  "schema_version": 1,
  "generated_on": "2026-09-26",
  "title": "Epoch AI frontier-site map overlay",
  "purpose": "Plot all 93 Epoch AI frontier data-center observations using public address-derived state or country display geography.",
  "accounting": "Independent secondary site-evidence layer. These points are not additions to the core queue total and are not treated as exact facility coordinates unless the cited underlying source provides exact coordinates (this layer currently uses state/country display centroids).",
  "record_count": 93,
  "mapped_count": 93,
  "records": [
    {
      "id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "country": "United States",
      "address": "5420 Tulane Rd, Memphis, TN 38109",
      "owner": "SpaceXAI #confident",
      "users": "Anthropic #confident, Cursor #confident, SpaceXAI #confident",
      "current_power_mw": 946,
      "current_h100_equivalents": 1111672.5618999496,
      "grid_jurisdiction": "TVA / Tennessee transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/xai-colossus-2-ff09d693",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/colossus-2",
      "precision": "state centroid derived from public address",
      "lat": 35.8,
      "lon": -86.3,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_power_request",
          "authority": "Tennessee Valley Authority (TVA)",
          "record_name": "Colossus II direct-supply power request",
          "source_url": "https://dailymemphian.com/article/65680/spacexai-power-memphis-tennessee-valley-authority-tva",
          "confidence": "medium"
        }
      ],
      "next_action": "Search TVA/serving-utility filings, local regulatory records and any interconnection or service agreement record that identifies the campus by case or project number."
    },
    {
      "id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "country": "United States",
      "address": "1435 Hwy 54 W, Fayetteville, GA 30214",
      "owner": "Microsoft #confident",
      "users": "OpenAI #likely, Microsoft #likely",
      "current_power_mw": 636,
      "current_h100_equivalents": 768768.7220818596,
      "grid_jurisdiction": "SERC / Georgia transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/microsoft-fairwater-atlanta-9f8f329f",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta",
      "precision": "state centroid derived from public address",
      "lat": 32.7,
      "lon": -83.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Georgia Power",
          "record_name": "Fairwater Atlanta utility relationship",
          "source_url": "https://registry.deploy.report/datacenters/facilities/qts-fayetteville-ga-campus",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Georgia PSC and Georgia Power large-load filings for the Fairwater/QTS Fayetteville campus, including docket records and service/interconnection documentation."
    },
    {
      "id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "country": "United States",
      "address": "55001 Larrison Blvd, New Carlisle, IN 46552",
      "owner": "Amazon #confident",
      "users": "Anthropic #confident",
      "current_power_mw": 910,
      "current_h100_equivalents": 685912.076806468,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle",
      "precision": "state centroid derived from public address",
      "lat": 39.9,
      "lon": -86.3,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Indiana Michigan Power (AEP)",
          "record_name": "Project Rainier / New Carlisle power supply",
          "source_url": "https://www.compute-atlas.com/facilities/amazon-project-rainier-new-carlisle-in",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Indiana Utility Regulatory Commission and Indiana Michigan Power records for the New Carlisle Project Rainier service/interconnection case."
    },
    {
      "id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "country": "United States",
      "address": "4581 Webb St, Pryor, OK 74361",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 368,
      "current_h100_equivalents": 636685.1945426983,
      "grid_jurisdiction": "SPP",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/google-pryor-north-be7b42dd",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-pryor-north",
      "precision": "state centroid derived from public address",
      "lat": 35.6,
      "lon": -97.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Grand River Dam Authority (GRDA)",
          "record_name": "Google Pryor power supply / customer relationship",
          "source_url": "https://grda.com/wp-content/uploads/2025/06/Continuing-Disclosure-2024_06.26.2025-FINAL.pdf",
          "confidence": "medium"
        }
      ],
      "next_action": "Search GRDA, MidAmerica Industrial Park and Oklahoma Corporation Commission records for a site-specific Google Pryor service/interconnection document or project number."
    },
    {
      "id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "country": "United States",
      "address": "1 Community Cir, New Albany, OH 43054",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 496,
      "current_h100_equivalents": 599845.17433047,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/meta-prometheus-c979ce44",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-prometheus",
      "precision": "state centroid derived from public address",
      "lat": 40.4,
      "lon": -82.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_capacity_record",
          "authority": "AEP Ohio",
          "record_name": "Meta Prometheus public utility/facility record",
          "source_url": "https://www.datacenter.fyi/utility/american-electric-power",
          "confidence": "medium"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "AEP Ohio",
          "record_name": "Meta Prometheus grid relationship",
          "source_url": "https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Ohio Power Siting Board, PUCO, AEP Ohio and PJM for the exact Prometheus service/interconnection cases and reconcile the facility-level 695 MW report with Epoch's 496 MW current IT-power estimate."
    },
    {
      "id": "EPOCH-2c2e40ddb178da3e",
      "site_name": "OpenAI Stargate Abilene",
      "country": "United States",
      "address": "5502 Spinks Rd, Abilene, TX 79601",
      "owner": "Oracle #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 421,
      "current_h100_equivalents": 509348.15563415864,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/openai-stargate-abilene-82570d68",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "AEP Texas / Oncor",
          "record_name": "Stargate Abilene serving-utility record",
          "source_url": "https://registry.deploy.report/datacenters/stargate-infrastructure-stargate-abilene",
          "confidence": "medium"
        }
      ],
      "next_action": "Search ERCOT large-load records, AEP Texas/Oncor service records, TCEQ permits and Taylor County filings for a site-specific case or agreement."
    },
    {
      "id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "country": "United States",
      "address": "4800 90th St, Mount Pleasant, WI 53403",
      "owner": "Microsoft #confident",
      "users": "OpenAI #likely, Microsoft #likely",
      "current_power_mw": 369,
      "current_h100_equivalents": 445679.63617988885,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/microsoft-fairwater-wisconsin-45d98f47",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin",
      "precision": "state centroid derived from public address",
      "lat": 44.6,
      "lon": -89.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "We Energies",
          "record_name": "Fairwater Mount Pleasant utility relationship",
          "source_url": "https://registry.deploy.report/datacenters/microsoft-fairwater-wisconsin",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Wisconsin PSC, We Energies and MISO records for the Fairwater service/interconnection case and associated generation/transmission filings."
    },
    {
      "id": "EPOCH-04f65e1aee6c98ab",
      "site_name": "DayOne Kempas",
      "country": "Malaysia",
      "address": "HP79+MP, 81300 Johor Bahru, Johor, Malaysia",
      "owner": "",
      "users": "",
      "current_power_mw": 322.470096,
      "current_h100_equivalents": 367547.2460838808,
      "grid_jurisdiction": "Malaysia national / utility grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/dayone-kempas",
      "precision": "country centroid",
      "lat": 4.2105,
      "lon": 101.9758,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-d8b28fdbc55817f9",
      "site_name": "Google Columbus",
      "country": "United States",
      "address": "5076 S High St, Columbus, OH 43207",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 303,
      "current_h100_equivalents": 331985.85144012125,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-columbus",
      "precision": "state centroid derived from public address",
      "lat": 40.4,
      "lon": -82.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "AEP Ohio",
          "record_name": "Google Columbus utility relationship",
          "source_url": "https://datacentersexposed.com/facilities/google-columbus",
          "confidence": "medium"
        }
      ],
      "next_action": "Search AEP Ohio, PUCO and PJM records for the site-specific service/interconnection record and reconcile multiple campus/building addresses."
