  "schema_version": 1,
  "generated_on": "2026-09-28",
  "title": "BPA Large-Load Request Registry — normalized official workbook layer",
  "purpose": "Non-additive normalization of BPA Line/Load interconnection request records. Requested MW remain requests-as-filed; existing display geometry is preserved only by matching BPA request ID.",
  "threshold_mw": 100,
  "additive_to_core": false,
  "source": {
    "id": "BPA-LARGE-LOAD",
    "name": "BPA Line/Load Interconnection Request Queue",
    "official_source_url": "https://www.bpa.gov/energy-and-services/transmission/interconnection",
    "official_workbook_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
    "secondary_source_urls": [
      "https://substationscout.com/large-load-registry/",
      "https://www.wattstreet.net/load-ledger/"
    ],
    "source_authority": "official BPA workbook with secondary reproductions retained for corroboration",
    "official_publisher": "Bonneville Power Administration",
    "source_capture_dates": [
      "2026-09-28"
    ],
    "raw_official_snapshot_retained": false,
    "raw_official_snapshot_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
    "raw_official_snapshot_bytes": 228486,
    "raw_source_semantics": "The official workbook linked by BPA is fetched at refresh time. The binary is not committed; SHA-256 is retained to fingerprint the exact downloaded source.",
    "source_population_accounting": {
      "source_last_updated": "2026-09-28",
      "raw_l_series_rows_on_record": 457,
      "eligible_rows_at_threshold_mw": 128,
      "threshold_mw": 100,
      "requests_on_record_at_source": 128,
      "live_requests_at_source_computed": 81,
      "repository_retained_records": 128,
      "repository_retained_live_rows": 81,
      "repository_retained_mapped_rows": 25,
      "coverage_statement": "The official workbook exposed 457 L-series rows; this dedicated large-load layer retains only rows with filed load MW >= 100. It is not presented as a data-center-only population because BPA does not publish a reliable end-use classification."
    }
  },
  "record_count": 128,
  "mapped_record_count": 25,
  "unmapped_record_count": 103,
  "records": [
    {
      "id": "BPA-L0705",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Open Range",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Adams",
      "county_or_zone": "Adams",
      "queue_id": "L0705",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 3300,
          "unit": "MW",
          "raw_value": "3300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.99,
        -117.16
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Lower Monumental-Hanford No 1\nLower Monumental-Ashe No 1\nGrand Coulee-Hanford No 1",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 9,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0705",
          "request_date": "2026-08-06 08:31:00",
          "project_name": "Open Range",
          "requestor": "Big Bend Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Adams",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2030-01-31 00:00:00",
          "agreed_to_blank_tbd": "2030-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 3300,
          "max_winter_interconnection_service_mw": 3300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 3300,
          "nameplate_mw_total": 3300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Lower Monumental-Hanford No 1\nLower Monumental-Ashe No 1\nGrand Coulee-Hanford No 1"
        }
      }
    },
    {
      "id": "BPA-L0673",
      "evidence_type": "official_large_load_request_record",
      "project_name": "DOE Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0673",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 2750,
          "unit": "MW",
          "raw_value": "2750",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ashe 500 kV Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 54,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0673",
          "request_date": "2025-11-12 14:30:38.133000",
          "project_name": "DOE Data Center",
          "requestor": "US Department of Energy - Hanford Field Office",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-11-01 00:00:00",
          "agreed_to_blank_tbd": "2027-11-01 00:00:00",
          "max_summer_interconnection_service_mw": 2750,
          "max_winter_interconnection_service_mw": 2750,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 2750,
          "nameplate_mw_total": 2750,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ashe 500 kV Substation"
        }
      }
    },
    {
      "id": "BPA-L0653",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Longhorn-McNary 230 kV Loop",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Umatilla and Morrow",
      "county_or_zone": "Umatilla and Morrow",
      "queue_id": "L0653",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 2225,
          "unit": "MW",
          "raw_value": "2225",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.57,
        -118.92
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longhorn Substation, McNary Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 84,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0653",
          "request_date": "2025-06-02 11:56:00",
          "project_name": "Longhorn-McNary 230 kV Loop",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "county": "Umatilla and Morrow",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-06-03 00:00:00",
          "agreed_to_blank_tbd": "2028-06-03 00:00:00",
          "max_summer_interconnection_service_mw": 2225,
          "max_winter_interconnection_service_mw": 2225,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 2225,
          "nameplate_mw_total": 2225,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longhorn Substation, McNary Substation"
        }
      }
    },
    {
      "id": "BPA-L0561",
      "evidence_type": "official_large_load_request_record",
      "project_name": "NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Washington, OR",
      "county_or_zone": "Washington",
      "queue_id": "L0561",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1800",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.55,
        -123.1
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Allston-Keeler No. 1 500kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 387,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0561",
          "request_date": "2023-05-12 08:49:00",
          "project_name": "NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)",
          "requestor": "Portland General Electric Company",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Washington",
          "status": "STUDY",
          "original_requested_in_service_date": "2032-12-31 00:00:00",
          "agreed_to_blank_tbd": "2027-05-22 00:00:00",
          "max_summer_interconnection_service_mw": 1800,
          "max_winter_interconnection_service_mw": 1800,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1800,
          "nameplate_mw_total": 1800,
          "reason_not_completed": ".",
          "point_of_interconnection": "Allston-Keeler No. 1 500kV"
        }
      }
    },
    {
      "id": "BPA-L0221",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Pacific West Coast Cable",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Columbia, OR",
      "county_or_zone": "Columbia",
      "queue_id": "L0221",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1600,
          "unit": "MW",
          "raw_value": "1600",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Allston 500 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1310,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0221",
          "request_date": "2005-11-01 00:00:00",
          "project_name": "Pacific West Coast Cable",
          "requestor": "Sea Breeze Pacific West Coast Cable LP",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Columbia",
          "comments": "Sea Breeze Pacific West Coast Cable, LP - failed to execute Facility Study",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2007-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 1600,
          "max_winter_interconnection_service_mw": 1600,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 0,
          "nameplate_mw_total": 0,
          "reason_not_completed": ".",
          "point_of_interconnection": "Allston 500 kV"
        }
      }
    },
    {
      "id": "BPA-L0555",
      "evidence_type": "official_large_load_request_record",
      "project_name": "CAC Green H2 Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Columbia, WA",
      "county_or_zone": "Columbia",
      "queue_id": "L0555",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1600,
          "unit": "MW",
          "raw_value": "1600",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Allston Substation or St Johns Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 405,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0555",
          "request_date": "2023-03-28 13:42:00",
          "project_name": "CAC Green H2 Facility",
          "requestor": "Columbia River People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Columbia",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2030-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 1600,
          "max_winter_interconnection_service_mw": 1600,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1600,
          "nameplate_mw_total": 1600,
          "reason_not_completed": ".",
          "point_of_interconnection": "Allston Substation or St Johns Substation"
        }
      }
    },
    {
      "id": "BPA-L0585",
      "evidence_type": "official_large_load_request_record",
      "project_name": "McNary 230 kV Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Linn, OR",
      "county_or_zone": "Linn",
      "queue_id": "L0585",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1450,
          "unit": "MW",
          "raw_value": "1450",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        44.5,
        -122.5
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 231,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0585",
          "request_date": "2023-11-08 15:37:00",
          "project_name": "McNary 230 kV Substation",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Linn",
          "status": "STUDY",
          "original_requested_in_service_date": "2030-01-31 00:00:00",
          "agreed_to_blank_tbd": "2028-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 1450,
          "max_winter_interconnection_service_mw": 1450,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1450,
          "nameplate_mw_total": 1450,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary Substation"
        }
      }
    },
    {
      "id": "BPA-L0560",
      "evidence_type": "official_large_load_request_record",
      "project_name": "West Hillsboro Data Center Project (Phase 1)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Washington, OR",
      "county_or_zone": "Washington",
      "queue_id": "L0560",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1400",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.55,
        -123.1
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Keeler-Forest Grove No. 1 & No. 2 115kV Lines",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 386,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0560",
          "request_date": "2023-05-12 08:49:00",
          "project_name": "West Hillsboro Data Center Project (Phase 1)",
          "requestor": "Portland General Electric Company",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Washington",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-12-31 00:00:00",
          "agreed_to_blank_tbd": "2026-05-22 00:00:00",
          "max_summer_interconnection_service_mw": 1400,
          "max_winter_interconnection_service_mw": 1400,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1400,
          "nameplate_mw_total": 1400,
          "reason_not_completed": ".",
          "point_of_interconnection": "Keeler-Forest Grove No. 1 & No. 2 115kV Lines"
        }
      }
    },
    {
      "id": "BPA-L0690",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Lakeside Industries",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Klickitat, WA",
      "county_or_zone": "Klickitat",
      "queue_id": "L0690",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1260,
          "unit": "MW",
          "raw_value": "1260",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Big Eddy Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 29,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0690",
          "request_date": "2026-03-10 00:00:00",
          "project_name": "Lakeside Industries",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Klickitat",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2026-12-01 00:00:00",
          "agreed_to_blank_tbd": "2026-12-01 00:00:00",
          "max_summer_interconnection_service_mw": 1260,
          "max_winter_interconnection_service_mw": 1260,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1260,
          "nameplate_mw_total": 1260,
          "reason_not_completed": ".",
          "point_of_interconnection": "Big Eddy Substation"
        }
      }
    },
    {
      "id": "BPA-L0636",
      "evidence_type": "official_large_load_request_record",
      "project_name": "McNary 230 kV Looped",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Umatilla",
      "county_or_zone": "Umatilla",
      "queue_id": "L0636",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1256,
          "unit": "MW",
          "raw_value": "1256",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.59,
        -118.33
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 106,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0636",
          "request_date": "2024-11-21 10:47:00",
          "project_name": "McNary 230 kV Looped",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "county": "Umatilla",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-11-21 00:00:00",
          "agreed_to_blank_tbd": "2027-11-21 00:00:00",
          "max_summer_interconnection_service_mw": 1256,
          "max_winter_interconnection_service_mw": 1256,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1256,
          "nameplate_mw_total": 1256,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary Substation"
        }
      }
    },
    {
      "id": "BPA-L0649",
      "evidence_type": "official_large_load_request_record",
      "project_name": "1200 MW Data Center Loads",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Walla Walla",
      "county_or_zone": "Walla Walla",
      "queue_id": "L0649",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.23,
        -118.48
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Between #37/1 & 32/1 on the Lower Monumental-McNary 500kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 89,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0649",
          "request_date": "2025-04-03 16:46:00",
          "project_name": "1200 MW Data Center Loads",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "county": "Walla Walla",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-04-07 00:00:00",
          "agreed_to_blank_tbd": "2028-04-07 00:00:00",
          "max_summer_interconnection_service_mw": 1200,
          "max_winter_interconnection_service_mw": 1200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1200,
          "nameplate_mw_total": 1200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Between #37/1 & 32/1 on the Lower Monumental-McNary 500kV line"
        }
      }
    },
    {
      "id": "BPA-L0682",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Second 1200 MW Data Center Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Walla Walla",
      "county_or_zone": "Walla Walla",
      "queue_id": "L0682",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.23,
        -118.48
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Lower Monumental-McNary No. 1 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 42,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0682",
          "request_date": "2026-01-15 07:33:00",
          "project_name": "Second 1200 MW Data Center Load",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "county": "Walla Walla",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2029-01-15 00:00:00",
          "agreed_to_blank_tbd": "2029-01-15 00:00:00",
          "max_summer_interconnection_service_mw": 1200,
          "max_winter_interconnection_service_mw": 1200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1200,
          "nameplate_mw_total": 1200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Lower Monumental-McNary No. 1 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0684",
      "evidence_type": "official_large_load_request_record",
      "project_name": "SSP-Sunset",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Yakima",
      "county_or_zone": "Yakima",
      "queue_id": "L0684",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.46,
        -120.74
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Wautoma-Rock Creek No. 1 500 kV line or Spring Creek-Wine Country No. 1 230 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 37,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0684",
          "request_date": "2026-02-06 10:34:00",
          "project_name": "SSP-Sunset",
