-24T00:00:00",
        "Screening Study Started": "2026-03-18T00:00:00",
        "Screening Study Complete": "2026-06-15T00:00:00",
        "FIS Requested": "2026-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1253,
      "raw": {
        "INR": "27INR0578",
        "Project Name": "Trailblazer Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trailblazer Infrastructure LLC",
        "POI Location": "#11420 Sweetwater East Switch 345 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 323.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-18T00:00:00",
        "Screening Study Started": "2026-03-18T00:00:00",
        "Screening Study Complete": "2026-06-15T00:00:00",
        "FIS Requested": "2026-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0578",
        "Project Name": "Trailblazer Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Trailblazer Infrastructure LLC",
        "POI Location": "#11420 Sweetwater East Switch 345 kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-12T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 323.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-18T00:00:00",
        "Screening Study Started": "2026-03-18T00:00:00",
        "Screening Study Complete": "2026-06-15T00:00:00",
        "FIS Requested": "2026-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1254,
      "raw": {
        "INR": "27INR0581",
        "Project Name": "Limitless Energy Hub I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Limitless Energy Hub I LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1238.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0581",
        "Project Name": "Limitless Energy Hub I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Limitless Energy Hub I LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1238.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1255,
      "raw": {
        "INR": "27INR0582",
        "Project Name": "Limitless Energy Hub II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Limitless Energy Hub II LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1238.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0582",
        "Project Name": "Limitless Energy Hub II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Limitless Energy Hub II LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B.",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1238.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1256,
      "raw": {
        "INR": "27INR0584",
        "Project Name": "Lytton Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Lytton Springs LLC",
        "POI Location": "Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 55.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-01T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0584",
        "Project Name": "Lytton Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Lytton Springs LLC",
        "POI Location": "Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 55.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-01T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1257,
      "raw": {
        "INR": "27INR0585",
        "Project Name": "Lytton Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Lytton Springs LLC",
        "POI Location": "Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 76.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-01T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0585",
        "Project Name": "Lytton Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SMT Lytton Springs LLC",
        "POI Location": "Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 76.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-01T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1258,
      "raw": {
        "INR": "27INR0593",
        "Project Name": "Pecan Ridge",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Luminous Energy Renewables LLC",
        "POI Location": "60386 HEARTLAN2A 69kV",
        "County": "McCulloch",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-09T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-01-13T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0593",
        "Project Name": "Pecan Ridge",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Luminous Energy Renewables LLC",
        "POI Location": "60386 HEARTLAN2A 69kV",
        "County": "McCulloch",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.79,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-09T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-01-13T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1259,
      "raw": {
        "INR": "27INR0606",
        "Project Name": "Big Watt Mustang Power",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Watt Power Mustang LLC",
        "POI Location": "Tapping the 138 kV line from Taylor (Bus#3658) to Thorndale North (Bus#3659)",
        "County": "Williamson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 448.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-03-13T00:00:00",
        "Screening Study Started": "2026-03-16T00:00:00",
        "Screening Study Complete": "2026-06-05T00:00:00",
        "FIS Requested": "2026-03-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0606",
        "Project Name": "Big Watt Mustang Power",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Watt Power Mustang LLC",
        "POI Location": "Tapping the 138 kV line from Taylor (Bus#3658) to Thorndale North (Bus#3659)",
        "County": "Williamson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 448.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-03-13T00:00:00",
        "Screening Study Started": "2026-03-16T00:00:00",
        "Screening Study Complete": "2026-06-05T00:00:00",
        "FIS Requested": "2026-03-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1260,
      "raw": {
        "INR": "27INR0607",
        "Project Name": "Prairie Phoenix Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Hill Wind Project LLC",
        "POI Location": "3403 Lake Hall 345kV\n",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-24T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-11T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-01T00:00:00",
        "FIS Requested": "2026-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0607",
        "Project Name": "Prairie Phoenix Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Hill Wind Project LLC",
        "POI Location": "3403 Lake Hall 345kV\n",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-08-24T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 297.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-11T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-01T00:00:00",
        "FIS Requested": "2026-02-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1261,
      "raw": {
        "INR": "27INR0611",
        "Project Name": " Bodkin BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bodkin BESS, LLC",
        "POI Location": "The 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-23T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0611",
        "Project Name": " Bodkin BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bodkin BESS, LLC",
        "POI Location": "The 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-23T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1262,
      "raw": {
        "INR": "27INR0618",
        "Project Name": "Prairie Point Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Point LLC",
        "POI Location": "RAMHORNH 5 - 31875",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1000,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0618",
        "Project Name": "Prairie Point Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Point LLC",
        "POI Location": "RAMHORNH 5 - 31875",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1000,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1263,
      "raw": {
        "INR": "27INR0619",
        "Project Name": "Prairie Point Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Point LLC",
        "POI Location": "RAMHORNH 5 - 31875",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1000,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0619",
        "Project Name": "Prairie Point Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Point LLC",
        "POI Location": "RAMHORNH 5 - 31875",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1000,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1264,
      "raw": {
        "INR": "27INR0620",
        "Project Name": "st gall IIIA Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power Management LLC",
        "POI Location": "38355 LEON_CRK 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-22T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-07T00:00:00",
        "FIS Requested": "2026-03-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0620",
        "Project Name": "st gall IIIA Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power Management LLC",
        "POI Location": "38355 LEON_CRK 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-22T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-07T00:00:00",
        "FIS Requested": "2026-03-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1265,
      "raw": {
        "INR": "27INR0621",
        "Project Name": "st gall IIIB Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power Management LLC",
        "POI Location": "38355 LEON_CRK 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-22T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-07T00:00:00",
        "FIS Requested": "2026-03-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0621",
        "Project Name": "st gall IIIB Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power Management LLC",
        "POI Location": "38355 LEON_CRK 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-22T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-07T00:00:00",
        "FIS Requested": "2026-03-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1266,
      "raw": {
        "INR": "27INR0623",
        "Project Name": "Helion Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Helion Solar LLC",
        "POI Location": "59912 GALVANI 345",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-30T00:00:00",
        "Screening Study Started": "2026-05-15T00:00:00",
        "Screening Study Complete": "2026-08-12T00:00:00",
        "FIS Requested": "2026-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0623",
        "Project Name": "Helion Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Helion Solar LLC",
        "POI Location": "59912 GALVANI 345",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-10-22T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-30T00:00:00",
        "Screening Study Started": "2026-05-15T00:00:00",
        "Screening Study Complete": "2026-08-12T00:00:00",
        "FIS Requested": "2026-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1267,
      "raw": {
        "INR": "27INR0624",
        "Project Name": "Helion BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Helion BESS",
        "POI Location": "59912 GALVANI 345",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-30T00:00:00",
        "Screening Study Started": "2026-05-15T00:00:00",
        "Screening Study Complete": "2026-08-12T00:00:00",
        "FIS Requested": "2026-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0624",
        "Project Name": "Helion BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Helion BESS",
        "POI Location": "59912 GALVANI 345",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-30T00:00:00",
        "Screening Study Started": "2026-05-15T00:00:00",
        "Screening Study Complete": "2026-08-12T00:00:00",
        "FIS Requested": "2026-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1268,
      "raw": {
        "INR": "27INR0625",
        "Project Name": "Hornet Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hornet Energy Storage LLC",
        "POI Location": "23901 OZARKTRAIL_5 345kV",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-04-09T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0625",
        "Project Name": "Hornet Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hornet Energy Storage LLC",
        "POI Location": "23901 OZARKTRAIL_5 345kV",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-04-09T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1269,
      "raw": {
        "INR": "27INR0627",
        "Project Name": "Redbird BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Redbird BESS, LLC ",
        "POI Location": "44090 Cedar Creek 345kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-27T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0627",
        "Project Name": "Redbird BESS ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Redbird BESS, LLC ",
        "POI Location": "44090 Cedar Creek 345kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-27T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-07-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1270,
      "raw": {
        "INR": "27INR0631",
        "Project Name": "Power Lane II - Gas",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "GEUS",
        "POI Location": "GREENV_IN_8 (977) via (future) GEUS_STM Substation",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 104.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-17T00:00:00",
        "Screening Study Started": "2026-08-17T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0631",
        "Project Name": "Power Lane II - Gas",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "GEUS",
        "POI Location": "GREENV_IN_8 (977) via (future) GEUS_STM Substation",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-08-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 104.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-17T00:00:00",
        "Screening Study Started": "2026-08-17T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1271,
      "raw": {
        "INR": "27INR0636",
        "Project Name": "Myrtle Solar Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Myrtle Solar, LLC",
        "POI Location": "42110 Angleton 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 314.27,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-10T00:00:00",
        "Screening Study Started": "2026-09-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-10T00:00:00",
        "FIS Approved": "2026-09-15T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0636",
        "Project Name": "Myrtle Solar Repower",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Myrtle Solar, LLC",
        "POI Location": "42110 Angleton 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 314.27,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-10T00:00:00",
        "Screening Study Started": "2026-09-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-10T00:00:00",
        "FIS Approved": "2026-09-15T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1272,
      "raw": {
        "INR": "27INR0646",
        "Project Name": "Files BESS SLF",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Files BESS",
        "POI Location": "Fort Smith Switch (#3389) 345 kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 34,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-07-20T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0646",
        "Project Name": "Files BESS SLF",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Files BESS",
        "POI Location": "Fort Smith Switch (#3389) 345 kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 34,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-07-20T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1273,
      "raw": {
        "INR": "27INR0651",
        "Project Name": "Three Canes Gas P1",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CleanAI, LLC",
        "POI Location": "#3344 Tarantula Switching Station",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-02T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0651",
        "Project Name": "Three Canes Gas P1",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CleanAI, LLC",
        "POI Location": "#3344 Tarantula Switching Station",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-02T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1274,
      "raw": {
        "INR": "27INR0652",
        "Project Name": "Three Canes Gas P2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CleanAI, LLC",
        "POI Location": "Tap on the 345 kV Outlaw Switch (bus #3386) to Limestone Plant Station (bus #46020) Transmission Line",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-02T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0652",
        "Project Name": "Three Canes Gas P2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CleanAI, LLC",
        "POI Location": "Tap on the 345 kV Outlaw Switch (bus #3386) to Limestone Plant Station (bus #46020) Transmission Line",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2027-11-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-02T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1275,
      "raw": {
        "INR": "27INR0653",
        "Project Name": "Rock House Draw Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longfellow Power LLC",
        "POI Location": "38431 TNCENTRY1_1 138 KV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 523,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-25T00:00:00",
        "Screening Study Started": "2026-06-25T00:00:00",
        "Screening Study Complete": "2026-09-20T00:00:00",
        "FIS Requested": "2026-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0653",
        "Project Name": "Rock House Draw Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Longfellow Power LLC",
        "POI Location": "38431 TNCENTRY1_1 138 KV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-11-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 523,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-25T00:00:00",
        "Screening Study Started": "2026-06-25T00:00:00",
        "Screening Study Complete": "2026-09-20T00:00:00",
        "FIS Requested": "2026-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1276,
      "raw": {
        "INR": "27INR0655",
        "Project Name": "Lynx Energy Storage_Full",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Corpus Battery Storage, LLC",
        "POI Location": "PRIMAVERA 138kV Substation",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "MWH",
        "Technology": "SO",
        "Capacity (MW)": 50,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-08-20T00:00:00",
        "Screening Study Started": "2026-08-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "27INR0655",
        "Project Name": "Lynx Energy Storage_Full",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Corpus Battery Storage, LLC",
        "POI Location": "PRIMAVERA 138kV Substation",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-12-01T00:00:00",
        "Fuel": "MWH",
        "Technology": "SO",
        "Capacity (MW)": 50,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-08-20T00:00:00",
        "Screening Study Started": "2026-08-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1277,
      "raw": {
        "INR": "28INR0005",
        "Project Name": "Tetris Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings LLC   ",
        "POI Location": "TAP 345kV 80307 Del Sol 7C - 80225 Cenizo 7C\n",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 359,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-15T00:00:00",
        "Screening Study Started": "2023-07-28T00:00:00",
        "Screening Study Complete": "2023-10-23T00:00:00",
        "FIS Requested": "2023-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0005",
        "Project Name": "Tetris Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings LLC   ",
        "POI Location": "TAP 345kV 80307 Del Sol 7C - 80225 Cenizo 7C\n",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 359,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-15T00:00:00",
        "Screening Study Started": "2023-07-28T00:00:00",
        "Screening Study Complete": "2023-10-23T00:00:00",
        "FIS Requested": "2023-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1278,
      "raw": {
        "INR": "28INR0008",
        "Project Name": "Oriole Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rolling Plains Solar",
        "POI Location": "Tap 345kV 6076 Foxtail - 60791 Perigee ",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-03T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0008",
        "Project Name": "Oriole Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rolling Plains Solar",
        "POI Location": "Tap 345kV 6076 Foxtail - 60791 Perigee ",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-05-03T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1279,
      "raw": {
        "INR": "28INR0009",
        "Project Name": "Oriole BES",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rolling Plains Solar",
        "POI Location": "Tap 345kV 6076 Foxtail - 60791 Perigee",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-28T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0009",
        "Project Name": "Oriole BES",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rolling Plains Solar",
        "POI Location": "Tap 345kV 6076 Foxtail - 60791 Perigee",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-04-28T00:00:00",
        "Screening Study Started": "2023-05-15T00:00:00",
        "Screening Study Complete": "2023-08-11T00:00:00",
        "FIS Requested": "2023-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-08T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1280,
      "raw": {
        "INR": "28INR0013",
        "Project Name": "Varadero Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "#68092 Liberty Station 345kV",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-03T00:00:00",
        "FIS Requested": "2023-07-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-20T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0013",
        "Project Name": "Varadero Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC   ",
        "POI Location": "#68092 Liberty Station 345kV",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 206,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-06-26T00:00:00",
        "Screening Study Started": "2023-07-10T00:00:00",
        "Screening Study Complete": "2023-10-03T00:00:00",
        "FIS Requested": "2023-07-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-12T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-04-20T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1281,
      "raw": {
        "INR": "28INR0017",
        "Project Name": "Sitges Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Whistling Flats Wind, LLC",
        "POI Location": "Tap 345kV 59904 Cottonwood–60500 Edith Clarke",
        "County": "Motley",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0017",
        "Project Name": "Sitges Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Whistling Flats Wind, LLC",
        "POI Location": "Tap 345kV 59904 Cottonwood–60500 Edith Clarke",
        "County": "Motley",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1282,
      "raw": {
        "INR": "28INR0020",
        "Project Name": "Caracara Energy Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FRESH AIR ENERGY II, LLC",
        "POI Location": "Tap 138kV 5055 Cagnon - 5346 Potranco ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-19T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0020",
        "Project Name": "Caracara Energy Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "FRESH AIR ENERGY II, LLC",
        "POI Location": "Tap 138kV 5055 Cagnon - 5346 Potranco ",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-08-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-19T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-08-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1283,
      "raw": {
        "INR": "28INR0023",
        "Project Name": "Silverton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "Tap 345kV 23914 Tule Canyon - 79001 Cross_W1",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 410,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-01T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2024-03-18T21:53:38",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0023",
        "Project Name": "Silverton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "Tap 345kV 23914 Tule Canyon - 79001 Cross_W1",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 410,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-01T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2024-03-18T21:53:38",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1284,
      "raw": {
        "INR": "28INR0024",
        "Project Name": "Padua Grid BESS Unit 3",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Padua Grid 3, LLC",
        "POI Location": "Tap #5395 O.W Sommer 138kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-14T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-01T00:00:00",
        "FIS Approved": "2025-06-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-06-20T00:00:00",
        "Meets All Planning": "2025-07-17T00:00:00",
        "Unnamed: 25": "2025-07-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-12T00:00:00",
        "Approved for Synchronization": "2026-06-22T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0024",
        "Project Name": "Padua Grid BESS Unit 3",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Padua Grid 3, LLC",
        "POI Location": "Tap #5395 O.W Sommer 138kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-14T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-01T00:00:00",
        "FIS Approved": "2025-06-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-03-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": "2025-06-20T00:00:00",
        "Meets All Planning": "2025-07-17T00:00:00",
        "Unnamed: 25": "2025-07-17T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-12T00:00:00",
        "Approved for Synchronization": "2026-06-22T00:00:00",
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1285,
      "raw": {
        "INR": "28INR0029",
        "Project Name": "Old Fiddler Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Old Fiddler Energy Storage LLC",
        "POI Location": "3233 Foggle Switch 138 kV",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 224.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-19T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0029",
        "Project Name": "Old Fiddler Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Old Fiddler Energy Storage LLC",
        "POI Location": "3233 Foggle Switch 138 kV",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 224.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-19T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1286,
      "raw": {
        "INR": "28INR0030",
        "Project Name": "Brela BESS LLC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brela BESS LLC",
        "POI Location": "44040 Bailey SW 345 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-06-13T08:58:20",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0030",
        "Project Name": "Brela BESS LLC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brela BESS LLC",
        "POI Location": "44040 Bailey SW 345 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 251.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-26T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-08T00:00:00",
        "FIS Requested": "2024-06-13T08:58:20",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1287,
      "raw": {
        "INR": "28INR0037",
        "Project Name": "Bullring Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Halcon Wind, LLC",
        "POI Location": "Tap 345 kV  80355 DelSol7A - 80079 Cruce Ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 303.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-21T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0037",
        "Project Name": "Bullring Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Halcon Wind, LLC",
        "POI Location": "Tap 345 kV  80355 DelSol7A - 80079 Cruce Ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 303.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-21T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1288,
      "raw": {
        "INR": "28INR0038",
        "Project Name": "Bullring Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Halcon Wind, LLC",
        "POI Location": "Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 303.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-19T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0038",
        "Project Name": "Bullring Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Halcon Wind, LLC",
        "POI Location": "Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 303.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-19T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1289,
      "raw": {
        "INR": "28INR0039",
        "Project Name": "Bullring Wind 3",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Halcon Wind, LLC",
        "POI Location": "Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 190.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-19T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0039",
        "Project Name": "Bullring Wind 3",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Halcon Wind, LLC",
        "POI Location": "Tap 345 kV 80355 DelSol7A - 80079 Cruce Ckt 1",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 190.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-19T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-11-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-01-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1290,
      "raw": {
        "INR": "28INR0040",
        "Project Name": "Black Hawk Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ACE DevCo NC, LLC",
        "POI Location": "San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027. ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0040",
        "Project Name": "Black Hawk Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ACE DevCo NC, LLC",
        "POI Location": "San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027. ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.34,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-24T00:00:00",
        "FIS Requested": "2024-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1291,
      "raw": {
        "INR": "28INR0043",
        "Project Name": "Sendero Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ACE DevCo NC, LLC",
        "POI Location": "Tap 345kV 80079 Cruce - 80355 Del Sol",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.69,
        "Unnamed: 11": "Proj Name     ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-09T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0043",
        "Project Name": "Sendero Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ACE DevCo NC, LLC",
        "POI Location": "Tap 345kV 80079 Cruce - 80355 Del Sol",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.69,
        "Unnamed: 11": "Proj Name     ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2024-01-11T00:00:00",
        "Screening Study Complete": "2024-04-09T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1292,
      "raw": {
        "INR": "28INR0048",
        "Project Name": "Findley BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Adon Texas Sixteen LLC",
        "POI Location": "Tap 69kV #107 Prairie Hill - #99 Ben Hur ",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-23T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-16T00:00:00",
        "FIS Approved": "2026-01-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0048",
        "Project Name": "Findley BESS",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Adon Texas Sixteen LLC",
        "POI Location": "Tap 69kV #107 Prairie Hill - #99 Ben Hur ",
        "County": "Limestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-12-23T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2024-01-16T00:00:00",
        "FIS Approved": "2026-01-21T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1293,
      "raw": {
        "INR": "28INR0055",
        "Project Name": "Freestone Battery Storage Project ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Freestone Power Generation, LLC",
        "POI Location": "3134 RICHLAND CHAMBERS 345kV (PSS/E Bus Name: RICHLND1_5)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2025-01-17T21:59:37",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0055",
        "Project Name": "Freestone Battery Storage Project ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Freestone Power Generation, LLC",
        "POI Location": "3134 RICHLAND CHAMBERS 345kV (PSS/E Bus Name: RICHLND1_5)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 210.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2024-02-07T00:00:00",
        "Screening Study Complete": "2024-04-30T00:00:00",
        "FIS Requested": "2025-01-17T21:59:37",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1294,
      "raw": {
        "INR": "28INR0057",
        "Project Name": "Windecker",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Windecker Energy LLC",
        "POI Location": "10058 Catclaw Switch 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 419.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-13T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0057",
        "Project Name": "Windecker",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Windecker Energy LLC",
        "POI Location": "10058 Catclaw Switch 138kV",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-17T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 419.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-13T00:00:00",
        "Screening Study Started": "2024-03-29T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1295,
      "raw": {
        "INR": "28INR0059",
        "Project Name": "Verily Solar (FKA Cuello De Cuero Solar)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Verily Solar, LLC",
        "POI Location": "80078 Reforzar Switch Station 345kV",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 261,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0059",
        "Project Name": "Verily Solar (FKA Cuello De Cuero Solar)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Verily Solar, LLC",
        "POI Location": "80078 Reforzar Switch Station 345kV",
        "County": "Brooks",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 261,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-02-29T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1296,
      "raw": {
        "INR": "28INR0061",
        "Project Name": "Sunrose Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sunrose Renewable Energy LLC",
        "POI Location": "Tap 138kV #44740 WALLIS - #44700 GEBHRT ",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-04T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 309.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-05T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-03-29T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0061",
        "Project Name": "Sunrose Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sunrose Renewable Energy LLC",
        "POI Location": "Tap 138kV #44740 WALLIS - #44700 GEBHRT ",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-04T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 309.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-05T00:00:00",
        "Screening Study Started": "2024-04-09T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-03-29T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1297,
      "raw": {
        "INR": "28INR0063",
        "Project Name": "Bluefox Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Industrial November Project LLC",
        "POI Location": "#8754 Zoisite 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-01-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0063",
        "Project Name": "Bluefox Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Industrial November Project LLC",
        "POI Location": "#8754 Zoisite 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-01-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1298,
      "raw": {
        "INR": "28INR0064",
        "Project Name": "Bluefox Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Industrial November Project LLC",
        "POI Location": "#8754 Zoisite 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-04-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0064",
        "Project Name": "Bluefox Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Industrial November Project LLC",
        "POI Location": "#8754 Zoisite 345kV",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-04-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-12T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-02-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1299,
      "raw": {
        "INR": "28INR0066",
        "Project Name": "Sunrose Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sunrose Renewable Energy LLC",
        "POI Location": "Tap 138kV 44740 WALLIS - 44700 GEBHRT",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-19T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-12T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0066",
        "Project Name": "Sunrose Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Sunrose Renewable Energy LLC",
        "POI Location": "Tap 138kV 44740 WALLIS - 44700 GEBHRT",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-19T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-12T00:00:00",
        "FIS Approved": "2025-09-11T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1300,
      "raw": {
        "INR": "28INR0067",
        "Project Name": "Indigo Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo solar 3",
        "POI Location": "Tap Line Segment Tankawa  (Bus #1048) to Graham (Bus #1430)\n",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 800,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-25T00:00:00",
        "FIS Requested": "2025-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0067",
        "Project Name": "Indigo Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo solar 3",
        "POI Location": "Tap Line Segment Tankawa  (Bus #1048) to Graham (Bus #1430)\n",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 800,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-25T00:00:00",
        "FIS Requested": "2025-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1301,
      "raw": {
        "INR": "28INR0068",
        "Project Name": "Alpujarra Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greening USA Corp.",
        "POI Location": "5521 GALOW 138 KV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 112.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-23T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-27T00:00:00",
        "FIS Requested": "2024-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0068",
        "Project Name": "Alpujarra Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greening USA Corp.",
        "POI Location": "5521 GALOW 138 KV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 112.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-23T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-27T00:00:00",
        "FIS Requested": "2024-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1302,
      "raw": {
        "INR": "28INR0072",
        "Project Name": "Mirando Valley Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "ACE DevCo NC LLC",
        "POI Location": "Tap 345kV  80220 Cenizo - 80079 Cruce Ckt-1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-06T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 478.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-12T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-12T00:00:00",
        "FIS Requested": "2024-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0072",
        "Project Name": "Mirando Valley Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "ACE DevCo NC LLC",
        "POI Location": "Tap 345kV  80220 Cenizo - 80079 Cruce Ckt-1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-06T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 478.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-12T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-12T00:00:00",
        "FIS Requested": "2024-06-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1303,
      "raw": {
        "INR": "28INR0073",
        "Project Name": "Daystar Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Choate Solar, LLC",
        "POI Location": "5728 Choate 138kV",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-09T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-09T00:00:00",
        "FIS Approved": "2026-01-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0073",
        "Project Name": "Daystar Solar ",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Choate Solar, LLC",
        "POI Location": "5728 Choate 138kV",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-04-09T00:00:00",
        "Screening Study Started": "2024-04-15T00:00:00",
        "Screening Study Complete": "2024-07-05T00:00:00",
        "FIS Requested": "2024-04-09T00:00:00",
        "FIS Approved": "2026-01-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1304,
      "raw": {
        "INR": "28INR0074",
        "Project Name": "Massey Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Massey Storage, LLC",
        "POI Location": "Tap 138kV  Chevron_NewSub(#99300) and Cedar Bayou Tap(#48065) circuit 84",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-01-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-23T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-25T00:00:00",
        "FIS Requested": "2024-07-23T00:00:00",
        "FIS Approved": "2025-12-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0074",
        "Project Name": "Massey Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Massey Storage, LLC",
        "POI Location": "Tap 138kV  Chevron_NewSub(#99300) and Cedar Bayou Tap(#48065) circuit 84",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-01-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.86,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-23T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-25T00:00:00",
        "FIS Requested": "2024-07-23T00:00:00",
        "FIS Approved": "2025-12-12T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1305,
      "raw": {
        "INR": "28INR0075",
        "Project Name": "Wild Paw Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wild Paw Energy Center, LLC",
        "POI Location": "Tap 345kV 3124 Trinidad - 3130 Forest Grove",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.17,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-05-07T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0075",
        "Project Name": "Wild Paw Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wild Paw Energy Center, LLC",
        "POI Location": "Tap 345kV 3124 Trinidad - 3130 Forest Grove",
        "County": "Henderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.17,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2024-05-07T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1306,
      "raw": {
        "INR": "28INR0080",
        "Project Name": "Turtle Rock Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Turtle Rock Energy Center, LLC",
        "POI Location": "Tap 138 kV 13501 Clayhill to 13681 Reed",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 135.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-07T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0080",
        "Project Name": "Turtle Rock Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Turtle Rock Energy Center, LLC",
        "POI Location": "Tap 138 kV 13501 Clayhill to 13681 Reed",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 135.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-07T00:00:00",
        "Screening Study Started": "2024-05-09T00:00:00",
        "Screening Study Complete": "2024-08-05T00:00:00",
        "FIS Requested": "2024-05-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1307,
      "raw": {
        "INR": "28INR0086",
        "Project Name": "West Royal Natural Gas (TEF-Due Diligence) ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Invenergy Energy Transition Development LLC",
        "POI Location": "Tap 345kV 76000 L_NORTMC5_1Y - 18668 ROCKDRAW_5",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 888,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0086",
        "Project Name": "West Royal Natural Gas (TEF-Due Diligence) ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Invenergy Energy Transition Development LLC",
        "POI Location": "Tap 345kV 76000 L_NORTMC5_1Y - 18668 ROCKDRAW_5",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 888,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1308,
      "raw": {
        "INR": "28INR0087",
        "Project Name": "North Royal Thermal (TEF- Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Invenergy Energy Transition Development LLC",
        "POI Location": "Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5 ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-08-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 479,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0087",
        "Project Name": "North Royal Thermal (TEF- Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Invenergy Energy Transition Development LLC",
        "POI Location": "Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5 ",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-08-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 479,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1309,
      "raw": {
        "INR": "28INR0088",
        "Project Name": "Red Hollow Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Red Hollow Renewable Energy LLC",
        "POI Location": "Tap 345kV (Bus# 1422) Bowman - (Bus# 17002) Garvey Road ",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 308.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-10-04T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0088",
        "Project Name": "Red Hollow Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Red Hollow Renewable Energy LLC",
        "POI Location": "Tap 345kV (Bus# 1422) Bowman - (Bus# 17002) Garvey Road ",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-19T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 308.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-04T00:00:00",
        "Screening Study Started": "2024-07-01T00:00:00",
        "Screening Study Complete": "2024-10-04T00:00:00",
        "FIS Requested": "2024-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1310,
      "raw": {
        "INR": "28INR0089",
        "Project Name": "EmberYork ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "EmberYork Energy Center",
        "POI Location": "TAP 138kV WALLIS 44740 - GERBHRT 44700",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 900,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-30T00:00:00",
        "Screening Study Started": "2024-08-29T00:00:00",
        "Screening Study Complete": "2024-08-29T00:00:00",
        "FIS Requested": "2024-12-11T00:00:00",
        "FIS Approved": "2025-07-14T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-12T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0089",
        "Project Name": "EmberYork ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "EmberYork Energy Center",
        "POI Location": "TAP 138kV WALLIS 44740 - GERBHRT 44700",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 900,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-30T00:00:00",
        "Screening Study Started": "2024-08-29T00:00:00",
        "Screening Study Complete": "2024-08-29T00:00:00",
        "FIS Requested": "2024-12-11T00:00:00",
        "FIS Approved": "2025-07-14T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-12T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1311,
      "raw": {
        "INR": "28INR0090",
        "Project Name": "EmberGreen ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "EmberGreen Energy Center",
        "POI Location": "Tap 138kV 48050 Caney - 44150 Hungerford",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1036,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-28T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-12-18T00:00:00",
        "FIS Approved": "2026-04-21T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2026-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0090",
        "Project Name": "EmberGreen ",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "EmberGreen Energy Center",
        "POI Location": "Tap 138kV 48050 Caney - 44150 Hungerford",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1036,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-28T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-12-18T00:00:00",
        "FIS Approved": "2026-04-21T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2026-08-04T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1312,
      "raw": {
        "INR": "28INR0094",
        "Project Name": "Pham BESS",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "ASB1, LLC",
        "POI Location": "Tap 138kV 3281 TENNCLNY_8 - 3499 BLACKFTAP_8",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 132.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-30T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-08-11T00:00:00",
        "Meets Planning": "2026-08-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0094",
        "Project Name": "Pham BESS",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "ASB1, LLC",
        "POI Location": "Tap 138kV 3281 TENNCLNY_8 - 3499 BLACKFTAP_8",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 132.98,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-30T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2026-08-11T00:00:00",
        "Meets Planning": "2026-08-11T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1313,
      "raw": {
        "INR": "28INR0100",
        "Project Name": "Digital Ranch Gas ",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "MCV 1 LLC",
        "POI Location": "#1906 Venus Switch 345 kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 378,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0100",
        "Project Name": "Digital Ranch Gas ",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "MCV 1 LLC",
        "POI Location": "#1906 Venus Switch 345 kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 378,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1314,
      "raw": {
        "INR": "28INR0105",
        "Project Name": "Vast Sands Power I (TEF -Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Permian Power I LLC",
        "POI Location": "Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2 ",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 440,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-05T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-05T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-10-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-01-12T00:00:00",
        "GHG Permit": "2026-02-10T00:00:00",
        "Water Availability": "2026-04-12T00:00:00",
        "Meets Planning": "2026-02-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0105",
        "Project Name": "Vast Sands Power I (TEF -Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Permian Power I LLC",
        "POI Location": "Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2 ",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-05-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 440,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-05T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-05T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-10-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-01-12T00:00:00",
        "GHG Permit": "2026-02-10T00:00:00",
        "Water Availability": "2026-04-12T00:00:00",
        "Meets Planning": "2026-02-10T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1315,
      "raw": {
        "INR": "28INR0108",
        "Project Name": "RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rayburn Country Electric Cooperative, Inc.",
        "POI Location": "Double Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Haggerty - Winding Oaks Switch",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-26T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 570,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-02T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-03-31T00:00:00",
        "GHG Permit": "2026-03-31T00:00:00",
        "Water Availability": "2026-06-02T00:00:00",
        "Meets Planning": "2026-06-02T00:00:00",
        "Meets All Planning": "2026-08-25T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0108",
        "Project Name": "RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Rayburn Country Electric Cooperative, Inc.",
        "POI Location": "Double Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Haggerty - Winding Oaks Switch",
        "County": "Grayson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-26T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 570,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-02T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-03-31T00:00:00",
        "GHG Permit": "2026-03-31T00:00:00",
        "Water Availability": "2026-06-02T00:00:00",
        "Meets Planning": "2026-06-02T00:00:00",
        "Meets All Planning": "2026-08-25T00:00:00",
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1316,
      "raw": {
        "INR": "28INR0109",
        "Project Name": "Vast Sands Power II (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Permian Power I LLC",
        "POI Location": "Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2 ",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 440,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-05T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-03T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-10-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-01-12T00:00:00",
        "GHG Permit": "2025-09-24T00:00:00",
        "Water Availability": "2026-04-12T00:00:00",
        "Meets Planning": "2026-04-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0109",
        "Project Name": "Vast Sands Power II (TEF-Due Diligence)",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Permian Power I LLC",