    },
    {
      "id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "country": "United States",
      "address": "1101 Beech Rd SW, New Albany, OH 43054",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 333,
      "current_h100_equivalents": 323900.9600808489,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://datacentersexposed.com/facilities/google-new-albany",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-new-albany",
      "precision": "state centroid derived from public address",
      "lat": 40.4,
      "lon": -82.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "City of New Albany, Ohio",
          "record_name": "Google New Albany data center",
          "source_url": "https://datacenters.newalbanyohio.org/",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-83ca909f7eb211c7",
      "site_name": "Google Mesa",
      "country": "United States",
      "address": "",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 183,
      "current_h100_equivalents": 289540.17180394137,
      "grid_jurisdiction": "WECC / Arizona serving utilities (APS / SRP)",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/az/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-mesa",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_grid_facility_record",
          "authority": "Arizona Public Service",
          "record_name": "Google Mesa data-center facility record",
          "source_url": "https://www.datacenter.fyi/public-record/google-aa4275ee",
          "confidence": "medium"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Arizona Public Service",
          "record_name": "Google Mesa utility relationship",
          "source_url": "https://www.datacenter.fyi/public-record/google-aa4275ee",
          "confidence": "medium"
        }
      ],
      "next_action": "Search APS, Arizona Corporation Commission and Mesa permitting records for the underlying service/interconnection filing."
    },
    {
      "id": "EPOCH-55d4b5e818b5bb2a",
      "site_name": "DayOne Nusajaya",
      "country": "Malaysia",
      "address": "",
      "owner": "",
      "users": "",
      "current_power_mw": 240,
      "current_h100_equivalents": 281670.4396159676,
      "grid_jurisdiction": "Malaysia national / utility grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/dayone-nusajaya",
      "precision": "country centroid",
      "lat": 4.2105,
      "lon": 101.9758,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-2dadeb4b013bef05",
      "site_name": "Colossus 1",
      "country": "United States",
      "address": "3231 Riverport Rd, Memphis, TN 38109",
      "owner": "SpaceXAI #confident",
      "users": "Anthropic #confident",
      "current_power_mw": 340,
      "current_h100_equivalents": 275795.85649317835,
      "grid_jurisdiction": "TVA / Tennessee transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/xai-colossus-1-ce962f82",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/colossus-1",
      "precision": "state centroid derived from public address",
      "lat": 35.8,
      "lon": -86.3,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_power",
          "authority": "Memphis Light, Gas and Water / TVA",
          "record_name": "Colossus 1 grid supply",
          "source_url": "https://www.mlgw.com/xai",
          "confidence": "high"
        }
      ],
      "next_action": "Search MLGW/TVA filings and Memphis/Shelby regulatory records for the site-specific service agreement, connection upgrade record and any currently applicable capacity figure."
    },
    {
      "id": "EPOCH-1c8ee8b0305c6313",
      "site_name": "Google Council Bluffs (East)",
      "country": "United States",
      "address": "10410 Bunge Ave, Council Bluffs, IA 51503",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 237,
      "current_h100_equivalents": 255684.68923698837,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/google-council-bluffs-east-d8c434a9",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-council-bluffs-east",
      "precision": "state centroid derived from public address",
      "lat": 42.1,
      "lon": -93.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_utility_relationship",
          "authority": "MidAmerican Energy",
          "record_name": "Google Council Bluffs utility relationship",
          "source_url": "https://suedatacenters.org/data-centers/google-council-bluffs-ia",
          "confidence": "medium"
        }
      ],
      "next_action": "Search MidAmerican, Iowa Utilities Board and MISO records for a site-specific Google Council Bluffs service/interconnection case."
    },
    {
      "id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "country": "United States",
      "address": "8171 Jim Christal Rd, Denton, TX 76207",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #likely",
      "current_power_mw": 262,
      "current_h100_equivalents": 252652.85497726125,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.ercot.com/services/rq/large-load-integration",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-denton-tx",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_service_contract",
          "authority": "Denton Municipal Electric / Core Scientific",
          "record_name": "Denton Campus power purchase agreement",
          "source_url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001193125-26-165121/d149019dex992.htm",
          "confidence": "high"
        }
      ],
      "next_action": "Search ERCOT, Denton Municipal Electric and Texas regulatory records for the site-specific interconnection and service documentation; reconcile the 394 MW contract ceiling with the ~260 MW CoreWeave contracted capacity reported separately."
    },
    {
      "id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "country": "United States",
      "address": "6000 Technology Blvd, Sandston, VA 23150",
      "owner": "",
      "users": "",
      "current_power_mw": 238,
      "current_h100_equivalents": 242546.7407781708,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/qts-richmond-1",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "QTS Data Centers",
          "record_name": "Richmond 1 data-center campus",
          "source_url": "https://q.com/data-centers/richmond-1/",
          "confidence": "high"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Dominion Energy",
          "record_name": "QTS Richmond 1 utility relationship",
          "source_url": "https://epoch.ai/data/ai-data-centers",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Dominion Energy, PJM, Virginia SCC and Henrico County records for the underlying service/interconnection case."
    },
    {
      "id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "country": "United States",
      "address": "1772-2396 145th St, Rosemount, MN 55068, USA",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 178,
      "current_h100_equivalents": 215675.11520970188,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-rosemount",
      "precision": "state centroid derived from public address",
      "lat": 46.3,
      "lon": -94.3,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Xcel Energy",
          "record_name": "Meta Rosemount data-center power supply",
          "source_url": "https://stories.xcelenergy.com/stories/Building-the-21st-century-economy--Xcel-Energy-to-power-new-Meta-data-center",
          "confidence": "high"
        }
      ],
      "next_action": "Search Minnesota PUC and Xcel Energy records for the site's interconnection/service case and any large-load planning documents."
    },
    {
      "id": "EPOCH-0d287943c30fe239",
      "site_name": "Amazon Madison Mega Site",
      "country": "United States",
      "address": "Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County",
      "owner": "Amazon #confident",
      "users": "Anthropic #speculative",
      "current_power_mw": 284,
      "current_h100_equivalents": 214348.14354550533,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/amazon-madison-mega-site",
      "precision": "state centroid derived from public address",
      "lat": 32.7,
      "lon": -89.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_grid_facility_record",
          "authority": "Canton Municipal Utilities",
          "record_name": "Amazon Madison Mega Site public-record entry",
          "source_url": "https://www.datacenter.fyi/state/ms",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Canton Municipal Utilities, Entergy Mississippi where applicable, Mississippi PSC, Madison County and local permitting records for the specific electrical service/interconnection record."