          "requestor": "Benton Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "county": "Yakima",
          "status": "STUDY",
          "original_requested_in_service_date": "2029-01-31 00:00:00",
          "agreed_to_blank_tbd": "2029-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 1200,
          "max_winter_interconnection_service_mw": 1200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1200,
          "nameplate_mw_total": 1200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Wautoma-Rock Creek No. 1 500 kV line or Spring Creek-Wine Country No. 1 230 kV line"
        }
      }
    },
    {
      "id": "BPA-L0359",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PSE Cherry Point",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Whatcom, WA",
      "county_or_zone": "Whatcom",
      "queue_id": "L0359",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1176.2,
          "unit": "MW",
          "raw_value": "1176.2",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Loop in of BPA Intalco-Custer #1 230 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 963,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0359",
          "request_date": "2013-06-05 14:05:00",
          "project_name": "PSE Cherry Point",
          "requestor": "Puget Sound Energy, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Whatcom",
          "comments": "Withdrawn by customer.",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2017-03-01 00:00:00",
          "max_summer_interconnection_service_mw": 1176.2,
          "max_winter_interconnection_service_mw": 1176.2,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1176.2,
          "nameplate_mw_total": 1176.2,
          "reason_not_completed": ".",
          "point_of_interconnection": "Loop in of BPA Intalco-Custer #1 230 kV line"
        }
      }
    },
    {
      "id": "BPA-L0396",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Industrial Load Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Morrow, OR",
      "county_or_zone": "Morrow",
      "queue_id": "L0396",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1152,
          "unit": "MW",
          "raw_value": "1152",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA McNary and/or BPA Morrow Flat",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 888,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0396",
          "request_date": "2016-02-03 09:00:00",
          "project_name": "Industrial Load Phase 2",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Morrow",
          "comments": "Withdrawn by UEC on June 30, 2016.",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2018-01-01 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1152,
          "nameplate_mw_total": 1152,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA McNary and/or BPA Morrow Flat"
        }
      }
    },
    {
      "id": "BPA-L0521",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Sixmile Canyon 500kV Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0521",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1050,
          "unit": "MW",
          "raw_value": "1050",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's proposed Longhorn Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 558,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0521",
          "request_date": "2022-03-18 11:10:54.630000",
          "project_name": "Sixmile Canyon 500kV Substation",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2026-01-02 00:00:00",
          "agreed_to_blank_tbd": "2029-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 1050,
          "max_winter_interconnection_service_mw": 1050,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1050,
          "nameplate_mw_total": 1050,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's proposed Longhorn Substation"
        }
      }
    },
    {
      "id": "BPA-L0452",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Keeler Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Washington, OR",
      "county_or_zone": "Washington",
      "queue_id": "L0452",
      "status": "CONST AGRMT EXE",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.55,
        -123.1
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Keeler Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 758,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0452",
          "request_date": "2018-09-09 18:00:00",
          "project_name": "Keeler Substation",
          "requestor": "Portland General Electric Company",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Washington",
          "status": "CONST AGRMT EXE",
          "original_requested_in_service_date": "2021-09-09 00:00:00",
          "agreed_to_blank_tbd": "2027-07-01 00:00:00",
          "max_summer_interconnection_service_mw": 1000,
          "max_winter_interconnection_service_mw": 1000,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1000,
          "nameplate_mw_total": 1000,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Keeler Substation"
        }
      }
    },
    {
      "id": "BPA-L0510",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Six Mile Canyon Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0510",
      "status": "CONST AGRMT EXE",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.65,
        -118.68
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Ashe - Slatt No.1 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 590,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0510",
          "request_date": "2021-12-02 06:35:00",
          "project_name": "Six Mile Canyon Substation",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "CONST AGRMT EXE",
          "original_requested_in_service_date": "2024-12-07 00:00:00",
          "agreed_to_blank_tbd": "2027-08-30 00:00:00",
          "max_summer_interconnection_service_mw": 1000,
          "max_winter_interconnection_service_mw": 1000,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1000,
          "nameplate_mw_total": 1000,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Ashe - Slatt No.1 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0660",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Two Rivers 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Umatilla",
      "county_or_zone": "Umatilla",
      "queue_id": "L0660",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.59,
        -118.33
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary 230 kV Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 76,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0660",
          "request_date": "2025-07-17 16:57:00",
          "project_name": "Two Rivers 230 kV",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "county": "Umatilla",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-07-18 00:00:00",
          "agreed_to_blank_tbd": "2028-07-18 00:00:00",
          "max_summer_interconnection_service_mw": 1000,
          "max_winter_interconnection_service_mw": 1000,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1000,
          "nameplate_mw_total": 1000,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary 230 kV Substation"
        }
      }
    },
    {
      "id": "BPA-L0664",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Dallesport Server Farm",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Klickitat, WA",
      "county_or_zone": "Klickitat",
      "queue_id": "L0664",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Big Eddy Substation or Big Eddy-Chenowith No. 2 230 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 66,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0664",
          "request_date": "2025-08-25 11:29:00",
          "project_name": "Dallesport Server Farm",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Klickitat",
          "status": "STUDY",
          "original_requested_in_service_date": "2029-10-01 00:00:00",
          "agreed_to_blank_tbd": "2029-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 1000,
          "max_winter_interconnection_service_mw": 1000,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1000,
          "nameplate_mw_total": 1000,
          "reason_not_completed": ".",
          "point_of_interconnection": "Big Eddy Substation or Big Eddy-Chenowith No. 2 230 kV line"
        }
      }
    },
    {
      "id": "BPA-L0702",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Energizer II",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Klickitat",
      "county_or_zone": "Klickitat",
      "queue_id": "L0702",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Rock Creek Substation at 500 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 17,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0702",
          "request_date": "2026-06-23 08:24:00",
          "project_name": "Energizer II",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "county": "Klickitat",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2030-12-31 00:00:00",
          "agreed_to_blank_tbd": "2030-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 1000,
          "max_winter_interconnection_service_mw": 1000,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1000,
          "nameplate_mw_total": 1000,
          "reason_not_completed": ".",
          "point_of_interconnection": "Rock Creek Substation at 500 kV"
        }
      }
    },
    {
      "id": "BPA-L0704",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Vines Rest 1000 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Klickitat",
      "county_or_zone": "Klickitat",
      "queue_id": "L0704",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary-John Day No. 1 500 kV line\nMcNary-John Day No. 2 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 10,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0704",
          "request_date": "2026-07-27 11:00:00",
          "project_name": "Vines Rest 1000 MW",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "county": "Klickitat",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2030-12-31 00:00:00",
          "agreed_to_blank_tbd": "2030-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 1000,
          "max_winter_interconnection_service_mw": 1000,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 1000,
          "nameplate_mw_total": 1000,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary-John Day No. 1 500 kV line\nMcNary-John Day No. 2 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0699",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Yellow Rosebush",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Wasco",
      "county_or_zone": "Wasco",
      "queue_id": "L0699",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.18,
        -121.17
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Buckley Substation or Buckley-Marion No. 1 500 kV line or Ashe-Marion No. 2 500 kV line.",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 19,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0699",
          "request_date": "2026-06-11 16:04:00",
          "project_name": "Yellow Rosebush",
          "requestor": "Wasco Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Wasco",
          "status": "STUDY",
          "original_requested_in_service_date": "2030-12-31 00:00:00",
          "agreed_to_blank_tbd": "2030-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 970,
          "max_winter_interconnection_service_mw": 970,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 970,
          "nameplate_mw_total": 970,
          "reason_not_completed": ".",
          "point_of_interconnection": "Buckley Substation or Buckley-Marion No. 1 500 kV line or Ashe-Marion No. 2 500 kV line."
        }
      }
    },
    {
      "id": "BPA-L0545",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Stack IPI Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Klickitat, WA",
      "county_or_zone": "Klickitat",
      "queue_id": "L0545",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 958,
          "unit": "MW",
          "raw_value": "958",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "RKCR-JDAY-1 or MCNY-ROSS-2 near Harvalum Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 441,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0545",
          "request_date": "2022-12-07 10:22:00",
          "project_name": "Stack IPI Data Center",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Klickitat",
          "status": "STUDY",
          "original_requested_in_service_date": "2025-12-05 00:00:00",
          "agreed_to_blank_tbd": "2030-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 958,
          "max_winter_interconnection_service_mw": 958,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 958,
          "nameplate_mw_total": 958,
          "reason_not_completed": ".",
          "point_of_interconnection": "RKCR-JDAY-1 or MCNY-ROSS-2 near Harvalum Substation"
        }
      }
    },
    {
      "id": "BPA-L0703",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Plymouth 950 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0703",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary-John Day No. 2 500 kV line or McNary-Ross No. 1 345 k\nV line or McNary-Horse Heaven No. 1 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 12,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0703",
          "request_date": "2026-07-06 14:51:00",
          "project_name": "Plymouth 950 MW",
          "requestor": "Benton Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2029-01-31 00:00:00",
          "agreed_to_blank_tbd": "2029-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 950,
          "max_winter_interconnection_service_mw": 950,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 950,
          "nameplate_mw_total": 950,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary-John Day No. 2 500 kV line or McNary-Ross No. 1 345 k\nV line or McNary-Horse Heaven No. 1 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0621",
      "evidence_type": "official_large_load_request_record",
      "project_name": "West Richland Data Center Campus",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0621",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 912,
          "unit": "MW",
          "raw_value": "912",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ashe-Slatt No 1 500 kV line; Ashe-Marion No 2 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 120,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0621",
          "request_date": "2024-09-06 15:30:00",
          "project_name": "West Richland Data Center Campus",
          "requestor": "Benton Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-03-01 00:00:00",
          "agreed_to_blank_tbd": "2028-03-01 00:00:00",
          "max_summer_interconnection_service_mw": 912,
          "max_winter_interconnection_service_mw": 912,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 912,
          "nameplate_mw_total": 912,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ashe-Slatt No 1 500 kV line; Ashe-Marion No 2 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0622",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Plymouth Data Center Campus",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0622",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 864,
          "unit": "MW",
          "raw_value": "864",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary-John Day No. 2 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 121,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0622",
          "request_date": "2024-09-06 15:30:00",
          "project_name": "Plymouth Data Center Campus",
          "requestor": "Benton Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2028-09-01 00:00:00",
          "max_summer_interconnection_service_mw": 864,
          "max_winter_interconnection_service_mw": 864,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 864,
          "nameplate_mw_total": 864,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary-John Day No. 2 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0685",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Wind River - Plymouth 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Benton",
      "county_or_zone": "Benton",
      "queue_id": "L0685",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary-John Day No. 2 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 36,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0685",
          "request_date": "2026-02-10 07:14:00",
          "project_name": "Wind River - Plymouth 230 kV",
          "requestor": "Benton Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "county": "Benton",
          "status": "STUDY",
          "original_requested_in_service_date": "2029-02-01 00:00:00",
          "agreed_to_blank_tbd": "2029-02-01 00:00:00",
          "max_summer_interconnection_service_mw": 800,
          "max_winter_interconnection_service_mw": 800,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 800,
          "nameplate_mw_total": 800,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary-John Day No. 2 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0586",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Longhorn 230 kV Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Linn, OR",
      "county_or_zone": "Linn",
      "queue_id": "L0586",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 750,
          "unit": "MW",
          "raw_value": "750",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        44.5,