        "POI Location": "Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2 ",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 440,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-05T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-08T00:00:00",
        "FIS Requested": "2024-07-03T00:00:00",
        "FIS Approved": "2026-09-16T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-10-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-01-12T00:00:00",
        "GHG Permit": "2025-09-24T00:00:00",
        "Water Availability": "2026-04-12T00:00:00",
        "Meets Planning": "2026-04-21T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1317,
      "raw": {
        "INR": "28INR0110",
        "Project Name": "Biggs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Biggs Battery Facility, LLC",
        "POI Location": "76006 Bow Wood 345 kV",
        "County": "McCulloch",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-18T00:00:00",
        "FIS Requested": "2025-04-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0110",
        "Project Name": "Biggs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Biggs Battery Facility, LLC",
        "POI Location": "76006 Bow Wood 345 kV",
        "County": "McCulloch",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-18T00:00:00",
        "FIS Requested": "2025-04-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1318,
      "raw": {
        "INR": "28INR0111",
        "Project Name": "Biggs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Biggs Solar Farm, LLC",
        "POI Location": "#76006 Bow Wood 345 kV",
        "County": "McCulloch",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 400,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-18T00:00:00",
        "FIS Requested": "2025-04-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0111",
        "Project Name": "Biggs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Biggs Solar Farm, LLC",
        "POI Location": "#76006 Bow Wood 345 kV",
        "County": "McCulloch",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 400,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-18T00:00:00",
        "FIS Requested": "2025-04-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1319,
      "raw": {
        "INR": "28INR0114",
        "Project Name": "Elk Ridge Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Elk Ridge Solar, LLC",
        "POI Location": "AEP Solstice Substation #60404",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-09-26T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-09-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-09-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0114",
        "Project Name": "Elk Ridge Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Elk Ridge Solar, LLC",
        "POI Location": "AEP Solstice Substation #60404",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-09-26T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-09-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-09-22T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1320,
      "raw": {
        "INR": "28INR0116",
        "Project Name": "Salazar BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Salazar Energy Storage LLC",
        "POI Location": "2068 Rosen Heights 138kV",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 127.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-10T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-08-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0116",
        "Project Name": "Salazar BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Salazar Energy Storage LLC",
        "POI Location": "2068 Rosen Heights 138kV",
        "County": "Tarrant",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-07-11T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 127.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-10T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-08-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1321,
      "raw": {
        "INR": "28INR0118",
        "Project Name": "Copperleaf Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Copperleaf Energy Storage, LLC",
        "POI Location": "Tap 345kV Fisher Road Switch (#1425) – Riley (#6101) ",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 305.63,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0118",
        "Project Name": "Copperleaf Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Copperleaf Energy Storage, LLC",
        "POI Location": "Tap 345kV Fisher Road Switch (#1425) – Riley (#6101) ",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 305.63,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1322,
      "raw": {
        "INR": "28INR0119",
        "Project Name": "Rabbit Hollow Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rabbit Hollow Energy Storage, LLC",
        "POI Location": "1190 Barber Lake Switch 138kV",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 341.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0119",
        "Project Name": "Rabbit Hollow Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rabbit Hollow Energy Storage, LLC",
        "POI Location": "1190 Barber Lake Switch 138kV",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 341.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-26T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1323,
      "raw": {
        "INR": "28INR0121",
        "Project Name": "Jalisco Peaker",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HEP Power Generation, LLC",
        "POI Location": "8475 JAVELINA4A 138kV\n",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 183.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-04T00:00:00",
        "FIS Requested": "2025-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0121",
        "Project Name": "Jalisco Peaker",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HEP Power Generation, LLC",
        "POI Location": "8475 JAVELINA4A 138kV\n",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 183.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-06T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-11-04T00:00:00",
        "FIS Requested": "2025-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1324,
      "raw": {
        "INR": "28INR0124",
        "Project Name": "Silverbell Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silverbell Energy Center, LLC",
        "POI Location": "Tap 138kV Rivercrest SES 1780 - Deport REA 1768",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 129.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0124",
        "Project Name": "Silverbell Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silverbell Energy Center, LLC",
        "POI Location": "Tap 138kV Rivercrest SES 1780 - Deport REA 1768",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 129.18,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1325,
      "raw": {
        "INR": "28INR0125",
        "Project Name": "Silverbell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silverbell Energy Center, LLC",
        "POI Location": "Tap 138kV Rivercrest SES 1780 - Deport REA 1768",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0125",
        "Project Name": "Silverbell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Silverbell Energy Center, LLC",
        "POI Location": "Tap 138kV Rivercrest SES 1780 - Deport REA 1768",
        "County": "Red River",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-07T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1326,
      "raw": {
        "INR": "28INR0127",
        "Project Name": "Half Moon Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "#80231 Pronto 345kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 512.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-26T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2024-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-09-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0127",
        "Project Name": "Half Moon Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "#80231 Pronto 345kV",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 512.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-26T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2024-12-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-09-08T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1327,
      "raw": {
        "INR": "28INR0147",
        "Project Name": "Fallstone Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fallstone Solar, LLC",
        "POI Location": "Tap 69kV 3588 Groesbeck - 3637 Otto Junction ",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-08T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0147",
        "Project Name": "Fallstone Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fallstone Solar, LLC",
        "POI Location": "Tap 69kV 3588 Groesbeck - 3637 Otto Junction ",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 60.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-08T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1328,
      "raw": {
        "INR": "28INR0148",
        "Project Name": "Sonora High Noon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sonora High Noon, LLC",
        "POI Location": "60412 CARVER 138kV",
        "County": "Sutton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-28T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-27T00:00:00",
        "FIS Requested": "2024-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0148",
        "Project Name": "Sonora High Noon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sonora High Noon, LLC",
        "POI Location": "60412 CARVER 138kV",
        "County": "Sutton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-08-28T00:00:00",
        "Screening Study Started": "2024-09-04T00:00:00",
        "Screening Study Complete": "2024-11-27T00:00:00",
        "FIS Requested": "2024-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1329,
      "raw": {
        "INR": "28INR0149",
        "Project Name": "Fallstone Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fallstone Solar, LLC",
        "POI Location": "Tap 69kV 3588 Groesbeck - 3637 Otto Junction ",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-08T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0149",
        "Project Name": "Fallstone Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fallstone Solar, LLC",
        "POI Location": "Tap 69kV 3588 Groesbeck - 3637 Otto Junction ",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-08T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1330,
      "raw": {
        "INR": "28INR0150",
        "Project Name": "South Tripoint BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "South Triangle Energy, LLC",
        "POI Location": "7286 L_FAYETT8_1Y 138kV",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-19T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0150",
        "Project Name": "South Tripoint BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "South Triangle Energy, LLC",
        "POI Location": "7286 L_FAYETT8_1Y 138kV",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-19T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1331,
      "raw": {
        "INR": "28INR0151",
        "Project Name": "Chimney Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Chimney Creek Energy, LLC",
        "POI Location": "Tap 345 kV 68000 West Shackelford – 60515 Clear Crossing Ckt 1",
        "County": "Shackelford",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0151",
        "Project Name": "Chimney Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Chimney Creek Energy, LLC",
        "POI Location": "Tap 345 kV 68000 West Shackelford – 60515 Clear Crossing Ckt 1",
        "County": "Shackelford",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 203.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1332,
      "raw": {
        "INR": "28INR0154",
        "Project Name": "Pamela Heights I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pamela heights I Energy Center LLC",
        "POI Location": "#47150 HOC 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-03T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-03T00:00:00",
        "FIS Requested": "2024-09-09T00:00:00",
        "FIS Approved": "2025-08-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-10-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-22T00:00:00",
        "Meets Planning": "2025-10-28T00:00:00",
        "Meets All Planning": "2025-10-28T00:00:00",
        "Unnamed: 25": "2025-10-23T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0154",
        "Project Name": "Pamela Heights I",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pamela heights I Energy Center LLC",
        "POI Location": "#47150 HOC 138kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-03T00:00:00",
        "Screening Study Started": "2024-09-10T00:00:00",
        "Screening Study Complete": "2024-12-03T00:00:00",
        "FIS Requested": "2024-09-09T00:00:00",
        "FIS Approved": "2025-08-15T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2025-10-07T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "2025-10-22T00:00:00",
        "Meets Planning": "2025-10-28T00:00:00",
        "Meets All Planning": "2025-10-28T00:00:00",
        "Unnamed: 25": "2025-10-23T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1333,
      "raw": {
        "INR": "28INR0155",
        "Project Name": "Coke BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coke ESS, LLC",
        "POI Location": "76090 Divide Switchyard 345kV",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 220.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-24T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0155",
        "Project Name": "Coke BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Coke ESS, LLC",
        "POI Location": "76090 Divide Switchyard 345kV",
        "County": "Coke",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 220.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-24T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2024-09-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1334,
      "raw": {
        "INR": "28INR0156",
        "Project Name": "Chimney Rock BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Taylor ESS, LLC",
        "POI Location": "Tap 138kV 76317 MOORE - 76318 BUTMAN",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-11T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2024-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0156",
        "Project Name": "Chimney Rock BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Taylor ESS, LLC",
        "POI Location": "Tap 138kV 76317 MOORE - 76318 BUTMAN",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-11T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2024-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1335,
      "raw": {
        "INR": "28INR0157",
        "Project Name": "Axtell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PP Axtell BESS LLC",
        "POI Location": "345 kV Tiger Creek Switch (#3379)",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-30T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2026-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0157",
        "Project Name": "Axtell BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PP Axtell BESS LLC",
        "POI Location": "345 kV Tiger Creek Switch (#3379)",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-30T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-09T00:00:00",
        "FIS Requested": "2026-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1336,
      "raw": {
        "INR": "28INR0160",
        "Project Name": "Neal Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CH Neal Solar LLC",
        "POI Location": "tap of 138kV 8750 Chalmers - 8127 Lane City",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 146.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-14T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0160",
        "Project Name": "Neal Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CH Neal Solar LLC",
        "POI Location": "tap of 138kV 8750 Chalmers - 8127 Lane City",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 146.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-14T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1337,
      "raw": {
        "INR": "28INR0166",
        "Project Name": "Brookesmith Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brookesmith Storage LLC",
        "POI Location": "Tap Brown Switch #1444 – Russell Gap Switch #3348",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 351,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-12T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0166",
        "Project Name": "Brookesmith Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brookesmith Storage LLC",
        "POI Location": "Tap Brown Switch #1444 – Russell Gap Switch #3348",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 351,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-12T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1338,
      "raw": {
        "INR": "28INR0168",
        "Project Name": "Guajillo Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guajillo Wind LLC",
        "POI Location": "Tap 345 kV 80079 Cruce - 5901 San Miguel CKT 01",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 199.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-11T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0168",
        "Project Name": "Guajillo Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Guajillo Wind LLC",
        "POI Location": "Tap 345 kV 80079 Cruce - 5901 San Miguel CKT 01",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 199.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-11T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1339,
      "raw": {
        "INR": "28INR0169",
        "Project Name": "Sanders Hollow Energy Center",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Sanders Hollow Energy Center, LLC",
        "POI Location": "Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT 01",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-06-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 292.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-09T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-27T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-06-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0169",
        "Project Name": "Sanders Hollow Energy Center",
        "GIM Study Phase": "SS Completed, FIS Not Started, IA",
        "Interconnecting Entity": "Sanders Hollow Energy Center, LLC",
        "POI Location": "Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT 01",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-06-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 292.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-09T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-27T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-06-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1340,
      "raw": {
        "INR": "28INR0175",
        "Project Name": "Mobee Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mobee Springs, LLC",
        "POI Location": "#8805 BONIVIEW2A 69kV ",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-29T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0175",
        "Project Name": "Mobee Springs BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mobee Springs, LLC",
        "POI Location": "#8805 BONIVIEW2A 69kV ",
        "County": "Refugio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-29T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1341,
      "raw": {
        "INR": "28INR0176",
        "Project Name": "Gail Mountain Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gail Mountain Solar, LLC",
        "POI Location": "Muleshoe (Bus #59922) 345 kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 244.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-22T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0176",
        "Project Name": "Gail Mountain Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gail Mountain Solar, LLC",
        "POI Location": "Muleshoe (Bus #59922) 345 kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 244.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-22T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-14T00:00:00",
        "FIS Requested": "2024-10-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-30T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1342,
      "raw": {
        "INR": "28INR0177",
        "Project Name": "Sisters Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Oberon Solar III, LLC ",
        "POI Location": "tap 345kV 11010  Wolf Switching Station - 10012 Meteor ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-18T00:00:00",
        "Screening Study Started": "2024-10-21T00:00:00",
        "Screening Study Complete": "2025-01-10T00:00:00",
        "FIS Requested": "2024-10-18T00:00:00",
        "FIS Approved": "2026-03-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0177",
        "Project Name": "Sisters Solar II",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Oberon Solar III, LLC ",
        "POI Location": "tap 345kV 11010  Wolf Switching Station - 10012 Meteor ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-18T00:00:00",
        "Screening Study Started": "2024-10-21T00:00:00",
        "Screening Study Complete": "2025-01-10T00:00:00",
        "FIS Requested": "2024-10-18T00:00:00",
        "FIS Approved": "2026-03-27T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1343,
      "raw": {
        "INR": "28INR0179",
        "Project Name": "Sunburst Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo Solar, LLC",
        "POI Location": "KATOEN (Bus#8579)",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-09T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2025-01-07T00:00:00",
        "FIS Requested": "2024-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0179",
        "Project Name": "Sunburst Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo Solar, LLC",
        "POI Location": "KATOEN (Bus#8579)",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-09T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2025-01-07T00:00:00",
        "FIS Requested": "2024-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1344,
      "raw": {
        "INR": "28INR0180",
        "Project Name": "Green Ocelot Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Ocelot Solar LLC",
        "POI Location": "Tap 345kV 80076 Ajo  - 8601 Cebolla ",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-11-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 357,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-01-28T00:00:00",
        "FIS Approved": "2026-09-29T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0180",
        "Project Name": "Green Ocelot Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Ocelot Solar LLC",
        "POI Location": "Tap 345kV 80076 Ajo  - 8601 Cebolla ",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-11-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 357,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-01-28T00:00:00",
        "FIS Approved": "2026-09-29T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1345,
      "raw": {
        "INR": "28INR0181",
        "Project Name": "Sunburst BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo Solar, LLC",
        "POI Location": "KATOEN (Bus#8579)",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-09T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2025-01-07T00:00:00",
        "FIS Requested": "2024-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0181",
        "Project Name": "Sunburst BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Indigo Solar, LLC",
        "POI Location": "KATOEN (Bus#8579)",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-09T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2025-01-07T00:00:00",
        "FIS Requested": "2024-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1346,
      "raw": {
        "INR": "28INR0182",
        "Project Name": "Ponferrada Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Karol Solar VI",
        "POI Location": "Tap 138 KV  3456 CORSWEST1_8 - 3457 CORS_MOBT_8\n\n",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 148.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-02T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-18T00:00:00",
        "FIS Requested": "2025-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0182",
        "Project Name": "Ponferrada Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Karol Solar VI",
        "POI Location": "Tap 138 KV  3456 CORSWEST1_8 - 3457 CORS_MOBT_8\n\n",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-04-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 148.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-02T00:00:00",
        "Screening Study Started": "2024-10-01T00:00:00",
        "Screening Study Complete": "2024-12-18T00:00:00",
        "FIS Requested": "2025-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1347,
      "raw": {
        "INR": "28INR0185",
        "Project Name": "San Gabriel Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "San Gabriel Solar LLC",
        "POI Location": "Tap 138 kV 3750 Vosslake - 3749 Buckholts",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 255,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-08T00:00:00",
        "FIS Approved": "2026-07-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0185",
        "Project Name": "San Gabriel Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "San Gabriel Solar LLC",
        "POI Location": "Tap 138 kV 3750 Vosslake - 3749 Buckholts",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 255,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-08T00:00:00",
        "FIS Approved": "2026-07-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1348,
      "raw": {
        "INR": "28INR0186",
        "Project Name": "Saddlehorn Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Saddlehorn Energy Storage, LLC",
        "POI Location": "Tap 138kV 7287 Bellville North - 7291 Highway 36",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-25T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0186",
        "Project Name": "Saddlehorn Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Saddlehorn Energy Storage, LLC",
        "POI Location": "Tap 138kV 7287 Bellville North - 7291 Highway 36",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 256.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-25T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-12-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1349,
      "raw": {
        "INR": "28INR0188",
        "Project Name": "Ashra Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ashra Solar, LLC",
        "POI Location": "Tap 69kV bus#5823 UVALDE Switch (UVALDESW9) to bus#5820 UVALDE SUB (UVALDESUB9)",
        "County": "Uvalde",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0188",
        "Project Name": "Ashra Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ashra Solar, LLC",
        "POI Location": "Tap 69kV bus#5823 UVALDE Switch (UVALDESW9) to bus#5820 UVALDE SUB (UVALDESUB9)",
        "County": "Uvalde",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 40.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1350,
      "raw": {
        "INR": "28INR0189",
        "Project Name": "Green Ocelot Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Ocelot Solar LLC",
        "POI Location": "Tap 345kV 80076 Ajo 80076 - 8601 Cebolla ",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-11-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 178.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-01-28T00:00:00",
        "FIS Approved": "2026-09-29T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0189",
        "Project Name": "Green Ocelot Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Ocelot Solar LLC",
        "POI Location": "Tap 345kV 80076 Ajo 80076 - 8601 Cebolla ",
        "County": "Kenedy",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-11-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 178.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-01-28T00:00:00",
        "FIS Approved": "2026-09-29T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1351,
      "raw": {
        "INR": "28INR0190",
        "Project Name": "Ashra Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ashra Solar, LLC",
        "POI Location": "Tap 69kV 5823 UVALDE Switch - 5820 UVALDE SUB",
        "County": "Uvalde",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0190",
        "Project Name": "Ashra Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ashra Solar, LLC",
        "POI Location": "Tap 69kV 5823 UVALDE Switch - 5820 UVALDE SUB",
        "County": "Uvalde",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-30T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1352,
      "raw": {
        "INR": "28INR0191",
        "Project Name": "San Gabriel Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "San Gabriel Solar LLC",
        "POI Location": "Tap 138 kV 3750 Vosslake - 3749 Buckholts",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 127.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-08T00:00:00",
        "FIS Approved": "2026-07-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0191",
        "Project Name": "San Gabriel Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "San Gabriel Solar LLC",
        "POI Location": "Tap 138 kV 3750 Vosslake - 3749 Buckholts",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 127.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2025-01-28T00:00:00",
        "Screening Study Complete": "2025-04-17T00:00:00",
        "FIS Requested": "2025-01-08T00:00:00",
        "FIS Approved": "2026-07-20T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1353,
      "raw": {
        "INR": "28INR0195",
        "Project Name": "Star Grass Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Star Grass Renewable Energy LLC",
        "POI Location": "Tap 138kV 6310 Putnam - 3378 Carbon_8 ",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2024-12-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0195",
        "Project Name": "Star Grass Renewable Energy Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Star Grass Renewable Energy LLC",
        "POI Location": "Tap 138kV 6310 Putnam - 3378 Carbon_8 ",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2024-12-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1354,
      "raw": {
        "INR": "28INR0197",
        "Project Name": "Star Grass Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Star Grass Renewable Energy LLC",
        "POI Location": "Tap 138kV 6310 Putnam - 3378 Carbon_8",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2024-12-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0197",
        "Project Name": "Star Grass Renewable Energy Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Star Grass Renewable Energy LLC",
        "POI Location": "Tap 138kV 6310 Putnam - 3378 Carbon_8",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2024-12-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1355,
      "raw": {
        "INR": "28INR0198",
        "Project Name": "Winters Glow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Winters Glow Solar, LLC",
        "POI Location": "tap 345kV 1444 BROWN SWITCH  - 11406 CENTRAL BLUFF \n\n",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-21T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2024-01-06T00:00:00",
        "FIS Requested": "2024-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0198",
        "Project Name": "Winters Glow Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Winters Glow Solar, LLC",
        "POI Location": "tap 345kV 1444 BROWN SWITCH  - 11406 CENTRAL BLUFF \n\n",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-21T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2024-01-06T00:00:00",
        "FIS Requested": "2024-10-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1356,
      "raw": {
        "INR": "28INR0199",
        "Project Name": "Winters Glow Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Winters Glow Storage, LLC",
        "POI Location": "tap 345kV 1444 BROWN SWITCH  - 11406 CENTRAL BLUFF ",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-21T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2024-01-06T00:00:00",
        "FIS Requested": "2024-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0199",
        "Project Name": "Winters Glow Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Winters Glow Storage, LLC",
        "POI Location": "tap 345kV 1444 BROWN SWITCH  - 11406 CENTRAL BLUFF ",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-21T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2024-01-06T00:00:00",
        "FIS Requested": "2024-10-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1357,
      "raw": {
        "INR": "28INR0202",
        "Project Name": "Fluvanna Max BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fluvanna Max Solar LLC",
        "POI Location": "11305 DERMOTT 345 kV\n",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-10T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0202",
        "Project Name": "Fluvanna Max BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fluvanna Max Solar LLC",
        "POI Location": "11305 DERMOTT 345 kV\n",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-10T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1358,
      "raw": {
        "INR": "28INR0205",
        "Project Name": "Gypsum Plains Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 345kv line Wolf BUS# 11010 - Reiter BUS#18544",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0205",
        "Project Name": "Gypsum Plains Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 345kv line Wolf BUS# 11010 - Reiter BUS#18544",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1359,
      "raw": {
        "INR": "28INR0206",
        "Project Name": "Wagon Timber Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wagon Timber Solar, LLC",
        "POI Location": "6110 Munday East 138kV\n",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 172.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-10T00:00:00",
        "FIS Requested": "2024-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0206",
        "Project Name": "Wagon Timber Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wagon Timber Solar, LLC",
        "POI Location": "6110 Munday East 138kV\n",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 172.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-10T00:00:00",
        "FIS Requested": "2024-11-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1360,
      "raw": {
        "INR": "28INR0207",
        "Project Name": "Wagon Timber Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wagon Timber Storage, LLC",
        "POI Location": "6110 Munday East 138kV",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 53.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2024-12-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0207",
        "Project Name": "Wagon Timber Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wagon Timber Storage, LLC",
        "POI Location": "6110 Munday East 138kV",
        "County": "Knox",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 53.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-05T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2024-12-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1361,
      "raw": {
        "INR": "28INR0208",
        "Project Name": "Strawberry Dunes Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Strawberry Dunes LLC",
        "POI Location": "Tap 138kV ROSSVILLESB8 (5718) to OAKSSW8 (5713)",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-23T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0208",
        "Project Name": "Strawberry Dunes Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Strawberry Dunes LLC",
        "POI Location": "Tap 138kV ROSSVILLESB8 (5718) to OAKSSW8 (5713)",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-23T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1362,
      "raw": {
        "INR": "28INR0209",
        "Project Name": "Strawberry Dunes BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Strawberry Dunes LLC",
        "POI Location": "Tap 138kV ROSSVILLESB8 (5718)  to OAKSSW8 (5713)",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-23T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0209",
        "Project Name": "Strawberry Dunes BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Strawberry Dunes LLC",
        "POI Location": "Tap 138kV ROSSVILLESB8 (5718)  to OAKSSW8 (5713)",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-23T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1363,
      "raw": {
        "INR": "28INR0212",
        "Project Name": "Badger Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1Y",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 280.46,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2024-11-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0212",
        "Project Name": "Badger Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1Y",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 280.46,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2024-11-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1364,
      "raw": {
        "INR": "28INR0213",
        "Project Name": "Badger BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood BESS, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1Y",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 138.57,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2024-11-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0213",
        "Project Name": "Badger BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood BESS, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat - 76000 L_NORTMC5_1Y",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 138.57,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2025-02-12T00:00:00",
        "Screening Study Complete": "2025-04-22T00:00:00",
        "FIS Requested": "2024-11-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1365,
      "raw": {
        "INR": "28INR0215",
        "Project Name": "Complex Serenity Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Serenity Wind, LLC",
        "POI Location": "Double tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and Tule Canyon (bus# 23914) to Midpoint Switch (bus# 23931)",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 971,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-22T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0215",
        "Project Name": "Complex Serenity Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Serenity Wind, LLC",
        "POI Location": "Double tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and Tule Canyon (bus# 23914) to Midpoint Switch (bus# 23931)",
        "County": "Armstrong",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 971,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-22T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-04-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1366,
      "raw": {
        "INR": "28INR0217",
        "Project Name": "Gypsum Plains Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 345kv 11010 Wolf - 18544 Reiter ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 211.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-30T00:00:00",
        "Screening Study Started": "2025-01-31T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-01-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0217",
        "Project Name": "Gypsum Plains Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 345kv 11010 Wolf - 18544 Reiter ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 211.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-30T00:00:00",
        "Screening Study Started": "2025-01-31T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-01-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1367,
      "raw": {
        "INR": "28INR0219",
        "Project Name": "Neptune Gas Generation Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BPX Production Company",
        "POI Location": "11200 Longpast_T8 138kv",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-24T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-10-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0219",
        "Project Name": "Neptune Gas Generation Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BPX Production Company",
        "POI Location": "11200 Longpast_T8 138kv",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-03-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-24T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-04-18T00:00:00",
        "FIS Requested": "2025-10-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1368,
      "raw": {
        "INR": "28INR0221",
        "Project Name": "Rio Star Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Star Energy Storage, LLC",
        "POI Location": "Tap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 142.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-03T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0221",
        "Project Name": "Rio Star Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Star Energy Storage, LLC",
        "POI Location": "Tap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 142.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-03T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1369,
      "raw": {
        "INR": "28INR0223",
        "Project Name": "Bayou Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bayou Creek Solar LLC",
        "POI Location": "8606 Goddard 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 256.9,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-24T00:00:00",
        "FIS Requested": "2025-09-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-06-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0223",
        "Project Name": "Bayou Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Bayou Creek Solar LLC",
        "POI Location": "8606 Goddard 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 256.9,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-24T00:00:00",
        "FIS Requested": "2025-09-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-06-02T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1370,
      "raw": {
        "INR": "28INR0226",
        "Project Name": "Pamplona Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Karol Solar V",
        "POI Location": "Tap 138 kV 44740 WALLIS_S65_8 - 44700 GEBHRT_X65B8 Ckt#65",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2025-06-25T00:00:00",
        "FIS Approved": "2025-08-26T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0226",
        "Project Name": "Pamplona Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Karol Solar V",
        "POI Location": "Tap 138 kV 44740 WALLIS_S65_8 - 44700 GEBHRT_X65B8 Ckt#65",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-10-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2025-06-25T00:00:00",
        "FIS Approved": "2025-08-26T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1371,
      "raw": {
        "INR": "28INR0227",
        "Project Name": "GPlains Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 151.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-27T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0227",
        "Project Name": "GPlains Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 151.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-27T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1372,
      "raw": {
        "INR": "28INR0228",
        "Project Name": "GPlains Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 138kV WOLFSS_8 (1013) - SANDHLTA_8 (1103) ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-27T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0228",
        "Project Name": "GPlains Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gypsum Plains Solar, LLC",
        "POI Location": "Tap 138kV WOLFSS_8 (1013) - SANDHLTA_8 (1103) ",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 51.27,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-27T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1373,
      "raw": {
        "INR": "28INR0229",
        "Project Name": "Allthorn Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ALLTHORN SOLAR, LLC",
        "POI Location": "Tap 138 kV BRUNI4A (#8297) - CRESTONI4A (#8695) ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 231.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0229",
        "Project Name": "Allthorn Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ALLTHORN SOLAR, LLC",
        "POI Location": "Tap 138 kV BRUNI4A (#8297) - CRESTONI4A (#8695) ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-01-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 231.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1374,
      "raw": {
        "INR": "28INR0230",
        "Project Name": "Allthorn BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ALLTHORN SOLAR, LLC",
        "POI Location": "Tap 138 kV BRUNI44A (#8297) - CRESTONI4A (#8695) ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0230",
        "Project Name": "Allthorn BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ALLTHORN SOLAR, LLC",
        "POI Location": "Tap 138 kV BRUNI44A (#8297) - CRESTONI4A (#8695) ",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-01-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1375,
      "raw": {
        "INR": "28INR0238",
        "Project Name": "Dempsey Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dempsey Storage LLC",
        "POI Location": "Tap the 138 KV Ridge (#37)-Robertson (#32) line; BEPC",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0238",
        "Project Name": "Dempsey Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Dempsey Storage LLC",
        "POI Location": "Tap the 138 KV Ridge (#37)-Robertson (#32) line; BEPC",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1376,
      "raw": {
        "INR": "28INR0242",
        "Project Name": "Ciervo Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC   ",
        "POI Location": "Tap 345 kV 80355 DelSol7A - 80079 Cruce CKT 2",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-25T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0242",
        "Project Name": "Ciervo Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC   ",
        "POI Location": "Tap 345 kV 80355 DelSol7A - 80079 Cruce CKT 2",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-02-25T00:00:00",
        "FIS Requested": "2024-12-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1377,
      "raw": {
        "INR": "28INR0245",
        "Project Name": "Hittson Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties",
        "POI Location": "Tapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata (Bus# 68051) and Latimer (Bus# 68008) - Reata (Bus# 68051).",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0245",
        "Project Name": "Hittson Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties",
        "POI Location": "Tapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata (Bus# 68051) and Latimer (Bus# 68008) - Reata (Bus# 68051).",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1378,
      "raw": {
        "INR": "28INR0246",
        "Project Name": "Hittson Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties",
        "POI Location": "Tapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata (Bus# 68051) and Latimer (Bus# 68008) - Reata (Bus# 68051).",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0246",
        "Project Name": "Hittson Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties",
        "POI Location": "Tapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata (Bus# 68051) and Latimer (Bus# 68008) - Reata (Bus# 68051).",
        "County": "Callahan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-12-17T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-12-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1379,
      "raw": {
        "INR": "28INR0247",
        "Project Name": "Eligius BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Eligius Storage LLC",
        "POI Location": "tap 138kV Liston (#8394) – JL Bates (#8392) line, AEP",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 174.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-17T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0247",
        "Project Name": "Eligius BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Eligius Storage LLC",
        "POI Location": "tap 138kV Liston (#8394) – JL Bates (#8392) line, AEP",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 174.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-17T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1380,
      "raw": {
        "INR": "28INR0250",
        "Project Name": "Mojo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Power Synergy",
        "POI Location": "Tap 345 kV 5133 Elm Creek - 5901 San Miguel  CKT 1 & 2",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 527.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-26T00:00:00",
        "Screening Study Started": "2025-03-03T00:00:00",
        "Screening Study Complete": "2025-05-19T00:00:00",
        "FIS Requested": "2025-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0250",
        "Project Name": "Mojo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Power Synergy",
        "POI Location": "Tap 345 kV 5133 Elm Creek - 5901 San Miguel  CKT 1 & 2",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 527.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-26T00:00:00",
        "Screening Study Started": "2025-03-03T00:00:00",
        "Screening Study Complete": "2025-05-19T00:00:00",
        "FIS Requested": "2025-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1381,
      "raw": {
        "INR": "28INR0253",
        "Project Name": "Stonewall BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Stonewall ESS, LLC",
        "POI Location": "tap 138kV 6150 SPUR4A  - 6158 ASPM4A \n",
        "County": "Stonewall",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 135,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-17T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0253",
        "Project Name": "Stonewall BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Stonewall ESS, LLC",
        "POI Location": "tap 138kV 6150 SPUR4A  - 6158 ASPM4A \n",
        "County": "Stonewall",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 135,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-17T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1382,
      "raw": {
        "INR": "28INR0254",
        "Project Name": "Summerhill BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Taylor ESS, LLC",
        "POI Location": "Tap 138kv 6228 ABNTHWST4A - 6288 MULBERRY4D ",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 143,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-14T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0254",
        "Project Name": "Summerhill BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Taylor ESS, LLC",
        "POI Location": "Tap 138kv 6228 ABNTHWST4A - 6288 MULBERRY4D ",
        "County": "Taylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 143,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-14T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1383,
      "raw": {
        "INR": "28INR0255",
        "Project Name": "watermelon 5 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0255",
        "Project Name": "watermelon 5 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1384,
      "raw": {
        "INR": "28INR0256",
        "Project Name": "watermelon 6 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0256",
        "Project Name": "watermelon 6 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1385,
      "raw": {
        "INR": "28INR0257",
        "Project Name": "watermelon 7 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0257",
        "Project Name": "watermelon 7 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1386,
      "raw": {
        "INR": "28INR0258",
        "Project Name": "watermelon 8 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0258",
        "Project Name": "watermelon 8 energy storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus power management LLC",
        "POI Location": "Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.",
        "County": "Dallas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 102.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-06T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1387,
      "raw": {
        "INR": "28INR0260",
        "Project Name": "Rio Vista Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Vista Solar, LLC",
        "POI Location": "Tap 138kV #60393 PigCreek4A – #60385 Solstice4A",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 553.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0260",
        "Project Name": "Rio Vista Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Vista Solar, LLC",
        "POI Location": "Tap 138kV #60393 PigCreek4A – #60385 Solstice4A",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-02T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 553.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-13T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1388,
      "raw": {
        "INR": "28INR0261",
        "Project Name": "Rio Vista Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Vista Storage, LLC",
        "POI Location": "Tap 138kV #60393 Pigcreek4A – #60385 Solstice4A",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0261",
        "Project Name": "Rio Vista Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rio Vista Storage, LLC",
        "POI Location": "Tap 138kV #60393 Pigcreek4A – #60385 Solstice4A",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-14T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1389,
      "raw": {
        "INR": "28INR0262",
        "Project Name": "Pasture Rose Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pasture Rose, LLC",
        "POI Location": "TAP 345KV BUS 3721 STRANGER SW - 3711 BALE_S5\n",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-06-07T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 198.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0262",