    },
    {
      "id": "EPOCH-6db3bc2c79843ffd",
      "site_name": "Google Bristow",
      "country": "United States",
      "address": "13001 Rollins Ford Road, Bristow, VA 20136",
      "owner": "Google",
      "users": "Google DeepMind",
      "current_power_mw": 238,
      "current_h100_equivalents": 209860.53562405254,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-bristow",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_grid_facility_record",
          "authority": "Dominion Energy Virginia",
          "record_name": "Google Bristow public utility/facility record",
          "source_url": "https://www.datacenter.fyi/state/va/bristow",
          "confidence": "medium"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Dominion Energy Virginia",
          "record_name": "Google Bristow utility relationship",
          "source_url": "https://www.datacenter.fyi/public-record/google-be69857b",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Dominion Energy, Virginia SCC, Prince William County and PJM records for the underlying service/interconnection case."
    },
    {
      "id": "EPOCH-93a4aa4fa40d40ca",
      "site_name": "Microsoft Goodyear",
      "country": "United States",
      "address": "14250 W Broadway Rd, Goodyear, AZ 85338",
      "owner": "Microsoft #confident",
      "users": "OpenAI #likely, Microsoft #confident",
      "current_power_mw": 202,
      "current_h100_equivalents": 205154.11824153614,
      "grid_jurisdiction": "WECC / Arizona serving utilities (APS / SRP)",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/az/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-goodyear",
      "precision": "state centroid derived from public address",
      "lat": 34,
      "lon": -111.9,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_facility_record",
          "authority": "Arizona Public Service",
          "record_name": "Microsoft Goodyear data-center facility",
          "source_url": "https://suedatacenters.org/data-centers/microsoft-goodyear-az",
          "confidence": "medium"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Arizona Public Service",
          "record_name": "Microsoft Goodyear utility relationship",
          "source_url": "https://www.datacenter.fyi/public-record/microsoft-befedf4d",
          "confidence": "medium"
        }
      ],
      "next_action": "Search APS, Arizona Corporation Commission, City of Goodyear and Maricopa County records for the site-specific service/interconnection case."
    },
    {
      "id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "country": "United States",
      "address": "500 8th St, Jeffersonville, IN 47130, USA",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 178,
      "current_h100_equivalents": 203132.89540171804,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/meta-jeffersonville-646ed5d7",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-jeffersonville",
      "precision": "state centroid derived from public address",
      "lat": 39.9,
      "lon": -86.3,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Duke Energy Indiana",
          "record_name": "Meta Jeffersonville data-center utility relationship",
          "source_url": "https://datacenters.atmeta.com/wp-content/uploads/2024/10/Indiana-Jeffersonville.pdf",
          "confidence": "high"
        }
      ],
      "next_action": "Search Indiana Michigan Power / Duke Energy Indiana and Indiana Utility Regulatory Commission records for the site's service/interconnection case."
    },
    {
      "id": "EPOCH-6799460068cbed36",
      "site_name": "Google Kansas City East",
      "country": "United States",
      "address": "",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 105,
      "current_h100_equivalents": 202627.5896917635,
      "grid_jurisdiction": "SPP",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://opsportal.spp.org/Studies/GIActive",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-kansas-city-east",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_development_record",
          "authority": "Hunt Midwest",
          "record_name": "Google data center at Hunt Midwest Business Center",
          "source_url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
          "confidence": "high"
        }
      ],
      "next_action": "Search Evergy, Missouri Public Service Commission, Kansas City records and SPP materials for the site's electrical service/interconnection record."
    },
    {
      "id": "EPOCH-bdc85fadae79b6b2",
      "site_name": "AWS New Albany",
      "country": "United States",
      "address": "13360 Miller Rd NW",
      "owner": "Amazon #confident",
      "users": "",
      "current_power_mw": 213,
      "current_h100_equivalents": 201111.67256189996,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://datacentersexposed.com/facilities/amazon-new-albany-2",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/aws-new-albany",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "Amazon Web Services",
          "record_name": "AWS New Albany / Beech Road campus",
          "source_url": "https://suedatacenters.org/data-centers/aws-beech-road-new-albany-oh",
          "confidence": "medium"
        }
      ],
      "next_action": "Search AEP Ohio, PUCO, PJM and New Albany/Plain Township permitting records for the electrical service and interconnection record for this campus."
    },
    {
      "id": "EPOCH-4eeccbee73808216",
      "site_name": "Google Omaha",
      "country": "United States",
      "address": "11110 State St, Omaha, NE 68142",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 237,
      "current_h100_equivalents": 198585.14401212733,
      "grid_jurisdiction": "SPP",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://opsportal.spp.org/Studies/GIActive",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-omaha",
      "precision": "state centroid derived from public address",
      "lat": 41.5,
      "lon": -99.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "Google",
          "record_name": "Google Omaha data center",
          "source_url": "https://datacenters.google/locations/nebraska/",
          "confidence": "high"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Omaha Public Power District",
          "record_name": "Google Omaha demand-response / utility relationship",
          "source_url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/how-were-making-data-centers-more-flexible-to-benefit-power-grids/",
          "confidence": "high"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-e06bc7faa8b1b187",
      "site_name": "Google Lincoln",
      "country": "United States",
      "address": "5475 Cloud Ct, Lincoln, NE 68514",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 141,
      "current_h100_equivalents": 197574.53259221828,
      "grid_jurisdiction": "SPP",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://opsportal.spp.org/Studies/GIActive",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-lincoln",
      "precision": "state centroid derived from public address",
      "lat": 41.6,
      "lon": -72.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "Google",
          "record_name": "Google Lincoln data center",
          "source_url": "https://datacenters.google/locations/nebraska/",
          "confidence": "high"
        }
      ],
      "next_action": "Search Lincoln Electric System, OPPD, Nebraska Power Review Board and other state/local records for the site's specific service or interconnection record."
    },
    {
      "id": "EPOCH-052be5b551cd099b",
      "site_name": "QTS Richmond 2",
      "country": "United States",
      "address": "6030–6070 Technology Blvd, Sandston, VA 23150",
      "owner": "",
      "users": "",
      "current_power_mw": 180,
      "current_h100_equivalents": 182920.66700353715,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/qts-richmond-2",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "QTS Data Centers",
          "record_name": "Richmond 2 data-center campus",
          "source_url": "https://q.com/data-centers/richmond-2/",
          "confidence": "high"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Dominion Energy",
          "record_name": "QTS Richmond 2 secondary utility relationship",
          "source_url": "https://epoch.ai/data/ai-data-centers",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Dominion Energy, PJM, Virginia SCC and Henrico County records for the underlying service/interconnection case."
    },
    {
      "id": "EPOCH-40ccef8ef4236635",
      "site_name": "Google The Dalles",
      "country": "United States",
      "address": "3500 River Rd, The Dalles, OR",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 154,
      "current_h100_equivalents": 175341.0813542193,
      "grid_jurisdiction": "WECC / BPA and Pacific Northwest utilities",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/or/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-the-dalles",
      "precision": "state centroid derived from public address",
      "lat": 44,
      "lon": -120.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Northern Wasco County PUD",
          "record_name": "Google The Dalles serving utility",
          "source_url": "https://registry.deploy.report/datacenters/facilities/google-the-dalles-river-road-building-wasco-or",
          "confidence": "high"
        }
      ],
      "next_action": "Search Northern Wasco County PUD, BPA and Oregon public records for a specific interconnection/service case or account."