        -122.5
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longhorn Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 228,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0586",
          "request_date": "2023-11-16 08:12:00",
          "project_name": "Longhorn 230 kV Substation",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Linn",
          "status": "STUDY",
          "original_requested_in_service_date": "2025-01-31 00:00:00",
          "agreed_to_blank_tbd": "2028-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 750,
          "max_winter_interconnection_service_mw": 750,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 750,
          "nameplate_mw_total": 750,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longhorn Substation"
        }
      }
    },
    {
      "id": "BPA-L0659",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Woodburn 700 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Marion",
      "county_or_zone": "Marion",
      "queue_id": "L0659",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 700,
          "unit": "MW",
          "raw_value": "700",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        44.92,
        -122.8
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Big Eddy-Chemawa No 1 230 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 77,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0659",
          "request_date": "2025-07-16 12:25:00",
          "project_name": "Woodburn 700 MW",
          "requestor": "Portland General Electric Company",
          "connection_type": "LL",
          "surplus": false,
          "county": "Marion",
          "status": "STUDY",
          "original_requested_in_service_date": "2030-07-17 00:00:00",
          "agreed_to_blank_tbd": "2030-07-17 00:00:00",
          "max_summer_interconnection_service_mw": 700,
          "max_winter_interconnection_service_mw": 700,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 700,
          "nameplate_mw_total": 700,
          "reason_not_completed": ".",
          "point_of_interconnection": "Big Eddy-Chemawa No 1 230 kV line "
        }
      }
    },
    {
      "id": "BPA-L0701",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PARS - Clatskanie",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Columbia",
      "county_or_zone": "Columbia",
      "queue_id": "L0701",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 680,
          "unit": "MW",
          "raw_value": "680",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": [
        45.98,
        -123.1
      ],
      "map_precision": "county display point",
      "map_provenance": {
        "type": "carried_forward_existing_repository_geometry",
        "source_url": "https://substationscout.com/large-load-registry/",
        "source_capture_date": "2026-09-22",
        "precision": "county display point"
      },
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "TBD",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 16,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0701",
          "request_date": "2026-06-24 13:33:00",
          "project_name": "PARS - Clatskanie ",
          "requestor": "Clatskanie People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "county": "Columbia",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2027-01-01 00:00:00",
          "agreed_to_blank_tbd": "2027-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 680,
          "max_winter_interconnection_service_mw": 680,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 680,
          "nameplate_mw_total": 680,
          "reason_not_completed": ".",
          "point_of_interconnection": "TBD"
        }
      }
    },
    {
      "id": "BPA-L0511",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Ponderay Renewable Fiber and Blockchain Center Expansion",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Pend Oreille, WA",
      "county_or_zone": "Pend Oreille",
      "queue_id": "L0511",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Usk Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 580,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0511",
          "request_date": "2022-01-04 17:21:05.620000",
          "project_name": "Ponderay Renewable Fiber and Blockchain Center Expansion",
          "requestor": "Pend Oreille County PUD No. 1",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Pend Oreille",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2024-01-02 00:00:00",
          "agreed_to_blank_tbd": "2024-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 600,
          "max_winter_interconnection_service_mw": 600,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 600,
          "nameplate_mw_total": 600,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Usk Substation"
        }
      }
    },
    {
      "id": "BPA-L0572",
      "evidence_type": "official_large_load_request_record",
      "project_name": "GLP Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0572",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary-John Day No 2 500kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 325,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0572",
          "request_date": "2023-07-27 12:36:00",
          "project_name": "GLP Data Center",
          "requestor": "Benton Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2026-02-28 00:00:00",
          "agreed_to_blank_tbd": "2026-02-28 00:00:00",
          "max_summer_interconnection_service_mw": 600,
          "max_winter_interconnection_service_mw": 600,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 600,
          "nameplate_mw_total": 600,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary-John Day No 2 500kV line"
        }
      }
    },
    {
      "id": "BPA-L0661",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Steelhead 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Morrow, OR",
      "county_or_zone": "Morrow",
      "queue_id": "L0661",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Sixmile Canyon Substation at 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 71,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0661",
          "request_date": "2025-07-31 08:37:00",
          "project_name": "Steelhead 230 kV",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Morrow",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-12-12 00:00:00",
          "agreed_to_blank_tbd": "2028-08-01 00:00:00",
          "max_summer_interconnection_service_mw": 600,
          "max_winter_interconnection_service_mw": 600,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 600,
          "nameplate_mw_total": 600,
          "reason_not_completed": ".",
          "point_of_interconnection": "Sixmile Canyon Substation at 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0679",
      "evidence_type": "official_large_load_request_record",
      "project_name": "DPUD Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Chelan, WA",
      "county_or_zone": "Chelan",
      "queue_id": "L0679",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Rocky Reach-Columbia No. 1 230 kV line or Rocky Reach-Maple Valley No. 1 345 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 48,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0679",
          "request_date": "2025-12-17 08:31:00",
          "project_name": "DPUD Data Center",
          "requestor": "Public Utility District No. 1 of Douglas County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Chelan",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2028-12-18 00:00:00",
          "agreed_to_blank_tbd": "2031-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 600,
          "max_winter_interconnection_service_mw": 600,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 600,
          "nameplate_mw_total": 600,
          "reason_not_completed": ".",
          "point_of_interconnection": "Rocky Reach-Columbia No. 1 230 kV line or Rocky Reach-Maple Valley No. 1 345 kV line"
        }
      }
    },
    {
      "id": "BPA-L0201",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Juan de Fuca HVDC (Port Angeles)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Clallam, WA",
      "county_or_zone": "Clallam",
      "queue_id": "L0201",
      "status": "STUDY COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 550,
          "unit": "MW",
          "raw_value": "550",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Port Angeles 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1323,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0201",
          "request_date": "2005-04-04 09:38:00",
          "project_name": "Juan de Fuca HVDC (Port Angeles)",
          "requestor": "Olympic Converter, LP - Don'T Use",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Clallam",
          "comments": "FAS complete.  NEPA complete.",
          "status": "STUDY COMPLETED",
          "original_requested_in_service_date": "2007-05-01 00:00:00",
          "agreed_to_blank_tbd": "2025-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 550,
          "max_winter_interconnection_service_mw": 550,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 550,
          "nameplate_mw_total": 550,
          "reason_not_completed": ".",
          "point_of_interconnection": "Port Angeles 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0202",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Juan de Fuca HVDC (Fairmount)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Jefferson, WA",
      "county_or_zone": "Jefferson",
      "queue_id": "L0202",
      "status": "STUDY COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 550,
          "unit": "MW",
          "raw_value": "550",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Fairmount 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1324,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0202",
          "request_date": "2005-04-04 09:38:00",
          "project_name": "Juan de Fuca HVDC (Fairmount)",
          "requestor": "Olympic Converter, LP - Don'T Use",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Jefferson",
          "comments": "Sea Breeze Olympic Converter, LP",
          "status": "STUDY COMPLETED",
          "original_requested_in_service_date": "2008-05-01 00:00:00",
          "agreed_to_blank_tbd": "2025-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 550,
          "max_winter_interconnection_service_mw": 550,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 550,
          "nameplate_mw_total": 550,
          "reason_not_completed": ".",
          "point_of_interconnection": "Fairmount 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0426",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Wallula 500kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Walla Walla, WA",
      "county_or_zone": "Walla Walla",
      "queue_id": "L0426",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Lower Monumental-McNary 500kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 806,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0426",
          "request_date": "2017-12-07 16:12:50.140000",
          "project_name": "Wallula 500kV",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Walla Walla",
          "comments": "Withdrawn by customer",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2020-12-07 00:00:00",
          "agreed_to_blank_tbd": "2020-12-07 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 500,
          "nameplate_mw_total": 500,
          "reason_not_completed": ".",
          "point_of_interconnection": "Lower Monumental-McNary 500kV line"
        }
      }
    },
    {
      "id": "BPA-L0482",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Morrow Flat_Longhorn",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0482",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Morrow Flat 230kV Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 671,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0482",
          "request_date": "2020-09-22 10:13:00",
          "project_name": "Morrow Flat_Longhorn",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2022-08-31 00:00:00",
          "agreed_to_blank_tbd": "2025-05-01 00:00:00",
          "max_summer_interconnection_service_mw": 500,
          "max_winter_interconnection_service_mw": 500,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 500,
          "nameplate_mw_total": 500,
          "reason_not_completed": ".",
          "point_of_interconnection": "Morrow Flat 230kV Substation"
        }
      }
    },
    {
      "id": "BPA-L0583",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Lochner Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Linn, OR",
      "county_or_zone": "Linn",
      "queue_id": "L0583",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Albany-Lebanon 115kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 264,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0583",
          "request_date": "2023-10-12 13:37:00",
          "project_name": "Lochner Substation",
          "requestor": "Consumers Power, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Linn",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2026-10-13 00:00:00",
          "agreed_to_blank_tbd": "2026-10-13 00:00:00",
          "max_summer_interconnection_service_mw": 500,
          "max_winter_interconnection_service_mw": 500,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 500,
          "nameplate_mw_total": 500,
          "reason_not_completed": ".",
          "point_of_interconnection": "Albany-Lebanon 115kV line"
        }
      }
    },
    {
      "id": "BPA-L0674",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Starbuck 500 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Columbia, WA",
      "county_or_zone": "Columbia",
      "queue_id": "L0674",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Central Ferry-Lower Monumental No. 1 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 53,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0674",
          "request_date": "2025-11-18 11:02:00",
          "project_name": "Starbuck 500 MW",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Columbia",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-11-18 00:00:00",
          "agreed_to_blank_tbd": "2028-11-18 00:00:00",
          "max_summer_interconnection_service_mw": 500,
          "max_winter_interconnection_service_mw": 500,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 500,
          "nameplate_mw_total": 500,
          "reason_not_completed": ".",
          "point_of_interconnection": "Central Ferry-Lower Monumental No. 1 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0499",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Project Pivot and Specialized",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0499",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 484,
          "unit": "MW",
          "raw_value": "484",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 627,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0499",
          "request_date": "2021-08-13 12:39:41.617000",
          "project_name": "Project Pivot and Specialized",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "STUDY",
          "original_requested_in_service_date": "2024-08-09 00:00:00",
          "agreed_to_blank_tbd": "2027-12-01 00:00:00",
          "max_summer_interconnection_service_mw": 484,
          "max_winter_interconnection_service_mw": 484,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 484,
          "nameplate_mw_total": 484,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary Substation"
        }
      }
    },
    {
      "id": "BPA-L0389",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Industrial Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Morrow, OR",
      "county_or_zone": "Morrow",
      "queue_id": "L0389",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Mcnary Substation or Morrow Flat Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 908,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0389",
          "request_date": "2015-09-21 10:00:00",
          "project_name": "Industrial Load",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Morrow",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2019-01-01 00:00:00",
          "agreed_to_blank_tbd": "2019-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 450,
          "max_winter_interconnection_service_mw": 450,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 150,
          "nameplate_mw_total": 150,
          "reason_not_completed": ".",
          "point_of_interconnection": "Mcnary Substation or Morrow Flat Substation"
        }
      }
    },
    {
      "id": "BPA-L0481",
      "evidence_type": "official_large_load_request_record",
      "project_name": "McNary 230kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0481",
      "status": "CONST AGRMT EXE",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary 230kV, Bay 28",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 672,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0481",
          "request_date": "2020-09-22 10:07:00",
          "project_name": "McNary 230kV",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "CONST AGRMT EXE",
          "original_requested_in_service_date": "2022-08-31 00:00:00",
          "agreed_to_blank_tbd": "2025-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 450,