        "Project Name": "Pasture Rose Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pasture Rose, LLC",
        "POI Location": "TAP 345KV BUS 3721 STRANGER SW - 3711 BALE_S5\n",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-06-07T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 198.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-05T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1390,
      "raw": {
        "INR": "28INR0265",
        "Project Name": "Agricola BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Agricola BESS LLC",
        "POI Location": "Tap 138kV GEBHARDT (#44700) - Wallis (#44740)",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0265",
        "Project Name": "Agricola BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Agricola BESS LLC",
        "POI Location": "Tap 138kV GEBHARDT (#44700) - Wallis (#44740)",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-24T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1391,
      "raw": {
        "INR": "28INR0267",
        "Project Name": "Soluce Cotton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CTPB1, LLC",
        "POI Location": "Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE ",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 202.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0267",
        "Project Name": "Soluce Cotton Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CTPB1, LLC",
        "POI Location": "Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE ",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 202.91,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1392,
      "raw": {
        "INR": "28INR0268",
        "Project Name": "Soluce Cotton Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CTPB1,LLC",
        "POI Location": "Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE ",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0268",
        "Project Name": "Soluce Cotton Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CTPB1,LLC",
        "POI Location": "Tap 345kV 59904 COTTONWOOD - 60500 EDITH CLARKE ",
        "County": "Cottle",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1393,
      "raw": {
        "INR": "28INR0269",
        "Project Name": "Soluce Bravo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BNPB1, LLC",
        "POI Location": "tap 345kV 1444 BROWN  - 11441 CORN TRAIL SW CKT2\n",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 80.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0269",
        "Project Name": "Soluce Bravo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BNPB1, LLC",
        "POI Location": "tap 345kV 1444 BROWN  - 11441 CORN TRAIL SW CKT2\n",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 80.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1394,
      "raw": {
        "INR": "28INR0270",
        "Project Name": "Soluce Bravo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BNPB1, LLC",
        "POI Location": "tap 345kV 1444 BROWN  - 11441 CORN TRAIL SW CKT2\n",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 302.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0270",
        "Project Name": "Soluce Bravo Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BNPB1, LLC",
        "POI Location": "tap 345kV 1444 BROWN  - 11441 CORN TRAIL SW CKT2\n",
        "County": "Brown",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 302.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1395,
      "raw": {
        "INR": "28INR0271",
        "Project Name": "Three Ranches Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Three Ranches Energy LLC",
        "POI Location": "TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch",
        "County": "Brewster",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.53,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-10T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0271",
        "Project Name": "Three Ranches Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Three Ranches Energy LLC",
        "POI Location": "TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch",
        "County": "Brewster",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125.53,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-10T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-12T00:00:00",
        "FIS Requested": "2025-01-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1396,
      "raw": {
        "INR": "28INR0277",
        "Project Name": "Aurora Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Aurora Energy Storage, LLC",
        "POI Location": "Tap 345kV --- KILL_SS_5 (3422) --- BUCK_H_5 (3424)",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-03T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": "2026-05-04T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0277",
        "Project Name": "Aurora Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, No IA",
        "Interconnecting Entity": "Aurora Energy Storage, LLC",
        "POI Location": "Tap 345kV --- KILL_SS_5 (3422) --- BUCK_H_5 (3424)",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 306.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-03T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-13T00:00:00",
        "FIS Requested": "2025-02-05T00:00:00",
        "FIS Approved": "2026-05-04T00:00:00",
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1397,
      "raw": {
        "INR": "28INR0278",
        "Project Name": "Spur Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spur Energy Storage, LLC",
        "POI Location": "Tap 345kV (1429) JACKSBRO_5 - (11736) BIRDDOG_5",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 612.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-28T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-01-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0278",
        "Project Name": "Spur Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Spur Energy Storage, LLC",
        "POI Location": "Tap 345kV (1429) JACKSBRO_5 - (11736) BIRDDOG_5",
        "County": "Wise",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 612.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-28T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-01-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1398,
      "raw": {
        "INR": "28INR0280",
        "Project Name": "Live Oak Wind II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "#76003 Big Hill 345kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 302.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-21T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0280",
        "Project Name": "Live Oak Wind II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ENGIE IR Holdings LLC",
        "POI Location": "#76003 Big Hill 345kV",
        "County": "Schleicher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-09-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 302.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-21T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1399,
      "raw": {
        "INR": "28INR0286",
        "Project Name": "2 Cedar Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SunWR, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – Anna Switch 2373",
        "County": "Fannin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-02T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2026-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0286",
        "Project Name": "2 Cedar Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SunWR, LLC",
        "POI Location": "Tap 345kV 1729 Valley South – Anna Switch 2373",
        "County": "Fannin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-05-02T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2026-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1400,
      "raw": {
        "INR": "28INR0288",
        "Project Name": "Outrider BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sanders Hollow Energy Center, LLC",
        "POI Location": "Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT. Approximately distance from the POI to Cottonwood Substation is 11.13 miles and to Edith Clarke Substation 77.6 miles. ",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-06-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 302,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-06-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0288",
        "Project Name": "Outrider BESS",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Sanders Hollow Energy Center, LLC",
        "POI Location": "Tap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHCLA7A) CKT. Approximately distance from the POI to Cottonwood Substation is 11.13 miles and to Edith Clarke Substation 77.6 miles. ",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-06-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 302,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-08-29T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-06-09T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1401,
      "raw": {
        "INR": "28INR0290",
        "Project Name": "Field Marshal Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Field Marshal Storage LLC",
        "POI Location": "Dublin (1636) - Fullhouse (1652) 138kV",
        "County": "Erath",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-11T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0290",
        "Project Name": "Field Marshal Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Field Marshal Storage LLC",
        "POI Location": "Dublin (1636) - Fullhouse (1652) 138kV",
        "County": "Erath",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-11T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-09T00:00:00",
        "FIS Requested": "2025-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1402,
      "raw": {
        "INR": "28INR0292",
        "Project Name": "Wildflower Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wildflower Storage LLC",
        "POI Location": "Drane switch #3295",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 359.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-08T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0292",
        "Project Name": "Wildflower Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wildflower Storage LLC",
        "POI Location": "Drane switch #3295",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 359.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-08T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1403,
      "raw": {
        "INR": "28INR0294",
        "Project Name": "Infrakey Waco Data Park Gas 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Infrakey Capital LLC",
        "POI Location": "Tap 345kV 246 BOSQUESW5 – 3406 ELM_MOTT__5",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-30T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2026-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0294",
        "Project Name": "Infrakey Waco Data Park Gas 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Infrakey Capital LLC",
        "POI Location": "Tap 345kV 246 BOSQUESW5 – 3406 ELM_MOTT__5",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 180,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-30T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2026-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1404,
      "raw": {
        "INR": "28INR0295",
        "Project Name": "Margay Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Tap 138kV 42750 Mykawa - 48353 Telephone Ckt 06",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-29T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": "2025-11-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0295",
        "Project Name": "Margay Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Tap 138kV 42750 Mykawa - 48353 Telephone Ckt 06",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-04-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 101.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-29T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-24T00:00:00",
        "FIS Approved": "2025-11-13T00:00:00",
        "Economic Study Required": null,
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1405,
      "raw": {
        "INR": "28INR0297",
        "Project Name": "Magnet Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HyFuels Big Spring Solar LLC",
        "POI Location": "Faraday Substation 345kV - Bus #59905 ",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.09,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-05-05T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0297",
        "Project Name": "Magnet Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "HyFuels Big Spring Solar LLC",
        "POI Location": "Faraday Substation 345kV - Bus #59905 ",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 503.09,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-05-05T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-11T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1406,
      "raw": {
        "INR": "28INR0298",
        "Project Name": "Magnet Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HyFuels Big Spring LLC",
        "POI Location": "Faraday 345 kV Substation (#59905)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 426.7,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-10-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-08-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0298",
        "Project Name": "Magnet Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "HyFuels Big Spring LLC",
        "POI Location": "Faraday 345 kV Substation (#59905)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 426.7,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-10-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-08-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1407,
      "raw": {
        "INR": "28INR0299",
        "Project Name": "Moon Stone BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Moon Stone Battery Facility LLC",
        "POI Location": "Tap 138kV Eagle Creek (5132) to Floresville (5155)",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-14T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0299",
        "Project Name": "Moon Stone BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Moon Stone Battery Facility LLC",
        "POI Location": "Tap 138kV Eagle Creek (5132) to Floresville (5155)",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2025-02-14T00:00:00",
        "Screening Study Complete": "2025-05-14T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1408,
      "raw": {
        "INR": "28INR0301",
        "Project Name": "Carpet Tech Solar One",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CT Solar One",
        "POI Location": "#59911 MHOS 345 kV",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 110.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-19T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0301",
        "Project Name": "Carpet Tech Solar One",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CT Solar One",
        "POI Location": "#59911 MHOS 345 kV",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 110.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-19T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1409,
      "raw": {
        "INR": "28INR0303",
        "Project Name": "Kuy Creek Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kuy Creek Solar 1 LLC",
        "POI Location": "Tap Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 234.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-18T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-06-18T00:00:00",
        "FIS Requested": "2025-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0303",
        "Project Name": "Kuy Creek Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kuy Creek Solar 1 LLC",
        "POI Location": "Tap Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 234.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-18T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-06-18T00:00:00",
        "FIS Requested": "2025-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1410,
      "raw": {
        "INR": "28INR0304",
        "Project Name": "Kuy Creek Storage 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kuy Creek Storage 1 LLC",
        "POI Location": "Tap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 151.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-18T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-18T00:00:00",
        "FIS Requested": "2025-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0304",
        "Project Name": "Kuy Creek Storage 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kuy Creek Storage 1 LLC",
        "POI Location": "Tap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1",
        "County": "Goliad",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 151.46,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-18T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-18T00:00:00",
        "FIS Requested": "2025-03-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1411,
      "raw": {
        "INR": "28INR0305",
        "Project Name": "Iron Cowboy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero II Solar LLC",
        "POI Location": "Bus #8920 Haisley 4A 138 kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 144.59,
        "Unnamed: 11": "COD  SFS/NtP",
        "Unnamed: 12": "2025-04-25T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0305",
        "Project Name": "Iron Cowboy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero II Solar LLC",
        "POI Location": "Bus #8920 Haisley 4A 138 kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 144.59,
        "Unnamed: 11": "COD  SFS/NtP",
        "Unnamed: 12": "2025-04-25T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1412,
      "raw": {
        "INR": "28INR0306",
        "Project Name": "Iron Cowboy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero II Storage LLC",
        "POI Location": "Bus #8920 Haisley 4A 138 kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 63.27,
        "Unnamed: 11": "COD  SFS/NtP",
        "Unnamed: 12": "2025-04-25T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0306",
        "Project Name": "Iron Cowboy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Vaquero II Storage LLC",
        "POI Location": "Bus #8920 Haisley 4A 138 kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-07-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 63.27,
        "Unnamed: 11": "COD  SFS/NtP",
        "Unnamed: 12": "2025-04-25T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1413,
      "raw": {
        "INR": "28INR0307",
        "Project Name": "Prairie Power Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Power Wind, LLC",
        "POI Location": "Tap 345 kV Longshore Switch (Bus# 1058) to Cattleman Switch (Bus# 10053) CKT 4\n",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 302.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-27T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0307",
        "Project Name": "Prairie Power Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Power Wind, LLC",
        "POI Location": "Tap 345 kV Longshore Switch (Bus# 1058) to Cattleman Switch (Bus# 10053) CKT 4\n",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-17T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 302.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-27T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-05-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1414,
      "raw": {
        "INR": "28INR0317",
        "Project Name": "Falcon Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project, LLC",
        "POI Location": "Tap 345kV #80225 Cenizo7C to #80307 Del Sol7C",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 501.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-10-28T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0317",
        "Project Name": "Falcon Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project, LLC",
        "POI Location": "Tap 345kV #80225 Cenizo7C to #80307 Del Sol7C",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 501.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-10-28T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1415,
      "raw": {
        "INR": "28INR0321",
        "Project Name": "Altair Energy Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Altair Energy Storage",
        "POI Location": "Tap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520)",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-14T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0321",
        "Project Name": "Altair Energy Storage ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Altair Energy Storage",
        "POI Location": "Tap on 138 kV ALTAIR (bus# 78118) to STAFFORD HILL (bus# 78520)",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.76,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-14T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-03-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1416,
      "raw": {
        "INR": "28INR0322",
        "Project Name": "Velociraptor Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor Solar II, LLC",
        "POI Location": "Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 241.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-20T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0322",
        "Project Name": "Velociraptor Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor Solar II, LLC",
        "POI Location": "Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 241.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-20T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1417,
      "raw": {
        "INR": "28INR0323",
        "Project Name": "Velociraptor BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor BESS II, LLC",
        "POI Location": "Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 246.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-15T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0323",
        "Project Name": "Velociraptor BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velociraptor BESS II, LLC",
        "POI Location": "Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 246.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-15T00:00:00",
        "Screening Study Started": "2025-05-27T00:00:00",
        "Screening Study Complete": "2025-08-23T00:00:00",
        "FIS Requested": "2025-05-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1418,
      "raw": {
        "INR": "28INR0324",
        "Project Name": "Barkley Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties, LLC",
        "POI Location": "Tap 345 kV Line from Russel Gap Switch (Bus# 3348) - Killeen Switch (Bus# 3422)",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 312.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-12T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-08-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0324",
        "Project Name": "Barkley Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "174 Power Global Properties, LLC",
        "POI Location": "Tap 345 kV Line from Russel Gap Switch (Bus# 3348) - Killeen Switch (Bus# 3422)",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 312.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-12T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-08-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1419,
      "raw": {
        "INR": "28INR0325",
        "Project Name": "Cielo Vista Power Gas Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Power, LLC",
        "POI Location": "Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 343.8,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-29T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0325",
        "Project Name": "Cielo Vista Power Gas Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Power, LLC",
        "POI Location": "Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 343.8,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-29T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1420,
      "raw": {
        "INR": "28INR0327",
        "Project Name": "18-BRAVO BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Scout Energy Management, LLC",
        "POI Location": "138 kV Commerce Switch Substation. Bus no. #1816",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 407,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0327",
        "Project Name": "18-BRAVO BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Scout Energy Management, LLC",
        "POI Location": "138 kV Commerce Switch Substation. Bus no. #1816",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 407,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1421,
      "raw": {
        "INR": "28INR0328",
        "Project Name": "18-ALPHA BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SCOUT ENERGY MANAGEMENT, LLC",
        "POI Location": "To the 138 kV Valley View Substation, ( Bus No.691)",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 307.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0328",
        "Project Name": "18-ALPHA BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SCOUT ENERGY MANAGEMENT, LLC",
        "POI Location": "To the 138 kV Valley View Substation, ( Bus No.691)",
        "County": "Cooke",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-02-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 307.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-04T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1422,
      "raw": {
        "INR": "28INR0332",
        "Project Name": "Reunion Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Reunion Solar, LLC",
        "POI Location": "Tap 345kV #60504 Tesla Road to #6111 Riley",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 600.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0332",
        "Project Name": "Reunion Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Reunion Solar, LLC",
        "POI Location": "Tap 345kV #60504 Tesla Road to #6111 Riley",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 600.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1423,
      "raw": {
        "INR": "28INR0333",
        "Project Name": "Reunion Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Reunion Solar, LLC",
        "POI Location": "Tap 345kV #60504 Tesla Road to #6111 Riley",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0333",
        "Project Name": "Reunion Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Reunion Solar, LLC",
        "POI Location": "Tap 345kV #60504 Tesla Road to #6111 Riley",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-06T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-09-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1424,
      "raw": {
        "INR": "28INR0335",
        "Project Name": "Oak Valley Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oak Valley Solar LLC",
        "POI Location": "68091 (Navarro) (345)",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-25T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0335",
        "Project Name": "Oak Valley Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oak Valley Solar LLC",
        "POI Location": "68091 (Navarro) (345)",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-25T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1425,
      "raw": {
        "INR": "28INR0337",
        "Project Name": "Barrosos Creek Wind 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cascabel Wind Energy, LLC",
        "POI Location": "#80227 Rapido 345 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-30T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-07-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0337",
        "Project Name": "Barrosos Creek Wind 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cascabel Wind Energy, LLC",
        "POI Location": "#80227 Rapido 345 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-30T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-07-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1426,
      "raw": {
        "INR": "28INR0338",
        "Project Name": "Barrosos Creek Wind 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cascabel Wind Energy, LLC",
        "POI Location": "#80227 Rapido 345 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-30T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-07-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0338",
        "Project Name": "Barrosos Creek Wind 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cascabel Wind Energy, LLC",
        "POI Location": "#80227 Rapido 345 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 197.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-30T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-07-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1427,
      "raw": {
        "INR": "28INR0339",
        "Project Name": "Corralitos Wind 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Crestas Wind Energy, LLC",
        "POI Location": "ETT 345 kV Tiempo #80224 Substation (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 196.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-13T00:00:00",
        "Screening Study Complete": "2025-09-11T00:00:00",
        "FIS Requested": "2025-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0339",
        "Project Name": "Corralitos Wind 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Crestas Wind Energy, LLC",
        "POI Location": "ETT 345 kV Tiempo #80224 Substation (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C)",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 196.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-13T00:00:00",
        "Screening Study Complete": "2025-09-11T00:00:00",
        "FIS Requested": "2025-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1428,
      "raw": {
        "INR": "28INR0340",
        "Project Name": "Corralitos Wind 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Crestas Wind Energy, LLC",
        "POI Location": "ETT 345 kV Tiempo #80224 Substation  (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C) ",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 195.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-13T00:00:00",
        "Screening Study Complete": "2025-09-11T00:00:00",
        "FIS Requested": "2025-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0340",
        "Project Name": "Corralitos Wind 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Crestas Wind Energy, LLC",
        "POI Location": "ETT 345 kV Tiempo #80224 Substation  (Tap on 345kV 80225 CENIZO7C - 80307 DELSOL7C) ",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 195.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-13T00:00:00",
        "Screening Study Complete": "2025-09-11T00:00:00",
        "FIS Requested": "2025-06-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1429,
      "raw": {
        "INR": "28INR0341",
        "Project Name": "Bastion BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BESS BASTION LLC",
        "POI Location": "Blessing Substation 138 kV (ID 8121)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-26T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0341",
        "Project Name": "Bastion BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BESS BASTION LLC",
        "POI Location": "Blessing Substation 138 kV (ID 8121)",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-11-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-26T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1430,
      "raw": {
        "INR": "28INR0343",
        "Project Name": "Amphion Solar Phase 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0343",
        "Project Name": "Amphion Solar Phase 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1431,
      "raw": {
        "INR": "28INR0344",
        "Project Name": "Amphion Solar Phase 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 115.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0344",
        "Project Name": "Amphion Solar Phase 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 115.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1432,
      "raw": {
        "INR": "28INR0348",
        "Project Name": "Ringtail Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Bus # 1446, Lake Wichita, 138 kV ",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-15T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-04-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0348",
        "Project Name": "Ringtail Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Bus # 1446, Lake Wichita, 138 kV ",
        "County": "Archer",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 203.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-15T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-22T00:00:00",
        "FIS Requested": "2025-04-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1433,
      "raw": {
        "INR": "28INR0349",
        "Project Name": "Jaguarundi Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Bus # 1339, Eskota 138kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-11-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 152.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-29T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0349",
        "Project Name": "Jaguarundi Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerPulse LLC",
        "POI Location": "Bus # 1339, Eskota 138kV",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-11-10T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 152.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-29T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-06-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1434,
      "raw": {
        "INR": "28INR0355",
        "Project Name": "Galaxy I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar, LLC",
        "POI Location": "Stainback Switch (bus #2217) - Elrod Switch (bus #3159)\n",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 99.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0355",
        "Project Name": "Galaxy I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar, LLC",
        "POI Location": "Stainback Switch (bus #2217) - Elrod Switch (bus #3159)\n",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 99.42,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1435,
      "raw": {
        "INR": "28INR0356",
        "Project Name": "Arpeggio BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Arpeggio BESS, LLC",
        "POI Location": "#80064 Chocolate Bayou 138kV ",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-17T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0356",
        "Project Name": "Arpeggio BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Arpeggio BESS, LLC",
        "POI Location": "#80064 Chocolate Bayou 138kV ",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-17T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1436,
      "raw": {
        "INR": "28INR0358",
        "Project Name": "Cherry Sage Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cherry Sage Solar 1 LLC ",
        "POI Location": "(#60423) TREADWELL  138kV.",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-23T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 142.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-15T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-04-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0358",
        "Project Name": "Cherry Sage Solar 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cherry Sage Solar 1 LLC ",
        "POI Location": "(#60423) TREADWELL  138kV.",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-23T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 142.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-15T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-04-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1437,
      "raw": {
        "INR": "28INR0363",
        "Project Name": "Finch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Finch Storage, LLC",
        "POI Location": "165 WINDSORSW 138kV",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-08T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0363",
        "Project Name": "Finch Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Finch Storage, LLC",
        "POI Location": "165 WINDSORSW 138kV",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-08T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-04-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1438,
      "raw": {
        "INR": "28INR0375",
        "Project Name": "Barranca Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Barranca Wind Energy, LLC",
        "POI Location": "Tap the 345 kV CENIZO (#80225) - DELSOL (#80307) line ",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 300.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0375",
        "Project Name": "Barranca Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Barranca Wind Energy, LLC",
        "POI Location": "Tap the 345 kV CENIZO (#80225) - DELSOL (#80307) line ",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 300.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1439,
      "raw": {
        "INR": "28INR0376",
        "Project Name": "Barranca Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Barranca Wind Energy, LLC",
        "POI Location": "Tap the 345 kV CENIZO7C (#80225) - DELSOL7C (#80307) line.",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 298.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0376",
        "Project Name": "Barranca Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Barranca Wind Energy, LLC",
        "POI Location": "Tap the 345 kV CENIZO7C (#80225) - DELSOL7C (#80307) line.",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 298.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1440,
      "raw": {
        "INR": "28INR0377",
        "Project Name": "Wichita Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Solar II, LLC",
        "POI Location": "Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 3.43,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-06-12T00:00:00",
        "Screening Study Started": "2026-06-17T00:00:00",
        "Screening Study Complete": "2026-09-14T00:00:00",
        "FIS Requested": "2026-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0377",
        "Project Name": "Wichita Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Solar II, LLC",
        "POI Location": "Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 3.43,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-06-12T00:00:00",
        "Screening Study Started": "2026-06-17T00:00:00",
        "Screening Study Complete": "2026-09-14T00:00:00",
        "FIS Requested": "2026-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1441,
      "raw": {
        "INR": "28INR0378",
        "Project Name": "Wichita Creek Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Solar II, LLC",
        "POI Location": "Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-08-14T00:00:00",
        "Screening Study Started": "2026-08-21T00:00:00",
        "Screening Study Complete": "2026-09-14T00:00:00",
        "FIS Requested": "2026-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0378",
        "Project Name": "Wichita Creek Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wichita Solar II, LLC",
        "POI Location": "Tap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1",
        "County": "Wichita",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-08-14T00:00:00",
        "Screening Study Started": "2026-08-21T00:00:00",
        "Screening Study Complete": "2026-09-14T00:00:00",
        "FIS Requested": "2026-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1442,
      "raw": {
        "INR": "28INR0385",
        "Project Name": "Galaxy Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar 2, LLC",
        "POI Location": "3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0385",
        "Project Name": "Galaxy Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar 2, LLC",
        "POI Location": "3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.64,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1443,
      "raw": {
        "INR": "28INR0386",
        "Project Name": "Sagebrush Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ACE DevCo NC, LLC",
        "POI Location": "TAP 345KV 11420 SWEETWATER EAST - 11406 CENTRAL BLUFF CKT2\n",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 200.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0386",
        "Project Name": "Sagebrush Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ACE DevCo NC, LLC",
        "POI Location": "TAP 345KV 11420 SWEETWATER EAST - 11406 CENTRAL BLUFF CKT2\n",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 200.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-28T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1444,
      "raw": {
        "INR": "28INR0387",
        "Project Name": "Galaxy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar 2, LLC",
        "POI Location": "3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0387",
        "Project Name": "Galaxy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Galaxy Solar 2, LLC",
        "POI Location": "3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.87,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-10T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1445,
      "raw": {
        "INR": "28INR0389",
        "Project Name": "Tri-X BESS 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane I Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-05T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-08-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0389",
        "Project Name": "Tri-X BESS 1 SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Crane I Solar Electric, LLC",
        "POI Location": "138 kV Soda Lake (#76026) ",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-05T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-08-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-21T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1446,
      "raw": {
        "INR": "28INR0390",
        "Project Name": "Horsepower BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Horsepower BESS, LLC",
        "POI Location": "POI is 138 kV Howard Substation (Bus# 5230) (SSWG bus name: HOWARD), NMMS station code: S1",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-14T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-23T00:00:00",
        "FIS Requested": "2025-11-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0390",
        "Project Name": "Horsepower BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Horsepower BESS, LLC",
        "POI Location": "POI is 138 kV Howard Substation (Bus# 5230) (SSWG bus name: HOWARD), NMMS station code: S1",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-01-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 257.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-14T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-23T00:00:00",
        "FIS Requested": "2025-11-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1447,
      "raw": {
        "INR": "28INR0391",
        "Project Name": "Ruedrich BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ruedrich BESS",
        "POI Location": "LINE TAP OF CIBOLO (7608) AND McQUEENEY (7606)",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0391",
        "Project Name": "Ruedrich BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ruedrich BESS",
        "POI Location": "LINE TAP OF CIBOLO (7608) AND McQUEENEY (7606)",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-09T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-11T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1448,
      "raw": {
        "INR": "28INR0392",
        "Project Name": "Devine Mary BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Devine Mary BESS",
        "POI Location": "5813 PEARSONSW8 138 kV",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0392",
        "Project Name": "Devine Mary BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Devine Mary BESS",
        "POI Location": "5813 PEARSONSW8 138 kV",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1449,
      "raw": {
        "INR": "28INR0394",
        "Project Name": "Treehouse Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Treehouse Solar, LLC",
        "POI Location": "Tap the 345 kV Jewett (#3390) - Singleton (#44645) line",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-11-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 281.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-11T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0394",
        "Project Name": "Treehouse Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Treehouse Solar, LLC",
        "POI Location": "Tap the 345 kV Jewett (#3390) - Singleton (#44645) line",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-11-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 281.77,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-11T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1450,
      "raw": {
        "INR": "28INR0395",
        "Project Name": "Treehouse Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Treehouse Solar, LLC",
        "POI Location": "Tap the 345 kV Jewett (#3390) - Singleton (#44645) line, ONCOR\n",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-11-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0395",
        "Project Name": "Treehouse Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Treehouse Solar, LLC",
        "POI Location": "Tap the 345 kV Jewett (#3390) - Singleton (#44645) line, ONCOR\n",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-11-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.21,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-07T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1451,
      "raw": {
        "INR": "28INR0397",
        "Project Name": "Ouroboros Grid BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 1",
        "POI Location": "POIB: #88337 Chalybe 345 kV  \n(expansion of the #8735 Chalybe 138 kV – to be connected by double circuit line to #79500 Palmito 345 kV)",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0397",
        "Project Name": "Ouroboros Grid BESS 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 1",
        "POI Location": "POIB: #88337 Chalybe 345 kV  \n(expansion of the #8735 Chalybe 138 kV – to be connected by double circuit line to #79500 Palmito 345 kV)",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1452,
      "raw": {
        "INR": "28INR0398",
        "Project Name": "Ouroboros Grid BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 2",
        "POI Location": "88337 Chalybe 345 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0398",
        "Project Name": "Ouroboros Grid BESS 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 2",
        "POI Location": "88337 Chalybe 345 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1453,
      "raw": {
        "INR": "28INR0403",
        "Project Name": "Ouroboros Grid BESS 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 3",
        "POI Location": "88337 Chalybe 345 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0403",
        "Project Name": "Ouroboros Grid BESS 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 3",
        "POI Location": "88337 Chalybe 345 kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1454,
      "raw": {
        "INR": "28INR0404",
        "Project Name": "Penelope Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ash Creek Project LLC",
        "POI Location": "New sub in the 234 Chatt - 3473 Ash Creek 138kV line",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 97.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-02T00:00:00",
        "Screening Study Started": "2025-07-21T00:00:00",
        "Screening Study Complete": "2025-10-02T00:00:00",
        "FIS Requested": "2026-01-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0404",
        "Project Name": "Penelope Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ash Creek Project LLC",
        "POI Location": "New sub in the 234 Chatt - 3473 Ash Creek 138kV line",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 97.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-02T00:00:00",
        "Screening Study Started": "2025-07-21T00:00:00",
        "Screening Study Complete": "2025-10-02T00:00:00",
        "FIS Requested": "2026-01-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1455,
      "raw": {
        "INR": "28INR0408",
        "Project Name": "Max 4 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lake Creek Wind, LLC",
        "POI Location": "Tap 345 kV Gauss7D (Bus# 60703) to Quasar7A (Bus# 60712) Transmission Line",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 352.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0408",
        "Project Name": "Max 4 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lake Creek Wind, LLC",
        "POI Location": "Tap 345 kV Gauss7D (Bus# 60703) to Quasar7A (Bus# 60712) Transmission Line",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-08-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 352.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-06T00:00:00",
        "FIS Requested": "2025-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1456,
      "raw": {
        "INR": "28INR0411",
        "Project Name": "Black Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Francitas Renewables LLC",
        "POI Location": "New tap between line Bigfoot4A (8221) - MooreSw8 (5827)",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-20T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2026-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0411",
        "Project Name": "Black Creek BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Francitas Renewables LLC",
        "POI Location": "New tap between line Bigfoot4A (8221) - MooreSw8 (5827)",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-20T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2026-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1457,
      "raw": {
        "INR": "28INR0412",
        "Project Name": "Yellow Leaf II BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Yellow Leaf Energy Storage LLC",
        "POI Location": "Tap 138kV 2727 CRANDALL1_8 - 2724 KAUFMN_8",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-22T00:00:00",
        "Screening Study Complete": "2025-10-09T00:00:00",
        "FIS Requested": "2025-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0412",
        "Project Name": "Yellow Leaf II BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Yellow Leaf Energy Storage LLC",
        "POI Location": "Tap 138kV 2727 CRANDALL1_8 - 2724 KAUFMN_8",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-22T00:00:00",
        "Screening Study Complete": "2025-10-09T00:00:00",
        "FIS Requested": "2025-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1458,
      "raw": {
        "INR": "28INR0413",
        "Project Name": "Tolivar Power Plant Phase 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pecos Power Plant, LLC",
        "POI Location": "Tap 138 KV 38055 Saltdraw-38043 COWPEN ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 224.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-03T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-07-07T00:00:00",
        "FIS Approved": "2026-02-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-04-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-03-27T00:00:00",
        "GHG Permit": "2026-03-27T00:00:00",
        "Water Availability": "2026-06-17T00:00:00",
        "Meets Planning": "2026-05-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0413",
        "Project Name": "Tolivar Power Plant Phase 2",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Pecos Power Plant, LLC",
        "POI Location": "Tap 138 KV 38055 Saltdraw-38043 COWPEN ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-09-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 224.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-03T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-13T00:00:00",
        "FIS Requested": "2025-07-07T00:00:00",
        "FIS Approved": "2026-02-25T00:00:00",
        "Economic Study Required": "No",
        "IA Signed": "2026-04-14T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "2026-03-27T00:00:00",
        "GHG Permit": "2026-03-27T00:00:00",
        "Water Availability": "2026-06-17T00:00:00",
        "Meets Planning": "2026-05-04T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1459,
      "raw": {
        "INR": "28INR0415",
        "Project Name": "Alkali Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Alkali Creek Wind, LLC",
        "POI Location": "Tap 345 kV BUS #1048 Tonkawa -\nBUS #11050  Dusty Road",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 474.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-31T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0415",
        "Project Name": "Alkali Creek Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Alkali Creek Wind, LLC",
        "POI Location": "Tap 345 kV BUS #1048 Tonkawa -\nBUS #11050  Dusty Road",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 474.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-31T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1460,
      "raw": {
        "INR": "28INR0419",
        "Project Name": "PRI Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BHER Power Resources, Inc.",
        "POI Location": "The 345 kV Falcon Seaboard (#1025) substation; Oncor",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 63.84,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-07-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0419",
        "Project Name": "PRI Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BHER Power Resources, Inc.",
        "POI Location": "The 345 kV Falcon Seaboard (#1025) substation; Oncor",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-01-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 63.84,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-07-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1461,
      "raw": {
        "INR": "28INR0422",
        "Project Name": "Prairie Branch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Branch Energy, LLC",
        "POI Location": "Tap 345kV #1730 Krum West - #6111 Riley Ckt 1",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-05T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0422",