    },
    {
      "id": "EPOCH-02484a65a5dac16d",
      "site_name": "QTS Richmond 3",
      "country": "United States",
      "address": "3525–3543 Portugee Rd, Sandston, VA 23150",
      "owner": "",
      "users": "",
      "current_power_mw": 144,
      "current_h100_equivalents": 174835.77564426477,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/qts-richmond-3",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_record",
          "authority": "QTS Data Centers",
          "record_name": "Richmond 3 data-center campus",
          "source_url": "https://q.com/data-centers/richmond-3/",
          "confidence": "high"
        },
        {
          "type": "site_specific_utility_relationship",
          "authority": "Dominion Energy",
          "record_name": "QTS Richmond 3 secondary utility relationship",
          "source_url": "https://epoch.ai/data/ai-data-centers",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Dominion Energy, PJM, Virginia SCC and Henrico County records for the underlying service/interconnection case."
    },
    {
      "id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "country": "United States",
      "address": "Co Rd 42, Montgomery, AL 36105, USA",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 153,
      "current_h100_equivalents": 174517.43304699342,
      "grid_jurisdiction": "SERC / Alabama transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/al/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-montgomery",
      "precision": "state centroid derived from public address",
      "lat": 32.8,
      "lon": -86.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_regulatory",
          "authority": "Alabama Public Service Commission / Alabama Power",
          "record_name": "Dotier participation contract",
          "source_url": "https://www.psc.alabama.gov/",
          "confidence": "medium"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "country": "United States",
      "address": "601 Kuna Mora Rd,  Kuna ID 83634",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 152,
      "current_h100_equivalents": 173247.67205659422,
      "grid_jurisdiction": "WECC / Idaho Power, PacifiCorp, BPA and Avista",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/id/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-kuna",
      "precision": "state centroid derived from public address",
      "lat": 44.2,
      "lon": -114.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Idaho Power",
          "record_name": "Meta Kuna data-center energy planning",
          "source_url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
          "confidence": "high"
        }
      ],
      "next_action": "Search Idaho Public Utilities Commission and Idaho Power filings for the site-specific large-customer tariff, service agreement, interconnection or planning case."
    },
    {
      "id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "country": "United States",
      "address": "2310 Eberhardt Rd, Temple, TX 76504",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 152,
      "current_h100_equivalents": 173247.6719844078,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/meta-temple-f7dc40d2",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-temple",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Oncor Electric",
          "record_name": "Meta Temple data-center energy planning",
          "source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
          "confidence": "high"
        }
      ],
      "next_action": "Search ERCOT, Oncor and Public Utility Commission of Texas records for the Temple site's service/interconnection case."
    },
    {
      "id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "country": "United States",
      "address": "Cheyenne, WY 82007, USA",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 152,
      "current_h100_equivalents": 172814.5528044467,
      "grid_jurisdiction": "WECC / Wyoming serving utilities",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/wy/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-cheyenne",
      "precision": "state centroid derived from public address",
      "lat": 43,
      "lon": -107.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Black Hills Energy",
          "record_name": "Meta Cheyenne grid / energy relationship",
          "source_url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/",
          "confidence": "high"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-4a87099a6d1e001f",
      "site_name": "Amazon Ridgeland",
      "country": "United States",
      "address": "1626 County Line Road Ridgeland, Mississippi",
      "owner": "Amazon #confident",
      "users": "Anthropic #speculative",
      "current_power_mw": 228,
      "current_h100_equivalents": 171298.6356745831,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/amazon-ridgeland",
      "precision": "state centroid derived from public address",
      "lat": 32.7,
      "lon": -89.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Entergy Mississippi",
          "record_name": "Amazon Ridgeland secondary utility relationship",
          "source_url": "https://epoch.ai/data/ai-data-centers",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Entergy Mississippi, Mississippi Public Service Commission, MISO and Madison/Ridgeland public records for the underlying service or interconnection case."
    },
    {
      "id": "EPOCH-27e284efc1b1abc2",
      "site_name": "Meta Huntsville",
      "country": "United States",
      "address": "5400 Prosperity Dr NW, Toney, AL",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 146,
      "current_h100_equivalents": 166760.9903991915,
      "grid_jurisdiction": "SERC / Alabama transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/al/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-huntsville",
      "precision": "state centroid derived from public address",
      "lat": 32.8,
      "lon": -86.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Tennessee Valley Authority",
          "record_name": "Meta Huntsville secondary utility relationship",
          "source_url": "https://epoch.ai/data/ai-data-centers",
          "confidence": "medium"
        }
      ],
      "next_action": "Search TVA, Alabama Public Service Commission, local utility records and SERC-related connection filings for the underlying service or interconnection case."
    },
    {
      "id": "EPOCH-a69e48fd129d0cdb",
      "site_name": "Coreweave Helios",
      "country": "United States",
      "address": "984 County Road 112, Afton, TX 79220",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 132,
      "current_h100_equivalents": 159551.768236855,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/coreweave-helios-581fb155",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-helios",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-534376160415dc84",
      "site_name": "Microsoft Project Osmium",
      "country": "United States",
      "address": "5855 SW Kerry St, Cumming, IA 50061",
      "owner": "Microsoft #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 190,
      "current_h100_equivalents": 155634.15866599293,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-project-osmium",
      "precision": "state centroid derived from public address",
      "lat": 42.1,
      "lon": -93.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "MidAmerican Energy",
          "record_name": "Microsoft Project Osmium utility relationship",
          "source_url": "https://www.cleanenergydistricts.org/data-centers-in-iowa-resource-hub",
          "confidence": "medium"
        }
      ],
      "next_action": "Search MidAmerican Energy, MISO, Iowa Utilities Board and local records for the underlying service/interconnection case."
    },
    {
      "id": "EPOCH-0bb0b996b7c96beb",
      "site_name": "Meta Eagle Mountain",
      "country": "United States",
      "address": "1275 N Community Cir, Eagle Mountain, UT 84005",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 133,
      "current_h100_equivalents": 151354.21930267813,
      "grid_jurisdiction": "WECC / Utah serving utility",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/ut/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-eagle-mountain",
      "precision": "state centroid derived from public address",
      "lat": 39.3,
      "lon": -111.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Rocky Mountain Power",
          "record_name": "Meta Eagle Mountain grid infrastructure relationship",
          "source_url": "https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/",
          "confidence": "high"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-85492d2b8df586a1",
      "site_name": "Google Midlothian",
      "country": "United States",
      "address": "3250 Railport Parkway, Midlothian, TX 76065",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 103,
      "current_h100_equivalents": 143580.85118746842,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/google-87bef61e",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-midlothian",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "country": "United States",
      "address": "",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 161,
      "current_h100_equivalents": 133906.01313794847,
      "grid_jurisdiction": "WECC / Nevada serving utility",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/nv/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-storey-county",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Public Utilities Commission of Nevada / NV Energy",
          "record_name": "Google Storey County energy supply agreement",
          "source_url": "https://puc.nv.gov/uploadedFiles/puc.nv.gov/Content/About/Media_Outreach/NewsletterJuly2024.pdf",
          "confidence": "high"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-f92e98f4b76a9bcd",
      "site_name": "Google Lancaster",
      "country": "United States",
      "address": "105 Whiley Rd, Lancaster, OH 43130",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 137,
      "current_h100_equivalents": 130368.8731682668,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/google-b095581c",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-lancaster",
      "precision": "state centroid derived from public address",
      "lat": 40.4,
      "lon": -82.8,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-78f8285078416a9e",
      "site_name": "Meta-QTS Hillsboro 2",
      "country": "United States",
      "address": "4755 NE Huffman St, Hillsboro, OR 97124",
      "owner": "Meta #likely",
      "users": "Meta #likely",
      "current_power_mw": 180,
      "current_h100_equivalents": 123839,
      "grid_jurisdiction": "WECC / BPA and Pacific Northwest utilities",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/or/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-qts-hillsboro-2",
      "precision": "state centroid derived from public address",
      "lat": 41.5,
      "lon": -99.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Portland General Electric",
          "record_name": "Meta-QTS Hillsboro 2 secondary utility relationship",
          "source_url": "https://epoch.ai/data/ai-data-centers",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Portland General Electric, BPA, Oregon utility/regulatory records and Hillsboro public records for the underlying service/interconnection case."