          "max_winter_interconnection_service_mw": 450,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 450,
          "nameplate_mw_total": 450,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary 230kV, Bay 28"
        }
      }
    },
    {
      "id": "BPA-L0514",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Quantum Loophole",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0514",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 573,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0514",
          "request_date": "2022-01-27 13:22:00",
          "project_name": "Quantum Loophole",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-01-31 00:00:00",
          "agreed_to_blank_tbd": "2025-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 400,
          "max_winter_interconnection_service_mw": 400,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 400,
          "nameplate_mw_total": 400,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0594",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Hy2Gen",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0594",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 380,
          "unit": "MW",
          "raw_value": "380",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 157,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0594",
          "request_date": "2024-03-13 07:42:00",
          "project_name": "Hy2Gen",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2027-03-18 00:00:00",
          "agreed_to_blank_tbd": "2029-10-31 00:00:00",
          "max_summer_interconnection_service_mw": 380,
          "max_winter_interconnection_service_mw": 380,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 380,
          "nameplate_mw_total": 380,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0614",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Hy2Gen Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0614",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 380,
          "unit": "MW",
          "raw_value": "380",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 132,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0614",
          "request_date": "2024-06-25 17:10:00",
          "project_name": "Hy2Gen Phase 2",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2027-06-27 00:00:00",
          "agreed_to_blank_tbd": "2027-06-27 00:00:00",
          "max_summer_interconnection_service_mw": 380,
          "max_winter_interconnection_service_mw": 380,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 380,
          "nameplate_mw_total": 380,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0417",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Boundary Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Pend Oreille, WA",
      "county_or_zone": "Pend Oreille",
      "queue_id": "L0417",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 370,
          "unit": "MW",
          "raw_value": "370",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Boundary Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 824,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0417",
          "request_date": "2017-07-26 15:00:00",
          "project_name": "Boundary Substation",
          "requestor": "Teck Metals, Ltd.",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Pend Oreille",
          "status": "STUDY",
          "original_requested_in_service_date": "2020-07-26 00:00:00",
          "agreed_to_blank_tbd": "2027-03-31 00:00:00",
          "max_summer_interconnection_service_mw": 370,
          "max_winter_interconnection_service_mw": 370,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 370,
          "nameplate_mw_total": 370,
          "reason_not_completed": ".",
          "point_of_interconnection": "Boundary Substation"
        }
      }
    },
    {
      "id": "BPA-L0640",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Exeter 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Lewis",
      "county_or_zone": "Lewis",
      "queue_id": "L0640",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 360,
          "unit": "MW",
          "raw_value": "360",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Chehalis Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 101,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0640",
          "request_date": "2025-01-02 09:49:00",
          "project_name": "Exeter 230 kV",
          "requestor": "Public Utility District No. 1 of Lewis County",
          "connection_type": "LL",
          "surplus": false,
          "county": "Lewis",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2028-01-02 00:00:00",
          "agreed_to_blank_tbd": "2028-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 360,
          "max_winter_interconnection_service_mw": 360,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 360,
          "nameplate_mw_total": 360,
          "reason_not_completed": ".",
          "point_of_interconnection": "Chehalis Substation"
        }
      }
    },
    {
      "id": "BPA-L0534",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Atlas Agro",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0534",
      "status": "STUDY COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 350,
          "unit": "MW",
          "raw_value": "350",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 508,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0534",
          "request_date": "2022-08-15 09:46:00",
          "project_name": "Atlas Agro",
          "requestor": "City of Richland, Washington",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "STUDY COMPLETED",
          "original_requested_in_service_date": "2025-08-15 00:00:00",
          "agreed_to_blank_tbd": "2026-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 350,
          "max_winter_interconnection_service_mw": 350,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 350,
          "nameplate_mw_total": 350,
          "reason_not_completed": ".",
          "point_of_interconnection": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line"
        }
      }
    },
    {
      "id": "BPA-L0598",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Green Hydrogen Project",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Whatcom, WA",
      "county_or_zone": "Whatcom",
      "queue_id": "L0598",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 304,
          "unit": "MW",
          "raw_value": "304",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Intalco Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 153,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0598",
          "request_date": "2024-03-22 14:56:00",
          "project_name": "Green Hydrogen Project",
          "requestor": "Public Utility District No. 1 of Whatcom County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Whatcom",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2027-03-25 00:00:00",
          "agreed_to_blank_tbd": "2028-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 304,
          "max_winter_interconnection_service_mw": 304,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 304,
          "nameplate_mw_total": 304,
          "reason_not_completed": ".",
          "point_of_interconnection": "Intalco Substation"
        }
      }
    },
    {
      "id": "BPA-L0380",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Network Load Expansion 3",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Wasco, OR",
      "county_or_zone": "Wasco",
      "queue_id": "L0380",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Chenoweth Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 929,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0380",
          "request_date": "2014-11-20 09:00:00",
          "project_name": "Network Load Expansion 3",
          "requestor": "Northern Wasco County People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Wasco",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2018-10-01 00:00:00",
          "agreed_to_blank_tbd": "2019-06-30 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Chenoweth Substation"
        }
      }
    },
    {
      "id": "BPA-L0392",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Ponderosa Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Crook, OR",
      "county_or_zone": "Crook",
      "queue_id": "L0392",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Ponderosa Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 900,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0392",
          "request_date": "2015-12-07 10:00:00",
          "project_name": "Ponderosa Substation",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Crook",
          "comments": "Withdrawn by PacifiCorp",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2018-12-01 00:00:00",
          "agreed_to_blank_tbd": "2018-12-01 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Ponderosa Substation"
        }
      }
    },
    {
      "id": "BPA-L0433",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Network Load Expansion 4 Quenett Creek Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Wasco, OR",
      "county_or_zone": "Wasco",
      "queue_id": "L0433",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Quenett Creek Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 798,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0433",
          "request_date": "2018-02-12 17:00:00",
          "project_name": "Network Load Expansion 4 Quenett Creek Substation",
          "requestor": "Northern Wasco County People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Wasco",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2021-02-12 00:00:00",
          "agreed_to_blank_tbd": "2024-09-01 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Quenett Creek Substation"
        }
      }
    },
    {
      "id": "BPA-L0446",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Rainbow Energy",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "MT, US",
      "location": "Flathead, MT",
      "county_or_zone": "Flathead",
      "queue_id": "L0446",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Conkelley Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 772,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0446",
          "request_date": "2018-06-14 08:00:00",
          "project_name": "Rainbow Energy",
          "requestor": "Flathead Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "MT",
          "county": "Flathead",
          "comments": "Withdrawn by customer",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2018-10-31 00:00:00",
          "agreed_to_blank_tbd": "2021-06-14 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Conkelley Substation"
        }
      }
    },
    {
      "id": "BPA-L0470",
      "evidence_type": "official_large_load_request_record",
      "project_name": "New Rail Loop Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Clark, WA",
      "county_or_zone": "Clark",
      "queue_id": "L0470",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "TBD",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 709,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0470",
          "request_date": "2019-11-15 12:00:00",
          "project_name": "New Rail Loop Load",
          "requestor": "Clark Public Utilities",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Clark",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2022-11-15 00:00:00",
          "agreed_to_blank_tbd": "2022-11-15 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "TBD"
        }
      }
    },
    {
      "id": "BPA-L0477",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Cherry Point Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Whatcom, WA",
      "county_or_zone": "Whatcom",
      "queue_id": "L0477",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Either Custer 230 kV or Intalco 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 685,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0477",
          "request_date": "2020-07-03 13:37:00",
          "project_name": "Cherry Point Load",
          "requestor": "Public Utility District No. 1 of Whatcom County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Whatcom",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2024-07-06 00:00:00",
          "agreed_to_blank_tbd": "2024-07-01 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Either Custer 230 kV or Intalco 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0494",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Ponderary Renewable Fiber and Blockchain Project",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Pend Oreille, WA",
      "county_or_zone": "Pend Oreille",
      "queue_id": "L0494",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Usk Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 636,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0494",
          "request_date": "2021-07-12 09:16:02.647000",
          "project_name": "Ponderary Renewable Fiber and Blockchain Project",
          "requestor": "Pend Oreille County PUD No. 1",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Pend Oreille",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2021-09-01 00:00:00",
          "agreed_to_blank_tbd": "2021-12-15 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Usk Substation"
        }
      }
    },
    {
      "id": "BPA-L0519",
      "evidence_type": "official_large_load_request_record",
      "project_name": "L0519 Mt. Solo Industrial Project",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0519",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Longview Substation 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 563,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0519",
          "request_date": "2022-03-11 09:22:55.063000",
          "project_name": "L0519 Mt. Solo Industrial Project",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-03-07 00:00:00",
          "agreed_to_blank_tbd": "2025-03-07 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Longview Substation 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0543",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Bonanza",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Crook, OR",
      "county_or_zone": "Crook",
      "queue_id": "L0543",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ponderosa Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 444,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0543",
          "request_date": "2022-12-02 12:12:00",
          "project_name": "Bonanza ",
          "requestor": "Central Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Crook",
          "status": "STUDY",
          "original_requested_in_service_date": "2025-12-02 00:00:00",
          "agreed_to_blank_tbd": "2028-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ponderosa Substation"
        }
      }
    },
    {
      "id": "BPA-L0558",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Stearns Lane",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Washington, OR",
      "county_or_zone": "Washington",
      "queue_id": "L0558",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Green Valley Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 394,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0558",
          "request_date": "2023-04-27 08:48:00",
          "project_name": "Stearns Lane",
          "requestor": "Douglas Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Washington",
          "status": "STUDY",
          "original_requested_in_service_date": "2025-12-01 00:00:00",
          "agreed_to_blank_tbd": "2030-06-30 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Green Valley Substation"
        }
      }
    },
    {
      "id": "BPA-L0568",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Fortescue",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Lewis, WA",
      "county_or_zone": "Lewis",
      "queue_id": "L0568",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Chehalis-Covington No. 1 230 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 338,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0568",
          "request_date": "2023-07-10 08:51:00",
          "project_name": "Fortescue",
          "requestor": "Public Utility District No. 1 of Lewis County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Lewis",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2026-07-10 00:00:00",
          "agreed_to_blank_tbd": "2028-09-30 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Chehalis-Covington No. 1 230 kV line"
        }
      }
    },
    {
      "id": "BPA-L0603",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Getchell Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Snohomish, WA",
      "county_or_zone": "Snohomish",
      "queue_id": "L0603",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Snohomish-Murray 230kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 148,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0603",
          "request_date": "2024-04-10 13:11:00",
          "project_name": "Getchell Substation",
          "requestor": "Public Utility District No. 1 of Snohomish County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Snohomish",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-06-15 00:00:00",
          "agreed_to_blank_tbd": "2027-06-15 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Snohomish-Murray 230kV line"
        }
      }
    },
    {