        "Project Name": "Prairie Branch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Branch Energy, LLC",
        "POI Location": "Tap 345kV #1730 Krum West - #6111 Riley Ckt 1",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.23,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-05T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1462,
      "raw": {
        "INR": "28INR0423",
        "Project Name": "Prairie Branch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Branch Energy, LLC",
        "POI Location": "Tap 345kV #1730 Krum West - #6111 Riley Ckt 1",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-27T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0423",
        "Project Name": "Prairie Branch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Prairie Branch Energy, LLC",
        "POI Location": "Tap 345kV #1730 Krum West - #6111 Riley Ckt 1",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-27T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-08-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1463,
      "raw": {
        "INR": "28INR0427",
        "Project Name": "Ouroboros Grid BESS 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 4",
        "POI Location": "79500 Palmito 345kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-21T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0427",
        "Project Name": "Ouroboros Grid BESS 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 4",
        "POI Location": "79500 Palmito 345kV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-21T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1464,
      "raw": {
        "INR": "28INR0428",
        "Project Name": "Ouroboros Grid BESS 5",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 5",
        "POI Location": "79500 Palmito 345KV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-21T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0428",
        "Project Name": "Ouroboros Grid BESS 5",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 5",
        "POI Location": "79500 Palmito 345KV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-21T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1465,
      "raw": {
        "INR": "28INR0429",
        "Project Name": "Ouroboros Grid BESS 6",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 6",
        "POI Location": "79500 Palmito 345KV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-21T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0429",
        "Project Name": "Ouroboros Grid BESS 6",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ouroboros Grid BESS Unit 6",
        "POI Location": "79500 Palmito 345KV",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.94,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-21T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1466,
      "raw": {
        "INR": "28INR0431",
        "Project Name": "Solarville Wind SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ville Solar, LLC",
        "POI Location": "Tap 345 kV (#2432)Tri Corner - (#3105) Elkton ",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-13T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0431",
        "Project Name": "Solarville Wind SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ville Solar, LLC",
        "POI Location": "Tap 345 kV (#2432)Tri Corner - (#3105) Elkton ",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-13T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1467,
      "raw": {
        "INR": "28INR0432",
        "Project Name": "Solarville BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ville Solar, LLC",
        "POI Location": "Tap 345 kV (#2432)Tri Corner - (#3105) Elkton ",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-07T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0432",
        "Project Name": "Solarville BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ville Solar, LLC",
        "POI Location": "Tap 345 kV (#2432)Tri Corner - (#3105) Elkton ",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-19T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-07T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1468,
      "raw": {
        "INR": "28INR0433",
        "Project Name": "Blue Spring Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flat Creek Solar, LLC",
        "POI Location": "#60515 Clear Crossing 345 kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-28T00:00:00",
        "Screening Study Started": "2025-10-03T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0433",
        "Project Name": "Blue Spring Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flat Creek Solar, LLC",
        "POI Location": "#60515 Clear Crossing 345 kV",
        "County": "Haskell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-10-28T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-28T00:00:00",
        "Screening Study Started": "2025-10-03T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1469,
      "raw": {
        "INR": "28INR0434",
        "Project Name": "Viento Bravo Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Webb Wind, LLC",
        "POI Location": "Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-06T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 366.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-29T00:00:00",
        "Screening Study Started": "2025-10-03T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0434",
        "Project Name": "Viento Bravo Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Webb Wind, LLC",
        "POI Location": "Tap 345kV 80220 Cenizo - 80079 Cruce Ckt-1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-07-06T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 366.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-29T00:00:00",
        "Screening Study Started": "2025-10-03T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-31T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1470,
      "raw": {
        "INR": "28INR0436",
        "Project Name": "Englehardt BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Comal BESS LLC",
        "POI Location": "River Oaks (7173)",
        "County": "Comal",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0436",
        "Project Name": "Englehardt BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Comal BESS LLC",
        "POI Location": "River Oaks (7173)",
        "County": "Comal",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-09-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1471,
      "raw": {
        "INR": "28INR0437",
        "Project Name": "Barbara BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Barbara BESS LLC",
        "POI Location": "LINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-10-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0437",
        "Project Name": "Barbara BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Barbara BESS LLC",
        "POI Location": "LINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE",
        "County": "Nueces",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-05-02T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.51,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": "2025-10-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1472,
      "raw": {
        "INR": "28INR0438",
        "Project Name": "Moss Rock Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Invenergy Storage Development LLC",
        "POI Location": "#7070 Goldthwaite 138kV",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-14T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0438",
        "Project Name": "Moss Rock Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Invenergy Storage Development LLC",
        "POI Location": "#7070 Goldthwaite 138kV",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 157.12,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-14T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-02T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1473,
      "raw": {
        "INR": "28INR0442",
        "Project Name": "Zunkerville BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zunkerville Energy, LLC",
        "POI Location": "345kV BUS #5725 PAWNEE SWITCHING STATION",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-03T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0442",
        "Project Name": "Zunkerville BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zunkerville Energy, LLC",
        "POI Location": "345kV BUS #5725 PAWNEE SWITCHING STATION",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.74,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-03T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1474,
      "raw": {
        "INR": "28INR0443",
        "Project Name": "Zunkerville Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zunkerville Energy, LLC",
        "POI Location": " #5725 PAWNEE SWITCHING STATION 345kV",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.67,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-02T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0443",
        "Project Name": "Zunkerville Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zunkerville Energy, LLC",
        "POI Location": " #5725 PAWNEE SWITCHING STATION 345kV",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.67,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-02T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1475,
      "raw": {
        "INR": "28INR0446",
        "Project Name": "Vista Bluff Wind I \"Alternate POI\"",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vista Bluff Windpower, LLC",
        "POI Location": "tap 345 kV (76000) North McCamey -  (59903) Bearkat \n(Benedum 345 kV station that LCRA will build part of 24RPG024).",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 290.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0446",
        "Project Name": "Vista Bluff Wind I \"Alternate POI\"",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vista Bluff Windpower, LLC",
        "POI Location": "tap 345 kV (76000) North McCamey -  (59903) Bearkat \n(Benedum 345 kV station that LCRA will build part of 24RPG024).",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 290.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1476,
      "raw": {
        "INR": "28INR0447",
        "Project Name": "Vista Bluff Wind II \"Alternate POI\"",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vista Bluff Windpower, LLC",
        "POI Location": "tap 345 kV (76000) North McCamey -  (59903) Bearkat \n(Benedum 345 kV station that LCRA will build part of 24RPG024).",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 290.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0447",
        "Project Name": "Vista Bluff Wind II \"Alternate POI\"",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vista Bluff Windpower, LLC",
        "POI Location": "tap 345 kV (76000) North McCamey -  (59903) Bearkat \n(Benedum 345 kV station that LCRA will build part of 24RPG024).",
        "County": "Upton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 290.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1477,
      "raw": {
        "INR": "28INR0448",
        "Project Name": "Gulf Prairie BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Prairie Energy LLC",
        "POI Location": "(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0448",
        "Project Name": "Gulf Prairie BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Gulf Prairie Energy LLC",
        "POI Location": "(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.78,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1478,
      "raw": {
        "INR": "28INR0452",
        "Project Name": "Neal Battery ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CH Neal Battery LLC",
        "POI Location": "tap of 138kV 8750 Chalmers - 8127 Lane City",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-10T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2026-01-06T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0452",
        "Project Name": "Neal Battery ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "CH Neal Battery LLC",
        "POI Location": "tap of 138kV 8750 Chalmers - 8127 Lane City",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-03T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 120.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-10T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2026-01-06T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1479,
      "raw": {
        "INR": "28INR0454",
        "Project Name": "Oakley BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oakley BESS LLC",
        "POI Location": "Tap 138 kV 612 BLUHORSE– 684 SPRING",
        "County": "Denton",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-02T00:00:00",
        "Screening Study Started": "2025-10-06T00:00:00",
        "Screening Study Complete": "2025-11-16T00:00:00",
        "FIS Requested": "2025-10-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0454",
        "Project Name": "Oakley BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oakley BESS LLC",
        "POI Location": "Tap 138 kV 612 BLUHORSE– 684 SPRING",
        "County": "Denton",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-09-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-02T00:00:00",
        "Screening Study Started": "2025-10-06T00:00:00",
        "Screening Study Complete": "2025-11-16T00:00:00",
        "FIS Requested": "2025-10-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1480,
      "raw": {
        "INR": "28INR0456",
        "Project Name": "Brazos Energy Security",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Golden Spread Electric",
        "POI Location": "Tap 345 kV (Bus #1048) Tonkawa Switch – (Bus #11050) Dusty Road\n",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-22T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3000,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-29T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2026-01-06T00:00:00",
        "FIS Requested": "2026-09-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0456",
        "Project Name": "Brazos Energy Security",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Golden Spread Electric",
        "POI Location": "Tap 345 kV (Bus #1048) Tonkawa Switch – (Bus #11050) Dusty Road\n",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-22T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3000,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-29T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2026-01-06T00:00:00",
        "FIS Requested": "2026-09-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1481,
      "raw": {
        "INR": "28INR0457",
        "Project Name": "Kilby1 Part 2 Tier1 BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 330,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-17T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-03-12T00:00:00",
        "FIS Requested": "2026-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0457",
        "Project Name": "Kilby1 Part 2 Tier1 BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-01-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 330,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-17T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-03-12T00:00:00",
        "FIS Requested": "2026-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1482,
      "raw": {
        "INR": "28INR0459",
        "Project Name": "Kilby1 Part 4 Large Block Simple Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-20T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 950,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0459",
        "Project Name": "Kilby1 Part 4 Large Block Simple Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-20T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 950,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1483,
      "raw": {
        "INR": "28INR0461",
        "Project Name": "Dilley Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AETS Development Holdings LLC",
        "POI Location": "Tap 138 kV 8212 DILLEY SWITCH AEP - 8613 BIG WELLS ",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0461",
        "Project Name": "Dilley Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AETS Development Holdings LLC",
        "POI Location": "Tap 138 kV 8212 DILLEY SWITCH AEP - 8613 BIG WELLS ",
        "County": "Frio",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1484,
      "raw": {
        "INR": "28INR0462",
        "Project Name": "Senterfitt Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AETS Development Holdings LLC",
        "POI Location": "Tap 138 kV 7080 Lometa - 7064 Lampasas ",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 68.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2026-03-11T00:00:00",
        "Screening Study Complete": "2026-06-05T00:00:00",
        "FIS Requested": "2026-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0462",
        "Project Name": "Senterfitt Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AETS Development Holdings LLC",
        "POI Location": "Tap 138 kV 7080 Lometa - 7064 Lampasas ",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-03T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 68.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2026-03-11T00:00:00",
        "Screening Study Complete": "2026-06-05T00:00:00",
        "FIS Requested": "2026-03-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1485,
      "raw": {
        "INR": "28INR0463",
        "Project Name": "Mutz Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AETS Development Holdings LLC",
        "POI Location": "Tap 69 kV 5693 San Miguel Tap - 5698 North Calliham Sub",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 72.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2026-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0463",
        "Project Name": "Mutz Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AETS Development Holdings LLC",
        "POI Location": "Tap 69 kV 5693 San Miguel Tap - 5698 North Calliham Sub",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 72.82,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2026-01-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1486,
      "raw": {
        "INR": "28INR0464",
        "Project Name": "Grayback Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grayback Solar, LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-31T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0464",
        "Project Name": "Grayback Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Grayback Solar, LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 221.81,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-31T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1487,
      "raw": {
        "INR": "28INR0465",
        "Project Name": "Valcrest BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flexen USA LLC",
        "POI Location": "tap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-26T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0465",
        "Project Name": "Valcrest BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flexen USA LLC",
        "POI Location": "tap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 154.25,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-26T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1488,
      "raw": {
        "INR": "28INR0466",
        "Project Name": "Nabla Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nabla Park LLC",
        "POI Location": "Double Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 750,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0466",
        "Project Name": "Nabla Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nabla Park LLC",
        "POI Location": "Double Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT",
        "County": "Parker",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 750,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-29T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1489,
      "raw": {
        "INR": "28INR0467",
        "Project Name": "Main Horn Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Main Horn Solar LLC",
        "POI Location": "3387 Revolution 138 KV",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-29T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2025-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0467",
        "Project Name": "Main Horn Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Main Horn Solar LLC",
        "POI Location": "3387 Revolution 138 KV",
        "County": "Navarro",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.43,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-29T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2025-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1490,
      "raw": {
        "INR": "28INR0468",
        "Project Name": "Glass Mountain Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Wind, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 519.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0468",
        "Project Name": "Glass Mountain Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Wind, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 519.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1491,
      "raw": {
        "INR": "28INR0469",
        "Project Name": "Paintbrush PV1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0469",
        "Project Name": "Paintbrush PV1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1492,
      "raw": {
        "INR": "28INR0470",
        "Project Name": "Paintbrush PV2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0470",
        "Project Name": "Paintbrush PV2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-05-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1493,
      "raw": {
        "INR": "28INR0472",
        "Project Name": "Seven Angels Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Seven Angels Infrastructure LLC",
        "POI Location": "68090 Sam Switch Bus 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 514,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0472",
        "Project Name": "Seven Angels Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Seven Angels Infrastructure LLC",
        "POI Location": "68090 Sam Switch Bus 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 514,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1494,
      "raw": {
        "INR": "28INR0473",
        "Project Name": "Seven Angels Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Seven Angels Infrastructure LLC",
        "POI Location": "68090 Sam Switch Bus 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 514,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0473",
        "Project Name": "Seven Angels Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Seven Angels Infrastructure LLC",
        "POI Location": "68090 Sam Switch Bus 345kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 514,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-11-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1495,
      "raw": {
        "INR": "28INR0474",
        "Project Name": "Mission Station Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mission Station LLC",
        "POI Location": "Tap 345kV (Bus #5400) SPRUCE – (Bus #5475) VON_ROSE Ckt 1;",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 375,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-07T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-05-08T00:00:00",
        "FIS Requested": "2026-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0474",
        "Project Name": "Mission Station Energy Storage I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mission Station LLC",
        "POI Location": "Tap 345kV (Bus #5400) SPRUCE – (Bus #5475) VON_ROSE Ckt 1;",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 375,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-07T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-05-08T00:00:00",
        "FIS Requested": "2026-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1496,
      "raw": {
        "INR": "28INR0475",
        "Project Name": "Mission Station Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mission Station LLC",
        "POI Location": "Tap 345kV (Bus #5400) SPRUCE – (Bus #5231) HOWARD_5 Ckt 1",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 375,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-07T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-05-08T00:00:00",
        "FIS Requested": "2026-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0475",
        "Project Name": "Mission Station Energy Storage II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mission Station LLC",
        "POI Location": "Tap 345kV (Bus #5400) SPRUCE – (Bus #5231) HOWARD_5 Ckt 1",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 375,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-07T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-05-08T00:00:00",
        "FIS Requested": "2026-02-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1497,
      "raw": {
        "INR": "28INR0476",
        "Project Name": "Pease River Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pease River Solar LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 276.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-25T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-11-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0476",
        "Project Name": "Pease River Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pease River Solar LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 276.35,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-25T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-11-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1498,
      "raw": {
        "INR": "28INR0478",
        "Project Name": "Alkali Creek Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Alkali Creek Wind, LLC",
        "POI Location": "Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 250.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-12T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-23T00:00:00",
        "FIS Requested": "2025-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0478",
        "Project Name": "Alkali Creek Wind 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Alkali Creek Wind, LLC",
        "POI Location": "Tap 345 kV BUS #1048 Tonkawa - BUS #11050 Dusty Road",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 250.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-12T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-23T00:00:00",
        "FIS Requested": "2025-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1499,
      "raw": {
        "INR": "28INR0482",
        "Project Name": "Falcon II Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project ",
        "POI Location": "8004 Revilla 138 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-02-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-05T00:00:00",
        "Screening Study Started": "2026-03-29T00:00:00",
        "Screening Study Complete": "2026-06-17T00:00:00",
        "FIS Requested": "2026-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0482",
        "Project Name": "Falcon II Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project ",
        "POI Location": "8004 Revilla 138 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-02-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.32,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-05T00:00:00",
        "Screening Study Started": "2026-03-29T00:00:00",
        "Screening Study Complete": "2026-06-17T00:00:00",
        "FIS Requested": "2026-03-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1500,
      "raw": {
        "INR": "28INR0483",
        "Project Name": "Falcon II BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project ",
        "POI Location": "8004 Revilla 138 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-02-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-05T00:00:00",
        "Screening Study Started": "2026-03-29T00:00:00",
        "Screening Study Complete": "2026-06-17T00:00:00",
        "FIS Requested": "2026-03-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0483",
        "Project Name": "Falcon II BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project ",
        "POI Location": "8004 Revilla 138 kV",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-02-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-05T00:00:00",
        "Screening Study Started": "2026-03-29T00:00:00",
        "Screening Study Complete": "2026-06-17T00:00:00",
        "FIS Requested": "2026-03-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1501,
      "raw": {
        "INR": "28INR0484",
        "Project Name": "Pathfinder Energy Storage, LLC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pathfinder Energy Storage, LLC",
        "POI Location": "8437 Rincon 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-23T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0484",
        "Project Name": "Pathfinder Energy Storage, LLC",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pathfinder Energy Storage, LLC",
        "POI Location": "8437 Rincon 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-23T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1502,
      "raw": {
        "INR": "28INR0485",
        "Project Name": "Sparta BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sparta Storage Center",
        "POI Location": "88690 SPTPOI7A 345kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-04T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-24T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0485",
        "Project Name": "Sparta BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sparta Storage Center",
        "POI Location": "88690 SPTPOI7A 345kV",
        "County": "Bee",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-04T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-24T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1503,
      "raw": {
        "INR": "28INR0486",
        "Project Name": "Spectra Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "SE DC Devco",
        "POI Location": "59912 Galvani 345KV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0486",
        "Project Name": "Spectra Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "SE DC Devco",
        "POI Location": "59912 Galvani 345KV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-11-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-29T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1504,
      "raw": {
        "INR": "28INR0490",
        "Project Name": "Vertus Energy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vertus Energy Storage 2 LLC",
        "POI Location": "38830 TNMAINLAND1 138 KV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-02-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-21T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0490",
        "Project Name": "Vertus Energy Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Vertus Energy Storage 2 LLC",
        "POI Location": "38830 TNMAINLAND1 138 KV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2028-02-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 204.93,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-21T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2026-01-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1505,
      "raw": {
        "INR": "28INR0494",
        "Project Name": "Wilson Gas Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Misae Gas Power",
        "POI Location": "Tap 345 kV 5133 ELMCREEK -  5901 MIGUEL5  CKT 1\nTap 345 kV 5133 ELMCREEK  -  5901 MIGUEL5  CKT 2",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 402.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-23T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0494",
        "Project Name": "Wilson Gas Plant",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Misae Gas Power",
        "POI Location": "Tap 345 kV 5133 ELMCREEK -  5901 MIGUEL5  CKT 1\nTap 345 kV 5133 ELMCREEK  -  5901 MIGUEL5  CKT 2",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 402.88,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-23T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1506,
      "raw": {
        "INR": "28INR0495",
        "Project Name": "Old Alma Road Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Wildcat Renewables, LLC",
        "POI Location": "2326 ENNS_SE_8 138kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 20.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-09-01T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0495",
        "Project Name": "Old Alma Road Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Wildcat Renewables, LLC",
        "POI Location": "2326 ENNS_SE_8 138kV",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 20.06,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-09-01T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1507,
      "raw": {
        "INR": "28INR0496",
        "Project Name": "Blue Kite",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "<Bus#8956> <WHITEPOINT> <345KV>",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-08-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 370.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-09T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0496",
        "Project Name": "Blue Kite",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "<Bus#8956> <WHITEPOINT> <345KV>",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-08-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 370.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-09T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1508,
      "raw": {
        "INR": "28INR0497",
        "Project Name": "Cielo Vista Power II",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Power II, LLC",
        "POI Location": "TAP 345 kV BUS # 5901 MIGUEL5 - BUS #80280\nCRUCE SM 7A Ckt-1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 350.38,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-04-16T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0497",
        "Project Name": "Cielo Vista Power II",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Power II, LLC",
        "POI Location": "TAP 345 kV BUS # 5901 MIGUEL5 - BUS #80280\nCRUCE SM 7A Ckt-1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 350.38,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-04-16T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1509,
      "raw": {
        "INR": "28INR0498",
        "Project Name": "Old Aqueduct BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power Management LLC",
        "POI Location": "23920 BLKWTRDR_5 345kV",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-09T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0498",
        "Project Name": "Old Aqueduct BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tempus Power Management LLC",
        "POI Location": "23920 BLKWTRDR_5 345kV",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-09T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1510,
      "raw": {
        "INR": "28INR0499",
        "Project Name": "Alpha Digital Campus Combined-cycle and Co-located Load",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerBridge LLC",
        "POI Location": "38044 TNCOWPEN__3 345kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 58.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-06T00:00:00",
        "Screening Study Started": "2026-04-28T00:00:00",
        "Screening Study Complete": "2026-07-09T00:00:00",
        "FIS Requested": "2026-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0499",
        "Project Name": "Alpha Digital Campus Combined-cycle and Co-located Load",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "PowerBridge LLC",
        "POI Location": "38044 TNCOWPEN__3 345kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 58.26,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-06T00:00:00",
        "Screening Study Started": "2026-04-28T00:00:00",
        "Screening Study Complete": "2026-07-09T00:00:00",
        "FIS Requested": "2026-04-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1511,
      "raw": {
        "INR": "28INR0503",
        "Project Name": "Rancho Grande Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bordas Renewable Energy, LLC",
        "POI Location": "345 kV Tiempo Substation #80224",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-30T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0503",
        "Project Name": "Rancho Grande Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bordas Renewable Energy, LLC",
        "POI Location": "345 kV Tiempo Substation #80224",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-05-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.58,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-30T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1512,
      "raw": {
        "INR": "28INR0504",
        "Project Name": "Sweetwater 5 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetwater Wind 5 LLC",
        "POI Location": "Bitter Creek Substation",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 79.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-13T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0504",
        "Project Name": "Sweetwater 5 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetwater Wind 5 LLC",
        "POI Location": "Bitter Creek Substation",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 79.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-13T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1513,
      "raw": {
        "INR": "28INR0509",
        "Project Name": "Thunder Bird 2 Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BKV Power Ventures Jack, LLC 3",
        "POI Location": "Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443)",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2031-06-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1272.8,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-05-03T00:00:00",
        "Screening Study Started": "2026-05-26T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0509",
        "Project Name": "Thunder Bird 2 Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BKV Power Ventures Jack, LLC 3",
        "POI Location": "Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443)",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2031-06-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1272.8,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-05-03T00:00:00",
        "Screening Study Started": "2026-05-26T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1514,
      "raw": {
        "INR": "28INR0514",
        "Project Name": "Young Road Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "reNRG TX 5 LLC",
        "POI Location": "The POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) 69 KV SUB STATIONS.",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-05T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0514",
        "Project Name": "Young Road Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "reNRG TX 5 LLC",
        "POI Location": "The POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784) AND LAKE KEMP SWITCH (782) 69 KV SUB STATIONS.",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 101.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-05T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1515,
      "raw": {
        "INR": "28INR0520",
        "Project Name": "SunRustler Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "SunRustler Solar",
        "POI Location": "11082 MAVRKDRW_8 138kV",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.49,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-23T00:00:00",
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0520",
        "Project Name": "SunRustler Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "SunRustler Solar",
        "POI Location": "11082 MAVRKDRW_8 138kV",
        "County": "Culberson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.49,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-23T00:00:00",
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1516,
      "raw": {
        "INR": "28INR0524",
        "Project Name": "Anawa La Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anawa La Solar LLC",
        "POI Location": "Liston 138 KV to Bates 138 KV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 250,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-06-18T00:00:00",
        "Screening Study Started": "2026-06-24T00:00:00",
        "Screening Study Complete": "2026-09-19T00:00:00",
        "FIS Requested": "2026-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0524",
        "Project Name": "Anawa La Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anawa La Solar LLC",
        "POI Location": "Liston 138 KV to Bates 138 KV",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 250,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-06-18T00:00:00",
        "Screening Study Started": "2026-06-24T00:00:00",
        "Screening Study Complete": "2026-09-19T00:00:00",
        "FIS Requested": "2026-06-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1517,
      "raw": {
        "INR": "28INR0529",
        "Project Name": "Victory Ellis–BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Victory Ellis, LLC",
        "POI Location": "Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-09-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 452.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-23T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": "2026-08-18T00:00:00",
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0529",
        "Project Name": "Victory Ellis–BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Victory Ellis, LLC",
        "POI Location": "Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-09-28T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 452.99,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-23T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": "2026-08-18T00:00:00",
        "FIS Requested": "2026-06-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1518,
      "raw": {
        "INR": "28INR0530",
        "Project Name": "Wickson Creek Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wickson Creek Center, LLC",
        "POI Location": "Jack Creek Station 345 kV (#975)",
        "County": "Brazos",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1022.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-09-04T00:00:00",
        "FIS Requested": "2026-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0530",
        "Project Name": "Wickson Creek Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wickson Creek Center, LLC",
        "POI Location": "Jack Creek Station 345 kV (#975)",
        "County": "Brazos",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-10-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1022.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-09-04T00:00:00",
        "FIS Requested": "2026-06-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1519,
      "raw": {
        "INR": "28INR0531",
        "Project Name": "Crape Myrtle Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Crape Myrtle Solar LLC",
        "POI Location": "Tap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 140.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0531",
        "Project Name": "Crape Myrtle Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Crape Myrtle Solar LLC",
        "POI Location": "Tap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 140.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1520,
      "raw": {
        "INR": "28INR0532",
        "Project Name": "Alpha Power Phase 1",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0532",
        "Project Name": "Alpha Power Phase 1",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1521,
      "raw": {
        "INR": "28INR0535",
        "Project Name": "Daisy Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Daisy Solar LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-01T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "28INR0535",
        "Project Name": "Daisy Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Daisy Solar LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-01T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1522,
      "raw": {
        "INR": "29INR0003",
        "Project Name": "Aurelius Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Roman, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1124.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-07-18T00:00:00",
        "Screening Study Complete": "2023-10-15T00:00:00",
        "FIS Requested": "2023-07-13T00:00:00",
        "FIS Approved": "2025-09-22T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-10-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0003",
        "Project Name": "Aurelius Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Roman, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1124.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-07-18T00:00:00",
        "Screening Study Complete": "2023-10-15T00:00:00",
        "FIS Requested": "2023-07-13T00:00:00",
        "FIS Approved": "2025-09-22T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-10-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1523,
      "raw": {
        "INR": "29INR0004",
        "Project Name": "Aurelius Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Roman Wind, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 621.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-08-07T00:00:00",
        "FIS Approved": "2025-09-22T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-10-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0004",
        "Project Name": "Aurelius Wind",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "IP Roman Wind, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 621.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-07-13T00:00:00",
        "Screening Study Started": "2023-08-14T00:00:00",
        "Screening Study Complete": "2023-11-06T00:00:00",
        "FIS Requested": "2023-08-07T00:00:00",
        "FIS Approved": "2025-09-22T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2025-10-09T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-17T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1524,
      "raw": {
        "INR": "29INR0009",
        "Project Name": "Aurelius 2 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Roman, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 445.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0009",
        "Project Name": "Aurelius 2 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "IP Roman, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 445.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-10T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-07-13T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1525,
      "raw": {
        "INR": "29INR0010",
        "Project Name": " Aurelius 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman Wind II, LLC",
        "POI Location": "23908 Deaf Smith station 345kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 621.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0010",
        "Project Name": " Aurelius 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman Wind II, LLC",
        "POI Location": "23908 Deaf Smith station 345kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 621.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1526,
      "raw": {
        "INR": "29INR0011",
        "Project Name": " Aurelius 3 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman III, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 445.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-11-20T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0011",
        "Project Name": " Aurelius 3 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman III, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 445.4,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2023-11-20T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1527,
      "raw": {
        "INR": "29INR0012",
        "Project Name": " Aurelius 3 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman III, LLC",
        "POI Location": "23908 Deaf Smith station 345kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 497.3,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0012",
        "Project Name": " Aurelius 3 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman III, LLC",
        "POI Location": "23908 Deaf Smith station 345kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 497.3,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2023-11-28T00:00:00",
        "Screening Study Started": "2023-12-04T00:00:00",
        "Screening Study Complete": "2024-03-01T00:00:00",
        "FIS Requested": "2023-11-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1528,
      "raw": {
        "INR": "29INR0013",
        "Project Name": "Cattle Drive Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cattle Drive Solar, LLC",
        "POI Location": "76000 North McCamey 345kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 307,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-06-13T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-29T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0013",
        "Project Name": "Cattle Drive Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cattle Drive Solar, LLC",
        "POI Location": "76000 North McCamey 345kV",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 307,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-06-13T00:00:00",
        "Screening Study Started": "2024-06-13T00:00:00",
        "Screening Study Complete": "2024-09-10T00:00:00",
        "FIS Requested": "2024-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-29T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1529,
      "raw": {
        "INR": "29INR0015",
        "Project Name": "Funston Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Funston Solar LLC",
        "POI Location": "tap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 351.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-04-03T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-26T00:00:00",
        "FIS Requested": "2024-03-19T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": "2026-01-28T00:00:00",
        "Unnamed: 25": "2026-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0015",
        "Project Name": "Funston Solar",
        "GIM Study Phase": "SS Completed, FIS Completed, IA",
        "Interconnecting Entity": "Funston Solar LLC",
        "POI Location": "tap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-02-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 351.1,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2024-04-03T00:00:00",
        "Screening Study Started": "2024-02-27T00:00:00",
        "Screening Study Complete": "2024-05-26T00:00:00",
        "FIS Requested": "2024-03-19T00:00:00",
        "FIS Approved": "2025-12-17T00:00:00",
        "Economic Study Required": "Yes",
        "IA Signed": "2024-10-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2025-09-15T00:00:00",
        "Meets All Planning": "2026-01-28T00:00:00",
        "Unnamed: 25": "2026-01-28T00:00:00",
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1530,
      "raw": {
        "INR": "29INR0017",
        "Project Name": "Big Rooter East Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Big Rooter East, LLC",
        "POI Location": "39950 TNP One Plant 345 kV",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 554.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0017",
        "Project Name": "Big Rooter East Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Big Rooter East, LLC",
        "POI Location": "39950 TNP One Plant 345 kV",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 554.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1531,
      "raw": {
        "INR": "29INR0018",
        "Project Name": "Big Rooter East Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Big Rooter East, LLC",
        "POI Location": "39950 TNP One Plant 345 kV",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0018",
        "Project Name": "Big Rooter East Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Big Rooter East, LLC",
        "POI Location": "39950 TNP One Plant 345 kV",
        "County": "Robertson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-03-04T00:00:00",
        "Screening Study Started": "2024-03-22T00:00:00",
        "Screening Study Complete": "2024-06-19T00:00:00",
        "FIS Requested": "2024-03-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1532,
      "raw": {
        "INR": "29INR0019",
        "Project Name": "Infinium Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Jackalope Flats Solar, LLC",
        "POI Location": "#1058 Longshore Switch - #18548 Prairieland Switch 345kV Ckt 1",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-03T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0019",
        "Project Name": "Infinium Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Jackalope Flats Solar, LLC",
        "POI Location": "#1058 Longshore Switch - #18548 Prairieland Switch 345kV Ckt 1",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-06-03T00:00:00",
        "Screening Study Started": "2024-08-16T00:00:00",
        "Screening Study Complete": "2024-10-07T00:00:00",
        "FIS Requested": "2024-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1533,
      "raw": {
        "INR": "29INR0021",
        "Project Name": "Buzios BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buzios Energy Storage, LLC",
        "POI Location": "Tap 345kV 59904 Cottonwood - 23922 White River Ckt 2",
        "County": "Motley",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-03T00:00:00",
        "Screening Study Started": "2025-04-08T00:00:00",
        "Screening Study Complete": "2025-07-01T00:00:00",
        "FIS Requested": "2025-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0021",
        "Project Name": "Buzios BESS SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Buzios Energy Storage, LLC",
        "POI Location": "Tap 345kV 59904 Cottonwood - 23922 White River Ckt 2",
        "County": "Motley",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-03T00:00:00",
        "Screening Study Started": "2025-04-08T00:00:00",
        "Screening Study Complete": "2025-07-01T00:00:00",