    },
    {
      "id": "EPOCH-a2c9f0846296fe65",
      "site_name": "Google Waltham Cross",
      "country": "United Kingdom",
      "address": "Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 88,
      "current_h100_equivalents": 123799.89893885801,
      "grid_jurisdiction": "Great Britain NESO + local distribution network connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-waltham-cross",
      "precision": "country centroid",
      "lat": 55.3781,
      "lon": -3.436,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_energy_contract",
          "authority": "Shell Energy Europe Limited / Google",
          "record_name": "Google Waltham Cross 24/7 carbon-free energy management agreement",
          "source_url": "https://www.datacenters.google/locations/waltham-cross/",
          "confidence": "high"
        }
      ],
      "next_action": "Search the UK transmission/distribution and planning records for the site's physical electricity connection and any capacity/service identifier."
    },
    {
      "id": "EPOCH-a286a89bd1c1b6e7",
      "site_name": "VNET Bayin Ulanqab",
      "country": "China",
      "address": "Bayin, Ulanqab, China",
      "owner": "VNET #confident",
      "users": "ByteDance #speculative",
      "current_power_mw": 221,
      "current_h100_equivalents": 122789.28751894896,
      "grid_jurisdiction": "China State Grid / provincial grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/vnet-bayin-ulanqab",
      "precision": "country centroid",
      "lat": 35.8617,
      "lon": 104.1954,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-785d6e4c34607dd4",
      "site_name": "Google Arcola",
      "country": "United States",
      "address": "42575 Arcola Blvd, Sterling, VA 20166",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 77,
      "current_h100_equivalents": 108135.42193026781,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-arcola",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Dominion Energy",
          "record_name": "Google Arcola serving-utility relationship",
          "source_url": "https://suedatacenters.org/data-centers/google-arcola-loudoun-va",
          "confidence": "medium"
        }
      ],
      "next_action": "Search Dominion Energy, Virginia SCC, PJM and local Loudoun County records for the exact service/interconnection case, contract, substation or project identifier."
    },
    {
      "id": "EPOCH-f1a2bcdd78478bc2",
      "site_name": "Google Red Oak",
      "country": "United States",
      "address": "330 Austin Blvd, Red Oak, TX 75154",
      "owner": "Google #confident",
      "users": "",
      "current_power_mw": 77,
      "current_h100_equivalents": 108135.42193026781,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://interchange.puc.texas.gov/Documents/58306_402_1549178.PDF",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-red-oak",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-4525348d114e3e8e",
      "site_name": "Google Papillion",
      "country": "United States",
      "address": "14651-15249 Gold Coast Rd 68138 Papillion Nebraska, USA",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 237,
      "current_h100_equivalents": 100555.83628094998,
      "grid_jurisdiction": "SPP",
      "grid_status": "public_customer_planning_record",
      "site_queue_id": null,
      "site_queue_name": "OPPD Google Papillion large-customer planning",
      "grid_evidence_url": "https://www.oppd.com/media/316613/neomaha01a-pos-2019.pdf",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-papillion",
      "precision": "state centroid derived from public address",
      "lat": 41.5,
      "lon": -99.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_planning",
          "authority": "OPPD",
          "record_name": "Google Papillion large-customer planning",
          "source_url": "https://www.oppd.com/media/316613/neomaha01a-pos-2019.pdf",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "country": "United States",
      "address": "1 Meta Lp, Gallatin, TN 37066",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 87,
      "current_h100_equivalents": 99545.22486104093,
      "grid_jurisdiction": "TVA / Tennessee transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://suedatacenters.org/data-centers/meta-gallatin-tn",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-gallatin",
      "precision": "state centroid derived from public address",
      "lat": 35.8,
      "lon": -86.3,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-02c050b6b554fadd",
      "site_name": "Meta Los Lunas",
      "country": "United States",
      "address": "4250 Messenger Lp, Los Lunas, NM 87031",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 87,
      "current_h100_equivalents": 99545.22486104093,
      "grid_jurisdiction": "WECC / PNM and other New Mexico serving utilities",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/nm/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-los-lunas",
      "precision": "state centroid derived from public address",
      "lat": 34.4,
      "lon": -106.1,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Public Service Company of New Mexico (PNM)",
          "record_name": "Meta Los Lunas serving-utility relationship",
          "source_url": "https://registry.deploy.report/datacenters/facilities/meta-new-mexico-los-lunas",
          "confidence": "medium"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-768183e4de6062d2",
      "site_name": "CoreWeave Ellendale ND",
      "country": "United States",
      "address": "9685 87th Ave SE, Ellendale, ND 58436",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 68,
      "current_h100_equivalents": 93481.55634158666,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-ellendale-nd",
      "precision": "state centroid derived from public address",
      "lat": 47.5,
      "lon": -100.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_compute_tenancy",
          "authority": "CoreWeave / Applied Digital",
          "record_name": "CoreWeave Ellendale Campus 250 MW datacenter leases",
          "source_url": "https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm",
          "confidence": "high"
        }
      ],
      "next_action": "Search the serving utility, North Dakota regulatory records, MISO/SPP-relevant records and site permitting sources for the electrical service/interconnection record associated with the leased compute capacity."