      "id": "BPA-L0630",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Data Storage Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Walla Walla, WA",
      "county_or_zone": "Walla Walla",
      "queue_id": "L0630",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Lower Monumental-McNary No. 1 500 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 113,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0630",
          "request_date": "2024-10-02 13:01:00",
          "project_name": "Data Storage Facility",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Walla Walla",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-10-03 00:00:00",
          "agreed_to_blank_tbd": "2027-10-03 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Lower Monumental-McNary No. 1 500 kV line"
        }
      }
    },
    {
      "id": "BPA-L0647",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Atlas Agro Data Server Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0647",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 92,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0647",
          "request_date": "2025-03-18 13:57:00",
          "project_name": "Atlas Agro Data Server Facility",
          "requestor": "City of Richland, Washington",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-12-31 00:00:00",
          "agreed_to_blank_tbd": "2028-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line"
        }
      }
    },
    {
      "id": "BPA-L0650",
      "evidence_type": "official_large_load_request_record",
      "project_name": "300 MW Data Center Load Served from Grizzly",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Jefferson",
      "county_or_zone": "Jefferson",
      "queue_id": "L0650",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Grizzly Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 88,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0650",
          "request_date": "2025-04-04 11:42:00",
          "project_name": "300 MW Data Center Load Served from Grizzly",
          "requestor": "Central Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Jefferson",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-04-04 00:00:00",
          "agreed_to_blank_tbd": "2028-04-04 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Grizzly Substation"
        }
      }
    },
    {
      "id": "BPA-L0657",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Atlas Agro Data Server Facility, Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Benton, WA",
      "county_or_zone": "Benton",
      "queue_id": "L0657",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 79,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0657",
          "request_date": "2025-07-10 13:34:00",
          "project_name": "Atlas Agro Data Server Facility, Phase 2",
          "requestor": "City of Richland, Washington",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Benton",
          "status": "STUDY",
          "original_requested_in_service_date": "2032-01-02 00:00:00",
          "agreed_to_blank_tbd": "2032-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line"
        }
      }
    },
    {
      "id": "BPA-L0700",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PARS - MW&L",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Yamhill",
      "county_or_zone": "Yamhill",
      "queue_id": "L0700",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "TBD",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 18,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0700",
          "request_date": "2026-06-18 14:33:00",
          "project_name": "PARS - MW&L",
          "requestor": "The City of McMinnville, a municipal corporation of the State of Oregon, acting by and through its Water and Light Commission",
          "connection_type": "LL",
          "surplus": false,
          "county": "Yamhill",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2031-06-18 00:00:00",
          "agreed_to_blank_tbd": "2031-06-18 00:00:00",
          "max_summer_interconnection_service_mw": 300,
          "max_winter_interconnection_service_mw": 300,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 300,
          "nameplate_mw_total": 300,
          "reason_not_completed": ".",
          "point_of_interconnection": "TBD"
        }
      }
    },
    {
      "id": "BPA-L0489",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Aberdeen Biodiesel",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Grays Harbor, WA",
      "county_or_zone": "Grays Harbor",
      "queue_id": "L0489",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 275,
          "unit": "MW",
          "raw_value": "275",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Aberdeen Substation 230 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 645,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0489",
          "request_date": "2021-04-27 17:08:00",
          "project_name": "Aberdeen Biodiesel",
          "requestor": "Public Utility District No. 1 of Grays Harbor County Washington",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Grays Harbor",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-01-02 00:00:00",
          "agreed_to_blank_tbd": "2025-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 275,
          "max_winter_interconnection_service_mw": 275,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 275,
          "nameplate_mw_total": 275,
          "reason_not_completed": ".",
          "point_of_interconnection": "Aberdeen Substation 230 kV"
        }
      }
    },
    {
      "id": "BPA-L0385",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Southend Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0385",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Kalama 115kV Sub Phase 1, then Longview 230kV Sub in next phase",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 916,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0385",
          "request_date": "2015-06-05 16:00:00",
          "project_name": "Southend Load",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2018-10-01 00:00:00",
          "agreed_to_blank_tbd": "2023-10-30 00:00:00",
          "max_summer_interconnection_service_mw": 250,
          "max_winter_interconnection_service_mw": 250,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 400,
          "nameplate_mw_total": 400,
          "reason_not_completed": ".",
          "point_of_interconnection": "Kalama 115kV Sub Phase 1, then Longview 230kV Sub in next phase"
        }
      }
    },
    {
      "id": "BPA-L0397",
      "evidence_type": "official_large_load_request_record",
      "project_name": "L0397 Clatskanie PUD Allston",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Columbia, OR",
      "county_or_zone": "Columbia",
      "queue_id": "L0397",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Allston Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 882,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0397",
          "request_date": "2016-03-04 09:00:00",
          "project_name": "L0397 Clatskanie PUD Allston",
          "requestor": "Clatskanie People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Columbia",
          "comments": "Withdrawn by customer",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2020-01-01 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 250,
          "nameplate_mw_total": 250,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Allston Substation"
        }
      }
    },
    {
      "id": "BPA-L0527",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Bull Road Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Kittitas, WA",
      "county_or_zone": "Kittitas",
      "queue_id": "L0527",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ellensburg-Moxee No 1 115kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 545,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0527",
          "request_date": "2022-05-11 09:33:06.830000",
          "project_name": "Bull Road Data Center",
          "requestor": "City of Ellensburg",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Kittitas",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-05-07 00:00:00",
          "agreed_to_blank_tbd": "2025-05-07 00:00:00",
          "max_summer_interconnection_service_mw": 250,
          "max_winter_interconnection_service_mw": 250,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 250,
          "nameplate_mw_total": 250,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ellensburg-Moxee No 1 115kV line"
        }
      }
    },
    {
      "id": "BPA-L0533",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Sunbreak",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Crook, OR",
      "county_or_zone": "Crook",
      "queue_id": "L0533",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ponderosa Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 507,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0533",
          "request_date": "2022-08-15 11:47:00",
          "project_name": "Sunbreak",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Crook",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-03-31 00:00:00",
          "agreed_to_blank_tbd": "2025-08-11 00:00:00",
          "max_summer_interconnection_service_mw": 250,
          "max_winter_interconnection_service_mw": 250,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 250,
          "nameplate_mw_total": 250,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ponderosa Substation"
        }
      }
    },
    {
      "id": "BPA-L0610",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PW1 & PW2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Columbia, WA",
      "county_or_zone": "Columbia",
      "queue_id": "L0610",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Allston Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 138,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0610",
          "request_date": "2024-05-20 14:17:00",
          "project_name": "PW1 & PW2",
          "requestor": "Clatskanie People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Columbia",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-05-20 00:00:00",
          "agreed_to_blank_tbd": "2027-05-20 00:00:00",
          "max_summer_interconnection_service_mw": 250,
          "max_winter_interconnection_service_mw": 250,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 250,
          "nameplate_mw_total": 250,
          "reason_not_completed": ".",
          "point_of_interconnection": "Allston Substation"
        }
      }
    },
    {
      "id": "BPA-L0666",
      "evidence_type": "official_large_load_request_record",
      "project_name": "WA CEC Blue-Green Hydrogen Plant",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Cowlitz",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0666",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 64,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0666",
          "request_date": "2025-08-26 13:06:00",
          "project_name": "WA CEC Blue-Green Hydrogen Plant",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2028-01-01 00:00:00",
          "agreed_to_blank_tbd": "2028-08-27 00:00:00",
          "max_summer_interconnection_service_mw": 250,
          "max_winter_interconnection_service_mw": 250,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 250,
          "nameplate_mw_total": 250,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0668",
      "evidence_type": "official_large_load_request_record",
      "project_name": "ATP TES Data Server",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Benton",
      "county_or_zone": "Benton",
      "queue_id": "L0668",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Benton Substation 115 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 60,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0668",
          "request_date": "2025-10-07 09:25:00",
          "project_name": "ATP TES Data Server",
          "requestor": "City of Richland, Washington",
          "connection_type": "LL",
          "surplus": false,
          "county": "Benton",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2027-07-01 00:00:00",
          "agreed_to_blank_tbd": "2027-07-01 00:00:00",
          "max_summer_interconnection_service_mw": 250,
          "max_winter_interconnection_service_mw": 250,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 250,
          "nameplate_mw_total": 250,
          "reason_not_completed": ".",
          "point_of_interconnection": "Benton Substation 115 kV"
        }
      }
    },
    {
      "id": "BPA-L0601",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Trammel Crow Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0601",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 150,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0601",
          "request_date": "2024-04-02 12:28:00",
          "project_name": "Trammel Crow Data Center",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2024-04-03 00:00:00",
          "agreed_to_blank_tbd": "2029-10-31 00:00:00",
          "max_summer_interconnection_service_mw": 240,
          "max_winter_interconnection_service_mw": 240,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 240,
          "nameplate_mw_total": 240,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0677",
      "evidence_type": "official_large_load_request_record",
      "project_name": "TC KERR Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0677",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 50,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0677",
          "request_date": "2025-12-11 12:48:00",
          "project_name": "TC KERR Data Center",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-09-15 00:00:00",
          "agreed_to_blank_tbd": "2028-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 240,
          "max_winter_interconnection_service_mw": 240,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 240,
          "nameplate_mw_total": 240,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0693",
      "evidence_type": "official_large_load_request_record",
      "project_name": "230 kV Feed from Longview Substation to Alcoa",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz,, WA",
      "county_or_zone": "Cowlitz,",
      "queue_id": "L0693",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Cowlitz Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 26,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0693",
          "request_date": "2026-04-30 11:35:00",
          "project_name": "230 kV Feed from Longview Substation to Alcoa",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz,",
          "status": "STUDY",
          "original_requested_in_service_date": "2029-05-01 00:00:00",
          "max_summer_interconnection_service_mw": 240,
          "max_winter_interconnection_service_mw": 240,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 240,
          "nameplate_mw_total": 240,
          "reason_not_completed": ".",
          "point_of_interconnection": "Cowlitz Substation"
        }
      }
    },
    {
      "id": "BPA-L0698",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PARS - Betsy Johnson Substation (POD 4514)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Columbia",
      "county_or_zone": "Columbia",
      "queue_id": "L0698",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "TBD",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 21,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0698",
          "request_date": "2026-05-27 07:03:00",
          "project_name": "PARS - Betsy Johnson Substation (POD 4514)",
          "requestor": "Columbia River People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "county": "Columbia",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2026-05-20 00:00:00",
          "agreed_to_blank_tbd": "2026-05-20 00:00:00",
          "max_summer_interconnection_service_mw": 240,
          "max_winter_interconnection_service_mw": 240,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 240,
          "nameplate_mw_total": 240,
          "reason_not_completed": ".",
          "point_of_interconnection": "TBD"
        }
      }
    },
    {
      "id": "BPA-L0472",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Project Bald Eagle",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Clark, WA",
      "county_or_zone": "Clark",
      "queue_id": "L0472",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 230,
          "unit": "MW",
          "raw_value": "230",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA Sifton Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 704,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0472",
          "request_date": "2019-12-20 17:17:00",
          "project_name": "Project Bald Eagle",
          "requestor": "Clark Public Utilities",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Clark",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2022-11-01 00:00:00",
          "agreed_to_blank_tbd": "2022-09-01 00:00:00",
          "max_summer_interconnection_service_mw": 230,
          "max_winter_interconnection_service_mw": 230,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 230,
          "nameplate_mw_total": 230,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA Sifton Substation"
        }
      }
    },
    {
      "id": "BPA-L0351",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PDX-1 and PDX-4 Data Centers - Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Morrow, OR",