        "FIS Requested": "2025-01-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1534,
      "raw": {
        "INR": "29INR0025",
        "Project Name": "Skyrider Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "138kV #38365 TNPINION",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 370,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0025",
        "Project Name": "Skyrider Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "138kV #38365 TNPINION",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 370,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2024-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-23T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-30T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1535,
      "raw": {
        "INR": "29INR0030",
        "Project Name": "Commodus Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell, LLC",
        "POI Location": "Tap 345kV 23914 Tule Canyon - 23900 Alibates",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-17T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0030",
        "Project Name": "Commodus Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell, LLC",
        "POI Location": "Tap 345kV 23914 Tule Canyon - 23900 Alibates",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-17T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1536,
      "raw": {
        "INR": "29INR0031",
        "Project Name": "Commodus Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell, LLC",
        "POI Location": "tap 345kV 23914 Tule Canyon - 23900 Alibates\n",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 641.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-17T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0031",
        "Project Name": "Commodus Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell, LLC",
        "POI Location": "tap 345kV 23914 Tule Canyon - 23900 Alibates\n",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 641.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-17T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1537,
      "raw": {
        "INR": "29INR0032",
        "Project Name": "Commodus 2 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell II, LLC",
        "POI Location": "Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-25T00:00:00",
        "Screening Study Started": "2025-03-03T00:00:00",
        "Screening Study Complete": "2025-06-03T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0032",
        "Project Name": "Commodus 2 Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell II, LLC",
        "POI Location": "Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-25T00:00:00",
        "Screening Study Started": "2025-03-03T00:00:00",
        "Screening Study Complete": "2025-06-03T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1538,
      "raw": {
        "INR": "29INR0033",
        "Project Name": "Commodus 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell II, LLC",
        "POI Location": "Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 641.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-03T00:00:00",
        "Screening Study Complete": "2025-06-03T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0033",
        "Project Name": "Commodus 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Blackwell II, LLC",
        "POI Location": "Tapping the 345 kV Double-Circuit Line from Tule Canyon (Bus# 23914) to Alibates (Bus# 23900)",
        "County": "Swisher",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 641.48,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-24T00:00:00",
        "Screening Study Started": "2025-03-03T00:00:00",
        "Screening Study Complete": "2025-06-03T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1539,
      "raw": {
        "INR": "29INR0034",
        "Project Name": "Cavell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Cavell, LLC ",
        "POI Location": "Tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1\n",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-03T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-06-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0034",
        "Project Name": "Cavell Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Cavell, LLC ",
        "POI Location": "Tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1\n",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-03T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-06-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1540,
      "raw": {
        "INR": "29INR0035",
        "Project Name": "Cavell Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Cavell, LLC ",
        "POI Location": "tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 641.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-03T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0035",
        "Project Name": "Cavell Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Cavell, LLC ",
        "POI Location": "tap 345kV 23910 Windmill - 23912 Ogallala Ckt 1",
        "County": "Castro",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-07-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 641.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-03T00:00:00",
        "Screening Study Started": "2024-07-22T00:00:00",
        "Screening Study Complete": "2024-10-17T00:00:00",
        "FIS Requested": "2024-07-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1541,
      "raw": {
        "INR": "29INR0040",
        "Project Name": "Gusty Windpower",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gusty Windpower, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station  ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 248.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-12T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-27T00:00:00",
        "FIS Requested": "2024-08-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0040",
        "Project Name": "Gusty Windpower",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gusty Windpower, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat - 1058 Longshore_5; Anemone 345 kV Station  ",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 248.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-09-12T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-27T00:00:00",
        "FIS Requested": "2024-08-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-03T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1542,
      "raw": {
        "INR": "29INR0041",
        "Project Name": "Homestead Power (TEF-Due Diligence) ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Homestead Power LLC",
        "POI Location": "138 kV New Bremen #7271",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 260.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-29T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-27T00:00:00",
        "FIS Requested": "2024-07-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0041",
        "Project Name": "Homestead Power (TEF-Due Diligence) ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Homestead Power LLC",
        "POI Location": "138 kV New Bremen #7271",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 260.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-07-29T00:00:00",
        "Screening Study Started": "2024-07-30T00:00:00",
        "Screening Study Complete": "2024-10-27T00:00:00",
        "FIS Requested": "2024-07-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1543,
      "raw": {
        "INR": "29INR0042",
        "Project Name": "Slager Lake Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Resources Interconnection Holdings, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat – 76000 NORTMC5_1Y; Badger 345 kV Station",
        "County": "Reagan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 310.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-05T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-11-16T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0042",
        "Project Name": "Slager Lake Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "NextEra Energy Resources Interconnection Holdings, LLC",
        "POI Location": "Tap 345kV 59903 Bearkat – 76000 NORTMC5_1Y; Badger 345 kV Station",
        "County": "Reagan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 310.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-05T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-11-16T00:00:00",
        "FIS Requested": "2025-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-23T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1544,
      "raw": {
        "INR": "29INR0050",
        "Project Name": "Amphion Solar Phase 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt FOWRTN_SMIGL2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-10T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2025-01-07T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0050",
        "Project Name": "Amphion Solar Phase 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt FOWRTN_SMIGL2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 180.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-10-10T00:00:00",
        "Screening Study Started": "2024-10-10T00:00:00",
        "Screening Study Complete": "2025-01-07T00:00:00",
        "FIS Requested": "2024-10-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1545,
      "raw": {
        "INR": "29INR0056",
        "Project Name": "Palomino Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Renewables",
        "POI Location": "Tap 345kV 1695 Monticello - 1697 Sulphur Springs",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-10-18T00:00:00",
        "Screening Study Complete": "2025-01-13T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0056",
        "Project Name": "Palomino Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Renewables",
        "POI Location": "Tap 345kV 1695 Monticello - 1697 Sulphur Springs",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-10-18T00:00:00",
        "Screening Study Complete": "2025-01-13T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1546,
      "raw": {
        "INR": "29INR0057",
        "Project Name": "Palomino Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Renewables",
        "POI Location": "Tap 345kV 1695 Monticello - 1697 Sulphur Springs",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-01-13T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0057",
        "Project Name": "Palomino Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Renewables",
        "POI Location": "Tap 345kV 1695 Monticello - 1697 Sulphur Springs",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-01-13T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1547,
      "raw": {
        "INR": "29INR0058",
        "Project Name": "Brahman Renewables Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brahman Renewables",
        "POI Location": "Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-25T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0058",
        "Project Name": "Brahman Renewables Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brahman Renewables",
        "POI Location": "Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-28T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-25T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1548,
      "raw": {
        "INR": "29INR0059",
        "Project Name": "Brahman Renewables Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brahman Renewables",
        "POI Location": "Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.88,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-04-21T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-25T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0059",
        "Project Name": "Brahman Renewables Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brahman Renewables",
        "POI Location": "Tap Voss Lake switch #3751 – Badger Switch #3761 345 kV",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 206.88,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2025-04-21T00:00:00",
        "Screening Study Started": "2024-10-29T00:00:00",
        "Screening Study Complete": "2025-01-25T00:00:00",
        "FIS Requested": "2025-04-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1549,
      "raw": {
        "INR": "29INR0063",
        "Project Name": "Columbine Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wilson Wind LLC",
        "POI Location": "TAP 345KV BUS #5380 SHAULA- BUS #5133 ELM CREEK \n",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 295,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-18T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0063",
        "Project Name": "Columbine Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wilson Wind LLC",
        "POI Location": "TAP 345KV BUS #5380 SHAULA- BUS #5133 ELM CREEK \n",
        "County": "Gonzales",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 295,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-02-18T00:00:00",
        "Screening Study Started": "2025-02-25T00:00:00",
        "Screening Study Complete": "2025-05-20T00:00:00",
        "FIS Requested": "2025-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1550,
      "raw": {
        "INR": "29INR0065",
        "Project Name": "Cash Mills Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mills Storage Center",
        "POI Location": "Tap Line between Evant (bus#7068) and Goldthwaite (Bus# 7070)",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0065",
        "Project Name": "Cash Mills Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mills Storage Center",
        "POI Location": "Tap Line between Evant (bus#7068) and Goldthwaite (Bus# 7070)",
        "County": "Mills",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-28T00:00:00",
        "Screening Study Started": "2024-11-26T00:00:00",
        "Screening Study Complete": "2025-02-18T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1551,
      "raw": {
        "INR": "29INR0068",
        "Project Name": "Gregory Power Development SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gregory Power Partners LLC",
        "POI Location": "8580 Resnick 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 469.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-15T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2025-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-07-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "2025-12-15T00:00:00",
        "GHG Permit": "2025-12-15T00:00:00",
        "Water Availability": "2026-07-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0068",
        "Project Name": "Gregory Power Development SLF",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Gregory Power Partners LLC",
        "POI Location": "8580 Resnick 138kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2028-12-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 469.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-15T00:00:00",
        "Screening Study Started": "2024-11-19T00:00:00",
        "Screening Study Complete": "2025-02-20T00:00:00",
        "FIS Requested": "2025-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-07-01T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": "2025-12-15T00:00:00",
        "GHG Permit": "2025-12-15T00:00:00",
        "Water Availability": "2026-07-15T00:00:00",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1552,
      "raw": {
        "INR": "29INR0073",
        "Project Name": "Oasis wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "6562 Friend Ranch Station 138kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 350,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-07-16T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0073",
        "Project Name": "Oasis wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Interconnection Holdings, LLC",
        "POI Location": "6562 Friend Ranch Station 138kV",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 350,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-07-16T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1553,
      "raw": {
        "INR": "29INR0077",
        "Project Name": "Fluvanna Max Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fluvanna Max Solar LLC",
        "POI Location": "11305 DERMOTT 345 kV\n",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0077",
        "Project Name": "Fluvanna Max Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fluvanna Max Solar LLC",
        "POI Location": "11305 DERMOTT 345 kV\n",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-14T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 152.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-11-04T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2024-11-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1554,
      "raw": {
        "INR": "29INR0082",
        "Project Name": "Peach Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AEUG Peach Creek Solar LLC",
        "POI Location": "44040 Bailey 345 kV ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-10T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-12-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0082",
        "Project Name": "Peach Creek Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "AEUG Peach Creek Solar LLC",
        "POI Location": "44040 Bailey 345 kV ",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-10T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-12-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1555,
      "raw": {
        "INR": "29INR0084",
        "Project Name": "Jolly Rock Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Jolly Rock Storage Center LLC",
        "POI Location": "Tap 138kV 1431 GRAHAM Plant Switch - 11525 Short Grass Circuit 1.\n",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-29T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2025-04-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0084",
        "Project Name": "Jolly Rock Storage Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Jolly Rock Storage Center LLC",
        "POI Location": "Tap 138kV 1431 GRAHAM Plant Switch - 11525 Short Grass Circuit 1.\n",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-05-16T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 208.57,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-29T00:00:00",
        "Screening Study Started": "2024-12-19T00:00:00",
        "Screening Study Complete": "2025-03-18T00:00:00",
        "FIS Requested": "2025-04-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1556,
      "raw": {
        "INR": "29INR0085",
        "Project Name": "Firefly Fields Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Firefly Fields Energy Center LLC",
        "POI Location": "Tap 138 kV <57640> <Rock Island> - <7258> <Glidden>",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-06T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2024-12-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0085",
        "Project Name": "Firefly Fields Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Firefly Fields Energy Center LLC",
        "POI Location": "Tap 138 kV <57640> <Rock Island> - <7258> <Glidden>",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-06T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2024-12-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1557,
      "raw": {
        "INR": "29INR0103",
        "Project Name": "Meitner 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Meitner, LLC",
        "POI Location": "79000 Gray Substation 345kV",
        "County": "Gray",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 709.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-02T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0103",
        "Project Name": "Meitner 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Meitner, LLC",
        "POI Location": "79000 Gray Substation 345kV",
        "County": "Gray",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 709.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-02T00:00:00",
        "Screening Study Started": "2025-06-05T00:00:00",
        "Screening Study Complete": "2025-09-02T00:00:00",
        "FIS Requested": "2025-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1558,
      "raw": {
        "INR": "29INR0105",
        "Project Name": "Falls County Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "3711 BALSW 345kV",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-27T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-26T00:00:00",
        "FIS Requested": "2026-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0105",
        "Project Name": "Falls County Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "3711 BALSW 345kV",
        "County": "Falls",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 60,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-27T00:00:00",
        "Screening Study Started": "2025-04-29T00:00:00",
        "Screening Study Complete": "2025-07-26T00:00:00",
        "FIS Requested": "2026-01-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1559,
      "raw": {
        "INR": "29INR0106",
        "Project Name": "Kalina Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "8606 GODDARD 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-22T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2026-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0106",
        "Project Name": "Kalina Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "8606 GODDARD 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 104.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-22T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2026-01-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1560,
      "raw": {
        "INR": "29INR0107",
        "Project Name": "7L Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "7L Solar, LLC",
        "POI Location": "Tap 69kV 5870 Brundage - 5868 Big Wells",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 71.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0107",
        "Project Name": "7L Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "7L Solar, LLC",
        "POI Location": "Tap 69kV 5870 Brundage - 5868 Big Wells",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 71.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1561,
      "raw": {
        "INR": "29INR0108",
        "Project Name": "7L Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "7L Solar, LLC",
        "POI Location": "Tap 69kV 5870 Brundage - 5868 Big Wells",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0108",
        "Project Name": "7L Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "7L Solar, LLC",
        "POI Location": "Tap 69kV 5870 Brundage - 5868 Big Wells",
        "County": "Dimmit",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1562,
      "raw": {
        "INR": "29INR0115",
        "Project Name": "Cielo Vista Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Storage, LLC",
        "POI Location": "Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-18T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-18T00:00:00",
        "FIS Requested": "2025-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0115",
        "Project Name": "Cielo Vista Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Cielo Vista Storage, LLC",
        "POI Location": "Tap 345kV Bus #5901 Miguel5 - Bus #80079 Cruce7A Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-18T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-18T00:00:00",
        "FIS Requested": "2025-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1563,
      "raw": {
        "INR": "29INR0119",
        "Project Name": "Simsboro Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Simsboro Storage LLC",
        "POI Location": "Tap Outlaw (3386) – Limestone (46020)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-09T00:00:00",
        "Screening Study Started": "2025-06-11T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0119",
        "Project Name": "Simsboro Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Simsboro Storage LLC",
        "POI Location": "Tap Outlaw (3386) – Limestone (46020)",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 301.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-09T00:00:00",
        "Screening Study Started": "2025-06-11T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": "2025-05-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1564,
      "raw": {
        "INR": "29INR0120",
        "Project Name": "MilamStation Power Secured Gas Generation",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "LCC-TX8, LLC",
        "POI Location": "Little Pond Switch (Bus #3377) – Hog Creek Switch (Bus #3704) 345 kV Line",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-25T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 846,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-17T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0120",
        "Project Name": "MilamStation Power Secured Gas Generation",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "LCC-TX8, LLC",
        "POI Location": "Little Pond Switch (Bus #3377) – Hog Creek Switch (Bus #3704) 345 kV Line",
        "County": "Milam",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-25T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 846,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-17T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1565,
      "raw": {
        "INR": "29INR0123",
        "Project Name": "Firefly Fields Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Firefly Fields Energy Center LLC",
        "POI Location": "Tap 138 kV 57640 Rock Island to 7258 Glidden",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-17T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0123",
        "Project Name": "Firefly Fields Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Firefly Fields Energy Center LLC",
        "POI Location": "Tap 138 kV 57640 Rock Island to 7258 Glidden",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 156.52,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-17T00:00:00",
        "Screening Study Started": "2025-03-24T00:00:00",
        "Screening Study Complete": "2025-06-19T00:00:00",
        "FIS Requested": "2025-03-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1566,
      "raw": {
        "INR": "29INR0124",
        "Project Name": "Apricot Sun Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Apricot Sun Energy Center, LLC",
        "POI Location": "Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0124",
        "Project Name": "Apricot Sun Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Apricot Sun Energy Center, LLC",
        "POI Location": "Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1567,
      "raw": {
        "INR": "29INR0125",
        "Project Name": "Apricot Sun Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Apricot Sun Energy Center, LLC",
        "POI Location": "Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0125",
        "Project Name": "Apricot Sun Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Apricot Sun Energy Center, LLC",
        "POI Location": "Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-03-26T00:00:00",
        "Screening Study Started": "2025-04-01T00:00:00",
        "Screening Study Complete": "2025-06-25T00:00:00",
        "FIS Requested": "2025-03-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1568,
      "raw": {
        "INR": "29INR0131",
        "Project Name": "Caesar Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Caesar Solar, LLC",
        "POI Location": "59916 Buck Canyon 345 kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-11-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181.6,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0131",
        "Project Name": "Caesar Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Caesar Solar, LLC",
        "POI Location": "59916 Buck Canyon 345 kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-11-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181.6,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1569,
      "raw": {
        "INR": "29INR0132",
        "Project Name": "Caesar Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Caesar Solar, LLC",
        "POI Location": "59916 Buck Canyon 345 kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-11-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0132",
        "Project Name": "Caesar Storage",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Caesar Solar, LLC",
        "POI Location": "59916 Buck Canyon 345 kV",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-11-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.5,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-22T00:00:00",
        "FIS Requested": "2025-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1570,
      "raw": {
        "INR": "29INR0139",
        "Project Name": "Trail Ranch Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "Tap 345KV  #6444 Red Creek  - #7077 AMOS Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-03T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2026-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0139",
        "Project Name": "Trail Ranch Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "Tap 345KV  #6444 Red Creek  - #7077 AMOS Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-03T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2026-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1571,
      "raw": {
        "INR": "29INR0145",
        "Project Name": "Elysium Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "44030 Arcola 138 kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-01-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0145",
        "Project Name": "Elysium Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "44030 Arcola 138 kV",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-01-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1572,
      "raw": {
        "INR": "29INR0146",
        "Project Name": "Estrella Dorada Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Estrella Dorada Wind Farm, LLC",
        "POI Location": "Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-13T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 306,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-21T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-07-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0146",
        "Project Name": "Estrella Dorada Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Estrella Dorada Wind Farm, LLC",
        "POI Location": "Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-07-13T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 306,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-16T00:00:00",
        "Screening Study Started": "2025-07-21T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-07-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1573,
      "raw": {
        "INR": "29INR0147",
        "Project Name": "Selenite Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Selenite Springs Solar, LLC",
        "POI Location": "Tap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching Station",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 253,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-16T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0147",
        "Project Name": "Selenite Springs Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Selenite Springs Solar, LLC",
        "POI Location": "Tap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching Station",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 253,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-04-16T00:00:00",
        "Screening Study Started": "2025-04-21T00:00:00",
        "Screening Study Complete": "2025-07-19T00:00:00",
        "FIS Requested": "2025-04-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1574,
      "raw": {
        "INR": "29INR0148",
        "Project Name": "Big Field Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Field Solar Energy LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B ",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 506.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-06-11T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0148",
        "Project Name": "Big Field Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Field Solar Energy LLC",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B ",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 506.17,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-16T00:00:00",
        "Screening Study Started": "2025-06-11T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1575,
      "raw": {
        "INR": "29INR0150",
        "Project Name": "Jewett Energy Center 1 Gas",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Jewett Energy Center LLC",
        "POI Location": "Tap #3391 JEWETT_N5 - #46020 LMEST_POI_5 and Tap #3390 JEWETT_S5 - #46020 LMEST_POI_5",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1274,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-10T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2025-11-19T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-15T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0150",
        "Project Name": "Jewett Energy Center 1 Gas",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Jewett Energy Center LLC",
        "POI Location": "Tap #3391 JEWETT_N5 - #46020 LMEST_POI_5 and Tap #3390 JEWETT_S5 - #46020 LMEST_POI_5",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1274,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-10T00:00:00",
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2025-11-19T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-07-15T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1576,
      "raw": {
        "INR": "29INR0152",
        "Project Name": "Ranger BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "SSWG Bus name: CSTROVILESB8 , Bus# : 5804\nPlanning Bus long name: CSTROVILESB8, 138 kV",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-20T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": "2025-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0152",
        "Project Name": "Ranger BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Nova Clean Energy LLC",
        "POI Location": "SSWG Bus name: CSTROVILESB8 , Bus# : 5804\nPlanning Bus long name: CSTROVILESB8, 138 kV",
        "County": "Medina",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-29T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 155.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-20T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": "2025-05-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1577,
      "raw": {
        "INR": "29INR0154",
        "Project Name": "Las Mujeres Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Mujeres Solar, LLC",
        "POI Location": "Cruces 7A (Bus #80079)",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 684.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0154",
        "Project Name": "Las Mujeres Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Las Mujeres Solar, LLC",
        "POI Location": "Cruces 7A (Bus #80079)",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 684.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1578,
      "raw": {
        "INR": "29INR0158",
        "Project Name": "NRG Prairie Energy Center ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NRG Prairie Energy Center LLC",
        "POI Location": "Tap #1907 Venus Switch – #3389 Fort Smith Switch 345 kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1253,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-26T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0158",
        "Project Name": "NRG Prairie Energy Center ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NRG Prairie Energy Center LLC",
        "POI Location": "Tap #1907 Venus Switch – #3389 Fort Smith Switch 345 kV",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1253,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-26T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1579,
      "raw": {
        "INR": "29INR0160",
        "Project Name": "Cazadores Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "OCI Energy LLC",
        "POI Location": "Tap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-16T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0160",
        "Project Name": "Cazadores Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "OCI Energy LLC",
        "POI Location": "Tap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2",
        "County": "Duval",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-04-10T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-16T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-10-01T00:00:00",
        "FIS Requested": "2025-06-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1580,
      "raw": {
        "INR": "29INR0166",
        "Project Name": "LOST PINES GAS RECIP",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#170174) LOST PINES 345 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-27T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-07-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0166",
        "Project Name": "LOST PINES GAS RECIP",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#170174) LOST PINES 345 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-27T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-07-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1581,
      "raw": {
        "INR": "29INR0167",
        "Project Name": "Big Watt Power Austin-1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Watt Power Austin-1 LLC",
        "POI Location": "Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton Springs (Bus# 9074) and Zorn (Bus# 7042) -  Austrop (Bus# 7040).",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 448.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-09-26T00:00:00",
        "Screening Study Started": "2025-10-03T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-09-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0167",
        "Project Name": "Big Watt Power Austin-1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Watt Power Austin-1 LLC",
        "POI Location": "Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton Springs (Bus# 9074) and Zorn (Bus# 7042) -  Austrop (Bus# 7040).",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-11-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 448.98,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-09-26T00:00:00",
        "Screening Study Started": "2025-10-03T00:00:00",
        "Screening Study Complete": "2025-11-14T00:00:00",
        "FIS Requested": "2025-09-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1582,
      "raw": {
        "INR": "29INR0169",
        "Project Name": "Falcon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project, LLC",
        "POI Location": "Tap 345kV #80225 CENIZO to #80307 DEL SOL",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 516.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-10-28T00:00:00",
        "FIS Requested": "2025-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0169",
        "Project Name": "Falcon BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Falcon Energy Project, LLC",
        "POI Location": "Tap 345kV #80225 CENIZO to #80307 DEL SOL",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 516.72,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-10-28T00:00:00",
        "FIS Requested": "2025-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1583,
      "raw": {
        "INR": "29INR0170",
        "Project Name": "Three Ranches BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Three Ranches Energy LLC",
        "POI Location": "TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch",
        "County": "Brewster",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-22T00:00:00",
        "Screening Study Started": "2025-08-21T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-08-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0170",
        "Project Name": "Three Ranches BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Three Ranches Energy LLC",
        "POI Location": "TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch",
        "County": "Brewster",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 103.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-22T00:00:00",
        "Screening Study Started": "2025-08-21T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-08-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1584,
      "raw": {
        "INR": "29INR0171",
        "Project Name": "Sweetheart Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetheart Energy, LLC",
        "POI Location": "Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0171",
        "Project Name": "Sweetheart Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetheart Energy, LLC",
        "POI Location": "Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.14,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1585,
      "raw": {
        "INR": "29INR0172",
        "Project Name": "Sweetheart BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetheart Energy, LLC",
        "POI Location": "Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0172",
        "Project Name": "Sweetheart BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetheart Energy, LLC",
        "POI Location": "Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 310.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-08-26T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1586,
      "raw": {
        "INR": "29INR0173",
        "Project Name": "Howard Road BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Project Fast Flow LLC",
        "POI Location": "5231 HOWARD RD 345 kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 617.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-03T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0173",
        "Project Name": "Howard Road BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Project Fast Flow LLC",
        "POI Location": "5231 HOWARD RD 345 kV",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2028-04-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 617.63,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-03T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1587,
      "raw": {
        "INR": "29INR0174",
        "Project Name": "Palisade BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flexen USA LLC",
        "POI Location": "Hoffman (42810) - Lake Jackson (42880) 138 kV line ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-23T00:00:00",
        "Screening Study Started": "2025-09-23T00:00:00",
        "Screening Study Complete": "2025-12-23T00:00:00",
        "FIS Requested": "2025-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0174",
        "Project Name": "Palisade BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Flexen USA LLC",
        "POI Location": "Hoffman (42810) - Lake Jackson (42880) 138 kV line ",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-23T00:00:00",
        "Screening Study Started": "2025-09-23T00:00:00",
        "Screening Study Complete": "2025-12-23T00:00:00",
        "FIS Requested": "2025-09-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1588,
      "raw": {
        "INR": "29INR0175",
        "Project Name": "Black Mountain Hale Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth Power Core LLC",
        "POI Location": "345 kV Blackwater Draw Switch (#23920)",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-04-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 990.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2025-08-27T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0175",
        "Project Name": "Black Mountain Hale Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Fort Worth Power Core LLC",
        "POI Location": "345 kV Blackwater Draw Switch (#23920)",
        "County": "Hale",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-04-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 990.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-26T00:00:00",
        "Screening Study Started": "2025-08-27T00:00:00",
        "Screening Study Complete": "2025-11-18T00:00:00",
        "FIS Requested": "2025-08-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1589,
      "raw": {
        "INR": "29INR0176",
        "Project Name": "SCHNEIDER GAS RICE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-12-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0176",
        "Project Name": "SCHNEIDER GAS RICE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-12-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1590,
      "raw": {
        "INR": "29INR0177",
        "Project Name": "Rattlesnake Gap Wind SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ET Fuels US Inc. ",
        "POI Location": "10119 Tributary Switch 138 kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0177",
        "Project Name": "Rattlesnake Gap Wind SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ET Fuels US Inc. ",
        "POI Location": "10119 Tributary Switch 138 kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1591,
      "raw": {
        "INR": "29INR0178",
        "Project Name": "Rattlesnake Gap Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ET Fuels US Inc. ",
        "POI Location": "10119 Tributary Switch 138 kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0178",
        "Project Name": "Rattlesnake Gap Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ET Fuels US Inc. ",
        "POI Location": "10119 Tributary Switch 138 kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1592,
      "raw": {
        "INR": "29INR0179",
        "Project Name": "Rattlesnake Gap Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ET Fuels US Inc. ",
        "POI Location": "10119 Tributary Switch 138 kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0179",
        "Project Name": "Rattlesnake Gap Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ET Fuels US Inc. ",
        "POI Location": "10119 Tributary Switch 138 kV",
        "County": "Howard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-09-15T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1593,
      "raw": {
        "INR": "29INR0181",
        "Project Name": "Pecos Flats Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "60404 SOLSTICE 345 kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-22T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0181",
        "Project Name": "Pecos Flats Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "60404 SOLSTICE 345 kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-22T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1594,
      "raw": {
        "INR": "29INR0182",
        "Project Name": "Pecos Flats Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0182",
        "Project Name": "Pecos Flats Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1595,
      "raw": {
        "INR": "29INR0183",
        "Project Name": "Pecos Flats Solar III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0183",
        "Project Name": "Pecos Flats Solar III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-05T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-25T00:00:00",
        "Screening Study Started": "2025-09-22T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-09-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1596,
      "raw": {
        "INR": "29INR0184",
        "Project Name": "Gridline Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Lake Ranch LLC",
        "POI Location": "76005 Schneeman Draw LCRA",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-31T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0184",
        "Project Name": "Gridline Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Big Lake Ranch LLC",
        "POI Location": "76005 Schneeman Draw LCRA",
        "County": "Crockett",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-31T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-07-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1597,
      "raw": {
        "INR": "29INR0185",
        "Project Name": "Roan Solar Phase 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Roan Solar, LLC",
        "POI Location": "Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0185",
        "Project Name": "Roan Solar Phase 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Roan Solar, LLC",
        "POI Location": "Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1598,
      "raw": {
        "INR": "29INR0187",
        "Project Name": "Roan Solar Phase 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Roan Solar, LLC",
        "POI Location": "Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0187",
        "Project Name": "Roan Solar Phase 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Roan Solar, LLC",
        "POI Location": "Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV",
        "County": "Sterling",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 205.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-10-21T00:00:00",
        "Screening Study Complete": "2025-12-12T00:00:00",
        "FIS Requested": "2025-10-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1599,
      "raw": {
        "INR": "29INR0188",
        "Project Name": "Star Of Texas Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BOULEVARD ASSOCIATES, LLC",
        "POI Location": "60152 Fort Stockton Switch 345kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 415,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-05T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0188",
        "Project Name": "Star Of Texas Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BOULEVARD ASSOCIATES, LLC",
        "POI Location": "60152 Fort Stockton Switch 345kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 415,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-05T00:00:00",
        "Screening Study Started": "2025-08-18T00:00:00",
        "Screening Study Complete": "2025-11-10T00:00:00",
        "FIS Requested": "2025-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1600,
      "raw": {
        "INR": "29INR0189",
        "Project Name": "Project Alpha Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SGE Alpha Energy LLC",
        "POI Location": "138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 121.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-05T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-12-11T00:00:00",
        "FIS Requested": "2026-01-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0189",
        "Project Name": "Project Alpha Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "SGE Alpha Energy LLC",
        "POI Location": "138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS",
        "County": "Hopkins",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-24T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 121.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-05T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-12-11T00:00:00",
        "FIS Requested": "2026-01-28T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1601,
      "raw": {
        "INR": "29INR0191",
        "Project Name": "Black Mountain Fannin Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Power LLC",
        "POI Location": "345 KV #1729 Valley South",
        "County": "Fannin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-26T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 990.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-27T00:00:00",
        "Screening Study Started": "2026-06-04T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0191",
        "Project Name": "Black Mountain Fannin Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Power LLC",
        "POI Location": "345 KV #1729 Valley South",
        "County": "Fannin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-04-26T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 990.59,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-27T00:00:00",
        "Screening Study Started": "2026-06-04T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1602,
      "raw": {
        "INR": "29INR0192",
        "Project Name": "Spurland Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Spurland Solar I",
        "POI Location": "59908 Nova Prime 345 345kV\n",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-28T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-08-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0192",
        "Project Name": "Spurland Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Spurland Solar I",
        "POI Location": "59908 Nova Prime 345 345kV\n",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-28T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-08-27T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1603,
      "raw": {
        "INR": "29INR0194",
        "Project Name": "Glass Mountain Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Wind, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 511.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2026-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0194",
        "Project Name": "Glass Mountain Wind 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Wind, LLC",
        "POI Location": "Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5 ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-31T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 511.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2026-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1604,
      "raw": {
        "INR": "29INR0195",
        "Project Name": "Spurland Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Spurland Solar II",
        "POI Location": "59908 Nova Prime 345 345kV",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-28T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0195",
        "Project Name": "Spurland Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Spurland Solar II",
        "POI Location": "59908 Nova Prime 345 345kV",
        "County": "Dickens",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2028-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-28T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-12T00:00:00",
        "FIS Requested": "2025-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-08-06T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1605,
      "raw": {
        "INR": "29INR0196",