    },
    {
      "id": "EPOCH-4b5df4f52274f2ba",
      "site_name": "Meta Sarpy",
      "country": "United States",
      "address": "14436-14998 Fairview Rd, Springfield, NE 68059, USA",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 80,
      "current_h100_equivalents": 91965.63921172309,
      "grid_jurisdiction": "SPP",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://opsportal.spp.org/Studies/GIActive",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-sarpy",
      "precision": "state centroid derived from public address",
      "lat": 41.5,
      "lon": -99.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Omaha Public Power District",
          "record_name": "Meta Sarpy serving-utility relationship",
          "source_url": "https://registry.deploy.report/datacenters/facilities/meta-nebraska-sarpy",
          "confidence": "medium"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "country": "China",
      "address": "Huawei, Horinger, China",
      "owner": "Huawei #confident",
      "users": "",
      "current_power_mw": 184.3,
      "current_h100_equivalents": 89439.11066195049,
      "grid_jurisdiction": "China State Grid / provincial grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger",
      "precision": "country centroid",
      "lat": 35.8617,
      "lon": 104.1954,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-2d362a1adb09fddd",
      "site_name": "CoreWeave Chester VA",
      "country": "United States",
      "address": "1401 Meadowville Technology Parkway, Chester, VA",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 82,
      "current_h100_equivalents": 88428.49924204143,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-chester-va",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-ea5d1ae5837aba5c",
      "site_name": "Oracle Batam",
      "country": "Indonesia",
      "address": "",
      "owner": "Oracle #likely",
      "users": "",
      "current_power_mw": 72,
      "current_h100_equivalents": 84386.05356240526,
      "grid_jurisdiction": "PLN grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/oracle-batam",
      "precision": "country centroid",
      "lat": -0.7893,
      "lon": 113.9213,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-03aad260b30bfbe1",
      "site_name": "AWS Berwick",
      "country": "United States",
      "address": "1125 Electron Ave, Berwick, PA 18603",
      "owner": "Amazon #confident",
      "users": "Anthropic #speculative",
      "current_power_mw": 108,
      "current_h100_equivalents": 81354.21930267812,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/aws-berwick",
      "precision": "state centroid derived from public address",
      "lat": 40.9,
      "lon": -77.8,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-eb87487504bda8ed",
      "site_name": "CoreWeave Marble NC",
      "country": "United States",
      "address": "155 Palmer Ln, Marble, NC 28905",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 65,
      "current_h100_equivalents": 78827.6907529055,
      "grid_jurisdiction": "SERC / North Carolina transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/nc/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-marble-nc",
      "precision": "state centroid derived from public address",
      "lat": 35.5,
      "lon": -79.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_service",
          "authority": "Murphy Electric Power Board / Duke Energy",
          "record_name": "Marble data-center utility supply",
          "source_url": "https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-7d9b5af0cce16f1c",
      "site_name": "Meta Aiken",
      "country": "United States",
      "address": "7601 State Hwy 105, Trenton, SC 29847, USA",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 69,
      "current_h100_equivalents": 78322.38504295099,
      "grid_jurisdiction": "SERC / South Carolina transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/sc/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-aiken",
      "precision": "state centroid derived from public address",
      "lat": 33.8,
      "lon": -80.9,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Aiken Electric Cooperative",
          "record_name": "Meta Aiken serving-utility relationship",
          "source_url": "https://suedatacenters.org/data-centers/meta-aiken-county-sc",
          "confidence": "medium"
        }
      ],
      "next_action": "Search the named utility/PUC/grid operator records for the exact service, interconnection, contract, or case identifier; retain additional sources without upgrading to a queue ID unless the site match is defensible."
    },
    {
      "id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "country": "China",
      "address": "Wuhu, China",
      "owner": "Huawei #confident",
      "users": "",
      "current_power_mw": 157,
      "current_h100_equivalents": 76326.42748863062,
      "grid_jurisdiction": "China State Grid / provincial grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu",
      "precision": "country centroid",
      "lat": 35.8617,
      "lon": 104.1954,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "country": "United States",
      "address": "7725 Lake Rd, Barker, NY 14012",
      "owner": "Core42 #confident",
      "users": "G42 #likely",
      "current_power_mw": 58,
      "current_h100_equivalents": 71753.4108135422,
      "grid_jurisdiction": "NYISO",
      "grid_status": "site_specific_queue_verified",
      "site_queue_id": "1670",
      "site_queue_name": "Lake Mariner Data II",
      "grid_evidence_url": "https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner",
      "precision": "state centroid derived from public address",
      "lat": 42.9,
      "lon": -75.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_queue",
          "authority": "NYISO",
          "record_name": "Lake Mariner Data II",
          "source_url": "https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "country": "United States",
      "address": "15000 Lambda Drive, San Antonio, TX 78245",
      "owner": "Microsoft #confident",
      "users": "",
      "current_power_mw": 75,
      "current_h100_equivalents": 64679.13087417888,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/sat40-data-center-c8935e71",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-sat40",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-c89a3269719f868a",
      "site_name": "STACK Infrastructure NVA02",
      "country": "United States",
      "address": "9590 Hornbaker Rd, Manassas, VA 20109",
      "owner": "",
      "users": "",
      "current_power_mw": 85,
      "current_h100_equivalents": 61141.99090449722,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/stack-infrastructure-nva02",
      "precision": "state centroid derived from public address",
      "lat": 37.5,
      "lon": -78.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_service",
          "authority": "NOVEC",
          "record_name": "NVA02 dedicated substations",
          "source_url": "https://www.stackinfra.com/locations/americas/northern-virginia/nva02/",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-29fb769630142638",
      "site_name": "Anthropic Lake Mariner",
      "country": "United States",
      "address": "7725 Lake Rd, Barker, NY 14012",
      "owner": "AI XPV Platform #confident",
      "users": "Anthropic #likely",
      "current_power_mw": 42,
      "current_h100_equivalents": 58564.93178372915,
      "grid_jurisdiction": "NYISO",
      "grid_status": "site_specific_queue_verified",
      "site_queue_id": "1670",
      "site_queue_name": "Lake Mariner Data II",
      "grid_evidence_url": "https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/anthropic-lake-mariner",
      "precision": "state centroid derived from public address",
      "lat": 42.9,
      "lon": -75.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_queue",
          "authority": "NYISO",
          "record_name": "Lake Mariner Data II",
          "source_url": "https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-781cbfae186209ad",
      "site_name": "Microsoft-Nebius New Jersey",
      "country": "United States",
      "address": "3963 S Lincoln Ave, Vineland, New Jersey",
      "owner": "Nebius #confident",
      "users": "Microsoft #likely",
      "current_power_mw": 50,
      "current_h100_equivalents": 56846.89236988378,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-nebius-new-jersey",
      "precision": "state centroid derived from public address",
      "lat": 40.2,
      "lon": -74.7,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-f48a533b01898dfd",
      "site_name": "CoreWeave Norway",
      "country": "Norway",
      "address": "Stølevegen 39, 4715 Øvrebø, Norway",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 42,
      "current_h100_equivalents": 50773.11773623042,
      "grid_jurisdiction": "Statnett + local distribution network connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-norway",
      "precision": "country centroid",
      "lat": 60.472,
      "lon": 8.4689,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-41dea3fb46d2e6a8",
      "site_name": "Nebius Mantsala",
      "country": "Finland",
      "address": "",
      "owner": "Nebius #confident",
      "users": "Microsoft #speculative",
      "current_power_mw": 75,
      "current_h100_equivalents": 48527.92066700354,
      "grid_jurisdiction": "Fingrid + local distribution network connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/nebius-mantsala",
      "precision": "country centroid",
      "lat": 61.9241,