      "county_or_zone": "Morrow",
      "queue_id": "L0351",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 225,
          "unit": "MW",
          "raw_value": "225",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Morrow Flats Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 978,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0351",
          "request_date": "2012-08-03 09:00:00",
          "project_name": "PDX-1 and PDX-4 Data Centers - Phase 2",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Morrow",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2015-11-02 00:00:00",
          "agreed_to_blank_tbd": "2016-10-26 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 225,
          "nameplate_mw_total": 225,
          "reason_not_completed": ".",
          "point_of_interconnection": "Morrow Flats Substation"
        }
      }
    },
    {
      "id": "BPA-L0644",
      "evidence_type": "official_large_load_request_record",
      "project_name": "225 MW at Usk Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Pend Oreille, WA",
      "county_or_zone": "Pend Oreille",
      "queue_id": "L0644",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 225,
          "unit": "MW",
          "raw_value": "225",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Usk Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 97,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0644",
          "request_date": "2025-02-12 11:47:00",
          "project_name": "225 MW at Usk Substation",
          "requestor": "Pend Oreille County PUD No. 1",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Pend Oreille",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-02-18 00:00:00",
          "agreed_to_blank_tbd": "2028-02-18 00:00:00",
          "max_summer_interconnection_service_mw": 225,
          "max_winter_interconnection_service_mw": 225,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 225,
          "nameplate_mw_total": 225,
          "reason_not_completed": ".",
          "point_of_interconnection": "Usk Substation"
        }
      }
    },
    {
      "id": "BPA-L0422",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Project Vitesse 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Crook, OR",
      "county_or_zone": "Crook",
      "queue_id": "L0422",
      "status": "CONST AGRMT EXE",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 220,
          "unit": "MW",
          "raw_value": "220",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ponderosa 230kV Substataion",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 810,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0422",
          "request_date": "2017-11-09 17:00:00",
          "project_name": "Project Vitesse 2",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Crook",
          "status": "CONST AGRMT EXE",
          "original_requested_in_service_date": "2020-01-01 00:00:00",
          "agreed_to_blank_tbd": "2026-12-10 00:00:00",
          "max_summer_interconnection_service_mw": 220,
          "max_winter_interconnection_service_mw": 220,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 220,
          "nameplate_mw_total": 220,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ponderosa 230kV Substataion"
        }
      }
    },
    {
      "id": "BPA-L0429",
      "evidence_type": "official_large_load_request_record",
      "project_name": "HiTest 2-Furnace Plant",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Pend Oreille, WA",
      "county_or_zone": "Pend Oreille",
      "queue_id": "L0429",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 210,
          "unit": "MW",
          "raw_value": "210",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Pine Street Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 802,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0429",
          "request_date": "2017-12-20 15:02:00",
          "project_name": "HiTest 2-Furnace Plant",
          "requestor": "Pend Oreille County PUD No. 1",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Pend Oreille",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2021-01-04 00:00:00",
          "agreed_to_blank_tbd": "2021-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 210,
          "max_winter_interconnection_service_mw": 210,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 210,
          "nameplate_mw_total": 210,
          "reason_not_completed": ".",
          "point_of_interconnection": "Pine Street Substation"
        }
      }
    },
    {
      "id": "BPA-L0497",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Energizer Data Center Expanded Capacity",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Klickitat, WA",
      "county_or_zone": "Klickitat",
      "queue_id": "L0497",
      "status": "STUDY COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "KPUD Energizer Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 630,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0497",
          "request_date": "2021-07-29 09:26:03.950000",
          "project_name": "Energizer Data Center Expanded Capacity",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Klickitat",
          "status": "STUDY COMPLETED",
          "original_requested_in_service_date": "2023-07-27 00:00:00",
          "agreed_to_blank_tbd": "2027-12-30 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "KPUD Energizer Substation"
        }
      }
    },
    {
      "id": "BPA-L0631",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Hyundai Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Lane",
      "county_or_zone": "Lane",
      "queue_id": "L0631",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Lane Substation or Eugene-Alvey No 2 115kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 112,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0631",
          "request_date": "2024-10-02 15:55:00",
          "project_name": "Hyundai Load",
          "requestor": "Eugene Water & Electric Board",
          "connection_type": "LL",
          "surplus": false,
          "county": "Lane",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-10-04 00:00:00",
          "agreed_to_blank_tbd": "2027-10-04 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Lane Substation or Eugene-Alvey No 2 115kV line"
        }
      }
    },
    {
      "id": "BPA-L0658",
      "evidence_type": "official_large_load_request_record",
      "project_name": "200 MW Data Center Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Crook",
      "county_or_zone": "Crook",
      "queue_id": "L0658",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ponderosa-Pilot Butte 230 kV No 1 line\nPonderosa-Corral 230 kV No line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 78,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0658",
          "request_date": "2025-07-15 14:16:00",
          "project_name": "200 MW Data Center Load",
          "requestor": "Central Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Crook",
          "status": "STUDY",
          "original_requested_in_service_date": "2029-01-01 00:00:00",
          "agreed_to_blank_tbd": "2029-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ponderosa-Pilot Butte 230 kV No 1 line\nPonderosa-Corral 230 kV No line "
        }
      }
    },
    {
      "id": "BPA-L0662",
      "evidence_type": "official_large_load_request_record",
      "project_name": "200 MW Data Center, Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Crook",
      "county_or_zone": "Crook",
      "queue_id": "L0662",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ponderosa-Pilot Butte 230 kV No 1 line, Ponderosa-Corral 230 kV No line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 69,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0662",
          "request_date": "2025-08-01 10:53:00",
          "project_name": "200 MW Data Center, Phase 2",
          "requestor": "Central Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Crook",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-08-04 00:00:00",
          "agreed_to_blank_tbd": "2028-08-04 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ponderosa-Pilot Butte 230 kV No 1 line, Ponderosa-Corral 230 kV No line "
        }
      }
    },
    {
      "id": "BPA-L0688",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Garrison Updgrades",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Silver Bow",
      "county_or_zone": "Silver Bow",
      "queue_id": "L0688",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Garrison Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 31,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0688",
          "request_date": "2026-03-03 07:23:00",
          "project_name": "Garrison Updgrades",
          "requestor": "NorthWestern Corporation (NorthWestern Energy)",
          "connection_type": "LL",
          "surplus": false,
          "county": "Silver Bow",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2028-01-01 00:00:00",
          "agreed_to_blank_tbd": "2028-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Garrison Substation"
        }
      }
    },
    {
      "id": "BPA-L0694",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PARS – Forest Grove Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Washington",
      "county_or_zone": "Washington",
      "queue_id": "L0694",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Forest Grove Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 22,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0694",
          "request_date": "2026-05-20 12:07:00",
          "project_name": "PARS – Forest Grove Substation",
          "requestor": "City of Forest Grove",
          "connection_type": "LL",
          "surplus": false,
          "county": "Washington",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2029-05-20 00:00:00",
          "agreed_to_blank_tbd": "2029-05-20 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Forest Grove Substation"
        }
      }
    },
    {
      "id": "BPA-L0695",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PARS – Filbert Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Washington",
      "county_or_zone": "Washington",
      "queue_id": "L0695",
      "status": "RECEIVED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Forest Grove-McMinnville No. 1 115 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 23,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0695",
          "request_date": "2026-05-20 12:07:00",
          "project_name": "PARS – Filbert Substation",
          "requestor": "City of Forest Grove",
          "connection_type": "LL",
          "surplus": false,
          "county": "Washington",
          "status": "RECEIVED",
          "original_requested_in_service_date": "2029-05-20 00:00:00",
          "agreed_to_blank_tbd": "2029-05-20 00:00:00",
          "max_summer_interconnection_service_mw": 200,
          "max_winter_interconnection_service_mw": 200,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 200,
          "nameplate_mw_total": 200,
          "reason_not_completed": ".",
          "point_of_interconnection": "Forest Grove-McMinnville No. 1 115 kV line"
        }
      }
    },
    {
      "id": "BPA-L0498",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Project Litespeed",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Gilliam, OR",
      "county_or_zone": "Gilliam",
      "queue_id": "L0498",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 185,
          "unit": "MW",
          "raw_value": "185",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Boardman - Alkali No.1 115 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 629,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0498",
          "request_date": "2021-08-13 09:47:23.317000",
          "project_name": "Project Litespeed",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Gilliam",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2024-01-01 00:00:00",
          "agreed_to_blank_tbd": "2024-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 185,
          "max_winter_interconnection_service_mw": 185,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 242,
          "nameplate_mw_total": 242,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Boardman - Alkali No.1 115 kV line"
        }
      }
    },
    {
      "id": "BPA-L0691",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Meadowlark Expansion",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Washington, OR",
      "county_or_zone": "Washington",
      "queue_id": "L0691",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 180,
          "unit": "MW",
          "raw_value": "180",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Forest Grove-McMinnville No. 1 115 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 28,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0691",
          "request_date": "2026-04-01 10:55:00",
          "project_name": "Meadowlark Expansion",
          "requestor": "City of Forest Grove",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Washington",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-04-01 00:00:00",
          "agreed_to_blank_tbd": "2027-04-01 00:00:00",
          "max_summer_interconnection_service_mw": 180,
          "max_winter_interconnection_service_mw": 180,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 180,
          "nameplate_mw_total": 180,
          "reason_not_completed": ".",
          "point_of_interconnection": "Forest Grove-McMinnville No. 1 115 kV line"
        }
      }
    },
    {
      "id": "BPA-L0273",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Beverly Park Expansion",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Snohomish, WA",
      "county_or_zone": "Snohomish",
      "queue_id": "L0273",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 178,
          "unit": "MW",
          "raw_value": "178",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Snohomish Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1257,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0273",
          "request_date": "2007-05-25 09:16:00",
          "project_name": "Beverly Park Expansion",
          "requestor": "Public Utility District No. 1 of Snohomish County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Snohomish",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2008-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 178,
          "max_winter_interconnection_service_mw": 178,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 0,
          "nameplate_mw_total": 0,
          "reason_not_completed": ".",
          "point_of_interconnection": "Snohomish Substation"
        }
      }
    },
    {
      "id": "BPA-L0537",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Mixed Use Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Spokane, WA",
      "county_or_zone": "Spokane",
      "queue_id": "L0537",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 170,
          "unit": "MW",
          "raw_value": "170",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Usk Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 464,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0537",
          "request_date": "2022-09-16 16:22:00",
          "project_name": "Mixed Use Load",
          "requestor": "Pend Oreille County PUD No. 1",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Spokane",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2022-11-01 00:00:00",
          "agreed_to_blank_tbd": "2026-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 170,
          "max_winter_interconnection_service_mw": 170,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 170,
          "nameplate_mw_total": 170,
          "reason_not_completed": ".",
          "point_of_interconnection": "Usk Substation"
        }
      }
    },
    {
      "id": "BPA-L0260",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Midstate LaPine Addition",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Deschutes, OR",
      "county_or_zone": "Deschutes",
      "queue_id": "L0260",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 163,
          "unit": "MW",
          "raw_value": "163",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "LaPine Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1268,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0260",
          "request_date": "2007-01-18 16:49:00",
          "project_name": "Midstate LaPine Addition",
          "requestor": "Midstate Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Deschutes",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2008-12-01 00:00:00",
          "max_summer_interconnection_service_mw": 163,
          "max_winter_interconnection_service_mw": 163,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 0,
          "nameplate_mw_total": 0,
          "reason_not_completed": ".",
          "point_of_interconnection": "LaPine Substation"
        }
      }
    },
    {
      "id": "BPA-L0411",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Project Quantum",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Clark, WA",
      "county_or_zone": "Clark",
      "queue_id": "L0411",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 160,
          "unit": "MW",
          "raw_value": "160",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Sifton Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 839,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0411",