        "Project Name": "Two Step Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Two Step Solar, LLC",
        "POI Location": "Tap 345kV 1907 Venus - 68091 Navarro",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-03T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0196",
        "Project Name": "Two Step Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Two Step Solar, LLC",
        "POI Location": "Tap 345kV 1907 Venus - 68091 Navarro",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-03T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-11-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1606,
      "raw": {
        "INR": "29INR0197",
        "Project Name": "Zora Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zora Solar, LLC",
        "POI Location": "46650 Athena 138 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-27T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-10T00:00:00",
        "FIS Requested": "2026-05-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0197",
        "Project Name": "Zora Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zora Solar, LLC",
        "POI Location": "46650 Athena 138 kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-27T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-10T00:00:00",
        "FIS Requested": "2026-05-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1607,
      "raw": {
        "INR": "29INR0198",
        "Project Name": "Velveteen Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velveteen Solar, LLC",
        "POI Location": "Tap into 6076 FOXTAIL- 6100 OKLAUNION ",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0198",
        "Project Name": "Velveteen Solar I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velveteen Solar, LLC",
        "POI Location": "Tap into 6076 FOXTAIL- 6100 OKLAUNION ",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 502.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1608,
      "raw": {
        "INR": "29INR0199",
        "Project Name": "Kilby1 Part 6 Large Block Combined Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1056,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-16T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0199",
        "Project Name": "Kilby1 Part 6 Large Block Combined Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Energy Forge One LLC",
        "POI Location": "#60404 Solstice Substation 345 kV",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-19T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1056,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-16T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1609,
      "raw": {
        "INR": "29INR0203",
        "Project Name": "Miller Bend Energy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Miller Bend Energy, LLC",
        "POI Location": "Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 531.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-08T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0203",
        "Project Name": "Miller Bend Energy Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Miller Bend Energy, LLC",
        "POI Location": "Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 531.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-08T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1610,
      "raw": {
        "INR": "29INR0204",
        "Project Name": "Miller Bend Energy BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Miller Bend Energy , LLC",
        "POI Location": "Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road ",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 547.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-08T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0204",
        "Project Name": "Miller Bend Energy BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Miller Bend Energy , LLC",
        "POI Location": "Tap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road ",
        "County": "Young",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 547.65,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-08T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1611,
      "raw": {
        "INR": "29INR0206",
        "Project Name": "Riviera Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BKV-BPP Power ",
        "POI Location": "Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 636.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-30T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-10-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0206",
        "Project Name": "Riviera Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "BKV-BPP Power ",
        "POI Location": "Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line",
        "County": "Bell",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 636.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-10-30T00:00:00",
        "Screening Study Started": "2025-11-05T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-10-30T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1612,
      "raw": {
        "INR": "29INR0207",
        "Project Name": "Alila BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Electra Energy Project, LLC",
        "POI Location": "8249 Angstrom 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-01-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-30T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-06T00:00:00",
        "FIS Requested": "2025-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0207",
        "Project Name": "Alila BESS II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Electra Energy Project, LLC",
        "POI Location": "8249 Angstrom 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-01-25T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.71,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-30T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-06T00:00:00",
        "FIS Requested": "2025-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1613,
      "raw": {
        "INR": "29INR0210",
        "Project Name": "Sawtooth Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sawtooth Solar, LLC",
        "POI Location": "Tap to the 345kV Odysseus (Bus#60072) to Bluff Creek (Bus #60040) line",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-08-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0210",
        "Project Name": "Sawtooth Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sawtooth Solar, LLC",
        "POI Location": "Tap to the 345kV Odysseus (Bus#60072) to Bluff Creek (Bus #60040) line",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-08-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-17T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2025-12-15T00:00:00",
        "FIS Requested": "2025-11-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1614,
      "raw": {
        "INR": "29INR0211",
        "Project Name": "Enfinity Juniper Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Juniper LLC",
        "POI Location": "Hickory Forest (7225)",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 261.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-02-05T00:00:00",
        "Screening Study Complete": "2026-05-01T00:00:00",
        "FIS Requested": "2026-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0211",
        "Project Name": "Enfinity Juniper Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Juniper LLC",
        "POI Location": "Hickory Forest (7225)",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 261.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-02-05T00:00:00",
        "Screening Study Complete": "2026-05-01T00:00:00",
        "FIS Requested": "2026-02-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1615,
      "raw": {
        "INR": "29INR0212",
        "Project Name": "Rosenix Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Rosenix Solar, LLC",
        "POI Location": "Cattleman (#10053)  – Gasconades (#76030) ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 501.64,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2026-06-29T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0212",
        "Project Name": "Rosenix Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Rosenix Solar, LLC",
        "POI Location": "Cattleman (#10053)  – Gasconades (#76030) ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-20T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 501.64,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2026-06-29T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1616,
      "raw": {
        "INR": "29INR0213",
        "Project Name": "Rosenix Storage",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Rosenix Solar, LLC",
        "POI Location": "Cattleman (#10053)  – Gasconades (#76030) ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 258.26,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2026-07-10T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0213",
        "Project Name": "Rosenix Storage",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Rosenix Solar, LLC",
        "POI Location": "Cattleman (#10053)  – Gasconades (#76030) ",
        "County": "Mitchell",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-20T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 258.26,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2026-07-10T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1617,
      "raw": {
        "INR": "29INR0214",
        "Project Name": "Amphion Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-03T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-03-26T00:00:00",
        "FIS Requested": "2026-01-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0214",
        "Project Name": "Amphion Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Amphion Solar, LLC",
        "POI Location": "TAP 345KV (#5709) Fowlerton - (#5901) SAN MIGUEL LINE Ckt-2",
        "County": "Atascosa",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-03T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-03-26T00:00:00",
        "FIS Requested": "2026-01-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1618,
      "raw": {
        "INR": "29INR0217",
        "Project Name": "Kickstart Energy Storage V",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "345 KV Venus 1906 to Fort Smith 3389",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 999,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-18T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0217",
        "Project Name": "Kickstart Energy Storage V",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "345 KV Venus 1906 to Fort Smith 3389",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 999,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-18T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1619,
      "raw": {
        "INR": "29INR0218",
        "Project Name": "Kickstart Energy Storage VI",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "345 KV Venus 1907 to Navarro 68091",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1026.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-10T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-23T00:00:00",
        "FIS Requested": "2025-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0218",
        "Project Name": "Kickstart Energy Storage VI",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Kickstart Infrastructure LLC",
        "POI Location": "345 KV Venus 1907 to Navarro 68091",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 1026.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-10T00:00:00",
        "Screening Study Started": "2025-12-17T00:00:00",
        "Screening Study Complete": "2026-02-23T00:00:00",
        "FIS Requested": "2025-11-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1620,
      "raw": {
        "INR": "29INR0219",
        "Project Name": "Cenizo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cenizo Energy Center LLC",
        "POI Location": "Tap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-20T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2025-12-19T00:00:00",
        "FIS Requested": "2025-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-09-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0219",
        "Project Name": "Cenizo Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Cenizo Energy Center LLC",
        "POI Location": "Tap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 301.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-20T00:00:00",
        "Screening Study Started": "2025-11-24T00:00:00",
        "Screening Study Complete": "2025-12-19T00:00:00",
        "FIS Requested": "2025-11-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2026-09-28T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1621,
      "raw": {
        "INR": "29INR0220",
        "Project Name": " Paintbrush PV3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0220",
        "Project Name": " Paintbrush PV3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1622,
      "raw": {
        "INR": "29INR0221",
        "Project Name": " Paintbrush PV4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0221",
        "Project Name": " Paintbrush PV4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-10-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2025-12-02T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1623,
      "raw": {
        "INR": "29INR0222",
        "Project Name": "Paintbrush BESS1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0222",
        "Project Name": "Paintbrush BESS1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Renew Development HoldCo LLC",
        "POI Location": "Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown Switch – 11406 Central Bluff Switch",
        "County": "Coleman",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-10-15T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.31,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-23T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1624,
      "raw": {
        "INR": "29INR0223",
        "Project Name": "Mandolin Solar II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center II, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 304.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-17T00:00:00",
        "Screening Study Started": "2026-07-23T00:00:00",
        "Screening Study Complete": "2026-08-18T00:00:00",
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0223",
        "Project Name": "Mandolin Solar II SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center II, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 304.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-17T00:00:00",
        "Screening Study Started": "2026-07-23T00:00:00",
        "Screening Study Complete": "2026-08-18T00:00:00",
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1625,
      "raw": {
        "INR": "29INR0224",
        "Project Name": "Mandolin Solar III SLF",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center I, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-10T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0224",
        "Project Name": "Mandolin Solar III SLF",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Mandolin Energy Center I, LLC",
        "POI Location": "Tap 345kV 80355 Del Sol - 80227 Rapido",
        "County": "Starr",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-10T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1626,
      "raw": {
        "INR": "29INR0225",
        "Project Name": "Velveteen Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velveteen Solar II, LLC",
        "POI Location": "Tap into 6076 FOXTAIL- 6100 OKLAUNION ",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0225",
        "Project Name": "Velveteen Solar II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velveteen Solar II, LLC",
        "POI Location": "Tap into 6076 FOXTAIL- 6100 OKLAUNION ",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 300.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-19T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1627,
      "raw": {
        "INR": "29INR0226",
        "Project Name": "Velveteen Solar III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velveteen Solar III, LLC",
        "POI Location": "Tap into 6076 FOXTAIL- 6100 OKLAUNION",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0226",
        "Project Name": "Velveteen Solar III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Velveteen Solar III, LLC",
        "POI Location": "Tap into 6076 FOXTAIL- 6100 OKLAUNION",
        "County": "Baylor",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1628,
      "raw": {
        "INR": "29INR0227",
        "Project Name": "San Patricio Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ferrovial Energy US 1 ",
        "POI Location": "8606 Goddard 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-22T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0227",
        "Project Name": "San Patricio Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ferrovial Energy US 1 ",
        "POI Location": "8606 Goddard 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2029-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.84,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-22T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-31T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1629,
      "raw": {
        "INR": "29INR0229",
        "Project Name": "Brazos Energy Center 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ferrovial Energy US 1 ",
        "POI Location": "Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-05T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0229",
        "Project Name": "Brazos Energy Center 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ferrovial Energy US 1 ",
        "POI Location": "Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-05T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1630,
      "raw": {
        "INR": "29INR0230",
        "Project Name": "Brazos Energy Center 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ferrovial Energy US 1",
        "POI Location": "Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0230",
        "Project Name": "Brazos Energy Center 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Ferrovial Energy US 1",
        "POI Location": "Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>",
        "County": "McLennan",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 300.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1631,
      "raw": {
        "INR": "29INR0231",
        "Project Name": "Tango Lily Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0231",
        "Project Name": "Tango Lily Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "Tap 138kV 60008 TRIBUTE4A - 6442 REDCREEK4A",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-21T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 200.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-17T00:00:00",
        "FIS Requested": "2025-12-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1632,
      "raw": {
        "INR": "29INR0242",
        "Project Name": "Enfinity Redbud Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Redbud LLC",
        "POI Location": "345kV Hays Energy (7043) - 345kV Bergheim (7770)",
        "County": "Comal",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 516.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-05-08T00:00:00",
        "FIS Requested": "2026-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0242",
        "Project Name": "Enfinity Redbud Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Redbud LLC",
        "POI Location": "345kV Hays Energy (7043) - 345kV Bergheim (7770)",
        "County": "Comal",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 516.05,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-05-08T00:00:00",
        "FIS Requested": "2026-02-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1633,
      "raw": {
        "INR": "29INR0243",
        "Project Name": "Oak Belt Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oak Belt Solar, LLC",
        "POI Location": "Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0243",
        "Project Name": "Oak Belt Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oak Belt Solar, LLC",
        "POI Location": "Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 181,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1634,
      "raw": {
        "INR": "29INR0244",
        "Project Name": "Oak Belt Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oak Belt Storage, LLC",
        "POI Location": "Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.7,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0244",
        "Project Name": "Oak Belt Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Oak Belt Storage, LLC",
        "POI Location": "Tap 138 kV (Bus #5506) FURHMANSB8 - (Bus #5584) VANDERBLTSW8",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.7,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-12-23T00:00:00",
        "Screening Study Complete": "2026-02-05T00:00:00",
        "FIS Requested": "2025-12-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1635,
      "raw": {
        "INR": "29INR0245",
        "Project Name": "Texas Deepwater BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TDWP Partners LLC",
        "POI Location": "#40881 Parkes Substation 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-03-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 313.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-10T00:00:00",
        "Screening Study Started": "2026-02-13T00:00:00",
        "Screening Study Complete": "2026-05-13T00:00:00",
        "FIS Requested": "2026-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0245",
        "Project Name": "Texas Deepwater BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "TDWP Partners LLC",
        "POI Location": "#40881 Parkes Substation 138 kV",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2029-03-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 313.29,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-10T00:00:00",
        "Screening Study Started": "2026-02-13T00:00:00",
        "Screening Study Complete": "2026-05-13T00:00:00",
        "FIS Requested": "2026-02-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1636,
      "raw": {
        "INR": "29INR0248",
        "Project Name": "Blue Energy Center - Phase 1b – Steam",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brother 1, LLC",
        "POI Location": "Tap 345kV 80286 DULCE7A - 8676 STATIC7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-10-17T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 330,
        "Unnamed: 11": "Proj Name MW Size    ",
        "Unnamed: 12": "2025-12-22T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-24T00:00:00",
        "FIS Requested": "2026-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0248",
        "Project Name": "Blue Energy Center - Phase 1b – Steam",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Brother 1, LLC",
        "POI Location": "Tap 345kV 80286 DULCE7A - 8676 STATIC7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-10-17T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 330,
        "Unnamed: 11": "Proj Name MW Size    ",
        "Unnamed: 12": "2025-12-22T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-04-24T00:00:00",
        "FIS Requested": "2026-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1637,
      "raw": {
        "INR": "29INR0249",
        "Project Name": "Lightcycle Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightcycle Energy Storage LLC",
        "POI Location": "9073 HOLMAN 345 kV",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-06T00:00:00",
        "FIS Requested": "2026-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0249",
        "Project Name": "Lightcycle Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lightcycle Energy Storage LLC",
        "POI Location": "9073 HOLMAN 345 kV",
        "County": "Fayette",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 409.69,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-09T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-06T00:00:00",
        "FIS Requested": "2026-01-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1638,
      "raw": {
        "INR": "29INR0250",
        "Project Name": "Slash Pine Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Slash Pine LLC",
        "POI Location": "1698 Sulphur Springs Switch and 3174 Canton Switch 138 kV",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0250",
        "Project Name": "Slash Pine Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Slash Pine LLC",
        "POI Location": "1698 Sulphur Springs Switch and 3174 Canton Switch 138 kV",
        "County": "Kaufman",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-12T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-07T00:00:00",
        "FIS Requested": "2025-12-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1639,
      "raw": {
        "INR": "29INR0251",
        "Project Name": "Sugarberry Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Sugarberry LLC",
        "POI Location": "78255 Pinto Creek 138 kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-11T00:00:00",
        "Screening Study Started": "2026-02-13T00:00:00",
        "Screening Study Complete": "2026-05-13T00:00:00",
        "FIS Requested": "2026-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0251",
        "Project Name": "Sugarberry Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Sugarberry LLC",
        "POI Location": "78255 Pinto Creek 138 kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 125,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-11T00:00:00",
        "Screening Study Started": "2026-02-13T00:00:00",
        "Screening Study Complete": "2026-05-13T00:00:00",
        "FIS Requested": "2026-02-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1640,
      "raw": {
        "INR": "29INR0252",
        "Project Name": "Sugarberry Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Sugarberry LLC",
        "POI Location": "78255 Pinto Creek 138 kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-12T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-05-13T00:00:00",
        "FIS Requested": "2026-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0252",
        "Project Name": "Sugarberry Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG Sugarberry LLC",
        "POI Location": "78255 Pinto Creek 138 kV",
        "County": "Kinney",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-12T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-05-13T00:00:00",
        "FIS Requested": "2026-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1641,
      "raw": {
        "INR": "29INR0255",
        "Project Name": "Los Toros Energy Center Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Los Toros Energy Center, LLC",
        "POI Location": "Tap 1167 Mustang_8 to 11206 Dillion_P8 138 kV",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-24T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0255",
        "Project Name": "Los Toros Energy Center Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Los Toros Energy Center, LLC",
        "POI Location": "Tap 1167 Mustang_8 to 11206 Dillion_P8 138 kV",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.56,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-24T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1642,
      "raw": {
        "INR": "29INR0263",
        "Project Name": "Whitethorn Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood III LLC",
        "POI Location": "345KV 860 GIRVINSW",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 163.1,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-08T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-10T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0263",
        "Project Name": "Whitethorn Solar Project",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Greasewood III LLC",
        "POI Location": "345KV 860 GIRVINSW",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-26T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 163.1,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-08T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-04-10T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1643,
      "raw": {
        "INR": "29INR0264",
        "Project Name": "Victory Ellis  – Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Victory Ellis, LLC",
        "POI Location": "Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 465.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-14T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": "2026-08-18T00:00:00",
        "FIS Requested": "2026-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0264",
        "Project Name": "Victory Ellis  – Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Victory Ellis, LLC",
        "POI Location": "Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT",
        "County": "Ellis",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 465.92,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-14T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": "2026-08-18T00:00:00",
        "FIS Requested": "2026-04-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1644,
      "raw": {
        "INR": "29INR0267",
        "Project Name": "Enfinity White Oak BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG White Oak LLC",
        "POI Location": "Tap 138kV Key (1307) to 138kV Gail (1308)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-10T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-21T00:00:00",
        "FIS Requested": "2026-02-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0267",
        "Project Name": "Enfinity White Oak BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG White Oak LLC",
        "POI Location": "Tap 138kV Key (1307) to 138kV Gail (1308)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-10T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-21T00:00:00",
        "FIS Requested": "2026-02-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1645,
      "raw": {
        "INR": "29INR0271",
        "Project Name": "Los Toros Energy Center Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Los Toros Energy Center, LLC",
        "POI Location": "Tap 1167 Mustang_8 to 11206 Dillion_P8 138 kV",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-19T00:00:00",
        "Screening Study Started": "2026-02-26T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0271",
        "Project Name": "Los Toros Energy Center Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Los Toros Energy Center, LLC",
        "POI Location": "Tap 1167 Mustang_8 to 11206 Dillion_P8 138 kV",
        "County": "Dawson",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-03-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-19T00:00:00",
        "Screening Study Started": "2026-02-26T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1646,
      "raw": {
        "INR": "29INR0272",
        "Project Name": "Trail Ranch Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "Tap 345 kV 6444 Red Creek   -7077 Amos Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 132.85,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": null,
        "Screening Study Started": "2026-01-14T00:00:00",
        "Screening Study Complete": "2026-03-25T00:00:00",
        "FIS Requested": "2026-09-17T10:47:02.999000",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0272",
        "Project Name": "Trail Ranch Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Aurora Solar LLC",
        "POI Location": "Tap 345 kV 6444 Red Creek   -7077 Amos Creek ",
        "County": "Concho",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 132.85,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": null,
        "Screening Study Started": "2026-01-14T00:00:00",
        "Screening Study Complete": "2026-03-25T00:00:00",
        "FIS Requested": "2026-09-17T10:47:02.999000",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1647,
      "raw": {
        "INR": "29INR0274",
        "Project Name": "Richardson McClung Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rising Star Energy Center, LLC",
        "POI Location": "33285 Rising Star 138 kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-01-28T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2026-05-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0274",
        "Project Name": "Richardson McClung Ranch Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rising Star Energy Center, LLC",
        "POI Location": "33285 Rising Star 138 kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 251.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-01-28T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2026-05-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1648,
      "raw": {
        "INR": "29INR0275",
        "Project Name": "Richardson McClung Ranch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rising Star Energy Center, LLC",
        "POI Location": "33285 Rising Star 138 kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-12T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2026-05-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0275",
        "Project Name": "Richardson McClung Ranch BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Rising Star Energy Center, LLC",
        "POI Location": "33285 Rising Star 138 kV",
        "County": "Eastland",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-11-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 205.49,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-12T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-02-09T00:00:00",
        "FIS Requested": "2026-05-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1649,
      "raw": {
        "INR": "29INR0279",
        "Project Name": "Tierra Loma Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tierra Loma Solar, LLC",
        "POI Location": "Tap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-17T00:00:00",
        "Screening Study Started": "2026-02-19T00:00:00",
        "Screening Study Complete": "2026-05-15T00:00:00",
        "FIS Requested": "2026-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0279",
        "Project Name": "Tierra Loma Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tierra Loma Solar, LLC",
        "POI Location": "Tap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-17T00:00:00",
        "Screening Study Started": "2026-02-19T00:00:00",
        "Screening Study Complete": "2026-05-15T00:00:00",
        "FIS Requested": "2026-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1650,
      "raw": {
        "INR": "29INR0280",
        "Project Name": "Tierra Loma Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tierra Loma Solar, LLC",
        "POI Location": "Tap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-17T00:00:00",
        "Screening Study Started": "2026-02-19T00:00:00",
        "Screening Study Complete": "2026-05-15T00:00:00",
        "FIS Requested": "2026-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0280",
        "Project Name": "Tierra Loma Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tierra Loma Solar, LLC",
        "POI Location": "Tap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1",
        "County": "Crane",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-09-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-17T00:00:00",
        "Screening Study Started": "2026-02-19T00:00:00",
        "Screening Study Complete": "2026-05-15T00:00:00",
        "FIS Requested": "2026-02-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1651,
      "raw": {
        "INR": "29INR0287",
        "Project Name": "Valentine Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Valentine Energy Center, LLC",
        "POI Location": "60400 Lynx 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 162.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-09T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-03-26T00:00:00",
        "FIS Requested": "2026-02-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0287",
        "Project Name": "Valentine Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Valentine Energy Center, LLC",
        "POI Location": "60400 Lynx 138kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 162.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-09T00:00:00",
        "Screening Study Started": "2026-02-10T00:00:00",
        "Screening Study Complete": "2026-03-26T00:00:00",
        "FIS Requested": "2026-02-09T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1652,
      "raw": {
        "INR": "29INR0291",
        "Project Name": " Enfinity Post Oak Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG White Oak LLC",
        "POI Location": "345kV Muleshoe (59922)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-13T00:00:00",
        "Screening Study Started": "2026-03-30T00:00:00",
        "Screening Study Complete": "2026-06-25T00:00:00",
        "FIS Requested": "2026-03-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0291",
        "Project Name": " Enfinity Post Oak Solar SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG White Oak LLC",
        "POI Location": "345kV Muleshoe (59922)",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-13T00:00:00",
        "Screening Study Started": "2026-03-30T00:00:00",
        "Screening Study Complete": "2026-06-25T00:00:00",
        "FIS Requested": "2026-03-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1653,
      "raw": {
        "INR": "29INR0292",
        "Project Name": "Enfinity Post Oak Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG White Oak LLC",
        "POI Location": "345kV Muleshoe (59922)\nTransmission line",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-13T00:00:00",
        "Screening Study Started": "2026-03-30T00:00:00",
        "Screening Study Complete": "2026-06-25T00:00:00",
        "FIS Requested": "2026-03-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0292",
        "Project Name": "Enfinity Post Oak Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "EG White Oak LLC",
        "POI Location": "345kV Muleshoe (59922)\nTransmission line",
        "County": "Borden",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-18T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-13T00:00:00",
        "Screening Study Started": "2026-03-30T00:00:00",
        "Screening Study Complete": "2026-06-25T00:00:00",
        "FIS Requested": "2026-03-27T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1654,
      "raw": {
        "INR": "29INR0293",
        "Project Name": "Pink Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pink Solar, LLC",
        "POI Location": "971 Pruitt 138kV",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-25T00:00:00",
        "Screening Study Started": "2026-02-26T00:00:00",
        "Screening Study Complete": "2026-05-25T00:00:00",
        "FIS Requested": "2026-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0293",
        "Project Name": "Pink Storage SLF",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pink Solar, LLC",
        "POI Location": "971 Pruitt 138kV",
        "County": "Hunt",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-25T00:00:00",
        "Screening Study Started": "2026-02-26T00:00:00",
        "Screening Study Complete": "2026-05-25T00:00:00",
        "FIS Requested": "2026-02-24T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1655,
      "raw": {
        "INR": "29INR0294",
        "Project Name": "Spurland Solar III",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Spurland Solar III, LLC",
        "POI Location": "Nova Prime Substation",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.85,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-08-20T00:00:00",
        "Screening Study Started": "2026-08-21T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0294",
        "Project Name": "Spurland Solar III",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Spurland Solar III, LLC",
        "POI Location": "Nova Prime Substation",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 321.85,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-08-20T00:00:00",
        "Screening Study Started": "2026-08-21T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1656,
      "raw": {
        "INR": "29INR0298",
        "Project Name": "BM Freestone Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "Loop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at  31.813367° -96.147730°",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-20T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 990.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-12T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-21T00:00:00",
        "FIS Requested": "2026-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0298",
        "Project Name": "BM Freestone Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "Loop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at  31.813367° -96.147730°",
        "County": "Freestone",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-09-20T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 990.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-12T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-21T00:00:00",
        "FIS Requested": "2026-02-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1657,
      "raw": {
        "INR": "29INR0305",
        "Project Name": "Flurry Gas 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NET Power Canaveral LLC",
        "POI Location": "Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 109.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-12T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0305",
        "Project Name": "Flurry Gas 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NET Power Canaveral LLC",
        "POI Location": "Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01",
        "County": "Midland",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-16T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 109.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-12T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-22T00:00:00",
        "FIS Requested": "2026-02-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1658,
      "raw": {
        "INR": "29INR0318",
        "Project Name": "Nockenut Springs Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0318",
        "Project Name": "Nockenut Springs Storage 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1659,
      "raw": {
        "INR": "29INR0319",
        "Project Name": "Nockenut Springs Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0319",
        "Project Name": "Nockenut Springs Storage 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1660,
      "raw": {
        "INR": "29INR0320",
        "Project Name": "Nockenut Springs Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0320",
        "Project Name": "Nockenut Springs Storage 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pecan Springs Energy, LLC",
        "POI Location": "Tap the 345 kV Elm Creek (#5133) - Shaula (#5380) Line, CPS",
        "County": "Wilson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-06-05T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.38,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-31T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1661,
      "raw": {
        "INR": "29INR0324",
        "Project Name": "Ashtrom Marigold BESS SLF",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Marigold BESS LLC",
        "POI Location": "860 GIRVINSW 345kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0324",
        "Project Name": "Ashtrom Marigold BESS SLF",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Marigold BESS LLC",
        "POI Location": "860 GIRVINSW 345kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-04-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 153.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-30T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1662,
      "raw": {
        "INR": "29INR0325",
        "Project Name": "Sweetwater 4 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetwater Wind 4 LLC",
        "POI Location": "<71050> <L_BITTCR5_1Y> <345kV>",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 421.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-13T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0325",
        "Project Name": "Sweetwater 4 Repower",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Sweetwater Wind 4 LLC",
        "POI Location": "<71050> <L_BITTCR5_1Y> <345kV>",
        "County": "Nolan",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-02-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 421.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-13T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-08T00:00:00",
        "FIS Requested": "2026-04-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1663,
      "raw": {
        "INR": "29INR0326",
        "Project Name": "Montgomery Ranch 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "60059 Penumbra 345-kV",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-02T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-05T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0326",
        "Project Name": "Montgomery Ranch 2 Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "60059 Penumbra 345-kV",
        "County": "Foard",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-02T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 301.5,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-05T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1664,
      "raw": {
        "INR": "29INR0328",
        "Project Name": "Moon Chapel Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Orsted Onshore Development North America, LLC",
        "POI Location": "Tap 345kV 76090 Divide – 76009 Twin Buttes Ckt 1",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-15T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-07T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0328",
        "Project Name": "Moon Chapel Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Orsted Onshore Development North America, LLC",
        "POI Location": "Tap 345kV 76090 Divide – 76009 Twin Buttes Ckt 1",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 402.01,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-15T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-07T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1665,
      "raw": {
        "INR": "29INR0332",
        "Project Name": "White Star Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "White Star Energy Storage, LLC",
        "POI Location": "Milton Substation 78583 L_MILTON8_1Y",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-21T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0332",
        "Project Name": "White Star Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "White Star Energy Storage, LLC",
        "POI Location": "Milton Substation 78583 L_MILTON8_1Y",
        "County": "Karnes",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-21T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1666,
      "raw": {
        "INR": "29INR0333",
        "Project Name": "Tyler Rose Power Plant 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ProEnergy Services, LLC",
        "POI Location": "Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 597.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0333",
        "Project Name": "Tyler Rose Power Plant 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "ProEnergy Services, LLC",
        "POI Location": "Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 597.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-06T00:00:00",
        "FIS Requested": "2026-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1667,
      "raw": {
        "INR": "29INR0336",
        "Project Name": "Tyler Rose Power Plant 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " ProEnergy Services, LLC",
        "POI Location": "Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 398.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0336",
        "Project Name": "Tyler Rose Power Plant 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " ProEnergy Services, LLC",
        "POI Location": "Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek",
        "County": "Grimes",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 398.24,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-13T00:00:00",
        "Screening Study Started": "2026-05-13T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-05-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1668,
      "raw": {
        "INR": "29INR0340",
        "Project Name": "Bobcat Generating Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Critical Grid Solutions Bobcat, LLC",
        "POI Location": "Between (7042) ZORN & (9074) LYTTON SPRINGS Substations on ONCOR 345kV.\n",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 450,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-22T00:00:00",
        "Screening Study Started": "2026-06-24T00:00:00",
        "Screening Study Complete": "2026-09-19T00:00:00",
        "FIS Requested": "2026-06-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0340",
        "Project Name": "Bobcat Generating Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Critical Grid Solutions Bobcat, LLC",
        "POI Location": "Between (7042) ZORN & (9074) LYTTON SPRINGS Substations on ONCOR 345kV.\n",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-11-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 450,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-22T00:00:00",
        "Screening Study Started": "2026-06-24T00:00:00",
        "Screening Study Complete": "2026-09-19T00:00:00",
        "FIS Requested": "2026-06-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1669,
      "raw": {
        "INR": "29INR0341",
        "Project Name": "Pampa Natural Gas ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Meitner Gas",
        "POI Location": "CTT Ghost Town (#79008)",
        "County": "Roberts",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 250.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-24T00:00:00",
        "Screening Study Complete": "2026-09-19T00:00:00",
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0341",
        "Project Name": "Pampa Natural Gas ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Meitner Gas",
        "POI Location": "CTT Ghost Town (#79008)",
        "County": "Roberts",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 250.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-24T00:00:00",
        "Screening Study Complete": "2026-09-19T00:00:00",
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1670,
      "raw": {
        "INR": "29INR0347",
        "Project Name": "Glass Mountain BB Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush  ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-10T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0347",
        "Project Name": "Glass Mountain BB Solar 1",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush  ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-10T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1671,
      "raw": {
        "INR": "29INR0348",
        "Project Name": "Glass Mountain BB Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar II, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-10T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0348",
        "Project Name": "Glass Mountain BB Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar II, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-03-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.66,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-10T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1672,
      "raw": {
        "INR": "29INR0349",
        "Project Name": "Glass Mountain BB Solar 5",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar V, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0349",
        "Project Name": "Glass Mountain BB Solar 5",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar V, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1673,
      "raw": {
        "INR": "29INR0354",
        "Project Name": "Wolf Bone North Energy Center",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "NRG Wolf Bone Energy Center LLC",
        "POI Location": "TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation)",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1174.4,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-06-15T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2026-09-18T00:00:00",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0354",
        "Project Name": "Wolf Bone North Energy Center",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "NRG Wolf Bone Energy Center LLC",
        "POI Location": "TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation)",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-02-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1174.4,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-06-15T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "2026-09-18T00:00:00",
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1674,
      "raw": {
        "INR": "29INR0356",
        "Project Name": "Enfinity Cedar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "EG Cedar LLC",
        "POI Location": "138kV Newton T.Busby Substation (60356)",
        "County": "Irion",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-29T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0356",
        "Project Name": "Enfinity Cedar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "EG Cedar LLC",
        "POI Location": "138kV Newton T.Busby Substation (60356)",
        "County": "Irion",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-29T00:00:00",
        "Screening Study Started": "2026-07-06T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-06-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1675,
      "raw": {
        "INR": "29INR0357",
        "Project Name": "Glass Mountain BB Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar III, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0357",
        "Project Name": "Glass Mountain BB Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar III, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1676,
      "raw": {
        "INR": "29INR0358",