      "lon": 25.7482,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-827d7832237170bd",
      "site_name": "Southgate Melbourne",
      "country": "Australia",
      "address": "",
      "owner": "Firmus #confident",
      "users": "",
      "current_power_mw": 41,
      "current_h100_equivalents": 46488.12531581607,
      "grid_jurisdiction": "AEMO + local network service provider connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/southgate-melbourne",
      "precision": "country centroid",
      "lat": -25.2744,
      "lon": 133.7751,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-ee5c7acdbc729ef8",
      "site_name": "Stream Phoenix",
      "country": "United States",
      "address": "2950 S. Litchfield Road",
      "owner": "",
      "users": "",
      "current_power_mw": 64,
      "current_h100_equivalents": 46134.4113188479,
      "grid_jurisdiction": "WECC / Arizona serving utilities (APS / SRP)",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/az/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/stream-phoenix",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-0355f445ca6cbed4",
      "site_name": "Microsoft SAT14",
      "country": "United States",
      "address": "3545 Wiseman Boulevard, San Antonio, TX 78251",
      "owner": "Microsoft #confident",
      "users": "",
      "current_power_mw": 47,
      "current_h100_equivalents": 45174.33046993431,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/sat14-data-center-2db58790",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-sat14",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-96d37578ca36f86c",
      "site_name": "Vantage TX1",
      "country": "United States",
      "address": "14720 Omicron Dr, San Antonio, TX 78245",
      "owner": "",
      "users": "",
      "current_power_mw": 32,
      "current_h100_equivalents": 38706.417382516425,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/tx11-187661c6",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/vantage-tx1",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_project_record",
          "authority": "Texas Department of Licensing and Regulation",
          "record_name": "Vantage TX11 / TX1 project",
          "source_url": "https://www.tdlr.texas.gov/",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-8696ef81d91560a9",
      "site_name": "CoreWeave Dalton 1 & 2",
      "country": "United States",
      "address": "2205 Industrial South Rd, Dalton, GA, 30721",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 28,
      "current_h100_equivalents": 32238.504295098533,
      "grid_jurisdiction": "SERC / Georgia transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/ga/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-dalton-1-2",
      "precision": "state centroid derived from public address",
      "lat": 32.7,
      "lon": -83.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_service_contract",
          "authority": "Dalton Utilities",
          "record_name": "DU electric service agreement / Dalton Campuses",
          "source_url": "https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "country": "China",
      "address": "Alibaba Zhangbei Yun Calculation Data Center, Zhangbei County, Zhangjiakou, Hebei, China, 076471",
      "owner": "Alibaba #confident",
      "users": "Alibaba #likely",
      "current_power_mw": 169,
      "current_h100_equivalents": 31884.79029813037,
      "grid_jurisdiction": "China State Grid / provincial grid connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei",
      "precision": "country centroid",
      "lat": 35.8617,
      "lon": 104.1954,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "country": "Portugal",
      "address": "Start Campus - Sustainable Data Center Services, Sines, Portugal",
      "owner": "Nscale #confident",
      "users": "Microsoft #confident",
      "current_power_mw": 33,
      "current_h100_equivalents": 31834.259727134915,
      "grid_jurisdiction": "REN + local network connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/start-campus-sines-data-campus",
      "precision": "country centroid",
      "lat": 39.3999,
      "lon": -8.2245,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-495a9afde5e4b96c",
      "site_name": "xAI QTS Atlanta",
      "country": "United States",
      "address": "1025 Jefferson Street NW, Atlanta, GA 30318",
      "owner": "SpaceXAI #confident",
      "users": "SpaceXAI #confident",
      "current_power_mw": 17.32971,
      "current_h100_equivalents": 11470.43961596766,
      "grid_jurisdiction": "SERC / Georgia transmission providers",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/ga/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/xai-qts-atlanta",
      "precision": "state centroid derived from public address",
      "lat": 32.7,
      "lon": -83.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-f1a70be0079d215a",
      "site_name": "Nscale Keflavik",
      "country": "Iceland",
      "address": "Valhallarbraut 868, 262 Reykjanesbær, Iceland",
      "owner": "Nscale #confident",
      "users": "",
      "current_power_mw": 5.11,
      "current_h100_equivalents": 5821.121778676099,
      "grid_jurisdiction": "Landsnet + local distribution network connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/nscale-keflavik",
      "precision": "country centroid",
      "lat": 64.9631,
      "lon": -19.0208,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "country": "United States",
      "address": "",
      "owner": "Cipher Mining #confident",
      "users": "Anthropic #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.ercot.com/services/rq/large-load-integration",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-7648e1438308fdae",
      "site_name": "CoreWeave Lancaster Greenfield site",
      "country": "United States",
      "address": "216 Greenfield Rd, Lancaster, PA \n",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-lancaster-greenfield-site",
      "precision": "state centroid derived from public address",
      "lat": 40.9,
      "lon": -77.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_facility_utility_evidence",
          "authority": "PPL Electric",
          "record_name": "CoreWeave Lancaster data center",
          "source_url": "https://registry.deploy.report/datacenters/facilities/coreweave-lancaster-pa",
          "confidence": "medium"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-65e758d676dc06d6",
      "site_name": "CoreWeave Muskogee OK",
      "country": "United States",
      "address": "1525 W 43rd St S, Muskogee, OK 74401, USA",
      "owner": "CoreWeave #confident",
      "users": "OpenAI #speculative",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "SPP",
      "grid_status": "public_service_contract_verified",
      "site_queue_id": null,
      "site_queue_name": "OG&E electric service agreement",
      "grid_evidence_url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001193125-26-165121/d149019dex992.htm",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/coreweave-muskogee-ok",
      "precision": "state centroid derived from public address",
      "lat": 35.6,
      "lon": -97.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_service_contract",
          "authority": "OG&E",
          "record_name": "OG&E electric service agreement",
          "source_url": "https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-4569f5444951b2fd",
      "site_name": "Crusoe Abilene Expansion",
      "country": "United States",
      "address": "5502 Spinks Rd, Abilene, TX 79601",
      "owner": "Microsoft #confident",
      "users": "Microsoft #likely",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.ercot.com/services/rq/large-load-integration",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/crusoe-abilene-expansion",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-dadec9d6ef7fca88",
      "site_name": "EcoDataCenter 2",
      "country": "Sweden",
      "address": "Kvarnsvedsvägen 420, 784 66 Borlänge, Sweden",
      "owner": "Mistral AI #confident",
      "users": "Mistral AI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "Svenska kraftnät + local distribution network connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/ecodatacenter-2",
      "precision": "country centroid",
      "lat": 60.1282,
      "lon": 18.6435,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-bbf05f2d8903eccc",
      "site_name": "Goodnight",
      "country": "United States",
      "address": "10001 Lima Rd, Claude, TX 79019",
      "owner": "Google #speculative",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.gridtracker.io/example-report",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/goodnight",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_regulatory_support",
          "authority": "Texas Commission on Environmental Quality",
          "record_name": "Goodnight Data Center permit",
          "source_url": "https://www.tceq.texas.gov/",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-2d6a8403fde79650",
      "site_name": "Google Cedar Rapids",
      "country": "United States",
      "address": "5800 EDGEWOOD RD SW CEDAR RAPIDS, IA 52404",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/google-cedar-rapids-fa5365cb",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-cedar-rapids",
      "precision": "state centroid derived from public address",
      "lat": 42.1,
      "lon": -93.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Alliant Energy",
          "record_name": "Google Big Cedar data-center project",