          "request_date": "2017-03-21 16:00:00",
          "project_name": "Project Quantum",
          "requestor": "Clark Public Utilities",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Clark",
          "comments": "Customer's load opted for a different location.",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2018-10-01 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 160,
          "nameplate_mw_total": 160,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Sifton Substation"
        }
      }
    },
    {
      "id": "BPA-L0436",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Harvalum",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Klickitat, WA",
      "county_or_zone": "Klickitat",
      "queue_id": "L0436",
      "status": "CONST AGRMT EXE",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 160,
          "unit": "MW",
          "raw_value": "160",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Harvalum Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 792,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0436",
          "request_date": "2018-02-23 13:00:00",
          "project_name": "Harvalum",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Klickitat",
          "status": "CONST AGRMT EXE",
          "original_requested_in_service_date": "2021-02-23 00:00:00",
          "agreed_to_blank_tbd": "2027-06-30 00:00:00",
          "max_summer_interconnection_service_mw": 160,
          "max_winter_interconnection_service_mw": 160,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 400,
          "nameplate_mw_total": 400,
          "reason_not_completed": ".",
          "point_of_interconnection": "Harvalum Substation"
        }
      }
    },
    {
      "id": "BPA-L0629",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Basalt 230 kV Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0629",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 154,
          "unit": "MW",
          "raw_value": "154",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "McNary Substation via McNary-Wanapa Switching Station No 1 230 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 114,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0629",
          "request_date": "2024-10-01 07:50:00",
          "project_name": "Basalt 230 kV Load",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-01-02 00:00:00",
          "agreed_to_blank_tbd": "2027-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 154,
          "max_winter_interconnection_service_mw": 154,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 153.4,
          "nameplate_mw_total": 153.4,
          "reason_not_completed": ".",
          "point_of_interconnection": "McNary Substation via McNary-Wanapa Switching Station No 1 230 kV line"
        }
      }
    },
    {
      "id": "BPA-L0496",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Birch Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Yamhill, OR",
      "county_or_zone": "Yamhill",
      "queue_id": "L0496",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 150,
          "unit": "MW",
          "raw_value": "150",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Keeler/Forest Grove 115 #1 & 2",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 631,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0496",
          "request_date": "2021-07-26 14:43:51.230000",
          "project_name": "Birch Data Center",
          "requestor": "City of Forest Grove",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Yamhill",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2023-03-31 00:00:00",
          "agreed_to_blank_tbd": "2024-07-22 00:00:00",
          "max_summer_interconnection_service_mw": 150,
          "max_winter_interconnection_service_mw": 150,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 150,
          "nameplate_mw_total": 150,
          "reason_not_completed": ".",
          "point_of_interconnection": "Keeler/Forest Grove 115 #1 & 2"
        }
      }
    },
    {
      "id": "BPA-L0611",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Kitsap Peninsula Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Kitsap, WA",
      "county_or_zone": "Kitsap",
      "queue_id": "L0611",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 150,
          "unit": "MW",
          "raw_value": "150",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Kitsap Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 136,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0611",
          "request_date": "2024-06-12 14:26:00",
          "project_name": "Kitsap Peninsula Load",
          "requestor": "Puget Sound Energy, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Kitsap",
          "status": "STUDY",
          "original_requested_in_service_date": "2034-12-31 00:00:00",
          "agreed_to_blank_tbd": "2034-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 150,
          "max_winter_interconnection_service_mw": 150,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 150,
          "nameplate_mw_total": 150,
          "reason_not_completed": ".",
          "point_of_interconnection": "Kitsap Substation"
        }
      }
    },
    {
      "id": "BPA-L0535",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Lithium Nevada",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "NV, US",
      "location": "Humboldt, NV",
      "county_or_zone": "Humboldt",
      "queue_id": "L0535",
      "status": "STUDY COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 142.7,
          "unit": "MW",
          "raw_value": "142.7",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's 115 kV breaker at NVE's Winnemucca Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 506,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0535",
          "request_date": "2022-08-17 16:14:00",
          "project_name": "Lithium Nevada",
          "requestor": "Harney Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "NV",
          "county": "Humboldt",
          "status": "STUDY COMPLETED",
          "original_requested_in_service_date": "2024-05-01 00:00:00",
          "agreed_to_blank_tbd": "2026-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 142.7,
          "max_winter_interconnection_service_mw": 142.7,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 142.7,
          "nameplate_mw_total": 142.7,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's 115 kV breaker at NVE's Winnemucca Substation"
        }
      }
    },
    {
      "id": "BPA-L0680",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Denio Junction 139 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "NV, US",
      "location": "Humboldt, NV",
      "county_or_zone": "Humboldt",
      "queue_id": "L0680",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 138.9,
          "unit": "MW",
          "raw_value": "138.9",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Planned BPA NOB Substation.   TBD.",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 45,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0680",
          "request_date": "2025-12-23 14:38:00",
          "project_name": "Denio Junction 139 MW",
          "requestor": "Harney Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "NV",
          "county": "Humboldt",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-12-29 00:00:00",
          "agreed_to_blank_tbd": "2028-12-29 00:00:00",
          "max_summer_interconnection_service_mw": 138.9,
          "max_winter_interconnection_service_mw": 138.9,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 138.9,
          "nameplate_mw_total": 138.9,
          "reason_not_completed": ".",
          "point_of_interconnection": "Planned BPA NOB Substation.   TBD."
        }
      }
    },
    {
      "id": "BPA-L0637",
      "evidence_type": "official_large_load_request_record",
      "project_name": "125 MW 115 kV Sacajawea Tap",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Walla Walla, WA",
      "county_or_zone": "Walla Walla",
      "queue_id": "L0637",
      "status": "BPA COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 125,
          "unit": "MW",
          "raw_value": "125",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": null,
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 105,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0637",
          "request_date": "2024-12-11 10:01:00",
          "project_name": "125 MW 115 kV Sacajawea Tap",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Walla Walla",
          "status": "BPA COMPLETED",
          "original_requested_in_service_date": "2027-12-16 00:00:00",
          "agreed_to_blank_tbd": "2027-12-16 00:00:00",
          "max_summer_interconnection_service_mw": 125,
          "max_winter_interconnection_service_mw": 125,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 125,
          "nameplate_mw_total": 125,
          "reason_not_completed": "."
        }
      }
    },
    {
      "id": "BPA-L0669",
      "evidence_type": "official_large_load_request_record",
      "project_name": "DLS 125 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Wasco",
      "county_or_zone": "Wasco",
      "queue_id": "L0669",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 125,
          "unit": "MW",
          "raw_value": "125",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Chenoweth Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 59,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0669",
          "request_date": "2025-10-17 08:00:00",
          "project_name": "DLS 125 MW",
          "requestor": "Northern Wasco County People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "county": "Wasco",
          "status": "STUDY",
          "original_requested_in_service_date": "2026-09-30 00:00:00",
          "agreed_to_blank_tbd": "2027-09-30 00:00:00",
          "max_summer_interconnection_service_mw": 125,
          "max_winter_interconnection_service_mw": 125,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 125,
          "nameplate_mw_total": 125,
          "reason_not_completed": ".",
          "point_of_interconnection": "Chenoweth Substation"
        }
      }
    },
    {
      "id": "BPA-L0686",
      "evidence_type": "official_large_load_request_record",
      "project_name": "NewSun 124 MW La Pine",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Deschutes",
      "county_or_zone": "Deschutes",
      "queue_id": "L0686",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 124,
          "unit": "MW",
          "raw_value": "124",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "LaPine Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 34,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0686",
          "request_date": "2026-02-18 08:46:00",
          "project_name": "NewSun 124 MW La Pine",
          "requestor": "Midstate Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Deschutes",
          "status": "STUDY",
          "original_requested_in_service_date": "2028-01-01 00:00:00",
          "agreed_to_blank_tbd": "2028-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 124,
          "max_winter_interconnection_service_mw": 124,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 124,
          "nameplate_mw_total": 124,
          "reason_not_completed": ".",
          "point_of_interconnection": "LaPine Substation"
        }
      }
    },
    {
      "id": "BPA-L0427",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Industrial Park",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "ID, US",
      "location": "Kootenai, ID",
      "county_or_zone": "Kootenai",
      "queue_id": "L0427",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Bell-Taft 500kV #1, Mile 77 Tower 4 OR Lancaster 230kV Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 804,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0427",
          "request_date": "2017-12-14 11:00:00",
          "project_name": "Industrial Park",
          "requestor": "Kootenai Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "ID",
          "county": "Kootenai",
          "comments": "Withdrawn by customer via email.",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2020-12-14 00:00:00",
          "agreed_to_blank_tbd": "2019-12-16 00:00:00",
          "max_summer_interconnection_service_mw": 120,
          "max_winter_interconnection_service_mw": 120,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 120,
          "nameplate_mw_total": 120,
          "reason_not_completed": ".",
          "point_of_interconnection": "Bell-Taft 500kV #1, Mile 77 Tower 4 OR Lancaster 230kV Substation"
        }
      }
    },
    {
      "id": "BPA-L0448",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Briones",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Crook, OR",
      "county_or_zone": "Crook",
      "queue_id": "L0448",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "PAC system downstream from BPA Ponderosa Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 769,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0448",
          "request_date": "2018-06-26 17:00:00",
          "project_name": "Briones",
          "requestor": "PacifiCorp",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Crook",
          "status": "STUDY",
          "original_requested_in_service_date": "2021-06-01 00:00:00",
          "agreed_to_blank_tbd": "2026-12-31 00:00:00",
          "max_summer_interconnection_service_mw": 120,
          "max_winter_interconnection_service_mw": 120,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 103,
          "nameplate_mw_total": 103,
          "reason_not_completed": ".",
          "point_of_interconnection": "PAC system downstream from BPA Ponderosa Substation"
        }
      }
    },
    {
      "id": "BPA-L0454",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Morrow Flat",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Morrow, OR",
      "county_or_zone": "Morrow",
      "queue_id": "L0454",
      "status": "BPA COMPLETED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA Morrow Flat Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 751,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0454",
          "request_date": "2018-11-20 08:40:00",
          "project_name": "Morrow Flat",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Morrow",
          "status": "BPA COMPLETED",
          "original_requested_in_service_date": "2019-12-31 00:00:00",
          "agreed_to_blank_tbd": "2022-04-29 00:00:00",
          "max_summer_interconnection_service_mw": 120,
          "max_winter_interconnection_service_mw": 120,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 120,
          "nameplate_mw_total": 120,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA Morrow Flat Substation"
        }
      }
    },
    {
      "id": "BPA-L0460",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Carborundum Substation Upgrade",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Clark, WA",
      "county_or_zone": "Clark",
      "queue_id": "L0460",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Ross-Carborundum No. 1 115 kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 729,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0460",
          "request_date": "2019-04-29 13:01:00",
          "project_name": "Carborundum Substation Upgrade",
          "requestor": "Clark Public Utilities",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Clark",
          "comments": "Withdrawn by customer",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2023-01-01 00:00:00",
          "agreed_to_blank_tbd": "2023-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 120,
          "max_winter_interconnection_service_mw": 120,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 70,
          "nameplate_mw_total": 70,
          "reason_not_completed": ".",
          "point_of_interconnection": "Ross-Carborundum No. 1 115 kV"
        }
      }
    },
    {
      "id": "BPA-L0352",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PDX-2 Data Center - Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Morrow, OR",
      "county_or_zone": "Morrow",
      "queue_id": "L0352",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 117,
          "unit": "MW",
          "raw_value": "117",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA McNary",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 979,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0352",
          "request_date": "2012-08-03 09:00:00",
          "project_name": "PDX-2 Data Center - Phase 2",
          "requestor": "Umatilla Electric Cooperative",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Morrow",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2015-11-02 00:00:00",
          "agreed_to_blank_tbd": "2016-10-26 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 117,
          "nameplate_mw_total": 117,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA McNary"
        }
      }
    },
    {
      "id": "BPA-L0361",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Network Load Expansion Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Wasco, OR",
      "county_or_zone": "Wasco",
      "queue_id": "L0361",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 112,
          "unit": "MW",