        "Project Name": "Glass Mountain BB Solar 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar IV, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0358",
        "Project Name": "Glass Mountain BB Solar 4",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Glass Mountain Solar IV, LLC",
        "POI Location": "Tap 345kV 60404 Solstice to 38441 Bottlebrush",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 302.61,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-11T00:00:00",
        "Screening Study Started": "2026-06-11T00:00:00",
        "Screening Study Complete": "2026-08-28T00:00:00",
        "FIS Requested": "2026-05-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1677,
      "raw": {
        "INR": "29INR0360",
        "Project Name": "Trumpet Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Resources Interconnection Holdings LLC ",
        "POI Location": "tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 533,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-06-17T00:00:00",
        "Screening Study Started": "2026-06-17T00:00:00",
        "Screening Study Complete": "2026-09-11T00:00:00",
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0360",
        "Project Name": "Trumpet Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Resources Interconnection Holdings LLC ",
        "POI Location": "tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 533,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-06-17T00:00:00",
        "Screening Study Started": "2026-06-17T00:00:00",
        "Screening Study Complete": "2026-09-11T00:00:00",
        "FIS Requested": "2026-06-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1678,
      "raw": {
        "INR": "29INR0361",
        "Project Name": "Aurelius 3 Natural Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman III Gas, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1275,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-06-24T00:00:00",
        "Screening Study Started": "2026-06-29T00:00:00",
        "Screening Study Complete": "2026-09-20T00:00:00",
        "FIS Requested": "2026-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0361",
        "Project Name": "Aurelius 3 Natural Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "IP Roman III Gas, LLC",
        "POI Location": "23908 Deaf Smith station 345 kV",
        "County": "Deaf Smith",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1275,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2026-06-24T00:00:00",
        "Screening Study Started": "2026-06-29T00:00:00",
        "Screening Study Complete": "2026-09-20T00:00:00",
        "FIS Requested": "2026-06-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1679,
      "raw": {
        "INR": "29INR0363",
        "Project Name": "Alpha Power Phase 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0363",
        "Project Name": "Alpha Power Phase 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1680,
      "raw": {
        "INR": "29INR0365",
        "Project Name": "Silver Sky Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "6444 Red Creek 345kV",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-10T00:00:00",
        "Screening Study Started": "2026-08-17T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0365",
        "Project Name": "Silver Sky Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "6444 Red Creek 345kV",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-13T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-10T00:00:00",
        "Screening Study Started": "2026-08-17T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1681,
      "raw": {
        "INR": "29INR0376",
        "Project Name": "Silver Sky BESS",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "6444 Red Creek 345kV",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-10T00:00:00",
        "Screening Study Started": "2026-08-17T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0376",
        "Project Name": "Silver Sky BESS",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Lightsource Renewable Energy Development LLC",
        "POI Location": "6444 Red Creek 345kV",
        "County": "Tom Green",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 201.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-10T00:00:00",
        "Screening Study Started": "2026-08-17T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1682,
      "raw": {
        "INR": "29INR0393",
        "Project Name": "Lone Tiger Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Origis Development, LLC",
        "POI Location": "Tap 345 kV Claytonville (#68001) to phantom hill (#68004) ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.8,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-15T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0393",
        "Project Name": "Lone Tiger Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Origis Development, LLC",
        "POI Location": "Tap 345 kV Claytonville (#68001) to phantom hill (#68004) ",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-10-06T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.8,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-15T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1683,
      "raw": {
        "INR": "29INR0394",
        "Project Name": "Buzzer Butte Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Origis Development, LLC",
        "POI Location": "Tap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911)",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.8,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-15T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0394",
        "Project Name": "Buzzer Butte Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Origis Development, LLC",
        "POI Location": "Tap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911)",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.8,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-15T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1684,
      "raw": {
        "INR": "29INR0397",
        "Project Name": "Black Mountain Briscoe Gas",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Power LLC",
        "POI Location": "‎23914, Tule Canyon Substation, 345 kV",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 495.32,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-14T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0397",
        "Project Name": "Black Mountain Briscoe Gas",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Power LLC",
        "POI Location": "‎23914, Tule Canyon Substation, 345 kV",
        "County": "Briscoe",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2029-09-28T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 495.32,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-14T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1685,
      "raw": {
        "INR": "29INR0399",
        "Project Name": "Rugged Prairie Wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Rugged Prairie Wind, LLC",
        "POI Location": "Tap 345kV BUS #11305 Dermott- BUS #60706 Kirchhef",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 294.14,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-29T00:00:00",
        "Screening Study Started": "2026-09-30T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "29INR0399",
        "Project Name": "Rugged Prairie Wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Rugged Prairie Wind, LLC",
        "POI Location": "Tap 345kV BUS #11305 Dermott- BUS #60706 Kirchhef",
        "County": "Fisher",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2029-12-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 294.14,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-29T00:00:00",
        "Screening Study Started": "2026-09-30T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1686,
      "raw": {
        "INR": "30INR0002",
        "Project Name": "Southeast Oklahoma Pumped Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Apex Energy Solutions, LLC",
        "POI Location": "1692 Paris Switch 345kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-01-01T00:00:00",
        "Fuel": "WAT",
        "Technology": "OT",
        "Capacity (MW)": 1232,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-28T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0002",
        "Project Name": "Southeast Oklahoma Pumped Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Apex Energy Solutions, LLC",
        "POI Location": "1692 Paris Switch 345kV",
        "County": "Lamar",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-01-01T00:00:00",
        "Fuel": "WAT",
        "Technology": "OT",
        "Capacity (MW)": 1232,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-03-28T00:00:00",
        "Screening Study Started": "2022-08-05T00:00:00",
        "Screening Study Complete": "2022-11-01T00:00:00",
        "FIS Requested": "2023-03-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1687,
      "raw": {
        "INR": "30INR0003",
        "Project Name": "Hecate Energy Jamaica Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy LLC",
        "POI Location": "42000 P. H. Robinson 345kV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1029.39,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-25T00:00:00",
        "FIS Requested": "2024-06-14T18:19:07.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0003",
        "Project Name": "Hecate Energy Jamaica Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy LLC",
        "POI Location": "42000 P. H. Robinson 345kV",
        "County": "Galveston",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1029.39,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-25T00:00:00",
        "FIS Requested": "2024-06-14T18:19:07.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1688,
      "raw": {
        "INR": "30INR0004",
        "Project Name": "Hecate Energy Arkansas Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Gulf Wind LLC",
        "POI Location": "8659 Naismith 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1029.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2024-04-03T15:06:24.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0004",
        "Project Name": "Hecate Energy Arkansas Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Hecate Energy Gulf Wind LLC",
        "POI Location": "8659 Naismith 345kV",
        "County": "San Patricio",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1029.39,
        "Unnamed: 11": null,
        "Unnamed: 12": "2024-05-15T00:00:00",
        "Screening Study Started": "2023-06-28T00:00:00",
        "Screening Study Complete": "2023-09-22T00:00:00",
        "FIS Requested": "2024-04-03T15:06:24.999000",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1689,
      "raw": {
        "INR": "30INR0005",
        "Project Name": "Woodland Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Woodland Energy Storage, LLC",
        "POI Location": "68040 Kopperl Substation 345kV",
        "County": "Bosque",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-28T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0005",
        "Project Name": "Woodland Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Woodland Energy Storage, LLC",
        "POI Location": "68040 Kopperl Substation 345kV",
        "County": "Bosque",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-10-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 207.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2023-10-28T00:00:00",
        "Screening Study Started": "2023-12-18T00:00:00",
        "Screening Study Complete": "2024-03-15T00:00:00",
        "FIS Requested": "2023-10-23T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1690,
      "raw": {
        "INR": "30INR0018",
        "Project Name": "Big Canyon Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Longfellow Wind, LLC",
        "POI Location": "38441 Bottlebrush 345kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0018",
        "Project Name": "Big Canyon Wind",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Longfellow Wind, LLC",
        "POI Location": "38441 Bottlebrush 345kV",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 1500,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-01-07T00:00:00",
        "Screening Study Started": "2025-01-13T00:00:00",
        "Screening Study Complete": "2025-04-08T00:00:00",
        "FIS Requested": "2025-01-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-25T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1691,
      "raw": {
        "INR": "30INR0020",
        "Project Name": "Willow Oak Gas ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Willow Oak Energy LLC",
        "POI Location": "40850 Jordan ",
        "County": "Jefferson",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1298,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-12-11T00:00:00",
        "FIS Requested": "2026-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0020",
        "Project Name": "Willow Oak Gas ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Willow Oak Energy LLC",
        "POI Location": "40850 Jordan ",
        "County": "Jefferson",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2030-01-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1298,
        "Unnamed: 11": "MW Size    ",
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-12-11T00:00:00",
        "FIS Requested": "2026-06-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1692,
      "raw": {
        "INR": "30INR0031",
        "Project Name": "Caldwell County Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Caldwell County Energy Center, LLC",
        "POI Location": "#7051 Misty Substation 345kV",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1500,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-05-03T00:00:00",
        "FIS Requested": "2025-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0031",
        "Project Name": "Caldwell County Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Caldwell County Energy Center, LLC",
        "POI Location": "#7051 Misty Substation 345kV",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1500,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": "2025-02-03T00:00:00",
        "Screening Study Complete": "2025-05-03T00:00:00",
        "FIS Requested": "2025-10-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1693,
      "raw": {
        "INR": "30INR0037",
        "Project Name": "Solgen Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lampasas Hybrid Energy LLC",
        "POI Location": "7066 Adamsville 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 160.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0037",
        "Project Name": "Solgen Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lampasas Hybrid Energy LLC",
        "POI Location": "7066 Adamsville 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 160.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1694,
      "raw": {
        "INR": "30INR0038",
        "Project Name": "Solgen Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lampasas Hybrid Energy LLC",
        "POI Location": "7066 Adamsville 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0038",
        "Project Name": "Solgen Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Lampasas Hybrid Energy LLC",
        "POI Location": "7066 Adamsville 138kV",
        "County": "Lampasas",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-08-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.3,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-16T00:00:00",
        "Screening Study Started": "2025-04-25T00:00:00",
        "Screening Study Complete": "2025-07-23T00:00:00",
        "FIS Requested": "2025-11-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1695,
      "raw": {
        "INR": "30INR0041",
        "Project Name": "Bell Song Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bell Song Solar, LLC",
        "POI Location": "Tap 345 kV #80079 CRUCE7A  - #80355 DELSOL7A  ckt 1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-15T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": "2025-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0041",
        "Project Name": "Bell Song Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bell Song Solar, LLC",
        "POI Location": "Tap 345 kV #80079 CRUCE7A  - #80355 DELSOL7A  ckt 1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-09-15T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-05-15T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": "2025-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1696,
      "raw": {
        "INR": "30INR0042",
        "Project Name": "La Morena Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 345 kV  80225 CENIZO7C -   80307 DELSOL7C ",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-23T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0042",
        "Project Name": "La Morena Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 345 kV  80225 CENIZO7C -   80307 DELSOL7C ",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-23T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1697,
      "raw": {
        "INR": "30INR0043",
        "Project Name": "La Morena Energy Center Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-27T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0043",
        "Project Name": "La Morena Energy Center Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 345 kV (80225) CENIZO7C - (80307) DELSOL7C",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-05-07T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 250,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-27T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1698,
      "raw": {
        "INR": "30INR0045",
        "Project Name": "Radiant Plains Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 138-kV Weimar (7254) to Schulenburg (7252)",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0045",
        "Project Name": "Radiant Plains Energy Center BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 138-kV Weimar (7254) to Schulenburg (7252)",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1699,
      "raw": {
        "INR": "30INR0049",
        "Project Name": "Bell Song Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bell Song Solar, LLC 2",
        "POI Location": "Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-04T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-05T00:00:00",
        "FIS Requested": "2025-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0049",
        "Project Name": "Bell Song Solar 2",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bell Song Solar, LLC 2",
        "POI Location": "Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-03-16T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-04T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-05T00:00:00",
        "FIS Requested": "2025-06-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1700,
      "raw": {
        "INR": "30INR0051",
        "Project Name": "Sim Gideon Combined Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#7310) SIM GIDEON 138 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 880,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0051",
        "Project Name": "Sim Gideon Combined Cycle",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#7310) SIM GIDEON 138 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 880,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1701,
      "raw": {
        "INR": "30INR0052",
        "Project Name": "Lost Pines Power Park",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#170174) LOST PINES 345 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 880,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-06T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0052",
        "Project Name": "Lost Pines Power Park",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#170174) LOST PINES 345 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 880,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-06T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-11T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1702,
      "raw": {
        "INR": "30INR0053",
        "Project Name": "MRR Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Antler Peak Solar, LLC",
        "POI Location": "Solstice Substation #60384 -AEP",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-07-15T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2026-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0053",
        "Project Name": "MRR Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Antler Peak Solar, LLC",
        "POI Location": "Solstice Substation #60384 -AEP",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 500,
        "Unnamed: 11": "SFS/NtP",
        "Unnamed: 12": "2025-07-15T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2026-09-15T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1703,
      "raw": {
        "INR": "30INR0054",
        "Project Name": "SCHNEIDER COMBINED CYCLE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs\n",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-05-10T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 880,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0054",
        "Project Name": "SCHNEIDER COMBINED CYCLE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs\n",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-05-10T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 880,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1704,
      "raw": {
        "INR": "30INR0058",
        "Project Name": "Springfield Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BOULEVARD ASSOCIATES, LLC",
        "POI Location": "Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV line",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-12T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-10-15T00:00:00",
        "FIS Requested": "2025-09-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0058",
        "Project Name": "Springfield Solar",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "BOULEVARD ASSOCIATES, LLC",
        "POI Location": "Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV line",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-08-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-08-12T00:00:00",
        "Screening Study Started": "2025-09-09T00:00:00",
        "Screening Study Complete": "2025-10-15T00:00:00",
        "FIS Requested": "2025-09-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": "2025-12-24T00:00:00",
        "Unnamed: 19": "Yes",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": "2026-03-24T00:00:00",
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1705,
      "raw": {
        "INR": "30INR0071",
        "Project Name": "Prairie Ridge (Gas - CC)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tenaska Power Generation, LLC",
        "POI Location": "Tap 345 kV 11699 Woodard – 1695 Monticello",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1660.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-18T00:00:00",
        "Screening Study Started": "2025-12-01T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0071",
        "Project Name": "Prairie Ridge (Gas - CC)",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Tenaska Power Generation, LLC",
        "POI Location": "Tap 345 kV 11699 Woodard – 1695 Monticello",
        "County": "Franklin",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1660.4,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-18T00:00:00",
        "Screening Study Started": "2025-12-01T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1706,
      "raw": {
        "INR": "30INR0073",
        "Project Name": "Bulldog Power II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bulldog Power II LLC",
        "POI Location": "39703 TNMP FM524 Substation 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-09-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 311,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-25T00:00:00",
        "Screening Study Started": "2025-12-16T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0073",
        "Project Name": "Bulldog Power II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bulldog Power II LLC",
        "POI Location": "39703 TNMP FM524 Substation 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2030-09-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 311,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-25T00:00:00",
        "Screening Study Started": "2025-12-16T00:00:00",
        "Screening Study Complete": "2026-02-04T00:00:00",
        "FIS Requested": "2025-12-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1707,
      "raw": {
        "INR": "30INR0076",
        "Project Name": "Zuma Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zuma Solar, LLC",
        "POI Location": "Tap 345kV 11263 Fisk Switch  -  11406 Central Bluff Switch ",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-16T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0076",
        "Project Name": "Zuma Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Zuma Solar, LLC",
        "POI Location": "Tap 345kV 11263 Fisk Switch  -  11406 Central Bluff Switch ",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-09T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.37,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-16T00:00:00",
        "Screening Study Started": "2026-04-02T00:00:00",
        "Screening Study Complete": "2026-06-30T00:00:00",
        "FIS Requested": "2026-03-26T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1708,
      "raw": {
        "INR": "30INR0077",
        "Project Name": "Moon Hammer",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Moon Hammer LLC",
        "POI Location": "tap 345 kV line between Tesla & Grey",
        "County": "Wheeler",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-11-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-29T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2025-12-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0077",
        "Project Name": "Moon Hammer",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "Moon Hammer LLC",
        "POI Location": "tap 345 kV line between Tesla & Grey",
        "County": "Wheeler",
        "CDR Reporting Zone": "PANHANDLE",
        "Projected COD": "2030-11-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 1300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-12-29T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2025-12-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1709,
      "raw": {
        "INR": "30INR0080",
        "Project Name": "Indigo Quill Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "59902 SAND_BLUFF 345KV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 370.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-24T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0080",
        "Project Name": "Indigo Quill Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "RWE Clean Energy Development, LLC",
        "POI Location": "59902 SAND_BLUFF 345KV",
        "County": "Glasscock",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2028-12-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 370.08,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-24T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1710,
      "raw": {
        "INR": "30INR0083",
        "Project Name": "Gravitas I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1124.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2026-03-24T00:00:00",
        "Screening Study Complete": "2026-06-19T00:00:00",
        "FIS Requested": "2026-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0083",
        "Project Name": "Gravitas I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line ",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1124.75,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2026-03-24T00:00:00",
        "Screening Study Complete": "2026-06-19T00:00:00",
        "FIS Requested": "2026-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1711,
      "raw": {
        "INR": "30INR0084",
        "Project Name": "Gravitas I Natural Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1247.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2026-03-24T00:00:00",
        "Screening Study Complete": "2026-06-19T00:00:00",
        "FIS Requested": "2026-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0084",
        "Project Name": "Gravitas I Natural Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1247.04,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2026-03-24T00:00:00",
        "Screening Study Complete": "2026-06-19T00:00:00",
        "FIS Requested": "2026-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1712,
      "raw": {
        "INR": "30INR0085",
        "Project Name": "Gravitas I Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 636.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2026-03-24T00:00:00",
        "Screening Study Complete": "2026-06-19T00:00:00",
        "FIS Requested": "2026-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0085",
        "Project Name": "Gravitas I Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " S&S Renewables, LLC",
        "POI Location": "Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 636.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-03-19T00:00:00",
        "Screening Study Started": "2026-03-24T00:00:00",
        "Screening Study Complete": "2026-06-19T00:00:00",
        "FIS Requested": "2026-03-18T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1713,
      "raw": {
        "INR": "30INR0086",
        "Project Name": "Permian I Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 636.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2026-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0086",
        "Project Name": "Permian I Wind",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 636.54,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-20T00:00:00",
        "Screening Study Started": "2026-01-26T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2026-01-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1714,
      "raw": {
        "INR": "30INR0088",
        "Project Name": "Mistflower Energy Center Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mistflower Energy Center LLC",
        "POI Location": "Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-18T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2026-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0088",
        "Project Name": "Mistflower Energy Center Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mistflower Energy Center LLC",
        "POI Location": "Tap 345kV 60072 ODYSSEUS7A– 60040 BLF_CRK7A",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.62,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-18T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2026-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1715,
      "raw": {
        "INR": "30INR0089",
        "Project Name": "Mistflower Energy Center Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mistflower Energy Center LLC",
        "POI Location": "Tap 345kV 60072 Odysseus – 60040 Bluff Creek\n",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 312.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-18T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2026-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0089",
        "Project Name": "Mistflower Energy Center Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Mistflower Energy Center LLC",
        "POI Location": "Tap 345kV 60072 Odysseus – 60040 Bluff Creek\n",
        "County": "Runnels",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 312.85,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-18T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-03-23T00:00:00",
        "FIS Requested": "2026-03-12T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1716,
      "raw": {
        "INR": "30INR0091",
        "Project Name": "BM Great Rock Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "Tap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> and  <345kV> <79007> < YELLOW WOLF> - <46020> <LIMEST_POI_5> Ckt<50>",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1981.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-27T00:00:00",
        "Screening Study Started": "2026-03-03T00:00:00",
        "Screening Study Complete": "2026-05-25T00:00:00",
        "FIS Requested": "2026-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0091",
        "Project Name": "BM Great Rock Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Black Mountain Energy Storage II",
        "POI Location": "Tap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> and  <345kV> <79007> < YELLOW WOLF> - <46020> <LIMEST_POI_5> Ckt<50>",
        "County": "Leon",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2029-05-15T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1981.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-27T00:00:00",
        "Screening Study Started": "2026-03-03T00:00:00",
        "Screening Study Complete": "2026-05-25T00:00:00",
        "FIS Requested": "2026-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1717,
      "raw": {
        "INR": "30INR0092",
        "Project Name": "Wallflower Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wallflower Solar, LLC",
        "POI Location": "Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line.",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-16T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0092",
        "Project Name": "Wallflower Solar ",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wallflower Solar, LLC",
        "POI Location": "Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line.",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 201.15,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-16T00:00:00",
        "Screening Study Started": "2026-03-10T00:00:00",
        "Screening Study Complete": "2026-06-04T00:00:00",
        "FIS Requested": "2026-03-05T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1718,
      "raw": {
        "INR": "30INR0093",
        "Project Name": "Wallflower Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wallflower Energy Storage",
        "POI Location": "Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-16T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-21T00:00:00",
        "FIS Requested": "2026-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0093",
        "Project Name": "Wallflower Energy Storage",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Wallflower Energy Storage",
        "POI Location": "Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line",
        "County": "Zapata",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 209.16,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-02-16T00:00:00",
        "Screening Study Started": "2026-02-25T00:00:00",
        "Screening Study Complete": "2026-05-21T00:00:00",
        "FIS Requested": "2026-02-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1719,
      "raw": {
        "INR": "30INR0099",
        "Project Name": "Quadspring BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quadspring BESS, LLC",
        "POI Location": "138 kV ANDRANCHT_8(#1081) - Loving_8(#1092)",
        "County": "Loving",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-09-04T00:00:00",
        "FIS Requested": "2026-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0099",
        "Project Name": "Quadspring BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Quadspring BESS, LLC",
        "POI Location": "138 kV ANDRANCHT_8(#1081) - Loving_8(#1092)",
        "County": "Loving",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200.7,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-09-04T00:00:00",
        "FIS Requested": "2026-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1720,
      "raw": {
        "INR": "30INR0100",
        "Project Name": "Pentarise BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pentarise BESS, LLC",
        "POI Location": "138 kV Pig Creek (#60393)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-09-04T00:00:00",
        "FIS Requested": "2026-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0100",
        "Project Name": "Pentarise BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Pentarise BESS, LLC",
        "POI Location": "138 kV Pig Creek (#60393)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-09-04T00:00:00",
        "FIS Requested": "2026-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1721,
      "raw": {
        "INR": "30INR0105",
        "Project Name": "The Giant Arc-II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Powering Knowledge, LLC",
        "POI Location": "Bus #60404 SOLSTICE CKT 02",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-11T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-21T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-09T00:00:00",
        "FIS Requested": "2026-04-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0105",
        "Project Name": "The Giant Arc-II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Powering Knowledge, LLC",
        "POI Location": "Bus #60404 SOLSTICE CKT 02",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-11T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-21T00:00:00",
        "Screening Study Started": "2026-04-22T00:00:00",
        "Screening Study Complete": "2026-07-09T00:00:00",
        "FIS Requested": "2026-04-10T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1722,
      "raw": {
        "INR": "30INR0110",
        "Project Name": "Thunder Bird 1 Gas",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "BKV Power Ventures Jack, LLC 3",
        "POI Location": "Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443)",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1272.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-27T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0110",
        "Project Name": "Thunder Bird 1 Gas",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "BKV Power Ventures Jack, LLC 3",
        "POI Location": "Tap Double circuit line between Jacksbro_5 (1429) to Willowck_5 (1421) and Jacksbro_5 (1429) to Hendrch_5 (1443)",
        "County": "Jack",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-06-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1272.8,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-04-27T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1723,
      "raw": {
        "INR": "30INR0111",
        "Project Name": "Tradition BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " Horizon Energy Storage Greenfield Project Holdings LLC",
        "POI Location": "32878 Greens Prairie 138kV\n ",
        "County": "Burleson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-03T00:00:00",
        "Screening Study Started": "2026-05-26T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-07-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0111",
        "Project Name": "Tradition BESS",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": " Horizon Energy Storage Greenfield Project Holdings LLC",
        "POI Location": "32878 Greens Prairie 138kV\n ",
        "County": "Burleson",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-03T00:00:00",
        "Screening Study Started": "2026-05-26T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-07-17T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1724,
      "raw": {
        "INR": "30INR0112",
        "Project Name": "Short River BESS",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": " Horizon Energy Storage Greenfield Project Holdings LLC",
        "POI Location": "7456 LOP3378 138kV",
        "County": "Comal",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-03T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0112",
        "Project Name": "Short River BESS",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": " Horizon Energy Storage Greenfield Project Holdings LLC",
        "POI Location": "7456 LOP3378 138kV",
        "County": "Comal",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 150.36,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-03T00:00:00",
        "Screening Study Started": "2026-07-08T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1725,
      "raw": {
        "INR": "30INR0113",
        "Project Name": "The Giant Arc I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Powering Knowledge, LLC",
        "POI Location": "Bus #60404 SOLSTICE CKT 01",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-08T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-04T00:00:00",
        "Screening Study Started": "2026-05-08T00:00:00",
        "Screening Study Complete": "2026-07-09T00:00:00",
        "FIS Requested": "2026-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0113",
        "Project Name": "The Giant Arc I",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Powering Knowledge, LLC",
        "POI Location": "Bus #60404 SOLSTICE CKT 01",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-08T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1300,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-04T00:00:00",
        "Screening Study Started": "2026-05-08T00:00:00",
        "Screening Study Complete": "2026-07-09T00:00:00",
        "FIS Requested": "2026-04-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1726,
      "raw": {
        "INR": "30INR0114",
        "Project Name": "Longleaf II Power Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "WattBridge Texas Holdings, LLC",
        "POI Location": "3321 Redland 345 kV ",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-03T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-04-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0114",
        "Project Name": "Longleaf II Power Station",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "WattBridge Texas Holdings, LLC",
        "POI Location": "3321 Redland 345 kV ",
        "County": "Angelina",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 600,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-05-03T00:00:00",
        "Screening Study Started": "2026-05-11T00:00:00",
        "Screening Study Complete": "2026-08-07T00:00:00",
        "FIS Requested": "2026-04-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1727,
      "raw": {
        "INR": "30INR0123",
        "Project Name": "Sideoats Solar 1",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Bush Knob Solar, LLC",
        "POI Location": "DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345 kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-08-26T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0123",
        "Project Name": "Sideoats Solar 1",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Bush Knob Solar, LLC",
        "POI Location": "DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345 kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-08-26T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1728,
      "raw": {
        "INR": "30INR0124",
        "Project Name": "Sideoats Solar 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Bush Knob Solar, LLC",
        "POI Location": "DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-16T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0124",
        "Project Name": "Sideoats Solar 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Bush Knob Solar, LLC",
        "POI Location": "DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-16T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1729,
      "raw": {
        "INR": "30INR0125",
        "Project Name": "Sideoats Solar 3",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Bush Knob Solar, LLC",
        "POI Location": "DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-08-26T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0125",
        "Project Name": "Sideoats Solar 3",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Bush Knob Solar, LLC",
        "POI Location": "DUSTYROAD_5 (11050) to GRHAMSES1 (1430) 345kV",
        "County": "Throckmorton",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2031-03-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-08-26T00:00:00",
        "Screening Study Started": "2026-09-18T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1730,
      "raw": {
        "INR": "30INR0128",
        "Project Name": "Horizon Ridge Wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CPV Horizon Ridge Wind, LLC",
        "POI Location": "POIB is 131853 NOTSW_1_8 - the Notrees SW Substation - Project includes property in Ector, Andrews, and Winkler counties. ",
        "County": "Winkler",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 406.55,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": null,
        "Screening Study Started": "2026-09-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0128",
        "Project Name": "Horizon Ridge Wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CPV Horizon Ridge Wind, LLC",
        "POI Location": "POIB is 131853 NOTSW_1_8 - the Notrees SW Substation - Project includes property in Ector, Andrews, and Winkler counties. ",
        "County": "Winkler",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 406.55,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": null,
        "Screening Study Started": "2026-09-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-03T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1731,
      "raw": {
        "INR": "30INR0131",
        "Project Name": "Pecos Flats Wind I",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Pecos Flats Wind, LLC",
        "POI Location": "Tap Bottlebrush (38441) to White Baker (38435) 345kV Line (TNMP)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 506.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-10T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0131",
        "Project Name": "Pecos Flats Wind I",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Pecos Flats Wind, LLC",
        "POI Location": "Tap Bottlebrush (38441) to White Baker (38435) 345kV Line (TNMP)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 506.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-10T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1732,
      "raw": {
        "INR": "30INR0132",
        "Project Name": "Pecos Flats Wind II",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Pecos Flats Wind II, LLC",
        "POI Location": "Tap 345kV 38441 Bottlebrush to 38435 White Baker 345kV line (TNMP)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 507.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-10T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0132",
        "Project Name": "Pecos Flats Wind II",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Pecos Flats Wind II, LLC",
        "POI Location": "Tap 345kV 38441 Bottlebrush to 38435 White Baker 345kV line (TNMP)",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-29T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 507.9,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-10T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": "Not Required",
        "GHG Permit": "Not Required",
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1733,
      "raw": {
        "INR": "30INR0133",
        "Project Name": "Starfield Energy Storage",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Starfield Energy Storage, LLC",
        "POI Location": "Tap 138kV 44150 Hungerford - 44190 East Bernard",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-09-01T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0133",
        "Project Name": "Starfield Energy Storage",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Starfield Energy Storage, LLC",
        "POI Location": "Tap 138kV 44150 Hungerford - 44190 East Bernard",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 122.2,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-09-01T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-19T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1734,
      "raw": {
        "INR": "30INR0135",
        "Project Name": "Blue Sage Wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CPV Blue Sage Wind, LLC",
        "POI Location": "BUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 394.54,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2026-07-13T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0135",
        "Project Name": "Blue Sage Wind",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "CPV Blue Sage Wind, LLC",
        "POI Location": "BUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION",
        "County": "Andrews",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-23T00:00:00",
        "Fuel": "WIN",
        "Technology": "WT",
        "Capacity (MW)": 394.54,
        "Unnamed: 11": "MW Size  COD  ",
        "Unnamed: 12": "2026-07-13T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-21T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1735,
      "raw": {
        "INR": "30INR0140",
        "Project Name": "Enfinity Primrose",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "EG Primrose LLC",
        "POI Location": "(741) DYEMOUND Substation 138kV ",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-07-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-20T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0140",
        "Project Name": "Enfinity Primrose",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "EG Primrose LLC",
        "POI Location": "(741) DYEMOUND Substation 138kV ",
        "County": "Montague",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-07-17T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 200,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-20T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-14T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1736,
      "raw": {
        "INR": "30INR0141",
        "Project Name": "Jackrabbit Flats Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Jackrabbit Flats Solar LLC",
        "POI Location": "Tap 345 kV 1185 Midland County NW - 1018 Moss",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-07T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0141",
        "Project Name": "Jackrabbit Flats Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Jackrabbit Flats Solar LLC",
        "POI Location": "Tap 345 kV 1185 Midland County NW - 1018 Moss",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-29T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 401.33,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-07T00:00:00",
        "Screening Study Started": "2026-07-22T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-16T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1737,
      "raw": {
        "INR": "30INR0143",
        "Project Name": "Alpha Power Phase 3",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0143",
        "Project Name": "Alpha Power Phase 3",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1738,
      "raw": {
        "INR": "30INR0146",
        "Project Name": "Hackberry Draw Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Orsted Onshore Development North America, LLC",
        "POI Location": "Tap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2\n",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 652.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-22T00:00:00",
        "Screening Study Started": "2026-08-03T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0146",
        "Project Name": "Hackberry Draw Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Orsted Onshore Development North America, LLC",
        "POI Location": "Tap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2\n",
        "County": "Jones",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-04-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 652.96,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-22T00:00:00",
        "Screening Study Started": "2026-08-03T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-15T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1739,
      "raw": {
        "INR": "30INR0150",
        "Project Name": "Blue Energy Center- Phase 1a - Gas ",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Brother 1, LLC",
        "POI Location": "Tap 345kV 80286 DULCE7A - 8676 STATIC7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-02T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 780,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-04T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0150",
        "Project Name": "Blue Energy Center- Phase 1a - Gas ",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Brother 1, LLC",
        "POI Location": "Tap 345kV 80286 DULCE7A - 8676 STATIC7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-05-02T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 780,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-04T00:00:00",
        "Screening Study Started": "2026-09-04T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1740,
      "raw": {
        "INR": "30INR0158",
        "Project Name": "Capshaw Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Resources Interconnection Holding, LLC",
        "POI Location": "POIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kV ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 450,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-17T00:00:00",
        "Screening Study Started": "2026-08-25T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0158",
        "Project Name": "Capshaw Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "NextEra Energy Resources Interconnection Holding, LLC",
        "POI Location": "POIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kV ",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 450,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-17T00:00:00",
        "Screening Study Started": "2026-08-25T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-20T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1741,
      "raw": {
        "INR": "30INR0164",
        "Project Name": " Buzzer Butte 2 Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Origis Development, LLC",
        "POI Location": "Tap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911)",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.8,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-29T00:00:00",
        "Screening Study Started": "2026-09-30T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "30INR0164",
        "Project Name": " Buzzer Butte 2 Solar",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Origis Development, LLC",