          "source_url": "https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-f340a33a5ef18d4f",
      "site_name": "Google Fort Wayne",
      "country": "United States",
      "address": "6015 Adams Center Road, Fort Wayne, IN 46806",
      "owner": "Google #confident",
      "users": "Google DeepMind #speculative",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.indianamichiganpower.com/company/news/view?releaseID=10359",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/google-fort-wayne",
      "precision": "state centroid derived from public address",
      "lat": 39.9,
      "lon": -86.3,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_regulatory",
          "authority": "Indiana Michigan Power / Indiana Utility Regulatory Commission",
          "record_name": "Google Fort Wayne energization",
          "source_url": "https://datacenterdata.io/insights/updates/u/b721b76c4739/",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-177c53f92d72ec4a",
      "site_name": "Meta Bowling Green",
      "country": "United States",
      "address": "12356 Middleton Pike, Bowling Green, OH 43402",
      "owner": "Meta",
      "users": "Meta",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://registry.deploy.report/datacenters/facilities/meta-ohio-bowling-green",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-bowling-green",
      "precision": "state centroid derived from public address",
      "lat": 40.4,
      "lon": -82.8,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Toledo Edison",
          "record_name": "Meta Bowling Green energy planning",
          "source_url": "https://datacenters.atmeta.com/2025/04/hello-bowling-green/",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "country": "United States",
      "address": "Holly Ridge, LA 71269",
      "owner": "Meta #confident",
      "users": "Meta #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/meta-hyperion",
      "precision": "state centroid derived from public address",
      "lat": 31,
      "lon": -92,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_regulatory",
          "authority": "Louisiana Public Service Commission / Entergy Louisiana",
          "record_name": "Large-load service proceedings for Meta Hyperion",
          "source_url": "https://www.lpsc.louisiana.gov/",
          "confidence": "medium"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "country": "Norway",
      "address": "",
      "owner": "Nscale #likely",
      "users": "Microsoft #likely",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "Statnett + local distribution network connections",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-narvik-norway",
      "precision": "country centroid",
      "lat": 60.472,
      "lon": 8.4689,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-dc6199921ba82b85",
      "site_name": "OpenAI Stargate Lordstown",
      "country": "United States",
      "address": "2300 Hallock Young Rd, Warren, OH 44481",
      "owner": "Softbank #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "PJM",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.pjm.com/planning/service-requests",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-lordstown",
      "precision": "state centroid derived from public address",
      "lat": 40.4,
      "lon": -82.8,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "country": "United States",
      "address": "",
      "owner": "Oracle #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "MISO",
      "grid_status": "public_service_contract_verified",
      "site_queue_id": null,
      "site_queue_name": "DTE special-contract / Stargate Michigan",
      "grid_evidence_url": "https://www.michigan.gov/som/data-centers",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-michigan",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_regulatory",
          "authority": "Michigan Public Service Commission / DTE Electric",
          "record_name": "DTE special-contract approval / Stargate Michigan",
          "source_url": "https://www.michigan.gov/som/data-centers",
          "confidence": "high"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "country": "United States",
      "address": "",
      "owner": "Softbank #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.ercot.com/services/rq/large-load-integration",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-milam",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "country": "United States",
      "address": "",
      "owner": "Oracle #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "WECC / PNM and other New Mexico serving utilities",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/nm/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-new-mexico",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-b427a75f62d61aae",
      "site_name": "OpenAI Stargate Shackelford",
      "country": "United States",
      "address": "175 Private Road 1604, Abilene, TX 79601, Shackelford County",
      "owner": "Oracle #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "ERCOT",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/openai-stargate-shackelford-4a71e560",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-shackelford",
      "precision": "state centroid derived from public address",
      "lat": 31.1,
      "lon": -99.4,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "country": "United Arab Emirates",
      "address": "Nexus L&T Project Office, Al Bihouth, Al Dhafrah, Abu Dhabi, United Arab Emirates",
      "owner": "G42 #likely",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "UAE transmission / local distribution connection process",
      "grid_status": "country_connection_system_mapped",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": null,
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-uae",
      "precision": "country centroid",
      "lat": 23.4241,
      "lon": 53.8478,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search national/transmission/distribution connection registers and regulator records."
    },
    {
      "id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "country": "United States",
      "address": "",
      "owner": "Oracle #confident",
      "users": "OpenAI #confident",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.misoenergy.org/api/giqueue/getprojects",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin",
      "precision": "country centroid",
      "lat": 39.8,
      "lon": -98.6,
      "site_level_evidence_status": "pending_site_specific_search",
      "site_level_evidence_count": 0,
      "site_level_evidence": [],
      "next_action": "Search primary RTO/ISO queue, utility large-load/service records, state PUC/PSC dockets, FERC and local records."
    },
    {
      "id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "country": "United States",
      "address": "6200 76th Ave SW, Fairfax, IA 52228",
      "owner": "",
      "users": "",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "MISO",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://www.interconnection.fyi/data-center/project/qts-cedar-rapids-1855c841",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/qts-cedar-rapids",
      "precision": "state centroid derived from public address",
      "lat": 42.1,
      "lon": -93.5,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 2,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Alliant Energy",
          "record_name": "QTS Cedar Rapids / Big Cedar campus",
          "source_url": "https://www.alliantenergy.com/news/news-center/2025/02/021225-qtsannouncementcr",
          "confidence": "high"
        },
        {
          "type": "site_specific_load_request",
          "authority": "MISO",
          "record_name": "SNA LLC Cedar Rapids new-load announcement",
          "source_url": "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf",
          "confidence": "medium"
        }
      ],
      "next_action": "Retain source-specific evidence; continue searching for a formal queue/case ID where the current evidence is a service/planning/regulatory record."
    },
    {
      "id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "country": "United States",
      "address": "652 E Hyperscale Way, Eagle Mountain, UT 84013",
      "owner": "",
      "users": "Meta #speculative",
      "current_power_mw": 0,
      "current_h100_equivalents": 0,
      "grid_jurisdiction": "WECC / Utah serving utility",
      "grid_status": "queue_jurisdiction_mapped_site_id_not_yet_verified",
      "site_queue_id": null,
      "site_queue_name": null,
      "grid_evidence_url": "https://wattstreet.net/state/ut/",
      "epoch_source_url": "https://epoch.ai/data/ai-data-centers/directory/qts-eagle-mountain",
      "precision": "state centroid derived from public address",
      "lat": 39.3,
      "lon": -111.7,
      "site_level_evidence_status": "evidence_found",
      "site_level_evidence_count": 1,
      "site_level_evidence": [
        {
          "type": "site_specific_utility_relationship",
          "authority": "Rocky Mountain Power",
          "record_name": "QTS Eagle Mountain serving-utility relationship",
          "source_url": "https://registry.deploy.report/datacenters/facilities/qts-eagle-mountain-eagle-mountain-ut",
          "confidence": "medium"
        }
      ],
      "next_action": "Search the serving utility and state/local regulatory records for the exact service/interconnection identifier, contract, substation and capacity record."
    }
  ],
  "evidence_crosswalk_source": "data/external/epoch_ai/site_level_connection_evidence.json"
}