          "raw_value": "112",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Discovery Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 960,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0361",
          "request_date": "2013-06-27 10:00:00",
          "project_name": "Network Load Expansion Phase 2",
          "requestor": "Northern Wasco County People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Wasco",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2017-10-01 00:00:00",
          "agreed_to_blank_tbd": "2017-10-02 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 112,
          "nameplate_mw_total": 112,
          "reason_not_completed": ".",
          "point_of_interconnection": "Discovery Substation"
        }
      }
    },
    {
      "id": "BPA-L0596",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Nucor Steel Mill",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Cowlitz, WA",
      "county_or_zone": "Cowlitz",
      "queue_id": "L0596",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 110,
          "unit": "MW",
          "raw_value": "110",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Longview Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 155,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0596",
          "request_date": "2024-03-21 08:34:00",
          "project_name": "Nucor Steel Mill",
          "requestor": "Public Utility District No. 1 of Cowlitz County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Cowlitz",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2027-03-21 00:00:00",
          "agreed_to_blank_tbd": "2029-10-31 00:00:00",
          "max_summer_interconnection_service_mw": 110,
          "max_winter_interconnection_service_mw": 110,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 110,
          "nameplate_mw_total": 110,
          "reason_not_completed": ".",
          "point_of_interconnection": "Longview Substation"
        }
      }
    },
    {
      "id": "BPA-L0536",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Lake Street Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Washington, OR",
      "county_or_zone": "Washington",
      "queue_id": "L0536",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 108,
          "unit": "MW",
          "raw_value": "108",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Keeler-Forest Grove No 2 115kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 478,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0536",
          "request_date": "2022-09-02 15:59:00",
          "project_name": "Lake Street Data Center",
          "requestor": "City of Forest Grove",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Washington",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-09-19 00:00:00",
          "agreed_to_blank_tbd": "2025-09-19 00:00:00",
          "max_summer_interconnection_service_mw": 108,
          "max_winter_interconnection_service_mw": 108,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 108,
          "nameplate_mw_total": 108,
          "reason_not_completed": ".",
          "point_of_interconnection": "Keeler-Forest Grove No 2 115kV line"
        }
      }
    },
    {
      "id": "BPA-L0428",
      "evidence_type": "official_large_load_request_record",
      "project_name": "HiTest 2-Furnace Plant",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Pend Oreille, WA",
      "county_or_zone": "Pend Oreille",
      "queue_id": "L0428",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 105,
          "unit": "MW",
          "raw_value": "105",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Pine Street Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 803,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0428",
          "request_date": "2017-12-20 14:49:00",
          "project_name": "HiTest 2-Furnace Plant",
          "requestor": "Pend Oreille County PUD No. 1",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Pend Oreille",
          "comments": "This request has been withdrawn by the customer.",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2021-01-04 00:00:00",
          "agreed_to_blank_tbd": "2021-01-04 00:00:00",
          "max_summer_interconnection_service_mw": 105,
          "max_winter_interconnection_service_mw": 105,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 105,
          "nameplate_mw_total": 105,
          "reason_not_completed": ".",
          "point_of_interconnection": "Pine Street Substation"
        }
      }
    },
    {
      "id": "BPA-L0602",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Forge Ahead 105 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Columbia, WA",
      "county_or_zone": "Columbia",
      "queue_id": "L0602",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 105,
          "unit": "MW",
          "raw_value": "105",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "White Bluffs 115kV Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 149,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0602",
          "request_date": "2024-04-04 08:28:00",
          "project_name": "Forge Ahead 105 MW",
          "requestor": "City of Richland, Washington",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Columbia",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2028-01-31 00:00:00",
          "agreed_to_blank_tbd": "2028-01-31 00:00:00",
          "max_summer_interconnection_service_mw": 105,
          "max_winter_interconnection_service_mw": 105,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "White Bluffs 115kV Substation"
        }
      }
    },
    {
      "id": "BPA-L0609",
      "evidence_type": "official_large_load_request_record",
      "project_name": "PW1 & PW2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Columbia, WA",
      "county_or_zone": "Columbia",
      "queue_id": "L0609",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 105,
          "unit": "MW",
          "raw_value": "105",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Allston Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 137,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0609",
          "request_date": "2024-05-20 14:17:00",
          "project_name": "PW1 & PW2",
          "requestor": "Clatskanie People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Columbia",
          "status": "STUDY",
          "original_requested_in_service_date": "2027-05-20 00:00:00",
          "agreed_to_blank_tbd": "2027-05-20 00:00:00",
          "max_summer_interconnection_service_mw": 105,
          "max_winter_interconnection_service_mw": 105,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 105,
          "nameplate_mw_total": 105,
          "reason_not_completed": ".",
          "point_of_interconnection": "Allston Substation"
        }
      }
    },
    {
      "id": "BPA-L0331",
      "evidence_type": "official_large_load_request_record",
      "project_name": "CEC POD at Ponderosa",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Crook, OR",
      "county_or_zone": "Crook",
      "queue_id": "L0331",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA Ponderosa Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1021,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0331",
          "request_date": "2011-05-12 12:58:56.250000",
          "project_name": "CEC POD at Ponderosa",
          "requestor": "Central Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Crook",
          "comments": "Withdrawn by customer",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2014-10-01 00:00:00",
          "agreed_to_blank_tbd": "2029-10-01 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA Ponderosa Substation"
        }
      }
    },
    {
      "id": "BPA-L0338",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Worden Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Franklin, WA",
      "county_or_zone": "Franklin",
      "queue_id": "L0338",
      "status": "ENERGIZED",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's Franklin-Walla Walla 115kV Line 13/6",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 1001,
        "capacity_source_column": "nameplate_mw1",
        "raw_fields": {
          "request_number": "L0338",
          "request_date": "2011-10-26 13:39:00",
          "project_name": "Worden Substation",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Franklin",
          "status": "ENERGIZED",
          "original_requested_in_service_date": "2013-01-01 00:00:00",
          "agreed_to_blank_tbd": "2017-01-31 00:00:00",
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's Franklin-Walla Walla 115kV Line 13/6"
        }
      }
    },
    {
      "id": "BPA-L0393",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Finley Butte Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Deschutes, OR",
      "county_or_zone": "Deschutes",
      "queue_id": "L0393",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "LaPine 115kV Bus",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 899,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0393",
          "request_date": "2015-12-17 10:00:00",
          "project_name": "Finley Butte Substation",
          "requestor": "Midstate Electric Cooperative, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Deschutes",
          "status": "STUDY",
          "original_requested_in_service_date": "2018-10-01 00:00:00",
          "agreed_to_blank_tbd": "2026-08-01 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "LaPine 115kV Bus"
        }
      }
    },
    {
      "id": "BPA-L0405",
      "evidence_type": "official_large_load_request_record",
      "project_name": "McNary-Badger Canyon",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0405",
      "status": "CONST AGRMT EXE",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "BPA's McNary Substation 115kV",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 850,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0405",
          "request_date": "2016-12-01 10:00:00",
          "project_name": "McNary-Badger Canyon",
          "requestor": "Public Utility District No. 1 of Benton County",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Umatilla",
          "status": "CONST AGRMT EXE",
          "original_requested_in_service_date": "2020-10-01 00:00:00",
          "agreed_to_blank_tbd": "2024-12-30 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "BPA's McNary Substation 115kV"
        }
      }
    },
    {
      "id": "BPA-L0484",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Spearfish Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Klickitat, WA",
      "county_or_zone": "Klickitat",
      "queue_id": "L0484",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Klickitat PUD's Spearfish Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 668,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0484",
          "request_date": "2020-10-07 16:10:50.813000",
          "project_name": "Spearfish Data Center",
          "requestor": "Public Utility District No. 1 of Klickitat County",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Klickitat",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2021-10-01 00:00:00",
          "agreed_to_blank_tbd": "2022-02-14 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "Klickitat PUD's Spearfish Substation"
        }
      }
    },
    {
      "id": "BPA-L0539",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Gardiner Hydrogen Production Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "OR, US",
      "location": "Douglas, OR",
      "county_or_zone": "Douglas",
      "queue_id": "L0539",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Gardiner Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 457,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0539",
          "request_date": "2022-10-05 13:47:00",
          "project_name": "Gardiner Hydrogen Production Facility",
          "requestor": "Central Lincoln People's Utility District",
          "connection_type": "LL",
          "surplus": false,
          "state": "OR",
          "county": "Douglas",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2027-06-30 00:00:00",
          "agreed_to_blank_tbd": "2027-06-30 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "Gardiner Substation"
        }
      }
    },
    {
      "id": "BPA-L0548",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Project Osprey",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Clark, WA",
      "county_or_zone": "Clark",
      "queue_id": "L0548",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Sifton Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 434,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0548",
          "request_date": "2022-12-19 09:38:00",
          "project_name": "Project Osprey",
          "requestor": "Clark Public Utilities",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Clark",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2025-12-15 00:00:00",
          "agreed_to_blank_tbd": "2025-10-01 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "Sifton Substation"
        }
      }
    },
    {
      "id": "BPA-L0551",
      "evidence_type": "official_large_load_request_record",
      "project_name": "CREA-Central Ferry",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "WA, US",
      "location": "Garfield, WA",
      "county_or_zone": "Garfield",
      "queue_id": "L0551",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Central Ferry Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 426,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0551",
          "request_date": "2023-01-10 14:54:00",
          "project_name": "CREA-Central Ferry",
          "requestor": "Columbia Rural Electric Association",
          "connection_type": "LL",
          "surplus": false,
          "state": "WA",
          "county": "Garfield",
          "status": "STUDY",
          "original_requested_in_service_date": "2026-01-09 00:00:00",
          "agreed_to_blank_tbd": "2027-01-01 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "Central Ferry Substation"
        }
      }
    },
    {
      "id": "BPA-L0639",
      "evidence_type": "official_large_load_request_record",
      "project_name": "Exeter 69 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Lewis",
      "county_or_zone": "Lewis",
      "queue_id": "L0639",
      "status": "WITHDRAWN",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Chehalis Substation",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 102,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0639",
          "request_date": "2025-01-02 09:46:00",
          "project_name": "Exeter 69 kV",
          "requestor": "Public Utility District No. 1 of Lewis County",
          "connection_type": "LL",
          "surplus": false,
          "county": "Lewis",
          "status": "WITHDRAWN",
          "original_requested_in_service_date": "2028-01-02 00:00:00",
          "agreed_to_blank_tbd": "2028-01-02 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",
          "point_of_interconnection": "Chehalis Substation"
        }
      }
    },
    {
      "id": "BPA-L0683",
      "evidence_type": "official_large_load_request_record",
      "project_name": "CPI Lochner Substation 100 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US",
      "location": "Benton",
      "county_or_zone": "Benton",
      "queue_id": "L0683",
      "status": "STUDY",
      "filed_month": null,
      "capacity_claims": [
        {
          "value_mw": 100,
          "unit": "MW",
          "raw_value": "100",
          "qualifier": "BPA Line/Load request MW as filed",
          "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
          "capture_date": "2026-09-28"
        }
      ],
      "source_authority": "official BPA Line/Load Interconnection workbook",
      "source_url": "https://www.bpa.gov/-/media/Aep/transmission-media-documents/InterconnectionQueueOutput.xlsx",
      "capture_date": "2026-09-28",
      "source_scope": "BPA InterconnectionQueueOutput.xlsx — Line/Load load requests",
      "map_point": null,
      "map_precision": null,
      "map_provenance": null,
      "notes": "Official BPA Line/Load workbook row. Requested MW is the requester's filed load request, not a study result, entitlement, contracted demand or measured load. Coordinates are carried forward only from an existing repository record with the same BPA request ID; no new geocoding or location inference is performed.",
      "poi_substation": "Albany-Lebanon No. 1 115 kV line",
      "source_provenance": {
        "workbook_sha256": "c98e1dad406d5615a28defffb7cbf5130b17abfe1818223fd2efeb647bbcd208",
        "sheet": "Sheet1",
        "source_row": 43,
        "capacity_source_column": "max_summer_interconnection_service_mw",
        "raw_fields": {
          "request_number": "L0683",
          "request_date": "2026-01-13 07:14:00",
          "project_name": "CPI Lochner Substation 100 MW",
          "requestor": "Consumers Power, Inc.",
          "connection_type": "LL",
          "surplus": false,
          "county": "Benton",
          "status": "STUDY",
          "original_requested_in_service_date": "2029-01-15 00:00:00",
          "agreed_to_blank_tbd": "2029-01-15 00:00:00",
          "max_summer_interconnection_service_mw": 100,
          "max_winter_interconnection_service_mw": 100,
          "generator_type_1": "Other",
          "fuel_source_1": "Other",
          "nameplate_mw1": 100,
          "nameplate_mw_total": 100,
          "reason_not_completed": ".",