        "POI Location": "Tap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911)",
        "County": "Kent",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-09-01T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 242.8,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-29T00:00:00",
        "Screening Study Started": "2026-09-30T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1742,
      "raw": {
        "INR": "31INR0009",
        "Project Name": "Bell Song Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bell Song Solar, LLC 3",
        "POI Location": "Tap 345 kV #80079 CRUCE7A  - #80355 DELSOL7A  ckt 1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0009",
        "Project Name": "Bell Song Solar 3",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bell Song Solar, LLC 3",
        "POI Location": "Tap 345 kV #80079 CRUCE7A  - #80355 DELSOL7A  ckt 1",
        "County": "Jim Hogg",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2030-08-31T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 167.6,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-12T00:00:00",
        "Screening Study Started": "2025-06-19T00:00:00",
        "Screening Study Complete": "2025-09-17T00:00:00",
        "FIS Requested": "2025-06-13T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1743,
      "raw": {
        "INR": "31INR0010",
        "Project Name": "LOST PINES GAS RECIP PHASE 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#170174) LOST PINES 345 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-27T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-07-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0010",
        "Project Name": "LOST PINES GAS RECIP PHASE 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#170174) LOST PINES 345 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-06-27T00:00:00",
        "Screening Study Started": "2025-07-07T00:00:00",
        "Screening Study Complete": "2025-09-30T00:00:00",
        "FIS Requested": "2025-07-02T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "Yes",
        "IA Signed": "2025-12-26T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1744,
      "raw": {
        "INR": "31INR0011",
        "Project Name": "SIM GIDEON GAS RICE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#7310) SIM GIDEON 138 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-05-10T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 226.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-03T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0011",
        "Project Name": "SIM GIDEON GAS RICE",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "(#7310) SIM GIDEON 138 kV",
        "County": "Bastrop",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-05-10T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 226.03,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-07-03T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1745,
      "raw": {
        "INR": "31INR0013",
        "Project Name": "SCHNEIDER GAS RICE PHASE 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs\n",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-12-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0013",
        "Project Name": "SCHNEIDER GAS RICE PHASE 2",
        "GIM Study Phase": "SS Completed, FIS Started, IA",
        "Interconnecting Entity": "LCRA",
        "POI Location": "Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton Springs\n",
        "County": "Caldwell",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-12-14T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 113.02,
        "Unnamed: 11": "COD  ",
        "Unnamed: 12": "2025-07-22T00:00:00",
        "Screening Study Started": "2025-07-29T00:00:00",
        "Screening Study Complete": "2025-10-26T00:00:00",
        "FIS Requested": "2025-07-25T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-12-19T00:00:00",
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1746,
      "raw": {
        "INR": "31INR0018",
        "Project Name": "Permian I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1125.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2025-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0018",
        "Project Name": "Permian I Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 1125.73,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2025-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": "No",
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1747,
      "raw": {
        "INR": "31INR0019",
        "Project Name": "Permian I Natural Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit\n",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1246.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2025-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0019",
        "Project Name": "Permian I Natural Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "S&S Renewables, LLC",
        "POI Location": "Tap TNMP White Baker (38435)–Bottlebrush(38441) 345-kV double-circuit\n",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2030-06-30T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 1246.95,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-01-06T00:00:00",
        "Screening Study Started": "2026-01-13T00:00:00",
        "Screening Study Complete": "2026-02-17T00:00:00",
        "FIS Requested": "2025-12-29T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1748,
      "raw": {
        "INR": "31INR0021",
        "Project Name": "Mule Deer Run Gas II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anderson Energy Center, LLC",
        "POI Location": "#3308 Pin Oak 345KV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1263,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-01T00:00:00",
        "Screening Study Started": "2026-06-04T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0021",
        "Project Name": "Mule Deer Run Gas II",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anderson Energy Center, LLC",
        "POI Location": "#3308 Pin Oak 345KV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1263,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-01T00:00:00",
        "Screening Study Started": "2026-06-04T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1749,
      "raw": {
        "INR": "31INR0022",
        "Project Name": "Mule Deer Run Gas III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anderson Energy Center, LLC",
        "POI Location": "#3308 Pin Oak 345KV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1263,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-01T00:00:00",
        "Screening Study Started": "2026-06-04T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0022",
        "Project Name": "Mule Deer Run Gas III",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anderson Energy Center, LLC",
        "POI Location": "#3308 Pin Oak 345KV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1263,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-01T00:00:00",
        "Screening Study Started": "2026-06-04T00:00:00",
        "Screening Study Complete": "2026-08-21T00:00:00",
        "FIS Requested": "2026-06-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1750,
      "raw": {
        "INR": "31INR0025",
        "Project Name": "Alpha Power Phase 4",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "31INR0025",
        "Project Name": "Alpha Power Phase 4",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2031-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1751,
      "raw": {
        "INR": "32INR0002",
        "Project Name": "Radiant Plains Energy Center  Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 138-kV Weimar (7254) to Schulenburg (7252)",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "32INR0002",
        "Project Name": "Radiant Plains Energy Center  Solar",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Adapture Solar Development",
        "POI Location": "Tap 138-kV Weimar (7254) to Schulenburg (7252)",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2029-12-27T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 100,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-04T00:00:00",
        "Screening Study Started": "2025-06-12T00:00:00",
        "Screening Study Complete": "2025-09-04T00:00:00",
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": "Not Required",
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1752,
      "raw": {
        "INR": "32INR0003",
        "Project Name": "Mule Deer Run Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anderson Energy Center, LLC",
        "POI Location": "#3308 Pin Oak 345KV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2031-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1263,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-05T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "32INR0003",
        "Project Name": "Mule Deer Run Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Anderson Energy Center, LLC",
        "POI Location": "#3308 Pin Oak 345KV",
        "County": "Anderson",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2031-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1263,
        "Unnamed: 11": null,
        "Unnamed: 12": "2025-11-05T00:00:00",
        "Screening Study Started": "2025-11-18T00:00:00",
        "Screening Study Complete": "2026-01-19T00:00:00",
        "FIS Requested": "2025-11-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1753,
      "raw": {
        "INR": "32INR0006",
        "Project Name": "H&C WILBARGER POWER I",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "H&C WILBARGER POWER I",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2032-02-27T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1025.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-06T00:00:00",
        "Screening Study Started": "2026-08-11T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "32INR0006",
        "Project Name": "H&C WILBARGER POWER I",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "H&C WILBARGER POWER I",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2032-02-27T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1025.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-06T00:00:00",
        "Screening Study Started": "2026-08-11T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-06T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1754,
      "raw": {
        "INR": "32INR0007",
        "Project Name": "Alpha Power Phase 5",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "32INR0007",
        "Project Name": "Alpha Power Phase 5",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Palomino Alpha, LLC",
        "POI Location": "345kV 7042 Zorn Substation",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2032-12-31T00:00:00",
        "Fuel": "GAS",
        "Technology": "GT",
        "Capacity (MW)": 400.1,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-07-08T00:00:00",
        "Screening Study Started": "2026-07-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-07-01T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1755,
      "raw": {
        "INR": "32INR0008",
        "Project Name": "H&C WILBARGER POWER II",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "H&C WILBARGER POWER I",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2032-02-27T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1025.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-06T00:00:00",
        "Screening Study Started": "2026-08-11T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "32INR0008",
        "Project Name": "H&C WILBARGER POWER II",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "H&C WILBARGER POWER I",
        "POI Location": "Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B",
        "County": "Wilbarger",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2032-02-27T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1025.55,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-08-06T00:00:00",
        "Screening Study Started": "2026-08-11T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-08-07T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1756,
      "raw": {
        "INR": "33INR0005",
        "Project Name": "Bullock Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bullock Data Center, LLC",
        "POI Location": "BULLOCK 345 KV STATION (Bus# 68096)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-04T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-07-29T00:00:00",
        "FIS Requested": "2026-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "33INR0005",
        "Project Name": "Bullock Gas",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Bullock Data Center, LLC",
        "POI Location": "BULLOCK 345 KV STATION (Bus# 68096)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-04T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-07-29T00:00:00",
        "FIS Requested": "2026-05-22T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1757,
      "raw": {
        "INR": "33INR0006",
        "Project Name": "Liberty Thermal Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Liberty Data Center I, LLC",
        "POI Location": "LIBERTY 345 KV STATION (Bus# 68092)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-07-29T00:00:00",
        "FIS Requested": "2026-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "33INR0006",
        "Project Name": "Liberty Thermal Energy Center",
        "GIM Study Phase": "SS Completed, FIS Started, No IA",
        "Interconnecting Entity": "Liberty Data Center I, LLC",
        "POI Location": "LIBERTY 345 KV STATION (Bus# 68092)",
        "County": "Hill",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2032-07-01T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 1400,
        "Unnamed: 11": null,
        "Unnamed: 12": "2026-06-08T00:00:00",
        "Screening Study Started": "2026-06-12T00:00:00",
        "Screening Study Complete": "2026-07-29T00:00:00",
        "FIS Requested": "2026-06-08T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Large Gen",
      "source_row_number": 1758,
      "raw": {
        "INR": "33INR0007",
        "Project Name": "Blue Energy Center - Phase 3 – Steam Stage 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Sister 1, LLC",
        "POI Location": "Tap 345kV 80286 DULCE7A - 8676 STATIC7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-15T00:00:00",
        "Fuel": "NUC",
        "Technology": "ST",
        "Capacity (MW)": 1320,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-04T00:00:00",
        "Screening Study Started": "2026-09-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      },
      "normalized": {
        "INR": "33INR0007",
        "Project Name": "Blue Energy Center - Phase 3 – Steam Stage 2",
        "GIM Study Phase": "SS Started, FIS Started, No IA",
        "Interconnecting Entity": "Sister 1, LLC",
        "POI Location": "Tap 345kV 80286 DULCE7A - 8676 STATIC7A",
        "County": "Victoria",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2033-06-15T00:00:00",
        "Fuel": "NUC",
        "Technology": "ST",
        "Capacity (MW)": 1320,
        "Unnamed: 11": "FIS Request ",
        "Unnamed: 12": "2026-09-04T00:00:00",
        "Screening Study Started": "2026-09-10T00:00:00",
        "Screening Study Complete": null,
        "FIS Requested": "2026-09-04T00:00:00",
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": null,
        "Unnamed: 19": "No",
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": null,
        "Change indicators: Proj Name, MW": null,
        "Financial Security": null
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 1,
      "raw": {
        "INR": "22INR0596",
        "Project Name": "Grizzly Ridge BESS SLF",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Grizzly Ridge Solar LLC",
        "POI Location": "Pottsville Switching Substation (Bus# 178)",
        "County": "Hamilton",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2021-10-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-02-10T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2022-09-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "22INR0596",
        "Project Name": "Grizzly Ridge BESS SLF",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Grizzly Ridge Solar LLC",
        "POI Location": "Pottsville Switching Substation (Bus# 178)",
        "County": "Hamilton",
        "CDR Reporting Zone": "NORTH",
        "Projected COD": "2030-07-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 0,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2021-10-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2023-02-10T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2022-09-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 2,
      "raw": {
        "INR": "23INR0483",
        "Project Name": "Rio Nogales CT1 Rotor Replacement",
        "GIM Study Phase": null,
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "Rio Nogales Substation\n5362 RIONOG 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-01-20T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2023-04-27T00:00:00",
        "Comment": null,
        "Model Ready Date": "2023-04-12T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "23INR0483",
        "Project Name": "Rio Nogales CT1 Rotor Replacement",
        "GIM Study Phase": null,
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "Rio Nogales Substation\n5362 RIONOG 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-01-20T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2023-04-27T00:00:00",
        "Comment": null,
        "Model Ready Date": "2023-04-12T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 3,
      "raw": {
        "INR": "23INR0529",
        "Project Name": "Torrecillas BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Torrecillas Interconnect, LLC",
        "POI Location": "161257 Torrecillas 345kV\nStation code: TORR",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2015-01-30T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-25T00:00:00",
        "Approved for Synchronization": "2025-07-01T00:00:00",
        "Comment": null,
        "Model Ready Date": "2024-09-05T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "23INR0529",
        "Project Name": "Torrecillas BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Torrecillas Interconnect, LLC",
        "POI Location": "161257 Torrecillas 345kV\nStation code: TORR",
        "County": "Webb",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2015-01-30T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-06-25T00:00:00",
        "Approved for Synchronization": "2025-07-01T00:00:00",
        "Comment": null,
        "Model Ready Date": "2024-09-05T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 4,
      "raw": {
        "INR": "23INR0548",
        "Project Name": "Leakey BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Leaky LLC",
        "POI Location": "Station Name (TDSP Station Code): LEAKEY; Load/Load Transformer Name: L_LEAKEY9_1Y; PTI BUS Name: 7426; Voltage in kV (Transmission Level): 69kV\nTransformers: 3x  4000kVA 800VAC Δ - 24.9kVA Υ\n12,000 MVA connected, Running load limited to 9.99 MW",
        "County": "Real",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-01-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-02T00:00:00",
        "Approved for Synchronization": "2026-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-06-03T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "23INR0548",
        "Project Name": "Leakey BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Leaky LLC",
        "POI Location": "Station Name (TDSP Station Code): LEAKEY; Load/Load Transformer Name: L_LEAKEY9_1Y; PTI BUS Name: 7426; Voltage in kV (Transmission Level): 69kV\nTransformers: 3x  4000kVA 800VAC Δ - 24.9kVA Υ\n12,000 MVA connected, Running load limited to 9.99 MW",
        "County": "Real",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-01-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-02T00:00:00",
        "Approved for Synchronization": "2026-07-10T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-06-03T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 5,
      "raw": {
        "INR": "23INR0556",
        "Project Name": "IEP Orchard BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "IEP Tejas Verde LLC",
        "POI Location": "Station Name (TDSP Station Code): OR\nLoad/Load Transformer Name :TR1\nPTI BUS number: 44541\nVoltage in kV (Transmission Level): 138 kV\nProject Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System. ",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-08-09T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-11-12T00:00:00",
        "Approved for Synchronization": "2024-12-06T00:00:00",
        "Comment": null,
        "Model Ready Date": "2024-01-04T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "23INR0556",
        "Project Name": "IEP Orchard BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "IEP Tejas Verde LLC",
        "POI Location": "Station Name (TDSP Station Code): OR\nLoad/Load Transformer Name :TR1\nPTI BUS number: 44541\nVoltage in kV (Transmission Level): 138 kV\nProject Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System. ",
        "County": "Fort Bend",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-12-31T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-08-09T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2024-11-12T00:00:00",
        "Approved for Synchronization": "2024-12-06T00:00:00",
        "Comment": null,
        "Model Ready Date": "2024-01-04T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 6,
      "raw": {
        "INR": "23INR0603",
        "Project Name": "Damon BESS 2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "PR DAMON, LLC",
        "POI Location": "9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. \nStation Name (TDSP Station Code): DA\nLoad/Load Transformer Name: TR2\nPTI BUS number: 42370\nVoltage in kV (Transmission Level): 138 kV\n",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-10-06T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2024-07-03T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "23INR0603",
        "Project Name": "Damon BESS 2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "PR DAMON, LLC",
        "POI Location": "9.99 MW 50 MWh battery energy storage project connecting at 12.47kV Damon (DA) substation. \nStation Name (TDSP Station Code): DA\nLoad/Load Transformer Name: TR2\nPTI BUS number: 42370\nVoltage in kV (Transmission Level): 138 kV\n",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-08-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-10-06T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2024-07-03T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 7,
      "raw": {
        "INR": "23INR0790",
        "Project Name": "DAMON BESS3",
        "GIM Study Phase": null,
        "Interconnecting Entity": "BarBar Storage LLC",
        "POI Location": "Station Name: DAMON\nTSP Station Code: DA\nLoad/Load Transformer Name: TR2\nPTI BUS number: 42370 \nVoltage in kV (Transmission Level): 138 kV\nNode (associated w/ load/load XFRM in NMMS): TR2",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2025-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.96,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-01-30T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-09-29T00:00:00",
        "Approved for Synchronization": "2026-03-04T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-09-04T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "23INR0790",
        "Project Name": "DAMON BESS3",
        "GIM Study Phase": null,
        "Interconnecting Entity": "BarBar Storage LLC",
        "POI Location": "Station Name: DAMON\nTSP Station Code: DA\nLoad/Load Transformer Name: TR2\nPTI BUS number: 42370 \nVoltage in kV (Transmission Level): 138 kV\nNode (associated w/ load/load XFRM in NMMS): TR2",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2025-12-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.96,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-01-30T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-09-29T00:00:00",
        "Approved for Synchronization": "2026-03-04T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-09-04T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 8,
      "raw": {
        "INR": "24INR0481",
        "Project Name": "Little York BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "ESTX-PLD-HOUSTON5, LLC",
        "POI Location": "Station Name (TDSP Station Code): Little York (LK)\nLoad/Load Transformer Name: TR3\nPTI BUS number: 45995\nVoltage in kV (Transmission Level): 138kV \nNode (associated w/ load/load XFMR in NMMS): TR3",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-11-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.96,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-20T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-05T00:00:00",
        "Approved for Synchronization": "2026-06-15T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-02-04T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "24INR0481",
        "Project Name": "Little York BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "ESTX-PLD-HOUSTON5, LLC",
        "POI Location": "Station Name (TDSP Station Code): Little York (LK)\nLoad/Load Transformer Name: TR3\nPTI BUS number: 45995\nVoltage in kV (Transmission Level): 138kV \nNode (associated w/ load/load XFMR in NMMS): TR3",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2026-11-12T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.96,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-08-20T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-06-05T00:00:00",
        "Approved for Synchronization": "2026-06-15T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-02-04T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 9,
      "raw": {
        "INR": "24INR0502",
        "Project Name": "Medina City BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Medina, LLC",
        "POI Location": "Station Name (TDSP Station Code): MEDINA; Load/Load Transformer Name: L_MEDICI9_1Y; PTI BUS number: 7430; Voltage in kV (Transmission Level): 69kV\nTransformers: 3x  4000kVA 800VAC Δ - 12.47kVA Υ\n12,000 MVA connected, Running load limited to 9.99 MW",
        "County": "Bandera",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-01-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-16T00:00:00",
        "Approved for Synchronization": "2026-07-29T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-06-03T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "24INR0502",
        "Project Name": "Medina City BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Medina, LLC",
        "POI Location": "Station Name (TDSP Station Code): MEDINA; Load/Load Transformer Name: L_MEDICI9_1Y; PTI BUS number: 7430; Voltage in kV (Transmission Level): 69kV\nTransformers: 3x  4000kVA 800VAC Δ - 12.47kVA Υ\n12,000 MVA connected, Running load limited to 9.99 MW",
        "County": "Bandera",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-26T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-01-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-16T00:00:00",
        "Approved for Synchronization": "2026-07-29T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-06-03T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 10,
      "raw": {
        "INR": "24INR0602",
        "Project Name": "CPS Rio Nogales CT301 Rotor Replacement",
        "GIM Study Phase": null,
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5362 RIONOG 345kV\n\n",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-10T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-04-03T00:00:00",
        "Comment": null,
        "Model Ready Date": "2024-04-29T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "24INR0602",
        "Project Name": "CPS Rio Nogales CT301 Rotor Replacement",
        "GIM Study Phase": null,
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5362 RIONOG 345kV\n\n",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-11-10T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2024-04-03T00:00:00",
        "Comment": null,
        "Model Ready Date": "2024-04-29T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 11,
      "raw": {
        "INR": "24INR0645",
        "Project Name": "COYOTE SPRINGS AGR1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "HEN INFRASTRUCTURE, LLC 1",
        "POI Location": "Station Name: COYOTSPR\nLoad Name: COYOTE_1\nBus#: 38113\nVoltage: 138 kV\nDAC: COYOTSPR_LD8\nCOYOTSPR/COYOTE_1/38113/COYOTSPR_LD8\n",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-23T00:00:00",
        "Fuel": "OIL",
        "Technology": "OT",
        "Capacity (MW)": 9.95,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-10-16T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2024-06-05T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "24INR0645",
        "Project Name": "COYOTE SPRINGS AGR1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "HEN INFRASTRUCTURE, LLC 1",
        "POI Location": "Station Name: COYOTSPR\nLoad Name: COYOTE_1\nBus#: 38113\nVoltage: 138 kV\nDAC: COYOTSPR_LD8\nCOYOTSPR/COYOTE_1/38113/COYOTSPR_LD8\n",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-23T00:00:00",
        "Fuel": "OIL",
        "Technology": "OT",
        "Capacity (MW)": 9.95,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-10-16T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2024-06-05T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 12,
      "raw": {
        "INR": "24INR0646",
        "Project Name": "SADDLEBACK AGR1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "HEN INFRASTRUCTURE, LLC 1",
        "POI Location": "SADLBACK/SADLBK_1/38058/SADLBACK_LD8",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-23T00:00:00",
        "Fuel": "OIL",
        "Technology": "OT",
        "Capacity (MW)": 9.95,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-10-16T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2024-06-05T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "24INR0646",
        "Project Name": "SADDLEBACK AGR1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "HEN INFRASTRUCTURE, LLC 1",
        "POI Location": "SADLBACK/SADLBK_1/38058/SADLBACK_LD8",
        "County": "Reeves",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-06-23T00:00:00",
        "Fuel": "OIL",
        "Technology": "OT",
        "Capacity (MW)": 9.95,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-10-16T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2024-06-05T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 13,
      "raw": {
        "INR": "24INR0712",
        "Project Name": "Byrd Ranch Repower ",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Byrd Ranch Storage LLC",
        "POI Location": "39700 SWEENY 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-01-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 5.5,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2020-12-14T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-04-15T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "No"
      },
      "normalized": {
        "INR": "24INR0712",
        "Project Name": "Byrd Ranch Repower ",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Byrd Ranch Storage LLC",
        "POI Location": "39700 SWEENY 138kV",
        "County": "Brazoria",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2027-01-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 5.5,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2020-12-14T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-04-15T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "No"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 14,
      "raw": {
        "INR": "25INR0601",
        "Project Name": "East Bernard BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis East Bernard LLC",
        "POI Location": "Station Name: East Bernard\nStation Code: EB\nERCOT Load Name: TR2\nERCOT BUS #: 44190\nVoltage (Transmission level kV): 138\nNode associated with load XFMR: 8045\n\nCNP 5-Digit Code: E_BERN\nShort Code: EB TR2\nFeeder: EB-81\nCNP XFMR #: EB TR2\n",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.5,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-29T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-09-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0601",
        "Project Name": "East Bernard BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis East Bernard LLC",
        "POI Location": "Station Name: East Bernard\nStation Code: EB\nERCOT Load Name: TR2\nERCOT BUS #: 44190\nVoltage (Transmission level kV): 138\nNode associated with load XFMR: 8045\n\nCNP 5-Digit Code: E_BERN\nShort Code: EB TR2\nFeeder: EB-81\nCNP XFMR #: EB TR2\n",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.5,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-29T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-09-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 15,
      "raw": {
        "INR": "25INR0602",
        "Project Name": "Hockley BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Hockley LLC",
        "POI Location": "30.021619, -95.846315\nStation Name (Station Code): Hockley (HK)\nLONG CODE: HOCKLY\nShort Code: HK TR5\nERCOT Bus Name: Hockley\nFeeder: HK-91\nERCOT Load Name: TR5\nCNP XFMR #: HK TR5\nERCOT Bus #: 45880\nNode: 0101",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-29T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2027-01-06T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0602",
        "Project Name": "Hockley BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Hockley LLC",
        "POI Location": "30.021619, -95.846315\nStation Name (Station Code): Hockley (HK)\nLONG CODE: HOCKLY\nShort Code: HK TR5\nERCOT Bus Name: Hockley\nFeeder: HK-91\nERCOT Load Name: TR5\nCNP XFMR #: HK TR5\nERCOT Bus #: 45880\nNode: 0101",
        "County": "Harris",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-03-01T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-29T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2027-01-06T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 16,
      "raw": {
        "INR": "25INR0604",
        "Project Name": "Pledger BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Pledger LLC",
        "POI Location": "29.188382, -95.911558\nCNP Pledger Substation\nLONG Name: PLEDGER\nShort Name: PG\nERCOT Bus #: 43120\nERCOT Load Name: TR2\nConnectivity Node: TR2",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-11-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.5,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-29T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-09-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0604",
        "Project Name": "Pledger BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Regis Pledger LLC",
        "POI Location": "29.188382, -95.911558\nCNP Pledger Substation\nLONG Name: PLEDGER\nShort Name: PG\nERCOT Bus #: 43120\nERCOT Load Name: TR2\nConnectivity Node: TR2",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-11-04T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.5,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-04-29T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-09-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 17,
      "raw": {
        "INR": "25INR0665",
        "Project Name": "CPS Rio Nogales CT201 Rotor Replacement",
        "GIM Study Phase": null,
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5362 RIONOG 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-07T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2025-04-02T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-04-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0665",
        "Project Name": "CPS Rio Nogales CT201 Rotor Replacement",
        "GIM Study Phase": null,
        "Interconnecting Entity": "CPS Energy",
        "POI Location": "5362 RIONOG 345kV",
        "County": "Guadalupe",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-07T00:00:00",
        "Fuel": "GAS",
        "Technology": "CC",
        "Capacity (MW)": 3.1,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-02-07T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": "2025-04-02T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-04-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 18,
      "raw": {
        "INR": "25INR0711",
        "Project Name": "Coyanosa Gas",
        "GIM Study Phase": null,
        "Interconnecting Entity": " RPC Merchant, LLC",
        "POI Location": "Station Name: COYANOSA\nLoad Name: COYAN_2\nTNMP Transformer Name: Xfmr T-2 (25kV)\nBus#: 38380\nTransmission Voltage: 138kV\nNode: 0033",
        "County": "Winkler",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-17T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-13T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2025-10-27T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0711",
        "Project Name": "Coyanosa Gas",
        "GIM Study Phase": null,
        "Interconnecting Entity": " RPC Merchant, LLC",
        "POI Location": "Station Name: COYANOSA\nLoad Name: COYAN_2\nTNMP Transformer Name: Xfmr T-2 (25kV)\nBus#: 38380\nTransmission Voltage: 138kV\nNode: 0033",
        "County": "Winkler",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-12-17T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-13T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2025-10-27T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 19,
      "raw": {
        "INR": "25INR0741",
        "Project Name": "Hollywood Solar Repower",
        "GIM Study Phase": null,
        "Interconnecting Entity": "RED TAILED HAWK SOLAR LLC",
        "POI Location": "44060 BLU 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-10-21T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2025-12-17T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0741",
        "Project Name": "Hollywood Solar Repower",
        "GIM Study Phase": null,
        "Interconnecting Entity": "RED TAILED HAWK SOLAR LLC",
        "POI Location": "44060 BLU 345kV",
        "County": "Wharton",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-09-30T00:00:00",
        "Fuel": "SOL",
        "Technology": "PV",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-10-21T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2025-12-17T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 20,
      "raw": {
        "INR": "25INR0747",
        "Project Name": "Knapp BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Knapp ESS Assets, LLC",
        "POI Location": "Station Name: KNAPP\nStation Code: KNAPP\nStation Bus Number: #1310\nStation Transmission Voltage: 138 kV\nLoad/Load Transformer Name: LDLXFMR2\nDistribution Voltage: 12.47 kV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.95,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-13T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-05T00:00:00",
        "Approved for Synchronization": "2025-11-24T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-09-04T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0747",
        "Project Name": "Knapp BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Knapp ESS Assets, LLC",
        "POI Location": "Station Name: KNAPP\nStation Code: KNAPP\nStation Bus Number: #1310\nStation Transmission Voltage: 138 kV\nLoad/Load Transformer Name: LDLXFMR2\nDistribution Voltage: 12.47 kV",
        "County": "Scurry",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-24T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.95,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-13T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2025-11-05T00:00:00",
        "Approved for Synchronization": "2025-11-24T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-09-04T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 21,
      "raw": {
        "INR": "25INR0768",
        "Project Name": "Stafford Hill BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Colorado Clean Energy Center, LLC",
        "POI Location": "New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Stafford Hill TSP Station Code: STAFHI Load Name: LOAD1 Bus #: PTI Bus Number: 78520 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-05-28T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-10-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0768",
        "Project Name": "Stafford Hill BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Colorado Clean Energy Center, LLC",
        "POI Location": "New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Stafford Hill TSP Station Code: STAFHI Load Name: LOAD1 Bus #: PTI Bus Number: 78520 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-11-14T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-05-28T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-10-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 22,
      "raw": {
        "INR": "25INR0769",
        "Project Name": "Kleimann BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Columbus Clean Energy Center, LLC",
        "POI Location": "New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Kleimann TSP Station Code: KLEIMA Load Name: LOAD1 Bus #: PTI Bus Number: 78115 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-31T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-09-02T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "25INR0769",
        "Project Name": "Kleimann BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Columbus Clean Energy Center, LLC",
        "POI Location": "New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Kleimann TSP Station Code: KLEIMA Load Name: LOAD1 Bus #: PTI Bus Number: 78115 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01",
        "County": "Colorado",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-12-08T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-03-31T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-09-02T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 23,
      "raw": {
        "INR": "26INR0574",
        "Project Name": "Apple BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Apple Infra LLC",
        "POI Location": "Station Name - Apple\nOncor 5-digit code - APPLE\nOncor XFMR # - 1\nERCOT Bus Name - APPLE_9\nERCOT Bus # 1276\nEROCT Load Name - LDLXFMR1\nSubstation Transmission kV - 138",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-03T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-04T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2025-12-10T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0574",
        "Project Name": "Apple BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Apple Infra LLC",
        "POI Location": "Station Name - Apple\nOncor 5-digit code - APPLE\nOncor XFMR # - 1\nERCOT Bus Name - APPLE_9\nERCOT Bus # 1276\nEROCT Load Name - LDLXFMR1\nSubstation Transmission kV - 138",
        "County": "Ector",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-11-27T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-04-03T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-08-04T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2025-12-10T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 24,
      "raw": {
        "INR": "26INR0682",
        "Project Name": "North Edinburg BESS 1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Edinburg ESS Assets LLC",
        "POI Location": "TSP Station Name: North Edinburg\nTSP Station Code: NEDIN\nLoad Name / Load Transformer Name: LOAD3\nBus #: PTI Bus Number: 8380\nVoltage (Transmission level kV): 138 kV\nNode (associated w/ load/load XFMR in NMMS): LD03\n\n\n",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-10T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-05T00:00:00",
        "Approved for Synchronization": "2026-08-10T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-10-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0682",
        "Project Name": "North Edinburg BESS 1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Edinburg ESS Assets LLC",
        "POI Location": "TSP Station Name: North Edinburg\nTSP Station Code: NEDIN\nLoad Name / Load Transformer Name: LOAD3\nBus #: PTI Bus Number: 8380\nVoltage (Transmission level kV): 138 kV\nNode (associated w/ load/load XFMR in NMMS): LD03\n\n\n",
        "County": "Hidalgo",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2026-08-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-10T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-05-05T00:00:00",
        "Approved for Synchronization": "2026-08-10T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-10-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 25,
      "raw": {
        "INR": "26INR0691",
        "Project Name": "Harlingen #1 BESS 1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Harlingen ESS Assets LLC",
        "POI Location": "TSP Station Name: Harlingen #1\nTSP Station Code: HARLIN_1\n• Load Name / Load Transformer Name: 69_12_1\nBus #: PTI Bus Number:8321\nVoltage (Transmission level kV):69kV\nNode (associated w/ load/load XFMR in NMMS): Transformer 1",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-08-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-14T00:00:00",
        "Approved for Synchronization": "2026-08-10T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-10-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0691",
        "Project Name": "Harlingen #1 BESS 1",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Harlingen ESS Assets LLC",
        "POI Location": "TSP Station Name: Harlingen #1\nTSP Station Code: HARLIN_1\n• Load Name / Load Transformer Name: 69_12_1\nBus #: PTI Bus Number:8321\nVoltage (Transmission level kV):69kV\nNode (associated w/ load/load XFMR in NMMS): Transformer 1",
        "County": "Cameron",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-08-21T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-07-14T00:00:00",
        "Approved for Synchronization": "2026-08-10T00:00:00",
        "Comment": null,
        "Model Ready Date": "2025-10-01T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 26,
      "raw": {
        "INR": "26INR0698",
        "Project Name": "Staghorn Gas",
        "GIM Study Phase": null,
        "Interconnecting Entity": "RPC Merchant LLC",
        "POI Location": "STATION NAME: STAGHORN\nLOAD NAME: STGHRN_3\nTNMP TRANSFORMER NAME: T3\nBUS #: 37990\nTRANSMISSION VOLTAGE: 138KV\nNODE: 9984",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-30T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-02T00:00:00",
        "Approved for Synchronization": "2026-09-18T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-02-04T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0698",
        "Project Name": "Staghorn Gas",
        "GIM Study Phase": null,
        "Interconnecting Entity": "RPC Merchant LLC",
        "POI Location": "STATION NAME: STAGHORN\nLOAD NAME: STGHRN_3\nTNMP TRANSFORMER NAME: T3\nBUS #: 37990\nTRANSMISSION VOLTAGE: 138KV\nNODE: 9984",
        "County": "Ward",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2026-10-29T00:00:00",
        "Fuel": "GAS",
        "Technology": "IC",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-05-30T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-02T00:00:00",
        "Approved for Synchronization": "2026-09-18T00:00:00",
        "Comment": null,
        "Model Ready Date": "2026-02-04T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 27,
      "raw": {
        "INR": "26INR0702",
        "Project Name": "Bexar Martinez BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Bexar Martinez LLC",
        "POI Location": "TSP Station Name: Martinez\nTSP Station Code: C5\nLoad Name / Load Transformer Name: T3\nBus #: PTI Bus Number: 5294\nVoltage (Transmission level kV): 138\nNode (associated w/ load/load XFMR in NMMS): 0120",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-01-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-02-03T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-15T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-07-01T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0702",
        "Project Name": "Bexar Martinez BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Bexar Martinez LLC",
        "POI Location": "TSP Station Name: Martinez\nTSP Station Code: C5\nLoad Name / Load Transformer Name: T3\nBus #: PTI Bus Number: 5294\nVoltage (Transmission level kV): 138\nNode (associated w/ load/load XFMR in NMMS): 0120",
        "County": "Bexar",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-01-23T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2026-02-03T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": "2026-09-15T00:00:00",
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-07-01T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 28,
      "raw": {
        "INR": "26INR0714",
        "Project Name": "Pavlov BESS2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Matagorda Clean Energy Center, LLC",
        "POI Location": "New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Pavlov TSP Station Code: PAVLOV Load Name: 138_13_1 Bus #: PTI Bus Number: 8608 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-08-05T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0714",
        "Project Name": "Pavlov BESS2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Matagorda Clean Energy Center, LLC",
        "POI Location": "New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Pavlov TSP Station Code: PAVLOV Load Name: 138_13_1 Bus #: PTI Bus Number: 8608 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01",
        "County": "Matagorda",
        "CDR Reporting Zone": "COASTAL",
        "Projected COD": "2026-12-13T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2025-06-18T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-08-05T00:00:00",
        "Change indicators: Proj Name, MW": "COD ",
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 29,
      "raw": {
        "INR": "26INR0734",
        "Project Name": "Alamo Street BESS2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Momentum Pilsner, LLC",
        "POI Location": "TSP Station Name:\tAlamo Street Sub TNP\nTSP Station Code:\t ALAMO_ST\nLoad Name / Load Transformer Name:\t ALAMO_2\nBus #: PTI Bus Number:\t 38331\nVoltage (Transmission level kV):\t 138\nNode (associated w/ load/load XFMR in NMMS):\t9631\n\n",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-02-01T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-12-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0734",
        "Project Name": "Alamo Street BESS2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Momentum Pilsner, LLC",
        "POI Location": "TSP Station Name:\tAlamo Street Sub TNP\nTSP Station Code:\t ALAMO_ST\nLoad Name / Load Transformer Name:\t ALAMO_2\nBus #: PTI Bus Number:\t 38331\nVoltage (Transmission level kV):\t 138\nNode (associated w/ load/load XFMR in NMMS):\t9631\n\n",
        "County": "Pecos",
        "CDR Reporting Zone": "WEST",
        "Projected COD": "2027-03-30T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.99,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2023-02-01T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-12-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 30,
      "raw": {
        "INR": "26INR0773",
        "Project Name": "Seaway BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Mount Whitney Energy Storage LLC",
        "POI Location": "TSP Substation Name - Seaway\nTSP Substation Code - Seaway\nLoad Name/Load Transformer Name - LOAD_T-4\nBus # / PTI Bus Number: 57670\nVoltage (Transmission level Kv) - 138kV\nNode (associated w/ load/load XFMR in NMMS) - 0009",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-12-11T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-12-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0773",
        "Project Name": "Seaway BESS",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Mount Whitney Energy Storage LLC",
        "POI Location": "TSP Substation Name - Seaway\nTSP Substation Code - Seaway\nLoad Name/Load Transformer Name - LOAD_T-4\nBus # / PTI Bus Number: 57670\nVoltage (Transmission level Kv) - 138kV\nNode (associated w/ load/load XFMR in NMMS) - 0009",
        "County": "Waller",
        "CDR Reporting Zone": "HOUSTON",
        "Projected COD": "2027-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-12-11T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-12-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    },
    {
      "source_sheet": "Project Details - Small Gen",
      "source_row_number": 31,
      "raw": {
        "INR": "26INR0774",
        "Project Name": "Wallis BESS2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Denali Energy Storage LLC",
        "POI Location": "TSP Substation Name - Wallis \nTSP Substation Code - WA\nLoad Name/Load Transformer Name - TR4\nBus # / PTI Bus Number: 44740\nVoltage (Transmission level kV) - 138 kV\nNode (associated w/ load/load XFMR in NMMS) - TR4",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-12-11T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-12-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      },
      "normalized": {
        "INR": "26INR0774",
        "Project Name": "Wallis BESS2",
        "GIM Study Phase": null,
        "Interconnecting Entity": "Denali Energy Storage LLC",
        "POI Location": "TSP Substation Name - Wallis \nTSP Substation Code - WA\nLoad Name/Load Transformer Name - TR4\nBus # / PTI Bus Number: 44740\nVoltage (Transmission level kV) - 138 kV\nNode (associated w/ load/load XFMR in NMMS) - TR4",
        "County": "Austin",
        "CDR Reporting Zone": "SOUTH",
        "Projected COD": "2027-02-22T00:00:00",
        "Fuel": "OTH",
        "Technology": "BA",
        "Capacity (MW)": 9.9,
        "Unnamed: 11": null,
        "Unnamed: 12": null,
        "Screening Study Started": null,
        "Screening Study Complete": null,
        "FIS Requested": null,
        "FIS Approved": null,
        "Economic Study Required": null,
        "IA Signed": "2024-12-11T00:00:00",
        "Unnamed: 19": null,
        "Air Permit": null,
        "GHG Permit": null,
        "Water Availability": null,
        "Meets Planning": null,
        "Meets All Planning": null,
        "Unnamed: 25": null,
        "Construction Start": null,
        "Construction End": null,
        "Approved for Energization": null,
        "Approved for Synchronization": null,
        "Comment": null,
        "Model Ready Date": "2026-12-02T00:00:00",
        "Change indicators: Proj Name, MW": null,
        "Financial Security": "Yes"
      }
    }
  ],
  "accounting": {
    "candidate_large_load_rows": 684,
    "candidate_large_load_mw": 149735.6,
    "candidate_filter_min_mw": 100.0
  },